Sri Rama Enclave
RAVI RAJENDER REDDY · Yadadri Bhuvanagiri · RERA P02000009069
SRI RAMA ENCLAVE is a plotted development in Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District. Registered promoter RAVI RAJENDER REDDY is developing the project across 13,858.27 sq. m, with a layout of 50 plots; no building or floor configuration is stated. The project is registered with TG-RERA under P02000009069, with proposed completion on 14/11/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI RAMA ENCLAVE RERA record |
| Project type | Plotted development / open plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not identified; registration is for the plotted project described in the filed record RERA record |
| TG-RERA registration number | P02000009069 RERA record Approvals record |
| Registration validity | 15/07/2024 to 14/07/2027, unless extended by the Authority |
| Registered promoter | RAVI RAJENDER REDDY RERA record Corporate record |
| RERA status | The supplied record identifies the project as a “New Project”; no later registration-status update is supplied RERA record RERA filing |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / site description | Bhongir; project documents describe the site as Bagayath Bhongir RERA record |
| Revenue village | Bagayath Bhongir is the village stated in layout documents; the RERA record’s village field is Bhongir. RERA filing |
| Mandal | Bhongir RERA record RERA filing |
| District | Yadadri Bhuvanagiri (also printed as Yadadri-Bhuvanagiri / Yadadri-Bhongiri in project documents) RERA record |
| PIN | 508116 RERA record RERA filing |
| Survey number / subdivision | Sy.No. 23/PART RERA record RERA filing |
| RERA-filed extent | 13,858.27 sq. m total and net area RERA filing |
| Boundaries in RERA record | East: 60 MT wide existing road; west and north: existing layout; south: neighbours’ land RERA filing |
| Area affected by road widening / FTL / nala widening | 0 sq. m as stated in the RERA land details RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the filed approval material also includes a draft layout letter from Bhongir Municipality / Municipal Corporation Approvals record |
| Principal layout approval | 001486/LO/HMDA/0305/GHT/2024, dated 15 July 2024 Approvals record |
| Layout scale | 50 plots in the filed layout material |
| Approved built-up area | 0.00 proposed built-up area, excluding and including parking, in the layout-plan extract |
| Buildings / floors | No building count, floor configuration or apartment-building schedule is established in the supplied project record. The filed plan describes a plotted layout. |
| Roads and land allocations | Plotted area 8,806.05 sq. m; layout roads 3,524.96 sq. m; open space 1,042.49 sq. m; social infrastructure 348.43 sq. m; utilities 136.13 sq. m Layout record |
| Mortgage shown in layout documents | Nine specified plots—Nos. 25, 30, 29, 28, 27, 26, 31, 14 and 15—measuring 1,447.82 sq. m, in favour of HMDA |
Offering and status
| Field | Record |
|---|---|
| RERA-filed offering | Plotted development; the layout drawing’s schedule records 50 plots RERA filing |
| Plot sizes / booked and available counts | Plot-size schedule and booked/available inventory are not supplied in this tab’s RERA-unit data. The drawing-derived schedule is summarized in section 4. Layout record |
| RERA-filed proposed completion | 14/11/2027 in the project header RERA record |
| Promoter-declared completion date | 14/07/2027 in the filed Form B declaration |
| Construction / development stage | No independently verified site-progress assessment is supplied. The layout approval material specifies development works and a period for completing them; this does not establish completed works. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project material. This is a plotted layout, and no tower- or phase-specific certificate status is supplied. Document index |
2. The project story
SRI RAMA ENCLAVE is registered as a plotted-development project covering land identified as Sy.No. 23/PART at Bagayath Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District. The RERA record describes a total and net extent of 13,858.27 sq. m. The filed layout material describes an open layout of 50 plots, with internal roads, open space, social-infrastructure land and a utility area. RERA record RERA filing
The layout permission is dated 15 July 2024. The documents identify nine plots as mortgaged to HMDA and state that specified roads, open spaces and social-infrastructure areas are to be handed over to the local body by registered gift deed before final layout release. The supplied material does not establish that those handovers or the listed infrastructure works have been completed.
The registration certificate remains valid through 14/07/2027, unless extended. The project header gives a proposed completion date of 14/11/2027, while the promoter’s Form B declaration states 14/07/2027; this overview presents each as recorded in its respective source without treating either date as evidence of actual progress. No independent construction-progress verification or occupancy/completion certificate is supplied. RERA record
3. Master plan, architecture & building design
The filed plan is a plotted-layout drawing, not an apartment-building plan. It records a net site area of 13,858.27 sq. m and a schedule of 50 plots. The land-use figures shown in the layout material are:
| Layout component | Area | Share shown in layout |
|---|---|---|
| Plotted area | 8,806.05 sq. m | 63.54% |
| Roads | 3,524.96 sq. m | 25.44% |
| Organized open space / park | 1,042.49 sq. m | 7.52% |
| Social infrastructure | 348.43 sq. m | 2.51% |
| Utility area | 136.13 sq. m | 0.98% |
| Amenity area | 0.00 sq. m | 0.00% |
The drawing lists internal roads of 9.14 m width and also prints other road widths, including 30.00M, 60.00M, 30'-0" ROAD, 40'-0" ROAD and 200'-0" WIDE BYPASS ROAD. The supplied extract does not identify the precise function or location of every printed road-width label, so these are reported as drawing labels rather than a description of a verified road hierarchy.
No residential or commercial building configuration, building footprint, floors, tower heights, apartment counts, lifts or stairs is established in the supplied project-specific layout record. The plan extract records proposed built-up area as 0.00 both excluding and including parking; apartment-style floor-plan measurements therefore do not apply to the evidence supplied here.
The layout-plan material lists a utility area and names facilities such as a tot-lot, social-infrastructure area, utility, SWPTIC tank, dustbin and sump. These are plan or filing references, not confirmation that the facilities have been built or handed over.
4. Homes, configurations & floor plans
This is recorded as a plotted layout, not an apartment configuration. The approved-layout drawing’s plot schedule records 50 plots. A software extraction from the drawing reports the following plot-size distribution; it is drawing-derived and should be checked against the signed plan schedule. Layout record
| Plot size band | Number of plots |
|---|---|
| 150–200 sq. yd (125–167 sq. m) | 34 |
| 200–250 sq. yd (167–209 sq. m) | 8 |
| 250–300 sq. yd (209–251 sq. m) | 2 |
| 300–400 sq. yd (251–334 sq. m) | 4 |
| 500–1,000 sq. yd (418–836 sq. m) | 2 |
The drawing extraction reports a smallest plot of 125.55 sq. m (150.2 sq. yd), a median of 139.36 sq. m (166.7 sq. yd) and a largest of 496.77 sq. m (594.1 sq. yd). Common sizes identified from the drawing include 139.35 sq. m (14 plots), 125.55 sq. m (10 plots), 139.36 sq. m (4 plots) and 185.81 sq. m (3 plots). These are software-measured drawing data, not a substitute for the individual plot schedule or an allotment document. Layout record
Booked and available plot counts, plot-specific saleable areas and individual plot allocations are not supplied. The floor-plan review contains two layout sheets and no flat floor plans; no apartment carpet-area or loading figures are provided. Floor plans
5. Parking & vehicle circulation
The layout-plan extract records 0.00 sq. m as common parking area. It does not establish a sanctioned count of car or two-wheeler spaces, visitor or accessible parking, mechanical parking, EV charging, or individual parking allocations. The drawing’s identification of plots should not be treated as proof of a buyer’s exclusive parking entitlement.
The layout documents state that roads are to be opened for access to neighbouring sites and that the applicant should not construct a boundary wall or fencing that blocks roads. The documents do not establish completed road formation, entry/exit arrangements, pedestrian separation or the present condition of internal driveways.
6. Amenities, recreation & open spaces
The layout documents identify land allocations and certain proposed facilities. The supplied record does not independently verify their completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 1,042.49 sq. m; 7.52% in the layout area statement | Shown in layout; completion and handover not independently verified | |
| Tot-lot | Named in the layout-plan extract; no size supplied | Plan-listed; completion not verified | |
| Social infrastructure | 348.43 sq. m; 2.51% in the layout area statement | Shown in layout; document says it is to be handed over before final layout release; completion not verified | |
| Utility area | 136.13 sq. m | Shown in layout; completion not verified | |
| Swimming pool, gym, clubhouse, children’s play area | Third-party vendor listing only; no project-filed dimensions or confirmation supplied | Promoter website | Not established as RERA-filed, sanctioned or delivered |
The RERA amenities record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station as available. The supplied entries show 0% progress; they do not establish completed delivery. RERA amenities
7. Utilities, building services & safety
The filed layout materials list proposed or specified infrastructure including internal water-supply pipelines, an overhead tank, a sump, electrical supply lines, street lights, a transformer, storm-water drains, underground drainage lines, rainwater-harvesting pits, avenue plantation and a common septic tank / STP. The layout-plan extract also names a SWPTIC tank and dustbin. No capacities, commissioning records or independent completion evidence are supplied.
| What the supplied record identifies | Internal supply pipelines, overhead tank and sump are listed in layout material |
|---|---|
| Status limitation | Source, storage capacity, treatment and completed supply are not established |
| What the supplied record identifies | Common septic tank / STP, underground drainage lines and storm-water drains are listed RERA amenities |
|---|---|
| Status limitation | Capacity, approvals, operation and completion are not established |
| What the supplied record identifies | Rainwater-harvesting pits are listed |
|---|---|
| Status limitation | Installation and performance are not verified |
| What the supplied record identifies | Electrical supply lines, transformer, street lighting and electrical meter room/sub-station are listed RERA amenities |
|---|---|
| Status limitation | Supply capacity, backup power and completion are not established |
| What the supplied record identifies | Dustbin is named in the layout-plan extract; the RERA amenities list includes solid-waste management and disposal RERA amenities |
|---|---|
| Status limitation | No operating waste-segregation or disposal arrangement is verified |
| What the supplied record identifies | No project-specific fire-safety system or clearance is identified in the supplied plotted-layout material RERA amenities |
|---|---|
| Status limitation | No compliance conclusion can be drawn |
| What the supplied record identifies | No accessible-route or accessible-parking provision is identified in the supplied material |
|---|---|
| Status limitation | Not established |
8. Location, access & connectivity
The project’s filed geographic identity is Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116; the layout documents describe the site as Bagayath Bhongir. The RERA land details give the east boundary as a 60 MT wide existing road, with existing layout to the west and north and neighbouring land to the south. RERA record RERA filing
The project location record supplies a geocoded point at 17.5172789, 78.8863383 and an approximate sampled distance of 23.1 km to the nearest sampled Outer Ring Road interchange. Location record
A third-party vendor listing says bus stops and railway stations are in close proximity, but supplies no measured distances or identified stops/stations. That connectivity description is vendor-sourced and is not confirmed in the supplied RERA documents. Promoter website
9. Developer & development status
The TG-RERA record identifies RAVI RAJENDER REDDY as the registered promoter and describes the organization as a proprietorship. A filed letter states that the promoter has a sole-proprietorship firm and no other partners. The supplied data does not establish a company registration number, GSTIN, promoter website or official project contact details. RERA record Corporate record
The layout application identifies DEVARAKONDA VIJAYENDER and DEVARAKONDA CHANDRASEKHAR as landowners, represented by Ravi Rajender Reddy as DAGPA holder. The project material therefore describes the promoter’s role in the layout through a development arrangement/authority, not a separate building-construction programme.
See the registration validity, completion dates and certificate status in section 2. RERA record
10. Approvals, official records & documents
| Identifier / date | P02000009069; commencing 15/07/2024, ending 14/07/2027 unless extended |
|---|---|
| What it establishes in the supplied material | Identifies SRI RAMA ENCLAVE and promoter Ravi Rajender Reddy; sets registration conditions. |
| Identifier / date | 001486/LO/HMDA/0305/GHT/2024; dated 15 July 2024 |
|---|---|
| What it establishes in the supplied material | Describes a 50-plot layout on Sy.No. 23/PART, with layout areas and conditions. |
| Identifier / date | 001486/LO/HMDA/0305/GHT/2024; application dated 13 February 2024 |
|---|---|
| What it establishes in the supplied material | Issued in the supplied material by Bhongir Municipality / Municipal Corporation; states that specified layout areas are to be handed over by registered gift deed before final layout release. |
| Identifier / date | 4448/2024, dated 24 June 2024 |
|---|---|
| What it establishes in the supplied material | Layout material identifies nine plots measuring 1,447.82 sq. m mortgaged in favour of HMDA. |
| Identifier / date | Filed declaration; states completion by 14/07/2027 |
|---|---|
| What it establishes in the supplied material | Contains promoter declarations on title basis, encumbrances, project funds, audits and pending approvals. |
| Identifier / date | Document 488075 |
|---|---|
| What it establishes in the supplied material | Supplies the 50-plot schedule, area statement, road labels, utility references and layout conditions. |
| Identifier / date | Not identified in the supplied project documents |
|---|---|
| What it establishes in the supplied material | No certificate is available in this evidence set to establish completion or occupancy status. Document index |
The supplied layout approval material lists existing layout references 26/LO/PLG/HMDA/2017 and 007189/LO/HMDA/1446/GHT/2022, and LTP licence CA/2018/97607.
1. Project at a glance
Project identity
Registered project name: SRI RAMA ENCLAVE
Project type: Plotted development / open plotted layout
Phase / registered portion: Phase not identified; registration is for the plotted project described in the filed record
TG-RERA registration number: P02000009069
Registration validity: 15/07/2024 to 14/07/2027, unless extended by the Authority
Registered promoter: RAVI RAJENDER REDDY
RERA status: The supplied record identifies the project as a “New Project”; no later registration-status update is supplied
Land and geographic identity
Locality / site description: Bhongir; project documents describe the site as Bagayath Bhongir
Revenue village: Bagayath Bhongir is the village stated in layout documents; the RERA record’s village field is Bhongir.
Mandal: Bhongir
District: Yadadri Bhuvanagiri (also printed as Yadadri-Bhuvanagiri / Yadadri-Bhongiri in project documents)
PIN: 508116
Survey number / subdivision: Sy.No. 23/PART
RERA-filed extent: 13,858.27 sq. m total and net area
Boundaries in RERA record: East: 60 MT wide existing road; west and north: existing layout; south: neighbours’ land
Area affected by road widening / FTL / nala widening: 0 sq. m as stated in the RERA land details
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the filed approval material also includes a draft layout letter from Bhongir Municipality / Municipal Corporation
Principal layout approval: 001486/LO/HMDA/0305/GHT/2024, dated 15 July 2024
Layout scale: 50 plots in the filed layout material
Approved built-up area: 0.00 proposed built-up area, excluding and including parking, in the layout-plan extract
Buildings / floors: No building count, floor configuration or apartment-building schedule is established in the supplied project record. The filed plan describes a plotted layout.
Roads and land allocations: Plotted area 8,806.05 sq. m; layout roads 3,524.96 sq. m; open space 1,042.49 sq. m; social infrastructure 348.43 sq. m; utilities 136.13 sq. m
Mortgage shown in layout documents: Nine specified plots—Nos. 25, 30, 29, 28, 27, 26, 31, 14 and 15—measuring 1,447.82 sq. m, in favour of HMDA
Offering and status
RERA-filed offering: Plotted development; the layout drawing’s schedule records 50 plots
Plot sizes / booked and available counts: Plot-size schedule and booked/available inventory are not supplied in this tab’s RERA-unit data. The drawing-derived schedule is summarized in section 4.
RERA-filed proposed completion: 14/11/2027 in the project header
Promoter-declared completion date: 14/07/2027 in the filed Form B declaration
Construction / development stage: No independently verified site-progress assessment is supplied. The layout approval material specifies development works and a period for completing them; this does not establish completed works.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project material. This is a plotted layout, and no tower- or phase-specific certificate status is supplied.
2. The project story
SRI RAMA ENCLAVE is registered as a plotted-development project covering land identified as Sy.No. 23/PART at Bagayath Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District. The RERA record describes a total and net extent of 13,858.27 sq. m. The filed layout material describes an open layout of 50 plots, with internal roads, open space, social-infrastructure land and a utility area.
The layout permission is dated 15 July 2024. The documents identify nine plots as mortgaged to HMDA and state that specified roads, open spaces and social-infrastructure areas are to be handed over to the local body by registered gift deed before final layout release. The supplied material does not establish that those handovers or the listed infrastructure works have been completed.
The registration certificate remains valid through 14/07/2027, unless extended. The project header gives a proposed completion date of 14/11/2027, while the promoter’s Form B declaration states 14/07/2027; this overview presents each as recorded in its respective source without treating either date as evidence of actual progress. No independent construction-progress verification or occupancy/completion certificate is supplied.
3. Master plan, architecture & building design
The filed plan is a plotted-layout drawing, not an apartment-building plan. It records a net site area of 13,858.27 sq. m and a schedule of 50 plots. The land-use figures shown in the layout material are:
| Layout component | Area | Share shown in layout |
|---|---|---|
| Plotted area | 8,806.05 sq. m | 63.54% |
| Roads | 3,524.96 sq. m | 25.44% |
| Organized open space / park | 1,042.49 sq. m | 7.52% |
| Social infrastructure | 348.43 sq. m | 2.51% |
| Utility area | 136.13 sq. m | 0.98% |
| Amenity area | 0.00 sq. m | 0.00% |
The drawing lists internal roads of 9.14 m width and also prints other road widths, including 30.00M, 60.00M, 30'-0" ROAD, 40'-0" ROAD and 200'-0" WIDE BYPASS ROAD. The supplied extract does not identify the precise function or location of every printed road-width label, so these are reported as drawing labels rather than a description of a verified road hierarchy.
No residential or commercial building configuration, building footprint, floors, tower heights, apartment counts, lifts or stairs is established in the supplied project-specific layout record. The plan extract records proposed built-up area as 0.00 both excluding and including parking; apartment-style floor-plan measurements therefore do not apply to the evidence supplied here.
The layout-plan material lists a utility area and names facilities such as a tot-lot, social-infrastructure area, utility, SWPTIC tank, dustbin and sump. These are plan or filing references, not confirmation that the facilities have been built or handed over.
4. Homes, configurations & floor plans
This is recorded as a plotted layout, not an apartment configuration. The approved-layout drawing’s plot schedule records 50 plots. A software extraction from the drawing reports the following plot-size distribution; it is drawing-derived and should be checked against the signed plan schedule.
150–200 sq. yd (125–167 sq. m): 34
200–250 sq. yd (167–209 sq. m): 8
250–300 sq. yd (209–251 sq. m): 2
300–400 sq. yd (251–334 sq. m): 4
500–1,000 sq. yd (418–836 sq. m): 2
The drawing extraction reports a smallest plot of 125.55 sq. m (150.2 sq. yd), a median of 139.36 sq. m (166.7 sq. yd) and a largest of 496.77 sq. m (594.1 sq. yd). Common sizes identified from the drawing include 139.35 sq. m (14 plots), 125.55 sq. m (10 plots), 139.36 sq. m (4 plots) and 185.81 sq. m (3 plots). These are software-measured drawing data, not a substitute for the individual plot schedule or an allotment document.
Booked and available plot counts, plot-specific saleable areas and individual plot allocations are not supplied. The floor-plan review contains two layout sheets and no flat floor plans; no apartment carpet-area or loading figures are provided.
5. Parking & vehicle circulation
The layout-plan extract records 0.00 sq. m as common parking area. It does not establish a sanctioned count of car or two-wheeler spaces, visitor or accessible parking, mechanical parking, EV charging, or individual parking allocations. The drawing’s identification of plots should not be treated as proof of a buyer’s exclusive parking entitlement.
The layout documents state that roads are to be opened for access to neighbouring sites and that the applicant should not construct a boundary wall or fencing that blocks roads. The documents do not establish completed road formation, entry/exit arrangements, pedestrian separation or the present condition of internal driveways.
6. Amenities, recreation & open spaces
The layout documents identify land allocations and certain proposed facilities. The supplied record does not independently verify their completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 1,042.49 sq. m; 7.52% in the layout area statement | Shown in layout; completion and handover not independently verified | |
| Tot-lot | Named in the layout-plan extract; no size supplied | Plan-listed; completion not verified | |
| Social infrastructure | 348.43 sq. m; 2.51% in the layout area statement | Shown in layout; document says it is to be handed over before final layout release; completion not verified | |
| Utility area | 136.13 sq. m | Shown in layout; completion not verified | |
| Swimming pool, gym, clubhouse, children’s play area | Third-party vendor listing only; no project-filed dimensions or confirmation supplied | Not established as RERA-filed, sanctioned or delivered |
The RERA amenities record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station as available. The supplied entries show 0% progress; they do not establish completed delivery.
7. Utilities, building services & safety
The filed layout materials list proposed or specified infrastructure including internal water-supply pipelines, an overhead tank, a sump, electrical supply lines, street lights, a transformer, storm-water drains, underground drainage lines, rainwater-harvesting pits, avenue plantation and a common septic tank / STP. The layout-plan extract also names a SWPTIC tank and dustbin. No capacities, commissioning records or independent completion evidence are supplied.
| What the supplied record identifies | Internal supply pipelines, overhead tank and sump are listed in layout material |
|---|---|
| Status limitation | Source, storage capacity, treatment and completed supply are not established |
| What the supplied record identifies | Common septic tank / STP, underground drainage lines and storm-water drains are listed |
|---|---|
| Status limitation | Capacity, approvals, operation and completion are not established |
| What the supplied record identifies | Rainwater-harvesting pits are listed |
|---|---|
| Status limitation | Installation and performance are not verified |
| What the supplied record identifies | Electrical supply lines, transformer, street lighting and electrical meter room/sub-station are listed |
|---|---|
| Status limitation | Supply capacity, backup power and completion are not established |
| What the supplied record identifies | Dustbin is named in the layout-plan extract; the RERA amenities list includes solid-waste management and disposal |
|---|---|
| Status limitation | No operating waste-segregation or disposal arrangement is verified |
| What the supplied record identifies | No project-specific fire-safety system or clearance is identified in the supplied plotted-layout material |
|---|---|
| Status limitation | No compliance conclusion can be drawn |
| What the supplied record identifies | No accessible-route or accessible-parking provision is identified in the supplied material |
|---|---|
| Status limitation | Not established |
8. Location, access & connectivity
The project’s filed geographic identity is Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116; the layout documents describe the site as Bagayath Bhongir. The RERA land details give the east boundary as a 60 MT wide existing road, with existing layout to the west and north and neighbouring land to the south.
The project location record supplies a geocoded point at 17.5172789, 78.8863383 and an approximate sampled distance of 23.1 km to the nearest sampled Outer Ring Road interchange.
A third-party vendor listing says bus stops and railway stations are in close proximity, but supplies no measured distances or identified stops/stations. That connectivity description is vendor-sourced and is not confirmed in the supplied RERA documents.
9. Developer & development status
The TG-RERA record identifies RAVI RAJENDER REDDY as the registered promoter and describes the organization as a proprietorship. A filed letter states that the promoter has a sole-proprietorship firm and no other partners. The supplied data does not establish a company registration number, GSTIN, promoter website or official project contact details.
The layout application identifies DEVARAKONDA VIJAYENDER and DEVARAKONDA CHANDRASEKHAR as landowners, represented by Ravi Rajender Reddy as DAGPA holder. The project material therefore describes the promoter’s role in the layout through a development arrangement/authority, not a separate building-construction programme.
See the registration validity, completion dates and certificate status in section 2.
10. Approvals, official records & documents
| Identifier / date | P02000009069; commencing 15/07/2024, ending 14/07/2027 unless extended |
|---|---|
| What it establishes in the supplied material | Identifies SRI RAMA ENCLAVE and promoter Ravi Rajender Reddy; sets registration conditions. |
| Identifier / date | 001486/LO/HMDA/0305/GHT/2024; dated 15 July 2024 |
|---|---|
| What it establishes in the supplied material | Describes a 50-plot layout on Sy.No. 23/PART, with layout areas and conditions. |
| Identifier / date | 001486/LO/HMDA/0305/GHT/2024; application dated 13 February 2024 |
|---|---|
| What it establishes in the supplied material | Issued in the supplied material by Bhongir Municipality / Municipal Corporation; states that specified layout areas are to be handed over by registered gift deed before final layout release. |
| Identifier / date | 4448/2024, dated 24 June 2024 |
|---|---|
| What it establishes in the supplied material | Layout material identifies nine plots measuring 1,447.82 sq. m mortgaged in favour of HMDA. |
| Identifier / date | Filed declaration; states completion by 14/07/2027 |
|---|---|
| What it establishes in the supplied material | Contains promoter declarations on title basis, encumbrances, project funds, audits and pending approvals. |
| Identifier / date | Document 488075 |
|---|---|
| What it establishes in the supplied material | Supplies the 50-plot schedule, area statement, road labels, utility references and layout conditions. |
| Identifier / date | Not identified in the supplied project documents |
|---|---|
| What it establishes in the supplied material | No certificate is available in this evidence set to establish completion or occupancy status. |
The supplied layout approval material lists existing layout references 26/LO/PLG/HMDA/2017 and 007189/LO/HMDA/1446/GHT/2022, and LTP licence CA/2018/97607.
Frequently asked questions
Is SRI RAMA ENCLAVE registered with Telangana RERA?
Yes. SRI RAMA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02000009069; the registration status is New Project.
Who is the developer of SRI RAMA ENCLAVE?
The promoter named in the RERA registration is RAVI RAJENDER REDDY.
Where is SRI RAMA ENCLAVE located?
SRI RAMA ENCLAVE is in BHONGIR, Yadadri Bhuvanagiri, Telangana (508116).
When will SRI RAMA ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 14/11/2027. This is the promoter's declaration, not a guarantee.