Sign in

Sri Sai Pvr Arcade

KPR CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200000571

SRI SAI PVR ARCADE is a residential apartment project in HMT OFFICERS COLONY, Malkajgiri mandal, Medchal-Malkajgiri district, developed by KPR CONSTRUCTIONS. The registered site area is 501.6 m², with one building, Building A, configured as Stilt + 5, and 15 homes: 10 1BHK units and 5 2BHK units. The project is registered under TG-RERA number P02200000571, with a proposed completion date of 17/03/2024.

01What we found

Period endedTG-RERA registration ran to 17 Mar 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
8court cases on this project's land (survey 588, 590, 591, Bank Colony)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bank Colony, Malkajgiri, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameSRI SAI PVR ARCADE
Project type / useResidential apartment project RERA record
Phase / registered portionPhase not separately identified; the RERA registration is for the project on the listed site
TG-RERA registrationP02200000571
Registration validity09/04/2019–17/03/2024; certificate states four years. This is registration validity, not a construction-status or occupancy certificate.
Registered promoterKPR CONSTRUCTIONS Corporate record
RERA-recorded statusOn-Going Project RERA filing

Land and geographic identity

FieldProject record
Locality / project location as recordedHMT OFFICERS COLONY; the RERA certificate also records Bank Colony, Malkajgiri RERA record
Revenue villageBank Colony, as recorded in the project identity; the title documents refer to Alwal Village RERA record Land records
Mandal / district / PINMalkajgiri / Medchal-Malkajgiri / 500076 RERA record
Project survey numbers588, 589, 590 and 591; no subdivisions are supplied Land records
Plot numbers49 AND 50
Registered site extent501.6 m²; net area 501.60 m², total area 501.6 m², and road-affected area recorded as 0 m² RERA filing
BoundariesEast: 30 WIDE ROAD; West: PLOT NO 41; North: PLOT NO 51; South: PLOT NO 48 RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval1/C16/04804/2018, approved 17 March, 2018; file no. 1/C16/11114/2017 Approvals record
Building configuration in sanctionBuilding A, residential, Stilt + 5; recorded building height 15 m
Approved built-up areaRERA project record: 1,445.04 m² RERA filing. The GHMC order separately lists 1,204.20 m² for residential upper floors and 227.49 m² for stilt; these are the order’s component figures, not a substitute for the RERA-recorded approved built-up area.
Buildings / blocksOne building is recorded in the RERA project details; the GHMC order identifies Building A RERA filing
Parking levels in sanctionCellar parking: 0; ground/upper-floor parking: 0; the order records the building as Stilt + 5 and requires approved stilt parking to be used for parking. A car-space count is not supplied.
Unit count15 units in the RERA unit record RERA unit table
Sanctioned unit countNot separately stated in the supplied sanction extraction

Offering and status

FieldProject record
Configurations1BHK: 10 units; 2BHK: 5 units RERA unit table
RERA-filed saleable areas1BHK: 92.15 m²; 2BHK: 105.44 m² RERA unit table
Booked / availablePortal-derived unit record lists 0 booked and 10 available 1BHKs, and 0 booked and 5 available 2BHKs. Counts are indicative: the source record has no as-of date. RERA unit table
Construction stageRERA status is “On-Going Project”; no independently verified current construction progress is supplied. RERA filing
Completion datePromoter’s Form B undertaking and RERA project record state 17/03/2024 as the completion date. RERA filing
Revised completion date17/03/2024 in the RERA project record RERA filing
Occupancy / completion certificateNo issued OC or completion certificate is included in the supplied evidence. The GHMC permit states an OC is required before occupation.

2. The project story

SRI SAI PVR ARCADE is recorded as a residential apartment project on Plot Nos. 49 and 50, covering Survey Nos. 588, 589, 590 and 591. The GHMC building-permit order identifies one residential building, Building A, with a Stilt + 5 configuration. The project is registered with TG-RERA as P02200000571.

The RERA unit record lists 15 homes: ten 1BHK units and five 2BHK units. It records no units as booked, but those booking counts have no stated as-of date and should be treated as indicative rather than current sales confirmation. The project is marked “On-Going Project” in the RERA record, with a stated completion date of 17/03/2024; no independently verified site-progress assessment or issued occupancy certificate is supplied here. RERA unit table RERA filing

3. Master plan, architecture & building design

The available GHMC building-permit extraction describes a single residential Building A, Stilt + 5, with a recorded height of 15 m. It gives the site area as 501.6 m² and net area as 501.6 m². The order records residential upper-floor area of 1,204.20 m² and stilt area of 227.49 m²; the RERA project fields separately report approved built-up area of 1,445.04 m². These are separately reported measures and should not be treated as interchangeable. RERA filing

The GHMC extraction records no cellar parking and no ground/upper-floor parking, and records the building as Stilt + 5. It also lists a tot-lot area of 0 m². No supplied drawing-derived data establishes floor-by-floor flat arrangements, building footprint, number of flats per floor, lift or stair details, internal circulation, or landscaped-area dimensions. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK1001092.15 m²Not availableNot supplied
2BHK505105.44 m²Not availableNot supplied

Unit counts, booking figures and saleable areas are from the RERA unit record. Booking figures have no stated as-of date. RERA unit table

The supplied floor-plan record says two drawings were present, but none had software-measured carpet areas; no flat configurations were measured from those drawings. Accordingly, there are no drawing-based room dimensions or measured carpet-area figures to report. RERA saleable area is not a carpet-area measurement; the supplied evidence does not provide a project-specific area breakdown or loading figure. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction records no cellar parking and no ground/upper-floor parking, while identifying a Stilt + 5 building and requiring cellar and stilt areas approved for parking to be used exclusively for vehicle parking. The extraction does not give a number of car or two-wheeler spaces, visitor or accessible parking provision, or a unit-by-unit parking allocation.

The RERA unit record marks the 1BHK configuration as mortgaged and the 2BHK configuration as not mortgaged; it does not establish parking allocation or exclusive parking rights for any unit. RERA unit details

6. Amenities, recreation & open spaces

Green strip / tot-lot / park
Description / sizeRERA amenity record marks “YES”; GHMC extraction records tot-lot area as 0 m² and requires the tot-lot to be fenced and maintained as greenery. RERA amenities
Evidence sourceRERA-filed / sanctioned condition; completion not independently verified
Rainwater harvesting
Description / sizeRERA amenity record marks water conservation and rainwater harvesting “YES”; GHMC order specifies 4 No. of RWHPs and a rainwater-harvesting structure (percolation pit). RERA amenities
Evidence sourceRERA-filed / specified in permit; completion not independently verified
Tree planting / greenery
Description / sizeGHMC extraction specifies 25 Trees, tree planting along the periphery and in front of the premises, and maintenance of a peripheral greenery strip.
Evidence sourceSanction condition; completion not independently verified
Community buildings
Description / sizeRERA amenity record lists community buildings, with no size or completion evidence supplied. RERA amenities
Evidence sourceRERA-listed; progress field is 0; completion not independently verified
Internal roads and footpaths
Description / sizeListed in the RERA amenity record; no dimensions or completion evidence supplied. RERA amenities
Evidence sourceRERA-listed; progress field is 0
Street lighting
Description / sizeListed in the RERA amenity record; no specifications or completion evidence supplied. RERA amenities
Evidence sourceRERA-listed; progress field is 0

The RERA amenity record shows progress as 0 for its listed items, including those marked available as “YES”; this is a filed progress field, not independent confirmation of on-site condition. RERA amenities

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, energy management, and an electrical meter room/sub-station/receiving station as “YES.” It does not supply capacities, source details, treatment specifications, or verified commissioning status. The same record lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management and fire-protection requirements, with progress fields of 0. RERA amenities

The GHMC permit specifies an ETP, a garbage house, space for a transformer, rainwater harvesting, and services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. It also requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of an occupancy certificate. These are permit requirements or recorded provisions; the supplied evidence does not establish their completion or operational status.

No evidence supplied here specifies lift count or capacity, backup-power capacity, CCTV or access-control systems, accessible routes, or fire-system equipment and capacities.

8. Location, access & connectivity

The registered project location is recorded as HMT OFFICERS COLONY / Bank Colony, Malkajgiri, Medchal-Malkajgiri, PIN 500076; the title materials refer to Alwal Village. The GHMC permit describes the premises as 49 and 50 in Hmt Colony, Hyderabad, and records an adjoining 30 WIDE ROAD on the east in the RERA land details. RERA record RERA filing

The location record supplies a geocode for HMT Officers Colony, Ward 133 Macha Bolarum, GHMC North Zone, Hyderabad, Alwal mandal, Medchal–Malkajgiri, Telangana, 500100. This is a location-record geocode, not a substitute for the registered village and PIN. The nearest sampled Outer Ring Road interchange is recorded as approximately 7.7 km away. Location record

9. Developer & development status

The registered promoter is KPR CONSTRUCTIONS, identified in the project record as a partnership. Its listed partners are KAJA MYTHILI and KAJA VIKRAM; KAJA PANDURANGARAO is identified as authorized signatory. The supplied corporate record identifies the partnership, but no official contact details or promoter website are provided in the project identity record. Corporate record Parties record

The promoter’s Form B, dated 17 March 2018 and signed by K. Vikram as managing partner, declares the land free from encumbrances and undertakes completion by 17 MARCH 2024. These are promoter declarations filed with the project. The RERA record lists the project as ongoing and gives the same completion date; independent current construction progress and OC status are not supplied. RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02200000571; issued 09/04/2019; valid to 17/03/2024
What the supplied record establishesFORM C registration for SRI SAI PVR ARCADE; certificate states four-year validity and includes the separate-account condition.
GHMC building-permit order
Reference / dateApproval 1/C16/04804/2018; file 1/C16/11114/2017; approved 17 March, 2018
What the supplied record establishesBuilding permission for Building A, Stilt + 5, on the site identified by Survey Nos. 588, 589, 590 and 591 and site area 501.6 m².
Promoter’s Form B declaration
Reference / date17 March 2018
What the supplied record establishesPromoter declaration concerning title, encumbrances, project completion and RERA obligations.
Legal title report
Reference / dateDated 13 February 2019
What the supplied record establishesAdvocate’s title scrutiny report concerning Plot Nos. 49 and 50 and the listed survey numbers.
Development Agreement cum GPA
Reference / dateRegistered 21 December 2017; cited in title documents
What the supplied record establishesRecords development and agency rights over the land.
Layout approval / plan document
Reference / dateRequired-document entry is present, but the supplied document record is not extracted
What the supplied record establishesAn approved layout plan is not established by the available extraction.
Occupancy / completion certificate
Reference / dateNot supplied
What the supplied record establishesThe GHMC permit requires an OC before occupation; no issued certificate is included in the reviewed project evidence.

Frequently asked questions

Is SRI SAI PVR ARCADE registered with Telangana RERA?

Yes. SRI SAI PVR ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02200000571; the registration status is On-Going Project.

Who is the developer of SRI SAI PVR ARCADE?

The promoter named in the RERA registration is KPR CONSTRUCTIONS.

Where is SRI SAI PVR ARCADE located?

SRI SAI PVR ARCADE is in HMT OFFICERS COLONY, Bank Colony, Malkajgiri, Medchal-Malkajgiri, Telangana (500076).

When will SRI SAI PVR ARCADE be completed?

The promoter's proposed date of completion filed with RERA is 17/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Malkajgiri