Sign in

Srilatha Arcade

KALPATARU CONSTRUCTIONS · Rangareddy · RERA P02400006041

Srilatha Arcade is a residential apartment project in Almasguda, Balapur Mandal, Ranga Reddy District, developed by registered promoter KALPATARU CONSTRUCTIONS, a partnership. The project has a land area of 752.51 m² and one residential building recorded as 1 Stilt + 5 upper floors. It comprises 20 2BHK units, each with a RERA-filed saleable area of 100.68 m². Its TG-RERA registration is P02400006041, and the promoter-declared completion date is 15/05/2024.

01What we found

Period endedTG-RERA registration ran to 15 May 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
10court cases on this project's land (survey 102, 110, 111, 122, Almasguda)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSrilatha Arcade RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project named Srilatha Arcade
TG-RERA registrationP02400006041
Registration validity18/04/2023 to 15/05/2024; certificate says “1 years”. No extension is recorded in the supplied certificate
Registered promoterKALPATARU CONSTRUCTIONS, a partnership RERA record Corporate record
RERA statusThe registration period shown on the certificate has ended; current registration status is not established by the supplied record

Land and geographic identity

FieldRecord
Locality / revenue villageAlmasguda / Almasguda RERA record
Mandal / district / PINBalapur / Ranga Reddy / 500058 RERA record
Project survey numbers102, 110, 111 and 122; no project-held subdivisions are identified in the supplied project filing
Plot numbers47, 48 and 49
Registered site extent752.51 m²
Sanction-record site area752.51 m²; net area 735.13 m²; the sanction records road-affected area as 13.94 m²
RERA land-details road-affected area17.38 m²; the RERA land-details fields give total area 752.51 m² and net area 735.13 m² Land records
BoundariesNorth: plots 40, 41 and 42; South: 33 wide road; East: plots 46 and 45; West: 25 wide road Land records

Development identity

FieldRecord
Sanctioning authorityBadangpet Municipal Corporation
Principal building approval0014/BP/3037/2022, approved 28 December 2022 Approvals record
File number011505/BP/DTCP/3037/0015/2022
Approved built-up area2,265.46 m² in the project fields RERA filing
Sanction-record building formOne residential building, recorded as 1 Stilt + 5 upper floors; height is stated as 15 m
Building countOne building RERA filing
Parking levels / sanctioned parkingSanction conditions state that the approved stilt (and any cellar, if applicable) is to be used exclusively for parking. No parking-space count is available in the supplied record
Unit count20 units in the RERA unit record; the sanction document also states that sanctioned unit numbers must not be increased without prior approval, but a sanctioned unit count is not separately extracted RERA unit table

Offering and status

FieldRecord
RERA-filed configuration2BHK; 20 units RERA unit table
RERA-filed saleable area100.68 m² per unit RERA unit table
Booked / available0 booked; 20 available in the portal data as read, with no as-of date supplied; treat as indicative RERA unit table
Promoter-declared completion15/05/2024
Occupancy / completion certificateNo completion certificate is recorded in the supplied approval extraction; it states completion is uncertified and requires an occupancy certificate before occupation
Construction stageNo independently verified construction-progress or site-inspection evidence is supplied RERA amenities

2. The project story

Srilatha Arcade is a single-building residential apartment project registered in Almasguda, Balapur Mandal, Ranga Reddy District, on plots 47, 48 and 49, associated in the project record with Survey Nos. 102, 110, 111 and 122. The building-construction approval describes one residential building with a stilt and five upper floors. The RERA unit data records twenty 2BHK apartments, each with a filed saleable area of 100.68 m². RERA record RERA unit table

The promoter’s Form B declares a completion date of 15 May 2024. That is a promoter declaration, not evidence that the building was completed. The supplied approval record says an occupancy certificate is required before occupation, and does not record one as issued. No independently verified current construction stage is available in the supplied evidence.

3. Master plan, architecture & building design

The filed and sanctioned project record describes one residential building on a site of 752.51 m². The sanction extraction records 735.13 m² net area, 13.94 m² road-affected area and a 15 m building height. The project’s RERA land-details fields separately record 17.38 m² as affected by road widening/FTL/Nala widening; these are field values, not a surveyed reconciliation. RERA filing

The sanction records one stilt and five upper floors. Approved built-up area is stated in the project fields as 2,265.46 m². Neither a separate FSI-counted area nor a building-footprint figure is supplied. The approved built-up figure should not be treated as carpet or saleable area. RERA filing

The supplied drawing-related record is incomplete: document 307900 is identified in the RERA file as a building/floor-plan document, but is not extracted; the measurement dataset says one drawing was measured and one remains pending. The record therefore does not establish the full floor-by-floor layout, flats per floor, lift and stair arrangement, entrances, circulation, landscaping, or common-area distribution. Document index Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020100.68 m²54.4–74.4 m²; median 59.5 m²41%

The unit count, booking figures and saleable area are RERA-filed. The available count is from portal data without an as-of date and is indicative. The carpet-area range, median and loading are software measurements from drawing geometry, not RERA disclosures; the supplied record says these measurements need review. The measured 2BHK drawing example shows a hall, two bedrooms, dining area, kitchen, two toilets, a balcony labelled 1.00 m wide, and a utility. RERA unit table RERA unit details Floor plans

Saleable area and measured carpet area are different measures: the supplied measurement note says saleable area also includes the home’s share of common areas. Balcony and utility areas are excluded from the measured carpet area in the example drawing. The supplied drawing information is not sufficient to confirm that the measured example represents every 2BHK design. Floor plans RERA unit details

5. Parking & vehicle circulation

The building approval says the stilt and any approved cellar parking are to be used exclusively for parking, without partitions or rolling shutters and without conversion to another use. The supplied records do not establish the number of sanctioned spaces, visitor or accessible parking, unit-wise allocations, parking-ramp arrangement, or EV charging. A parking bay shown in a drawing would not by itself establish exclusive allocation or ownership. Document index

The vendor record mentions covered car parking and bike parking, but these are vendor-listed features, not counts or documented unit allocations in the RERA-filed material. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record reports several items as available, but gives 0% progress for each listed item. “Available” is the filed status; it is not independent verification of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplyListed as available; source and capacity not stated hereRERA amenities0% recorded; not independently verified
Green strip / tot-lot / parkListed as available; no size suppliedRERA amenities0% recorded; not independently verified
Rainwater harvestingListed as available; no capacity suppliedRERA amenities0% recorded; not independently verified
Electrical meter room / sub-station / receiving stationListed as available; no capacity suppliedRERA amenities0% recorded; not independently verified
Internal roads and footpathsListed; no dimensions suppliedRERA amenities0% recorded; not independently verified
Sewerage, storm-water drainage, sewage treatment/disposal, solid-waste management, street lighting, community buildings, energy management, fire protection and recreational open spaceIncluded in the RERA amenity schedule; detailed sizes or capacities are not suppliedRERA amenitiesEach shown at 0%; no independent completion evidence

The sanction conditions also require a fenced tot-lot maintained as greenery, peripheral tree planting and greenery, and a rainwater-harvesting structure; these are approval conditions, not evidence that the work is complete.

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, rainwater harvesting and the electrical meter room/sub-station/receiving station as available, while its progress field records 0% for those items. The schedule also lists sewerage, storm-water drains, sewage treatment/disposal, solid-waste management and energy management, without supplied capacities or independent completion confirmation. RERA amenities

The building approval specifies a transformer space, rainwater-harvesting percolation pits, and separate underground and terrace water tanks of 25,000 litres each. It also sets out fire-safety conditions, including fire extinguishers, a manual alarm system, hose reel/downcomer, emergency lighting, generator backup and requirements for fire-vehicle maneuverability. These are approval conditions; the supplied record does not verify installation or operation.

The approval requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision, and requires an occupancy certificate before occupation. It does not establish the number or capacity of lifts, water source, STP capacity, backup capacity, accessibility features, or the installed status of the specified safety systems.

8. Location, access & connectivity

The registered location is Almasguda, Balapur Mandal, Ranga Reddy District, Telangana, PIN 500058. The supplied cadastral centroid is 17.29763, 78.54392; this is a parcel-centroid location, not a surveyed entrance point. RERA record Cadastral map

The nearest sampled Outer Ring Road interchange is recorded at approximately 6.4 km. The evidence does not provide other measured distances or verified public-transport connections. Location record

9. Developer & development status

The registered promoter is KALPATARU CONSTRUCTIONS, identified as a partnership, with GSTIN 36AAZFK4412D1Z8. The RERA record lists CHINTHAPALLY PRASHANTH REDDY as authorised signatory and AKKALA SHEKAR REDDY as partner. The supplied promoter address is SRIKRISHNA DEVARAYA NAGAR, VANASTHALIPURAM, Almasguda village, Balapur, Ranga Reddy, 500058. Corporate record Parties record RERA filing

The RERA certificate gives the promoter office as Village VANASTHALIPURAM, Mandal Hayathnagar, District Ranga Reddy, PIN 500070. No official website or promoter contact details are supplied.

The promoter’s Form B declares completion by 15/05/2024. The supplied evidence does not establish a revised completion date, an extension, independently verified construction progress, or an issued occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400006041; issued 18/04/2023; validity to 15/05/2024
What the supplied record establishesRegistration for Srilatha Arcade, Almasguda; certificate includes the separate-account condition
Building-construction approval
Identifier / date0014/BP/3037/2022; 28 December 2022
What the supplied record establishesBadangpet Municipal Corporation approval for a residential building; one stilt plus five upper floors; site area 752.51 m²
Approval file number
Identifier / date011505/BP/DTCP/3037/0015/2022
What the supplied record establishesFile number recorded in the building approval
Commencement / building approval document
Identifier / dateDocument 307899
What the supplied record establishesApproval extraction includes conditions on construction, parking, utilities, safety, completion notice and occupancy certificate; no completion or occupancy certificate is recorded in the extraction
Form B declaration
Identifier / dateDocument 310414; dated 18/02/2023
What the supplied record establishesPromoter declaration including the 15/05/2024 completion undertaking
Title-related RERA documents
Identifier / dateDocuments 307894 and 310413
What the supplied record establishesDevelopment agreement/GPA and advocate’s title-search report are listed in the supplied project documents; detailed title analysis belongs in the Land & Title section Document index
Floor-plan record
Identifier / dateDocument 307900
What the supplied record establishesRERA file identifies a building/floor-plan document; extraction and drawing review are incomplete Document index Floor plans

Frequently asked questions

Is Srilatha Arcade registered with Telangana RERA?

Yes. Srilatha Arcade is registered with the Telangana Real Estate Regulatory Authority as P02400006041; the registration status is New Project.

Who is the developer of Srilatha Arcade?

The promoter named in the RERA registration is KALPATARU CONSTRUCTIONS.

Where is Srilatha Arcade located?

Srilatha Arcade is in almasguda, Balapur, Rangareddy, Telangana (500058).

When will Srilatha Arcade be completed?

The promoter's proposed date of completion filed with RERA is 15/05/2024. This is the promoter's declaration, not a guarantee.

More projects in Almasguda