Sri Srinivasa Developers

CHALLARAPU RAJIREDDY AND OTHERS · Siddipet · RERA P01300008928

SRI SRINIVASA DEVELOPERS is a residential plotted development in Siddipet, Siddipet (Urban) Mandal, Siddipet District. The registered promoter is CHALLARAPU RAJIREDDY AND OTHERS. The project covers 41,334.86 sq. m and the SUDA approval describes 146 residential plots; buildings, floors and plot configurations are not disclosed in the supplied RERA record. It is registered under TG-RERA P01300008928, with a proposed completion date of 06/11/2024.

01What we found

Period endedTG-RERA registration ran to 6 Nov 2024 - check its extension on TG-RERA
29documents on file - each fact links to its page
2court cases on this project's land (survey 390, 1089, 1090, Narsapur)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSRI SRINIVASA DEVELOPERS RERA record
Project typePlotted development / residential layout RERA record RERA filing
Phase or registered portionThe RERA record identifies the project land as Sy. Nos. 390(P), 1090 and 1089; no separate phase designation is disclosed. RERA record
TG-RERA registrationP01300008928 RERA record
Registration validity07/10/2020 to 06/11/2024; the supplied certificate does not record an extension. Registration validity is distinct from the project completion deadline and any completion certificate. RERA record
Registered promoterCHALLARAPU RAJIREDDY AND OTHERS RERA record RERA filing
RERA statusRecorded as On-Going Project. RERA record RERA filing

Land and geographic identity

FieldRecord
LocalitySiddipet RERA record
Revenue villagesNarsapur and Mittapally are both named in the layout approval record.
MandalSiddipet (Urban) in the RERA project record; the layout approval document says Siddipet Mandal. RERA record
DistrictSiddipet RERA record
PIN502103 RERA record
Project survey numbers390(P), 1090 and 1089. The layout approval also uses the forms 390(p), 1090(p), 1089(p) and lists the land across Narsapur Village and Mittapally Village. RERA record
Registered site extent41,334.86 sq. m (also stated as AC.10.21 gts in the layout approval record). RERA filing
Net/total land areaRERA records total and net area as 41,334.86 sq. m; affected area is recorded as 0 sq. m. RERA filing
BoundariesEast: 45MT WIDE MAIN ROAD; west: VACANT LAND; north: NALA BUFFER ZONE; south: 18MT WIDE MAIN ROAD. RERA filing

Development identity

FieldRecord
Sanctioning authoritySiddipet Urban Development Authority (SUDA)
Principal layout approvalDraft Technical Layout Pattern No. 3148/Siddipet town/2019/0009, dated 07 October 2020 (date as recorded in the supplied approval extraction).
Approved layout scaleThe SUDA approval describes 146 plots and a layout area of 41,334.86 sq. m.
Approved built-up area26,728.65 sq. m is recorded in the RERA land/build-up details as “Approved Built up Area”; a building-specific plan, building count or floor configuration is not supplied for this plotted layout. RERA filing
Buildings / floorsNot disclosed in the supplied project record. The project is presented as a plotted layout, rather than a multi-storey building project. RERA record
ParkingNo sanctioned parking count, parking level or plot-wise parking allocation is supplied. RERA amenities

Offering and status

FieldRecord
OfferingResidential plots; the SUDA layout approval states 146 plots.
Plot counts and sizesThe approved-layout drawing extraction identifies 18 plots in the plot schedule, with software-measured sizes from 131.89 sq. m to 199.71 sq. m; drawing-derived counts and sizes require verification against the drawing. Layout record
Booked / available countsNot disclosed in the supplied RERA data. RERA record
Construction/development stageRERA records 80% completeness; this is a filed progress figure, not independent site verification. A work completion certificate dated 23 September 2024 states that development works were completed for the technically approved layout in the named survey numbers and village. RERA record
Original / revised completion deadline06/11/2024 / 06/11/2024 in the RERA project record. RERA record
Occupancy certificateNot applicable as a building-occupancy status on the supplied evidence for a plotted layout; no project-wide occupancy certificate is supplied. The separate work completion certificate concerns development works, not occupancy of buildings. RERA record

2. The project story

SRI SRINIVASA DEVELOPERS is registered as a residential plotted development in Siddipet, covering land identified in the project record as Sy. Nos. 390(P), 1090 and 1089. The layout approval identifies land in Narsapur Village and Mittapally Village, and describes a 146-plot layout over 41,334.86 sq. m. RERA record

The approval record describes plot land, internal roads, open space, social-infrastructure land and development conditions. It also states that development works include road formation, storm-water drains, underground drainage, water pipelines and storage, electrical supply and street lighting, park development, avenue planting and rainwater-harvesting pits. These are approval-record descriptions and requirements; they do not, by themselves, verify the present condition of each facility.

The RERA record reports 80% completeness and gives a completion deadline of 06/11/2024. Separately, a SUDA work completion certificate dated 23 September 2024 states that development works for the technically approved layout were completed. These are different records and scopes: the certificate covers layout development works, while the RERA percentage is the filed project-progress figure. RERA record

3. Master plan, architecture & building design

The SUDA approval describes a 41,334.86 sq. m layout with 26,728.65 sq. m of plotted area, 9,850.53 sq. m of road area, 3,193.11 sq. m reserved for open space, and 1,057.84 sq. m for social infrastructure. It records no utility-area allocation in that approval extraction. The approval also identifies AC. 1.05 as mortgage area (15.86% as stated in the approval record).

Layout land useAreaShare stated in approval
Plotted area26,728.65 sq. m64.87%
Road area9,850.53 sq. m23.91%
Open space / park3,193.11 sq. m7.75%
Social infrastructure1,057.84 sq. m2.57%
Utility00% stated
Mortgage area (plots)AC. 1.0515.86% stated

A separate drawing extraction reads the plot schedule as 18 plots and reports net layout area 5,766.22 sq. m, including 2,993.18 sq. m of plots, 1,957.11 sq. m of roads, 519.66 sq. m of parks/open space, 59.60 sq. m of utilities and 236.64 sq. m of social infrastructure. These are software-read figures from the drawing, not a substitute for the complete approved layout record; the drawing extraction itself says plot counts and sizes should be checked against the drawing. Layout record

No building arrangement, building footprint, floors, height, lifts, stairs, podium or basement is disclosed in the supplied record. The project is a plotted layout, so apartment floor-plan and tower descriptions are not evidenced. RERA record

4. Homes, configurations & floor plans

The offering recorded for the project is residential plots. The approved-layout drawing extraction identifies 18 plots in its plot schedule; it gives software-measured sizes ranging from 131.89 sq. m (157.7 sq. yd) to 199.71 sq. m (238.9 sq. yd), with a median of 172.38 sq. m (206.2 sq. yd). These drawing-derived counts and measurements should be verified against the plan. Layout record

Plot-size band (drawing-derived)Plots
150–200 sq. yd (125–167 sq. m)7
200–250 sq. yd (167–209 sq. m)11

The drawing extraction identifies 173.73 sq. m (207.8 sq. yd) as a common printed plot size, appearing four times. It records the net layout land-use split as 51.9% plots, 33.9% roads, 9.0% parks/open space, 1.0% utilities and 4.1% social infrastructure. Layout record

No RERA-filed plot-wise saleable areas, booked/available inventory counts or individual allotment details are supplied. Apartment carpet-area measurements and apartment configuration tables are not applicable to the evidence provided. RERA record Layout record

5. Parking & vehicle circulation

The approval record describes internal roads and requires roads to remain accessible to neighbouring sites; it gives an 18.00-metre road-width reference in the layout approval extraction. The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking, mechanical parking, EV charging, driveway arrangement or plot-specific parking allocation.

The approved layout drawing extraction lists road area as 1,957.11 sq. m within its own area statement. This is a drawing-derived layout figure, not a parking provision. Layout record

6. Amenities, recreation & open spaces

The layout approval specifies development works and reserved areas. The RERA amenities record marks several infrastructure items “YES” at 100%, but that field is a RERA filing status and is not independent verification of delivery. The SUDA work completion certificate separately states that certain layout development works were completed. RERA amenities

Landscape/open space — park
Description / sizeApproval reserves 3,193.11 sq. m (7.75% stated); the drawing extraction records 519.66 sq. m in its own area statement. Layout record
Evidence sourceSUDA approval; layout drawing extraction
Declared progress / verified statusApproval reservation is recorded; the work completion certificate states open-space greenery was completed, but does not provide a current independent inspection.
Landscape/open space — avenue planting
Description / sizeAvenue plantation and park development are listed as layout works.
Evidence sourceSUDA approval
Declared progress / verified statusRequired in approval; completion certificate states open-space greenery was completed.
Sports/recreation
Description / sizeNo specific sports facility is identified in the supplied evidence.
Evidence source—
Declared progress / verified statusNot disclosed.
Clubhouse/indoor
Description / sizeNo clubhouse or indoor amenity is identified in the supplied evidence.
Evidence source—
Declared progress / verified statusNot disclosed.
Convenience/community — social infrastructure land
Description / size1,057.84 sq. m (2.57% stated) in the SUDA approval; drawing extraction records 236.64 sq. m in its area statement. Layout record
Evidence sourceSUDA approval; layout drawing extraction
Declared progress / verified statusReserved land is described; no completed community building is evidenced.
Convenience/community — utility land
Description / sizeSUDA approval extraction records zero utility area; the layout drawing extraction records 59.60 sq. m. Layout record
Evidence sourceSUDA approval; layout drawing extraction
Declared progress / verified statusNo utility facility completion details supplied.

7. Utilities, building services & safety

The layout approval lists proposed/required infrastructure including storm-water drains, underground drainage lines, common septic tank/Sewage Treatment Plant (STP), internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, transformer, rainwater-harvesting pits and solid-waste-management facilities. It also requires specified open-space, roads and utility land to be handed over by registered gift deed before final layout release.

The RERA amenities record marks water supply, sewerage, storm-water drains, internal roads and footpaths, street lighting, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES” at 100%. It records fire-safety requirements, solid-waste management, energy management, sewage/sullage treatment and community buildings at 0%. These are filed amenity statuses; they do not establish technical capacity or current operation. RERA amenities

The work completion certificate states that rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply were completed for the layout development works. It does not provide system capacities or establish building-level fire systems, accessibility measures, security/CCTV, backup power or waste-management operations.

8. Location, access & connectivity

The registered project location is Narsapur, Siddipet (Urban) Mandal, Siddipet District, Telangana, PIN 502103. The RERA land record gives the boundary roads as a 45MT WIDE MAIN ROAD on the east and an 18MT WIDE MAIN ROAD on the south; the west boundary is recorded as vacant land and the north boundary as nala buffer zone. RERA record RERA filing

The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 23.7 km away. No other measured distances, public-transport details or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is CHALLARAPU RAJIREDDY AND OTHERS, recorded as a proprietorship in the promoter information. The RERA record names CHALLARAPU RAJI REDDY as authorized signatory. No corporate identification number, official website or project contact details are provided in the supplied evidence. RERA record RERA filing Parties record

The project record reports 80% completeness and a proposed/revised completion date of 06/11/2024. A SUDA work completion certificate dated 23 September 2024 states that the layout development works for the technically approved layout were complete. No project-wide occupancy certificate is supplied; the completion certificate concerns layout infrastructure works. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01300008928; validity 07/10/2020–06/11/2024
Scope and evidenceForm C certificate for SRI SRINIVASA DEVELOPERS; supplied certificate does not record an extension.
SUDA layout approval
Identifier / date3148/Siddipet town/2019/0009; 07 October 2020
Scope and evidenceDraft Technical Layout Pattern for the proposed 146-plot layout in Sy. Nos. 390(p), 1090 and 1089, Narsapur and Mittapally villages.
Work completion certificate
Identifier / dateEE /PR/SOPT; 23 September 2024
Scope and evidenceSUDA certificate concerning completed development works for the technically approved layout in Sy. Nos. 390(p), 1089(p) and 1090(p), Mittapally Village.
Promoter Form B declaration
Identifier / date2 May 2024
Scope and evidenceDeclaration by Challarapu Rajireddy; the supplied extraction does not include a completed completion-period entry.
Promoter Form B declaration
Identifier / dateCompletion undertaking: 22/04/2026
Scope and evidenceDeclaration by Naddi Srinivasa Rao under the same project name.
Project layout drawing
Identifier / dateDocument 440091
Scope and evidenceDrawing-based plot schedule and area statement used for the software-measured plot counts, sizes and land-use figures. Layout record

Frequently asked questions

Is SRI SRINIVASA DEVELOPERS registered with Telangana RERA?

Yes. SRI SRINIVASA DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P01300008928; the registration status is On-Going Project.

Who is the developer of SRI SRINIVASA DEVELOPERS?

The promoter named in the RERA registration is CHALLARAPU RAJIREDDY AND OTHERS.

Where is SRI SRINIVASA DEVELOPERS located?

SRI SRINIVASA DEVELOPERS is in SIDDIPET, NARSAPUR, SIDDIPET (URBAN), Telangana (502103).

When will SRI SRINIVASA DEVELOPERS be completed?

The promoter's proposed date of completion filed with RERA is 06/11/2024. This is the promoter's declaration, not a guarantee.