Sri Ramalingeshwara Developers
SRI RAMALINGESHWARA DEVELOPERS · Siddipet · RERA P01300005833
SRI RAMALINGESHWARA DEVELOPERS is a plotted development in AKBERPET locality, Mirdoddi Mandal, Siddipet District. The registered promoter developing it is SRI RAMALINGESHWARA DEVELOPERS. The RERA-filed site area is 48359.93 sq. m.; the DTCP draft-layout document states 119 plots, with no towers, blocks, floors or plot configurations disclosed. The project is registered with TG-RERA as P01300005833, and the RERA-filed completion undertaking is 14/10/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SRI RAMALINGESHWARA DEVELOPERS RERA record RERA filing |
| Project type | Plotted development; the DTCP record describes a residential plotted layout. RERA filing |
| Phase / registered portion | The available record identifies one registered project; a phase description is not disclosed. RERA record |
| TG-RERA registration | P01300005833 |
| Registration validity | 21/03/2023 to 14/10/2024; the supplied certificate says it is not extended. Registration validity is separate from the completion undertaking below. |
| Registered promoter | SRI RAMALINGESHWARA DEVELOPERS |
| RERA status in supplied record | New Project; certificate validity ended 14/10/2024, with no extension shown in the supplied certificate. Current portal status is not established by this record. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Locality: AKBERPET. The RERA record identifies “AKBERPET VILLAGE,BHOOMPALLY REVENUEVILLAGE”; the DTCP draft-layout document identifies Bhoompally Revenue Village and Akberpet locality. RERA record RERA filing |
| Mandal / district / PIN | MIRDODDI / Siddipet / 502102 RERA record |
| Project survey numbers and subdivisions | Sy. Nos. 75/P, 77/P and 90/P RERA filing |
| RERA-filed site area | Total area: 48359.93 sq. m.; net area: 48359.93 sq. m.; affected area reported as 0 sq. m. RERA filing |
| DTCP draft-layout area | Ac. 11-38 Guntas or Ac.11.95 Cents; 57838.00 Sq. Yds. |
| Boundaries (RERA filing) | East: ROAD; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | The Director of Town and Country Planning; the document states delegation to Akberpet Gram Panchayat. Approvals record |
| Principal layout approval | T.L.P.NO. 309/ 2022H, approved 15-10-2022; described in the document as a “DRAFT TECHNICAL LAYOUT PATTERN.” Approvals record |
| Approved built-up area | Not disclosed in the supplied project record. |
| Layout area allocation in DTCP document | Plotted area: Ac. 7.242 Cents; 35051.28 Sq. Yds. (60.61%). Open space: Ac. 1.195 Cents; 5783.80 Sq. Yds. (10.00%). Road area: Ac. 3.513 Cents; 17002.92 Sq. Yds. (29.39%). |
| Layout scale | 119 plots are stated in the DTCP draft-layout document. |
| Buildings / floors | Not applicable as a recorded building scheme for this plotted layout; no building count or floor configuration is disclosed. |
| Parking | Project-specific parking count or parking allocation is not disclosed. |
Offering and status
| Item | Record |
|---|---|
| Offered property type | Plots; plot count in the DTCP draft-layout document: 119. |
| Plot-size range | Not disclosed in the RERA-filed details supplied here. |
| Booked / available plots | Not disclosed in the supplied RERA record. |
| RERA-filed completion undertaking | 14/10/2024 |
| Construction / development stage | No project progress percentage or independently verified site-stage information is supplied. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied record. The document set does not establish whether one has since been issued. |
2. The project story
This is a plotted residential layout registered with TG-RERA as SRI RAMALINGESHWARA DEVELOPERS, covering survey subdivisions 75/P, 77/P and 90/P in the AKBERPET locality, identified in the RERA filing with AKBERPET VILLAGE and BHOOMPALLY REVENUEVILLAGE, Mirdoddi Mandal, Siddipet District. RERA record RERA filing
The DTCP document describes a draft layout of 119 plots, with land allocated to plots, roads and open space. It also identifies plots 67 to 69 and 75 to 89 as mortgage plots in favour of Akberpet Gram Panchayat. The same document says roads and open space are to be handed to the Gram Panchayat by registered gift deed before release of the final layout.
The available material does not establish construction or infrastructure completion, plot booking or availability, final layout release, or the issue of an occupancy or completion certificate. The promoter’s Form B records a completion undertaking of 14/10/2024; it is a promoter declaration, not independent confirmation of completion.
3. Master plan, architecture & building design
The supplied project is a plotted layout, not a documented apartment or multi-building scheme. The DTCP draft-layout record states a layout area of Ac. 11-38 Guntas or Ac.11.95 Cents; 57838.00 Sq. Yds., comprising 119 plots. It allocates 60.61% to plotted area, 29.39% to roads and 10.00% to open space.
The document specifies 33-0" WIDE ROAD and 40-0" WIDE ROAD. It calls for plot and open-space demarcation on the ground and says roads are to be opened for access to neighbouring sites. The plotted-area split, individual plot arrangement and road-by-road plan geometry are not available in the supplied extracted record.
The approval is identified as a draft layout approval, with conditions including a two-year execution period from approval and later gift of road and open-space areas before final-layout release. The supplied documents do not establish final layout release.
4. Homes, configurations & floor plans
This is a plotted development; no RERA-filed plot-size bands, plot-wise inventory, booked/available counts or saleable areas are supplied. The DTCP draft-layout document states 119 plots.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 119 in the DTCP draft-layout record | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Two drawing records are listed, but both are scans pending measurement; no plot or unit measurements have been extracted from them. Software-measured carpet area is therefore unavailable and, in any event, is not a RERA-filed plot measurement. Floor plans
5. Parking & vehicle circulation
The supplied project material does not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or a dedicated parking facility. The layout approval specifies 33-0" WIDE ROAD and 40-0" WIDE ROAD and requires roads to be opened for access to neighbouring sites; detailed driveway, pedestrian-separation and vehicle-circulation information is not available in the supplied extracted record.
6. Amenities, recreation & open spaces
The DTCP draft-layout document identifies open space (park), street lighting, electricity facilities, sewerage disposal, protected water supply and rain water harvesting pits as layout amenities or utilities. These are identified in the approval document; the supplied record does not verify that they have been installed or completed. The approval requires the open space to be handed over to the Gram Panchayat by registered gift deed before final-layout release.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | Ac. 1.195 Cents; 5783.80 Sq. Yds.; 10.00% of the layout area | DTCP draft-layout document | Included in draft layout; no completion or handover evidence supplied |
| Roads | Ac. 3.513 Cents; 17002.92 Sq. Yds.; 29.39%; specified road widths include 33-0" WIDE ROAD and 40-0" WIDE ROAD | DTCP draft-layout document | Included in draft layout; no completion or handover evidence supplied |
| Street lighting | No quantity or specification stated | DTCP draft-layout document | Listed; completion not verified |
| Electricity facilities | No capacity or specification stated | DTCP draft-layout document | Listed; completion not verified |
| Protected water supply system | No source, storage or capacity stated | DTCP draft-layout document | Listed; completion not verified |
| Sewerage disposal system | No capacity or treatment specification stated | DTCP draft-layout document | Listed; completion not verified |
| Rain water harvesting pits | No count or capacity stated | DTCP draft-layout document | Listed; completion not verified |
The supplied RERA amenity record also marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/TOT LOT/park, street lighting and aggregate recreational open space as available (“YES”), each with 0% progress shown. It does not provide evidence that these facilities are complete. RERA amenities
7. Utilities, building services & safety
The draft-layout approval lists a protected water supply system, sewerage disposal system, rain water harvesting pits, electricity facilities and street lighting, without capacities, detailed designs or completion evidence.
The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Where the record gives an availability field, it marks water supply, sewerage, storm-water drains and street lighting “YES”; the supplied progress entries are 0%. No service capacities, commissioning records or independently verified completion status are provided. RERA amenities
The available information does not establish water source or treatment, storage, STP capacity or reuse, electrical supply and backup capacity, fire-system design or clearance, waste-management arrangements, security systems, or accessibility features.
8. Location, access & connectivity
The registered location is AKBERPET locality, identified in the RERA record as “AKBERPET VILLAGE,BHOOMPALLY REVENUEVILLAGE,” Mirdoddi Mandal, Siddipet District, Telangana, PIN 502102. The DTCP layout record identifies Bhoompally Revenue Village and Akberpet locality. RERA record RERA filing
The DTCP document refers to 33-0" WIDE ROAD and 40-0" WIDE ROAD and requires roads to be opened for access to neighbouring sites. A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 57.4 km; this is a mapped distance, not a stated travel time. Location record
No specific local public-transport route, nearby landmark or project approach-road name is established by the supplied record.
9. Developer & development status
The registered promoter is SRI RAMALINGESHWARA DEVELOPERS, recorded as a partnership. Its supplied GSTIN is 36AETFS8947K1Z2. The RERA record gives a promoter address in Akberpet, Mirdoddi Mandal, Siddipet District, PIN 502102. No official website or project contact details are supplied. Corporate record RERA filing RERA filing
The promoter’s Form B, made by MUNIGALA SATHYANARAYANA, declares a completion date of 14/10/2024 and states that the land is free from encumbrances. These are promoter declarations in the filed affidavit; the supplied documents do not independently establish project completion or current site progress.
The TG-RERA certificate records registration from 21/03/2023 to 14/10/2024 and states that it was not extended. That validity period is distinct from the promoter’s completion undertaking. The supplied record does not establish a later extension or a completion/occupancy certificate.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for P01300005833; registered to SRI RAMALINGESHWARA DEVELOPERS, effective 21/03/2023 to 14/10/2024. The certificate says it is not extended. |
| Principal layout approval | DTCP approval T.L.P.NO. 309/ 2022H, dated 15-10-2022; described as a draft technical layout pattern for a residential plotted layout in Sy. Nos. 75/P, 77/P and 90/P. |
| Layout drawing / final release | The supplied layout-plan document entry is not extracted; the available DTCP record describes draft approval and conditions for later final-layout release. Document index |
| Promoter declaration | Form B affidavit dated 22 day of JAN- 2023, including the promoter’s completion undertaking of 14/10/2024. |
| Completion / occupancy certificate | Not included in the supplied documents; current certificate status is not established. |
| Project progress records | No construction-stage or completion-progress evidence is supplied. |
1. Project at a glance
Project identity
Registered project name: SRI RAMALINGESHWARA DEVELOPERS
Project type: Plotted development; the DTCP record describes a residential plotted layout.
Phase / registered portion: The available record identifies one registered project; a phase description is not disclosed.
TG-RERA registration: P01300005833
Registration validity: 21/03/2023 to 14/10/2024; the supplied certificate says it is not extended. Registration validity is separate from the completion undertaking below.
Registered promoter: SRI RAMALINGESHWARA DEVELOPERS
RERA status in supplied record: New Project; certificate validity ended 14/10/2024, with no extension shown in the supplied certificate. Current portal status is not established by this record.
Land and geographic identity
Locality / revenue village: Locality: AKBERPET. The RERA record identifies “AKBERPET VILLAGE,BHOOMPALLY REVENUEVILLAGE”; the DTCP draft-layout document identifies Bhoompally Revenue Village and Akberpet locality.
Mandal / district / PIN: MIRDODDI / Siddipet / 502102
Project survey numbers and subdivisions: Sy. Nos. 75/P, 77/P and 90/P
RERA-filed site area: Total area: 48359.93 sq. m.; net area: 48359.93 sq. m.; affected area reported as 0 sq. m.
DTCP draft-layout area: Ac. 11-38 Guntas or Ac.11.95 Cents; 57838.00 Sq. Yds.
Boundaries (RERA filing): East: ROAD; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND
Development identity
Sanctioning authority: The Director of Town and Country Planning; the document states delegation to Akberpet Gram Panchayat.
Principal layout approval: T.L.P.NO. 309/ 2022H, approved 15-10-2022; described in the document as a “DRAFT TECHNICAL LAYOUT PATTERN.”
Approved built-up area: Not disclosed in the supplied project record.
Layout area allocation in DTCP document: Plotted area: Ac. 7.242 Cents; 35051.28 Sq. Yds. (60.61%). Open space: Ac. 1.195 Cents; 5783.80 Sq. Yds. (10.00%). Road area: Ac. 3.513 Cents; 17002.92 Sq. Yds. (29.39%).
Layout scale: 119 plots are stated in the DTCP draft-layout document.
Buildings / floors: Not applicable as a recorded building scheme for this plotted layout; no building count or floor configuration is disclosed.
Parking: Project-specific parking count or parking allocation is not disclosed.
Offering and status
Offered property type: Plots; plot count in the DTCP draft-layout document: 119.
Plot-size range: Not disclosed in the RERA-filed details supplied here.
Booked / available plots: Not disclosed in the supplied RERA record.
RERA-filed completion undertaking: 14/10/2024
Construction / development stage: No project progress percentage or independently verified site-stage information is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied record. The document set does not establish whether one has since been issued.
2. The project story
This is a plotted residential layout registered with TG-RERA as SRI RAMALINGESHWARA DEVELOPERS, covering survey subdivisions 75/P, 77/P and 90/P in the AKBERPET locality, identified in the RERA filing with AKBERPET VILLAGE and BHOOMPALLY REVENUEVILLAGE, Mirdoddi Mandal, Siddipet District.
The DTCP document describes a draft layout of 119 plots, with land allocated to plots, roads and open space. It also identifies plots 67 to 69 and 75 to 89 as mortgage plots in favour of Akberpet Gram Panchayat. The same document says roads and open space are to be handed to the Gram Panchayat by registered gift deed before release of the final layout.
The available material does not establish construction or infrastructure completion, plot booking or availability, final layout release, or the issue of an occupancy or completion certificate. The promoter’s Form B records a completion undertaking of 14/10/2024; it is a promoter declaration, not independent confirmation of completion.
3. Master plan, architecture & building design
The supplied project is a plotted layout, not a documented apartment or multi-building scheme. The DTCP draft-layout record states a layout area of Ac. 11-38 Guntas or Ac.11.95 Cents; 57838.00 Sq. Yds., comprising 119 plots. It allocates 60.61% to plotted area, 29.39% to roads and 10.00% to open space.
The document specifies 33-0" WIDE ROAD and 40-0" WIDE ROAD. It calls for plot and open-space demarcation on the ground and says roads are to be opened for access to neighbouring sites. The plotted-area split, individual plot arrangement and road-by-road plan geometry are not available in the supplied extracted record.
The approval is identified as a draft layout approval, with conditions including a two-year execution period from approval and later gift of road and open-space areas before final-layout release. The supplied documents do not establish final layout release.
4. Homes, configurations & floor plans
This is a plotted development; no RERA-filed plot-size bands, plot-wise inventory, booked/available counts or saleable areas are supplied. The DTCP draft-layout document states 119 plots.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 119 in the DTCP draft-layout record | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
Two drawing records are listed, but both are scans pending measurement; no plot or unit measurements have been extracted from them. Software-measured carpet area is therefore unavailable and, in any event, is not a RERA-filed plot measurement.
5. Parking & vehicle circulation
The supplied project material does not establish a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or a dedicated parking facility. The layout approval specifies 33-0" WIDE ROAD and 40-0" WIDE ROAD and requires roads to be opened for access to neighbouring sites; detailed driveway, pedestrian-separation and vehicle-circulation information is not available in the supplied extracted record.
6. Amenities, recreation & open spaces
The DTCP draft-layout document identifies open space (park), street lighting, electricity facilities, sewerage disposal, protected water supply and rain water harvesting pits as layout amenities or utilities. These are identified in the approval document; the supplied record does not verify that they have been installed or completed. The approval requires the open space to be handed over to the Gram Panchayat by registered gift deed before final-layout release.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | Ac. 1.195 Cents; 5783.80 Sq. Yds.; 10.00% of the layout area | DTCP draft-layout document | Included in draft layout; no completion or handover evidence supplied |
| Roads | Ac. 3.513 Cents; 17002.92 Sq. Yds.; 29.39%; specified road widths include 33-0" WIDE ROAD and 40-0" WIDE ROAD | DTCP draft-layout document | Included in draft layout; no completion or handover evidence supplied |
| Street lighting | No quantity or specification stated | DTCP draft-layout document | Listed; completion not verified |
| Electricity facilities | No capacity or specification stated | DTCP draft-layout document | Listed; completion not verified |
| Protected water supply system | No source, storage or capacity stated | DTCP draft-layout document | Listed; completion not verified |
| Sewerage disposal system | No capacity or treatment specification stated | DTCP draft-layout document | Listed; completion not verified |
| Rain water harvesting pits | No count or capacity stated | DTCP draft-layout document | Listed; completion not verified |
The supplied RERA amenity record also marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/TOT LOT/park, street lighting and aggregate recreational open space as available (“YES”), each with 0% progress shown. It does not provide evidence that these facilities are complete.
7. Utilities, building services & safety
The draft-layout approval lists a protected water supply system, sewerage disposal system, rain water harvesting pits, electricity facilities and street lighting, without capacities, detailed designs or completion evidence.
The RERA amenity record lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. Where the record gives an availability field, it marks water supply, sewerage, storm-water drains and street lighting “YES”; the supplied progress entries are 0%. No service capacities, commissioning records or independently verified completion status are provided.
The available information does not establish water source or treatment, storage, STP capacity or reuse, electrical supply and backup capacity, fire-system design or clearance, waste-management arrangements, security systems, or accessibility features.
8. Location, access & connectivity
The registered location is AKBERPET locality, identified in the RERA record as “AKBERPET VILLAGE,BHOOMPALLY REVENUEVILLAGE,” Mirdoddi Mandal, Siddipet District, Telangana, PIN 502102. The DTCP layout record identifies Bhoompally Revenue Village and Akberpet locality.
The DTCP document refers to 33-0" WIDE ROAD and 40-0" WIDE ROAD and requires roads to be opened for access to neighbouring sites. A supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 57.4 km; this is a mapped distance, not a stated travel time.
No specific local public-transport route, nearby landmark or project approach-road name is established by the supplied record.
9. Developer & development status
The registered promoter is SRI RAMALINGESHWARA DEVELOPERS, recorded as a partnership. Its supplied GSTIN is 36AETFS8947K1Z2. The RERA record gives a promoter address in Akberpet, Mirdoddi Mandal, Siddipet District, PIN 502102. No official website or project contact details are supplied.
The promoter’s Form B, made by MUNIGALA SATHYANARAYANA, declares a completion date of 14/10/2024 and states that the land is free from encumbrances. These are promoter declarations in the filed affidavit; the supplied documents do not independently establish project completion or current site progress.
The TG-RERA certificate records registration from 21/03/2023 to 14/10/2024 and states that it was not extended. That validity period is distinct from the promoter’s completion undertaking. The supplied record does not establish a later extension or a completion/occupancy certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for P01300005833; registered to SRI RAMALINGESHWARA DEVELOPERS, effective 21/03/2023 to 14/10/2024. The certificate says it is not extended.
Principal layout approval: DTCP approval T.L.P.NO. 309/ 2022H, dated 15-10-2022; described as a draft technical layout pattern for a residential plotted layout in Sy. Nos. 75/P, 77/P and 90/P.
Layout drawing / final release: The supplied layout-plan document entry is not extracted; the available DTCP record describes draft approval and conditions for later final-layout release.
Promoter declaration: Form B affidavit dated 22 day of JAN- 2023, including the promoter’s completion undertaking of 14/10/2024.
Completion / occupancy certificate: Not included in the supplied documents; current certificate status is not established.
Project progress records: No construction-stage or completion-progress evidence is supplied.
Frequently asked questions
Is SRI RAMALINGESHWARA DEVELOPERS registered with Telangana RERA?
Yes. SRI RAMALINGESHWARA DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P01300005833; the registration status is New Project.
Who is the developer of SRI RAMALINGESHWARA DEVELOPERS?
The promoter named in the RERA registration is SRI RAMALINGESHWARA DEVELOPERS.
Where is SRI RAMALINGESHWARA DEVELOPERS located?
SRI RAMALINGESHWARA DEVELOPERS is in AKBERPET VILLAGE ,BHOOMPALLY REVENUEVILLAGE, AKBERPET, MIRDODDI, Siddipet, Telangana (502102).
When will SRI RAMALINGESHWARA DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 14/10/2024. This is the promoter's declaration, not a guarantee.
More projects in Siddipet