Sign in

Anr Dyapa Constructions

DYAPA · Mahabubnagar · RERA P01400006456

ANR DYAPA CONSTRUCTIONS is a plotted development in Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district, developed by registered promoter Dyapa Anantha Reddy. The RERA land details state a total and net area of 14,664.02 sq m, and the approved tentative residential layout comprises 51 plots; building count and floor configuration are not disclosed. The layout drawing’s software-read plot sizes range from 67.33 sq m to 198.82 sq m. It is registered under TG-RERA number P01400006456, and the promoter’s Form B undertaking states a completion date of 15th July, 2024.

01What we found

Period endedTG-RERA registration ran to 15 Jul 2024 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Yedira, Mahabubnagar Rural, Mahabubnagar · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameANR DYAPA CONSTRUCTIONS
Project type / statusPlotted development; TG-RERA record describes it as a new project. RERA record
Registered phase/portionNot separately identified; the registration is for the project listed above. RERA record
TG-RERA registrationP01400006456; registered from 07/07/2023 to 15/07/2024. The certificate records no extension. Registration validity is distinct from the promoter’s completion undertaking.
Registered promoterDyapa Anantha Reddy; the Form B declaration names Sri. DYAPA ANANTHA REDDY.
Entity type / RERA statusLegal entity type is not disclosed. The certificate records registration under section 5 and the stated validity period; current registration status after 15/07/2024 is not established by the supplied record. [corporate; doc:REGCERT-46840 p1]

Land and geographic identity

ItemRecord
Locality / registered locationYedira (Part); address field also records “Mahaboobnagar Minicipality.” [header; fields: Address Details; doc:REGCERT-46840 p1]
Revenue villageYedira (Part) in the RERA record; the layout approval identifies YEDIRA Revenue Village. [header; doc:REGCERT-46840 p1; doc:324389 p1]
Mandal / district / PINMahabubnagar Rural / Mahabubnagar / 509001. [header; doc:REGCERT-46840 p1]
All registered survey numbers22/1, 22/AA/2, 22/A/AA, 23/AA/1.
Site extentRERA land details state 14,664.02 sq m total and net area. The layout drawing’s area statement gives 14,663.28 sq m total/net layout area. RERA filing
BoundariesEast: OTHERS LAND; West: OTHERS LAND; North: EXISTING DTCP LAYOUT; South: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authority / principal approvalMahaboobnagar Municipality/Municipal Corporation; tentative layout approval 0062/LO/3063/2022, dated 15 July, 2022. [approvals; doc:324389 p1]
Application number004678/LO/DTCP/3063/0070/2021. [approvals; doc:324389 p1]
Approved developmentTentative residential layout comprising 51 plots. The approval describes the site as 3 Acer 24.94 Gts (17538 Sq. Yds).
Approved built-up area / buildingsRERA fields report approved built-up area of 7737.52 sq m; building count and floor configuration are not disclosed in the supplied records. RERA filing
Mortgage areaRERA fields report 1183.96 sq m; the layout area statement lists 1183.67 sq m. The drawing describes this as plots mortgaged to the approving authority pending completion of layout works. RERA filing

Offering and status

ItemRecord
What is offeredPlots; the approved layout drawing lists 51 plots.
Plot sizesSoftware-read from the layout drawing: 51 plots with sizes read; smallest 67.33 sq m, median 156.05 sq m, largest 198.82 sq m. These are drawing-derived readings, not a separately stated RERA unit schedule. Layout record
Booked / available countsNot supplied. RERA filing
Construction / development stageNo independently verified site-progress evidence is supplied. The RERA amenities record shows 0% for the listed facilities; this is the recorded progress field, not an independent site inspection. RERA amenities
Completion datePromoter’s Form B undertaking states 15th July, 2024. This is separate from the registration-validity period.
Completion / occupancy certificateNo completion certificate or occupancy certificate is supplied. The project is a plotted layout; the supplied record does not establish an OC status or a phase/tower-wise certificate. [documents; approvals]

2. The project story

ANR DYAPA CONSTRUCTIONS is registered as a plotted development in Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district. Its registered land is identified by survey numbers 22/1, 22/AA/2, 22/A/AA and 23/AA/1. [header; doc:REGCERT-46840 p1]

The filed layout approval is for a tentative residential layout of 51 plots. The drawing’s area statement allocates land to plots, internal roads, parks/open space, utilities and social infrastructure; it does not establish that these works have been completed. The RERA amenities progress fields show 0% for the listed facilities, and no independent site-progress assessment is supplied.

The promoter declared a completion undertaking of 15 July 2024. The registration certificate ran from 7 July 2023 to 15 July 2024 and records no extension. The supplied documents do not establish completion or a completion/occupancy certificate.

3. Master plan, architecture & building design

This is a plotted layout rather than a documented apartment-building scheme. The approved tentative layout identifies 51 plots. The drawing’s area statement reports a net layout area of 14,663.28 sq m and allocates it as follows; these are software-read/drawing-derived figures and should be checked against the approved drawing. [layout; doc:324389 p1]

Layout useAreaShare
Plots7736.95 sq m52.76%
Roads4998.33 sq m34.09%
Parks / open space1325.09 sq m9.04%
Utilities147.76 sq m1.01%
Social infrastructure374.2 sq m2.55%
Amenities0.0 sq m0.00%

The RERA fields separately state approved built-up area of 7737.52 sq m. The supplied records do not identify building footprints, floors, building count, or apartment floor plans; those building-design details are therefore not described here. RERA filing

The layout approval calls for roads, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water source, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval conditions and specified works, not evidence of completion.

4. Homes, configurations & floor plans

The registered offering is plots, not a RERA-filed apartment configuration schedule. The layout drawing’s plot schedule was software-read as 51 plots, with the following size bands. [layout; doc:324389 p1]

Plot size bandNumber of plots
0–100 sq yd (0–84 sq m)2
100–150 sq yd (84–125 sq m)6
150–200 sq yd (125–167 sq m)23
200–250 sq yd (167–209 sq m)20

The software-read size range is 67.33–198.82 sq m (80.5–237.8 sq yd), with a median of 156.05 sq m (186.6 sq yd). The drawing contains two layout sheets; the recorded plot areas sum to the plotted area in its area statement. These are software-measured drawing readings, not RERA-filed saleable-area figures. [layout; floor_plans]

No booked/available plot counts or unit-specific dimensions are provided. Apartment carpet-area and loading comparisons do not apply to this plotted offering based on the supplied records. RERA filing

5. Parking & vehicle circulation

The supplied records do not establish a parking-space count, visitor or accessible parking provision, or plot-specific parking allocation. The layout approval requires roads to be opened for access to neighbouring sites and includes road formation in the development works; it does not provide a parking schedule.

The approved drawing identifies 4998.33 sq m of road area, software-read from the layout area statement. No vehicle-entry/exit arrangement, driveway details, pedestrian separation, or EV-charging provision is established in the supplied evidence. Layout record

6. Amenities, recreation & open spaces

The layout approval describes facilities and development works to be provided; the RERA amenities fields record progress of 0% for listed items. No independent verification of completed facilities is supplied.

Park / open space
Description / size1325.09 sq m in the drawing area statement; approval states 0 Acer 13.1 Gts 1585 Sq. Yds (9.04%).
Evidence source[layout; doc:324389 p1]
Declared progress / verified statusRERA amenities field: 0%; completion not independently verified.
Social infrastructure site
Description / size374.2 sq m in drawing area statement; approval states 0 Acer 3.7 Gts 448 Sq. Yds (2.55%).
Evidence source[layout; doc:324389 p1]
Declared progress / verified statusRERA amenities field: 0%; completion not independently verified.
Internal roads and footpaths
Description / sizeRoad area 4998.33 sq m in drawing area statement; approval specifies road formation and access to neighbouring sites.
Evidence source[layout; doc:324389 p1]
Declared progress / verified statusRERA amenities field: 0%; completion not independently verified.
Avenue plantation
Description / sizeSpecified as part of layout development works; no size supplied.
Declared progress / verified statusCompletion not independently verified.
Park development
Description / sizeSpecified in layout approval; no separate facility size beyond the open-space allocation.
Declared progress / verified statusRERA amenities field: 0%; completion not independently verified.

The approval also reserves 147.76 sq m for utilities in the drawing area statement; utility works are described in the next section. [layout; doc:324389 p1]

7. Utilities, building services & safety

The layout approval specifies a package of site infrastructure, but the evidence does not establish that these items have been constructed or commissioned.

Water
Supplied project evidenceInternal water-supply pipelines, overhead tank and an assured water-supply source are specified.
Status / limitationNo capacity, source details or completion evidence supplied.
Sewerage and drainage
Supplied project evidenceUnderground drainage lines, common septic tank/STP, storm-water drains and sullage disposal are specified.
Status / limitationNo capacity, treatment-performance or commissioning evidence supplied.
Rainwater
Supplied project evidenceRainwater-harvesting pits are specified.
Status / limitationNo count, capacity or completion evidence supplied.
Electrical
Supplied project evidenceElectrical supply lines, street lighting and transformer are specified; the RERA amenities record lists an electrical meter room/sub-station/receiving station.
Status / limitationNo capacity, commissioning or completed-work evidence supplied.
Solid waste
Supplied project evidenceSolid Waste Management is identified in the approval’s utilities list and RERA amenities record.
Status / limitationNo operating arrangement or completion evidence supplied.
Energy management
Supplied project evidenceListed in the RERA amenities record.
Status / limitationNo system description or progress beyond the recorded 0% field supplied.
Fire and life safety
Supplied project evidence“Fire Protection And Fire Safety Requirements” appears in the RERA amenities list.
Status / limitationNo system design, clearance or completion evidence supplied.
Accessibility / circulation
Supplied project evidenceThe approval requires roads to be open for access to neighbouring sites.
Status / limitationNo accessible-route or pedestrian-separation details supplied.

8. Location, access & connectivity

The registered location is Yedira (Part), Mahabubnagar Rural mandal, Mahabubnagar district, PIN 509001; the layout approval identifies YEDIRA Revenue Village. The site boundaries recorded in the RERA fields are other land to the east, west and south, and an existing DTCP layout to the north. [header; fields: Address Details; fields: Land Details; doc:324389 p1]

The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 80.4 km. No other measured access distances, public-transport details or local landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is Dyapa Anantha Reddy; the Form B declaration identifies Sri. DYAPA ANANTHA REDDY, while the promoter’s legal-entity type is not disclosed in the supplied record.

In Form B, the promoter declared that the land was free from encumbrances, undertook completion by 15th July, 2024, and stated that 70% of amounts realized from allottees would be deposited in a separate scheduled-bank account and used for land and construction costs. These are promoter declarations, not independently verified findings.

The registration certificate identifies registration number P01400006456, valid from 07/07/2023 to 15/07/2024, and records no extension. No subsequent completion evidence or independently verified construction-progress report is supplied.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate, P01400006456, issued 07/07/2023; stated validity to 15/07/2024.
Tentative layout approvalApproval 0062/LO/3063/2022, dated 15 July 2022, issued by Mahaboobnagar Municipality/Municipal Corporation; 51 plots and listed development conditions.
Layout application004678/LO/DTCP/3063/0070/2021.
Mortgage deed cited in layout approval8729/2022, dated 07 July 2022; approval identifies plots 41, 47, 33, 16, 05, 01, 32, 31 and 17 as mortgaged in favour of the Municipality/Municipal Corporation.
Promoter declarationForm B by Sri. DYAPA ANANTHA REDDY, dated 10 May 2023, including title, encumbrance and completion declarations.
Completion / occupancy recordNo completion certificate or occupancy certificate is included in the supplied documents. [documents; approvals]

The tentative-layout approval expressly states that it is not proof of land title. The approval also specifies infrastructure and public-purpose reservations and conditions; the detailed conditions are recorded in the approval document.

Frequently asked questions

Is ANR DYAPA CONSTRUCTIONS registered with Telangana RERA?

Yes. ANR DYAPA CONSTRUCTIONS is registered with the Telangana Real Estate Regulatory Authority as P01400006456; the registration status is New Project.

Who is the developer of ANR DYAPA CONSTRUCTIONS?

The promoter named in the RERA registration is DYAPA.

Where is ANR DYAPA CONSTRUCTIONS located?

ANR DYAPA CONSTRUCTIONS is in Mahaboobnagar Minicipality, Yedira (Part), Mahabubnagar Rural, Mahabubnagar, Telangana (509001).

When will ANR DYAPA CONSTRUCTIONS be completed?

The promoter's proposed date of completion filed with RERA is 15/07/2024. This is the promoter's declaration, not a guarantee.

More projects in Yedira