Sri Srinivasa Developers
CHALLARAPU RAJIREDDY AND OTHERS · Siddipet · RERA P01300008928
SRI SRINIVASA DEVELOPERS is a residential plotted development in Siddipet, Siddipet (Urban) Mandal, Siddipet District. The registered promoter is CHALLARAPU RAJIREDDY AND OTHERS. The project covers 41,334.86 sq. m and the SUDA approval describes 146 residential plots; buildings, floors and plot configurations are not disclosed in the supplied RERA record. It is registered under TG-RERA P01300008928, with a proposed completion date of 06/11/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI SRINIVASA DEVELOPERS RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Phase or registered portion | The RERA record identifies the project land as Sy. Nos. 390(P), 1090 and 1089; no separate phase designation is disclosed. RERA record |
| TG-RERA registration | P01300008928 RERA record |
| Registration validity | 07/10/2020 to 06/11/2024; the supplied certificate does not record an extension. Registration validity is distinct from the project completion deadline and any completion certificate. RERA record |
| Registered promoter | CHALLARAPU RAJIREDDY AND OTHERS RERA record RERA filing |
| RERA status | Recorded as On-Going Project. RERA record RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Siddipet RERA record |
| Revenue villages | Narsapur and Mittapally are both named in the layout approval record. |
| Mandal | Siddipet (Urban) in the RERA project record; the layout approval document says Siddipet Mandal. RERA record |
| District | Siddipet RERA record |
| PIN | 502103 RERA record |
| Project survey numbers | 390(P), 1090 and 1089. The layout approval also uses the forms 390(p), 1090(p), 1089(p) and lists the land across Narsapur Village and Mittapally Village. RERA record |
| Registered site extent | 41,334.86 sq. m (also stated as AC.10.21 gts in the layout approval record). RERA filing |
| Net/total land area | RERA records total and net area as 41,334.86 sq. m; affected area is recorded as 0 sq. m. RERA filing |
| Boundaries | East: 45MT WIDE MAIN ROAD; west: VACANT LAND; north: NALA BUFFER ZONE; south: 18MT WIDE MAIN ROAD. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Siddipet Urban Development Authority (SUDA) |
| Principal layout approval | Draft Technical Layout Pattern No. 3148/Siddipet town/2019/0009, dated 07 October 2020 (date as recorded in the supplied approval extraction). |
| Approved layout scale | The SUDA approval describes 146 plots and a layout area of 41,334.86 sq. m. |
| Approved built-up area | 26,728.65 sq. m is recorded in the RERA land/build-up details as “Approved Built up Area”; a building-specific plan, building count or floor configuration is not supplied for this plotted layout. RERA filing |
| Buildings / floors | Not disclosed in the supplied project record. The project is presented as a plotted layout, rather than a multi-storey building project. RERA record |
| Parking | No sanctioned parking count, parking level or plot-wise parking allocation is supplied. RERA amenities |
Offering and status
| Field | Record |
|---|---|
| Offering | Residential plots; the SUDA layout approval states 146 plots. |
| Plot counts and sizes | The approved-layout drawing extraction identifies 18 plots in the plot schedule, with software-measured sizes from 131.89 sq. m to 199.71 sq. m; drawing-derived counts and sizes require verification against the drawing. Layout record |
| Booked / available counts | Not disclosed in the supplied RERA data. RERA record |
| Construction/development stage | RERA records 80% completeness; this is a filed progress figure, not independent site verification. A work completion certificate dated 23 September 2024 states that development works were completed for the technically approved layout in the named survey numbers and village. RERA record |
| Original / revised completion deadline | 06/11/2024 / 06/11/2024 in the RERA project record. RERA record |
| Occupancy certificate | Not applicable as a building-occupancy status on the supplied evidence for a plotted layout; no project-wide occupancy certificate is supplied. The separate work completion certificate concerns development works, not occupancy of buildings. RERA record |
2. The project story
SRI SRINIVASA DEVELOPERS is registered as a residential plotted development in Siddipet, covering land identified in the project record as Sy. Nos. 390(P), 1090 and 1089. The layout approval identifies land in Narsapur Village and Mittapally Village, and describes a 146-plot layout over 41,334.86 sq. m. RERA record
The approval record describes plot land, internal roads, open space, social-infrastructure land and development conditions. It also states that development works include road formation, storm-water drains, underground drainage, water pipelines and storage, electrical supply and street lighting, park development, avenue planting and rainwater-harvesting pits. These are approval-record descriptions and requirements; they do not, by themselves, verify the present condition of each facility.
The RERA record reports 80% completeness and gives a completion deadline of 06/11/2024. Separately, a SUDA work completion certificate dated 23 September 2024 states that development works for the technically approved layout were completed. These are different records and scopes: the certificate covers layout development works, while the RERA percentage is the filed project-progress figure. RERA record
3. Master plan, architecture & building design
The SUDA approval describes a 41,334.86 sq. m layout with 26,728.65 sq. m of plotted area, 9,850.53 sq. m of road area, 3,193.11 sq. m reserved for open space, and 1,057.84 sq. m for social infrastructure. It records no utility-area allocation in that approval extraction. The approval also identifies AC. 1.05 as mortgage area (15.86% as stated in the approval record).
| Layout land use | Area | Share stated in approval |
|---|---|---|
| Plotted area | 26,728.65 sq. m | 64.87% |
| Road area | 9,850.53 sq. m | 23.91% |
| Open space / park | 3,193.11 sq. m | 7.75% |
| Social infrastructure | 1,057.84 sq. m | 2.57% |
| Utility | 0 | 0% stated |
| Mortgage area (plots) | AC. 1.05 | 15.86% stated |
A separate drawing extraction reads the plot schedule as 18 plots and reports net layout area 5,766.22 sq. m, including 2,993.18 sq. m of plots, 1,957.11 sq. m of roads, 519.66 sq. m of parks/open space, 59.60 sq. m of utilities and 236.64 sq. m of social infrastructure. These are software-read figures from the drawing, not a substitute for the complete approved layout record; the drawing extraction itself says plot counts and sizes should be checked against the drawing. Layout record
No building arrangement, building footprint, floors, height, lifts, stairs, podium or basement is disclosed in the supplied record. The project is a plotted layout, so apartment floor-plan and tower descriptions are not evidenced. RERA record
4. Homes, configurations & floor plans
The offering recorded for the project is residential plots. The approved-layout drawing extraction identifies 18 plots in its plot schedule; it gives software-measured sizes ranging from 131.89 sq. m (157.7 sq. yd) to 199.71 sq. m (238.9 sq. yd), with a median of 172.38 sq. m (206.2 sq. yd). These drawing-derived counts and measurements should be verified against the plan. Layout record
| Plot-size band (drawing-derived) | Plots |
|---|---|
| 150–200 sq. yd (125–167 sq. m) | 7 |
| 200–250 sq. yd (167–209 sq. m) | 11 |
The drawing extraction identifies 173.73 sq. m (207.8 sq. yd) as a common printed plot size, appearing four times. It records the net layout land-use split as 51.9% plots, 33.9% roads, 9.0% parks/open space, 1.0% utilities and 4.1% social infrastructure. Layout record
No RERA-filed plot-wise saleable areas, booked/available inventory counts or individual allotment details are supplied. Apartment carpet-area measurements and apartment configuration tables are not applicable to the evidence provided. RERA record Layout record
5. Parking & vehicle circulation
The approval record describes internal roads and requires roads to remain accessible to neighbouring sites; it gives an 18.00-metre road-width reference in the layout approval extraction. The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking, mechanical parking, EV charging, driveway arrangement or plot-specific parking allocation.
The approved layout drawing extraction lists road area as 1,957.11 sq. m within its own area statement. This is a drawing-derived layout figure, not a parking provision. Layout record
6. Amenities, recreation & open spaces
The layout approval specifies development works and reserved areas. The RERA amenities record marks several infrastructure items “YES” at 100%, but that field is a RERA filing status and is not independent verification of delivery. The SUDA work completion certificate separately states that certain layout development works were completed. RERA amenities
| Description / size | Approval reserves 3,193.11 sq. m (7.75% stated); the drawing extraction records 519.66 sq. m in its own area statement. Layout record |
|---|---|
| Evidence source | SUDA approval; layout drawing extraction |
| Declared progress / verified status | Approval reservation is recorded; the work completion certificate states open-space greenery was completed, but does not provide a current independent inspection. |
| Description / size | Avenue plantation and park development are listed as layout works. |
|---|---|
| Evidence source | SUDA approval |
| Declared progress / verified status | Required in approval; completion certificate states open-space greenery was completed. |
| Description / size | No specific sports facility is identified in the supplied evidence. |
|---|---|
| Evidence source | — |
| Declared progress / verified status | Not disclosed. |
| Description / size | No clubhouse or indoor amenity is identified in the supplied evidence. |
|---|---|
| Evidence source | — |
| Declared progress / verified status | Not disclosed. |
| Description / size | 1,057.84 sq. m (2.57% stated) in the SUDA approval; drawing extraction records 236.64 sq. m in its area statement. Layout record |
|---|---|
| Evidence source | SUDA approval; layout drawing extraction |
| Declared progress / verified status | Reserved land is described; no completed community building is evidenced. |
| Description / size | SUDA approval extraction records zero utility area; the layout drawing extraction records 59.60 sq. m. Layout record |
|---|---|
| Evidence source | SUDA approval; layout drawing extraction |
| Declared progress / verified status | No utility facility completion details supplied. |
7. Utilities, building services & safety
The layout approval lists proposed/required infrastructure including storm-water drains, underground drainage lines, common septic tank/Sewage Treatment Plant (STP), internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, transformer, rainwater-harvesting pits and solid-waste-management facilities. It also requires specified open-space, roads and utility land to be handed over by registered gift deed before final layout release.
The RERA amenities record marks water supply, sewerage, storm-water drains, internal roads and footpaths, street lighting, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES” at 100%. It records fire-safety requirements, solid-waste management, energy management, sewage/sullage treatment and community buildings at 0%. These are filed amenity statuses; they do not establish technical capacity or current operation. RERA amenities
The work completion certificate states that rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply were completed for the layout development works. It does not provide system capacities or establish building-level fire systems, accessibility measures, security/CCTV, backup power or waste-management operations.
8. Location, access & connectivity
The registered project location is Narsapur, Siddipet (Urban) Mandal, Siddipet District, Telangana, PIN 502103. The RERA land record gives the boundary roads as a 45MT WIDE MAIN ROAD on the east and an 18MT WIDE MAIN ROAD on the south; the west boundary is recorded as vacant land and the north boundary as nala buffer zone. RERA record RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 23.7 km away. No other measured distances, public-transport details or landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is CHALLARAPU RAJIREDDY AND OTHERS, recorded as a proprietorship in the promoter information. The RERA record names CHALLARAPU RAJI REDDY as authorized signatory. No corporate identification number, official website or project contact details are provided in the supplied evidence. RERA record RERA filing Parties record
The project record reports 80% completeness and a proposed/revised completion date of 06/11/2024. A SUDA work completion certificate dated 23 September 2024 states that the layout development works for the technically approved layout were complete. No project-wide occupancy certificate is supplied; the completion certificate concerns layout infrastructure works. RERA record
10. Approvals, official records & documents
| Identifier / date | P01300008928; validity 07/10/2020–06/11/2024 |
|---|---|
| Scope and evidence | Form C certificate for SRI SRINIVASA DEVELOPERS; supplied certificate does not record an extension. |
| Identifier / date | 3148/Siddipet town/2019/0009; 07 October 2020 |
|---|---|
| Scope and evidence | Draft Technical Layout Pattern for the proposed 146-plot layout in Sy. Nos. 390(p), 1090 and 1089, Narsapur and Mittapally villages. |
| Identifier / date | EE /PR/SOPT; 23 September 2024 |
|---|---|
| Scope and evidence | SUDA certificate concerning completed development works for the technically approved layout in Sy. Nos. 390(p), 1089(p) and 1090(p), Mittapally Village. |
| Identifier / date | 2 May 2024 |
|---|---|
| Scope and evidence | Declaration by Challarapu Rajireddy; the supplied extraction does not include a completed completion-period entry. |
| Identifier / date | Completion undertaking: 22/04/2026 |
|---|---|
| Scope and evidence | Declaration by Naddi Srinivasa Rao under the same project name. |
| Identifier / date | Document 440091 |
|---|---|
| Scope and evidence | Drawing-based plot schedule and area statement used for the software-measured plot counts, sizes and land-use figures. Layout record |
1. Project at a glance
Project identity
Registered project name: SRI SRINIVASA DEVELOPERS
Project type: Plotted development / residential layout
Phase or registered portion: The RERA record identifies the project land as Sy. Nos. 390(P), 1090 and 1089; no separate phase designation is disclosed.
TG-RERA registration: P01300008928
Registration validity: 07/10/2020 to 06/11/2024; the supplied certificate does not record an extension. Registration validity is distinct from the project completion deadline and any completion certificate.
Registered promoter: CHALLARAPU RAJIREDDY AND OTHERS
RERA status: Recorded as On-Going Project.
Land and geographic identity
Locality: Siddipet
Revenue villages: Narsapur and Mittapally are both named in the layout approval record.
Mandal: Siddipet (Urban) in the RERA project record; the layout approval document says Siddipet Mandal.
District: Siddipet
PIN: 502103
Project survey numbers: 390(P), 1090 and 1089. The layout approval also uses the forms 390(p), 1090(p), 1089(p) and lists the land across Narsapur Village and Mittapally Village.
Registered site extent: 41,334.86 sq. m (also stated as AC.10.21 gts in the layout approval record).
Net/total land area: RERA records total and net area as 41,334.86 sq. m; affected area is recorded as 0 sq. m.
Boundaries: East: 45MT WIDE MAIN ROAD; west: VACANT LAND; north: NALA BUFFER ZONE; south: 18MT WIDE MAIN ROAD.
Development identity
Sanctioning authority: Siddipet Urban Development Authority (SUDA)
Principal layout approval: Draft Technical Layout Pattern No. 3148/Siddipet town/2019/0009, dated 07 October 2020 (date as recorded in the supplied approval extraction).
Approved layout scale: The SUDA approval describes 146 plots and a layout area of 41,334.86 sq. m.
Approved built-up area: 26,728.65 sq. m is recorded in the RERA land/build-up details as “Approved Built up Area”; a building-specific plan, building count or floor configuration is not supplied for this plotted layout.
Buildings / floors: Not disclosed in the supplied project record. The project is presented as a plotted layout, rather than a multi-storey building project.
Parking: No sanctioned parking count, parking level or plot-wise parking allocation is supplied.
Offering and status
Offering: Residential plots; the SUDA layout approval states 146 plots.
Plot counts and sizes: The approved-layout drawing extraction identifies 18 plots in the plot schedule, with software-measured sizes from 131.89 sq. m to 199.71 sq. m; drawing-derived counts and sizes require verification against the drawing.
Booked / available counts: Not disclosed in the supplied RERA data.
Construction/development stage: RERA records 80% completeness; this is a filed progress figure, not independent site verification. A work completion certificate dated 23 September 2024 states that development works were completed for the technically approved layout in the named survey numbers and village.
Original / revised completion deadline: 06/11/2024 / 06/11/2024 in the RERA project record.
Occupancy certificate: Not applicable as a building-occupancy status on the supplied evidence for a plotted layout; no project-wide occupancy certificate is supplied. The separate work completion certificate concerns development works, not occupancy of buildings.
2. The project story
SRI SRINIVASA DEVELOPERS is registered as a residential plotted development in Siddipet, covering land identified in the project record as Sy. Nos. 390(P), 1090 and 1089. The layout approval identifies land in Narsapur Village and Mittapally Village, and describes a 146-plot layout over 41,334.86 sq. m.
The approval record describes plot land, internal roads, open space, social-infrastructure land and development conditions. It also states that development works include road formation, storm-water drains, underground drainage, water pipelines and storage, electrical supply and street lighting, park development, avenue planting and rainwater-harvesting pits. These are approval-record descriptions and requirements; they do not, by themselves, verify the present condition of each facility.
The RERA record reports 80% completeness and gives a completion deadline of 06/11/2024. Separately, a SUDA work completion certificate dated 23 September 2024 states that development works for the technically approved layout were completed. These are different records and scopes: the certificate covers layout development works, while the RERA percentage is the filed project-progress figure.
3. Master plan, architecture & building design
The SUDA approval describes a 41,334.86 sq. m layout with 26,728.65 sq. m of plotted area, 9,850.53 sq. m of road area, 3,193.11 sq. m reserved for open space, and 1,057.84 sq. m for social infrastructure. It records no utility-area allocation in that approval extraction. The approval also identifies AC. 1.05 as mortgage area (15.86% as stated in the approval record).
| Layout land use | Area | Share stated in approval |
|---|---|---|
| Plotted area | 26,728.65 sq. m | 64.87% |
| Road area | 9,850.53 sq. m | 23.91% |
| Open space / park | 3,193.11 sq. m | 7.75% |
| Social infrastructure | 1,057.84 sq. m | 2.57% |
| Utility | 0 | 0% stated |
| Mortgage area (plots) | AC. 1.05 | 15.86% stated |
A separate drawing extraction reads the plot schedule as 18 plots and reports net layout area 5,766.22 sq. m, including 2,993.18 sq. m of plots, 1,957.11 sq. m of roads, 519.66 sq. m of parks/open space, 59.60 sq. m of utilities and 236.64 sq. m of social infrastructure. These are software-read figures from the drawing, not a substitute for the complete approved layout record; the drawing extraction itself says plot counts and sizes should be checked against the drawing.
No building arrangement, building footprint, floors, height, lifts, stairs, podium or basement is disclosed in the supplied record. The project is a plotted layout, so apartment floor-plan and tower descriptions are not evidenced.
4. Homes, configurations & floor plans
The offering recorded for the project is residential plots. The approved-layout drawing extraction identifies 18 plots in its plot schedule; it gives software-measured sizes ranging from 131.89 sq. m (157.7 sq. yd) to 199.71 sq. m (238.9 sq. yd), with a median of 172.38 sq. m (206.2 sq. yd). These drawing-derived counts and measurements should be verified against the plan.
150–200 sq. yd (125–167 sq. m): 7
200–250 sq. yd (167–209 sq. m): 11
The drawing extraction identifies 173.73 sq. m (207.8 sq. yd) as a common printed plot size, appearing four times. It records the net layout land-use split as 51.9% plots, 33.9% roads, 9.0% parks/open space, 1.0% utilities and 4.1% social infrastructure.
No RERA-filed plot-wise saleable areas, booked/available inventory counts or individual allotment details are supplied. Apartment carpet-area measurements and apartment configuration tables are not applicable to the evidence provided.
5. Parking & vehicle circulation
The approval record describes internal roads and requires roads to remain accessible to neighbouring sites; it gives an 18.00-metre road-width reference in the layout approval extraction. The supplied evidence does not establish a sanctioned parking count, visitor or accessible parking, mechanical parking, EV charging, driveway arrangement or plot-specific parking allocation.
The approved layout drawing extraction lists road area as 1,957.11 sq. m within its own area statement. This is a drawing-derived layout figure, not a parking provision.
6. Amenities, recreation & open spaces
The layout approval specifies development works and reserved areas. The RERA amenities record marks several infrastructure items “YES” at 100%, but that field is a RERA filing status and is not independent verification of delivery. The SUDA work completion certificate separately states that certain layout development works were completed.
| Description / size | Approval reserves 3,193.11 sq. m (7.75% stated); the drawing extraction records 519.66 sq. m in its own area statement. |
|---|---|
| Evidence source | SUDA approval; layout drawing extraction |
| Declared progress / verified status | Approval reservation is recorded; the work completion certificate states open-space greenery was completed, but does not provide a current independent inspection. |
| Description / size | Avenue plantation and park development are listed as layout works. |
|---|---|
| Evidence source | SUDA approval |
| Declared progress / verified status | Required in approval; completion certificate states open-space greenery was completed. |
| Description / size | No specific sports facility is identified in the supplied evidence. |
|---|---|
| Evidence source | — |
| Declared progress / verified status | Not disclosed. |
| Description / size | No clubhouse or indoor amenity is identified in the supplied evidence. |
|---|---|
| Evidence source | — |
| Declared progress / verified status | Not disclosed. |
| Description / size | 1,057.84 sq. m (2.57% stated) in the SUDA approval; drawing extraction records 236.64 sq. m in its area statement. |
|---|---|
| Evidence source | SUDA approval; layout drawing extraction |
| Declared progress / verified status | Reserved land is described; no completed community building is evidenced. |
| Description / size | SUDA approval extraction records zero utility area; the layout drawing extraction records 59.60 sq. m. |
|---|---|
| Evidence source | SUDA approval; layout drawing extraction |
| Declared progress / verified status | No utility facility completion details supplied. |
7. Utilities, building services & safety
The layout approval lists proposed/required infrastructure including storm-water drains, underground drainage lines, common septic tank/Sewage Treatment Plant (STP), internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, transformer, rainwater-harvesting pits and solid-waste-management facilities. It also requires specified open-space, roads and utility land to be handed over by registered gift deed before final layout release.
The RERA amenities record marks water supply, sewerage, storm-water drains, internal roads and footpaths, street lighting, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as “YES” at 100%. It records fire-safety requirements, solid-waste management, energy management, sewage/sullage treatment and community buildings at 0%. These are filed amenity statuses; they do not establish technical capacity or current operation.
The work completion certificate states that rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply were completed for the layout development works. It does not provide system capacities or establish building-level fire systems, accessibility measures, security/CCTV, backup power or waste-management operations.
8. Location, access & connectivity
The registered project location is Narsapur, Siddipet (Urban) Mandal, Siddipet District, Telangana, PIN 502103. The RERA land record gives the boundary roads as a 45MT WIDE MAIN ROAD on the east and an 18MT WIDE MAIN ROAD on the south; the west boundary is recorded as vacant land and the north boundary as nala buffer zone.
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 23.7 km away. No other measured distances, public-transport details or landmark distances are supplied.
9. Developer & development status
The registered promoter is CHALLARAPU RAJIREDDY AND OTHERS, recorded as a proprietorship in the promoter information. The RERA record names CHALLARAPU RAJI REDDY as authorized signatory. No corporate identification number, official website or project contact details are provided in the supplied evidence.
The project record reports 80% completeness and a proposed/revised completion date of 06/11/2024. A SUDA work completion certificate dated 23 September 2024 states that the layout development works for the technically approved layout were complete. No project-wide occupancy certificate is supplied; the completion certificate concerns layout infrastructure works.
10. Approvals, official records & documents
| Identifier / date | P01300008928; validity 07/10/2020–06/11/2024 |
|---|---|
| Scope and evidence | Form C certificate for SRI SRINIVASA DEVELOPERS; supplied certificate does not record an extension. |
| Identifier / date | 3148/Siddipet town/2019/0009; 07 October 2020 |
|---|---|
| Scope and evidence | Draft Technical Layout Pattern for the proposed 146-plot layout in Sy. Nos. 390(p), 1090 and 1089, Narsapur and Mittapally villages. |
| Identifier / date | EE /PR/SOPT; 23 September 2024 |
|---|---|
| Scope and evidence | SUDA certificate concerning completed development works for the technically approved layout in Sy. Nos. 390(p), 1089(p) and 1090(p), Mittapally Village. |
| Identifier / date | 2 May 2024 |
|---|---|
| Scope and evidence | Declaration by Challarapu Rajireddy; the supplied extraction does not include a completed completion-period entry. |
| Identifier / date | Completion undertaking: 22/04/2026 |
|---|---|
| Scope and evidence | Declaration by Naddi Srinivasa Rao under the same project name. |
| Identifier / date | Document 440091 |
|---|---|
| Scope and evidence | Drawing-based plot schedule and area statement used for the software-measured plot counts, sizes and land-use figures. |
Frequently asked questions
Is SRI SRINIVASA DEVELOPERS registered with Telangana RERA?
Yes. SRI SRINIVASA DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P01300008928; the registration status is On-Going Project.
Who is the developer of SRI SRINIVASA DEVELOPERS?
The promoter named in the RERA registration is CHALLARAPU RAJIREDDY AND OTHERS.
Where is SRI SRINIVASA DEVELOPERS located?
SRI SRINIVASA DEVELOPERS is in SIDDIPET, NARSAPUR, SIDDIPET (URBAN), Telangana (502103).
When will SRI SRINIVASA DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 06/11/2024. This is the promoter's declaration, not a guarantee.
More projects in Siddipet