Sri Om Pride
SRI OM BUILDERS · Medchal-Malkajgiri · RERA P02200008245
SRI OM PRIDE is a residential apartment project in PET BASHEERABAD, Qutballapur mandal, Medchal-Malkajgiri district, developed by registered promoter SRI OM BUILDERS. It is on a 1238.14 sq. m site and comprises one building with 1 Cellar + 1 Stilt + 5 upper floors and 25 homes: 15 2BHK and 10 3BHK. The project is registered under TG-RERA number P02200008245, and its proposed completion is 20 February 2025.
More from Sri Om Builders · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI OM PRIDE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | No separate phase name is disclosed; the registration identifies one building and one registered project. RERA record RERA unit table |
| TG-RERA registration number | P02200008245 RERA record |
| Registration validity | 17 May 2024 to 20 February 2025, as stated in the registration certificate. Registration validity is distinct from the completion undertaking and any occupancy certificate. RERA record |
| Registered promoter | SRI OM BUILDERS; partnership. RERA record Corporate record |
| RERA status shown in supplied record | New Project; the certificate records the validity dates above. The supplied evidence does not establish an extension or current registration status. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | PET BASHEERABAD RERA record |
| Revenue village | Pet Basherbad; the filed building-permit record also spells this Pet Basheerabad. RERA record |
| Mandal | Qutballapur; the building-permit record also spells this Qutubullapur. RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500055 RERA record |
| Project survey number / subdivision | SY NO 25/1/R (also shown in the building-permit extraction as 25/1/R). RERA record Land records |
| Site extent | 1238.14 sq. m; the building permit records 1238.14 sq. m plot area and 1238.14 sq. m net plot area. Land records |
| Road-affected / nala-affected area in permit | 0.0 sq. m / 0.0 sq. m, respectively. |
| Boundaries in RERA record | East: OTHERS LAND; West: 12MT WIDE ROAD; North: OTHERS LAND; South: OTHERS LAND. Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit number / date | 2226/GHMC/KPL/2022-BP, dated 20 February 2022 Approvals record |
| Application / file numbers | Application TS/063205/2021; file 005424/GHMC/2930/KPL1/2021-BP Approvals record |
| Approved building count and configuration | One proposed residential apartment building: 1 Cellar + 1 Stilt + 5 upper floors. RERA unit table |
| Height shown in permit extraction | 14.9 m |
| Approved built-up figures in supplied permit extraction | Residential upper floors: 2,612.85 sq. m; cellar: 697.47 sq. m; stilt: 460.99 sq. m; total parking area: 1,431.7 sq. m. The extraction also lists “BUILT UP AREA 2770.60” and “TOTAL BUA 4093.60”; these are reported as separately labelled in the filed extraction, not treated here as interchangeable measures. |
| Parking and sanctioned units | The permit extraction lists 28 proposed parkings. It lists 25 units in the layout-plan extraction; RERA unit records also show 25 units. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK: 15 units; 3BHK: 10 units. RERA unit table |
| RERA-filed saleable area | 2BHK: 118.81 sq. m; 3BHK: 134.42 sq. m. RERA unit table |
| Booking / availability | The portal-derived record shows 0 booked and 15 available 2BHK units, and 0 booked and 10 available 3BHK units. No as-of date is supplied, so treat these counts as indicative. RERA unit table |
| Construction stage | No independently verified or current site-progress figure is supplied. The RERA amenity record reports 0% against the listed infrastructure items; that is not, by itself, a verified site inspection. RERA amenities |
| Completion dates | The promoter’s Form B declaration undertakes completion by 20 February 2025; the building permit also states completion before 20 February 2025. |
| Occupancy / completion certificate | The permit requires an occupancy certificate before occupation. The supplied building-permit extraction states completion_certified: false; no occupancy or completion certificate is included in the supplied documents. |
2. The project story
SRI OM PRIDE is recorded as a residential apartment project on a 1,238.14 sq. m site in Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district. The RERA and GHMC records identify one residential building, sanctioned as one cellar, one stilt and five upper floors. The site is identified as survey SY NO 25/1/R. RERA record Land records
The filed offering comprises 25 homes: 15 two-bedroom apartments and 10 three-bedroom apartments. The sanctioned building permit specifies 28 proposed parking spaces. The approval also records a 62.48 sq. m tot lot and calls for rainwater-harvesting pits, a transformer space and a garbage house. These are approval-record provisions; the supplied evidence does not independently confirm that they have been completed. RERA unit table
The promoter’s Form B declaration and the permit set a 20 February 2025 completion deadline. The available record does not provide a verified construction-progress assessment or an occupancy certificate, so the project’s present physical completion and occupation status cannot be established from these materials. RERA amenities
3. Master plan, architecture & building design
The GHMC permit describes one residential apartment building with 1 Cellar + 1 Stilt + 5 upper floors, at a recorded height of 14.9 m. The permit extraction gives a site and net plot area of 1,238.14 sq. m, a 583.39 sq. m proposed coverage area, and a 654.75 sq. m vacant plot area. It separately records 2,612.85 sq. m of residential upper-floor area, 697.47 sq. m for the cellar and 460.99 sq. m for the stilt. The extraction lists 2,770.60 sq. m as “BUILT UP AREA” and 4,093.60 sq. m as “TOTAL BUA”; the source does not provide enough context here to reconcile those labels, so they should not be substituted for one another.
The filed permit lists a 62.48 sq. m tot lot and a 1,431.7 sq. m total parking area. The layout-plan extraction describes a 1.0 m wide greenery strip; the permit lists setbacks as Front 3.05, 8.57, Rear Side I 5.03 and Side II 3.04. The supplied material does not describe a multi-tower or phased arrangement.
The sanctioned layout-plan extract identifies the road-facing west boundary as a 12MT-wide road. It also lists 12.00 MT wide existing and proposed roads in the plan record. No supported floor-by-floor flat arrangement, lift count, stair count, entrance layout, landscaping plan beyond the listed tot lot/greenery conditions, or common-area distribution is available in the supplied extracts. Land records
4. Homes, configurations & floor plans
The RERA filing records 15 2BHK and 10 3BHK units, with the saleable areas shown below. Carpet areas are software measurements from the approved floor-plan drawings, not RERA-filed carpet-area declarations; the drawing-derived measurements require verification against the drawings. Saleable area and carpet area are different measures: the supplied record notes that saleable area includes the home’s share of common areas, while the measured carpet area is smaller. RERA unit table Floor plans RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 118.81 sq. m | 59.1–71.8 sq. m; median 66.4 sq. m (software-measured) | 44% |
| 3BHK | 10 | 0 | 10 | 134.42 sq. m | 106.5–107.5 sq. m; median 106.8 sq. m (software-measured) | 21% |
The software measured five 2BHK designs and four 3BHK designs from the supplied plan drawing, “W1-H:1.5 TYPICAL - 2, 3, 4& 5 FLOOR PLAN (SCALE=1:100).” The illustrated 2BHK includes living/dining, kitchen, two bedrooms, two toilets and two balconies; the illustrated 3BHK includes living, dining, kitchen, bedrooms, toilets, a wash area and two balconies. Dimensions and room areas are drawing measurements, not RERA disclosures. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit extraction lists 28 proposed parkings and 1,431.7 sq. m total parking area. It describes the building as having a cellar and stilt; the layout approval conditions state that the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. No separate resident, visitor or accessible-space counts, EV provision, parking allocation by apartment, or current parking-completion status is supplied. A sanctioned parking bay does not, by itself, establish an exclusive right attached to a particular unit.
The approval record requires one entry and one exit to the premises, each with a minimum width of 4.5 m and 5 m height clearance. The supplied extracts do not establish the as-built ramp arrangement or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
The table below separates provisions or declarations in the supplied records from verified delivery. The RERA amenity record shows 0% progress for each listed item, while marking several items “YES”; the record gives no inspection date or independent completion verification. RERA amenities
| Description / size | Tot lot: 62.48 sq. m; permit also calls for a greenery strip and tree planting. |
|---|---|
| Declared progress / verified status | Sanctioned/conditioned; independent completion not verified. |
| Description / size | Permit extraction lists 4 rainwater-harvesting pits; the plan conditions also refer to a percolation pit. |
|---|---|
| Declared progress / verified status | Sanctioned/conditioned; independent completion not verified. |
| Description / size | No facility description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; no independent verification. |
| Description / size | No project-filed evidence of a clubhouse, gym, indoor games or spa is supplied. |
|---|---|
| Evidence source | RERA amenities Document index |
| Declared progress / verified status | Not established in the supplied RERA/approval evidence. |
| Description / size | No sports facility is identified in the supplied project approval extract beyond the tot lot. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Not independently verified. |
| Description / size | The permit requires a garbage house within the premises and lists space for a transformer. |
|---|---|
| Declared progress / verified status | Approval conditions; completion not independently verified. |
7. Utilities, building services & safety
The building-plan approval extract lists a bore well, sump, septic tank, rainwater-harvesting pit and distribution transformer. It specifies a 30,000-litre sump in the plan parameters; the approval conditions separately call for an underground static water-storage tank and a terrace tank, each with a stated 25,000-litre capacity. The source does not establish that these facilities have been installed or commissioned.
The RERA amenity record marks water supply, sewerage (including septic tank/STP), storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting, fire protection and an electrical meter room/substation/receiving station as “YES,” but records 0% progress for those items. The project approval extraction specifically lists a septic tank; it does not substantiate an STP installation. No electrical-backup capacity, lift count or capacity, CCTV specification, waste-segregation system, accessibility features or commissioned utility-service status is provided. RERA amenities
The approval requires a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and an automatic sprinkler system in the cellar. The building-permit order also states that an occupancy fire NOC from the Director (EV&DM) is to be obtained before issue of an occupancy certificate. These are approval requirements; the supplied materials do not verify installation, clearance or occupancy certification.
8. Location, access & connectivity
The registered project location is Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The RERA land record identifies the west boundary as a 12MT-wide road. The GHMC plan extract lists 12.00 MT wide existing and proposed roads. RERA record Land records
A supplied location record gives an approximate 9.5 km distance to the nearest sampled Outer Ring Road interchange. This is a location-data measurement, not a travel-time claim. The supplied evidence does not provide verified distances or travel times to public transport, schools, hospitals or other landmarks. Location record
9. Developer & development status
The registered promoter is SRI OM BUILDERS, identified as a partnership. Its GSTIN is 36ADEFS9376EIZO. The RERA record identifies OM PRAKASH CHATLA as authorized signatory and GUNASRI CHATLA and CHANDRAKALA CHATLA as partners. The project’s supplied promoter address is SWARNADHAMA NAGAR MILITARY FARM ROAD, OLD BOWENPALLY, PET BASHEERABAD, Qutballapur, Medchal-Malkajgiri, 500055. Corporate record Parties record RERA record
The promoter’s Form B declaration undertakes completion by 20 February 2025. The permit contains the same completion date. No current, independently verified construction-progress figure, extension order, completion certificate or occupancy certificate is supplied. RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200008245; valid 17 May 2024–20 February 2025 |
|---|---|
| Scope and note | Form C certificate for SRI OM PRIDE, identifying SRI OM BUILDERS and the registered location/survey number. |
| Identifier / date | 2226/GHMC/KPL/2022-BP; 20 February 2022 |
|---|---|
| Scope and note | Permit for one residential building with 1 cellar, 1 stilt and 5 upper floors. Approvals record |
| Identifier / date | TS/063205/2021; 005424/GHMC/2930/KPL1/2021-BP |
|---|---|
| Scope and note | Application and file references in the supplied approval extracts. |
| Identifier / date | Document 354203 |
|---|---|
| Scope and note | GHMC building-plan details, sanctioned parameters, conditions and listed site facilities. |
| Identifier / date | 7 February 2024 |
|---|---|
| Scope and note | Promoter declaration, including the 20 February 2025 completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| Scope and note | The permit requires an occupancy certificate before occupation; the supplied permit extraction says completion_certified: false. |
The registration certificate records the registration and its stated validity; it is not a conveyance deed or evidence of a buyer’s title. The supplied records do not include an occupancy or completion certificate.
1. Project at a glance
Project identity
Registered project name: SRI OM PRIDE
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed; the registration identifies one building and one registered project.
TG-RERA registration number: P02200008245
Registration validity: 17 May 2024 to 20 February 2025, as stated in the registration certificate. Registration validity is distinct from the completion undertaking and any occupancy certificate.
Registered promoter: SRI OM BUILDERS; partnership.
RERA status shown in supplied record: New Project; the certificate records the validity dates above. The supplied evidence does not establish an extension or current registration status.
Land and geographic identity
Locality: PET BASHEERABAD
Revenue village: Pet Basherbad; the filed building-permit record also spells this Pet Basheerabad.
Mandal: Qutballapur; the building-permit record also spells this Qutubullapur.
District: Medchal-Malkajgiri
PIN: 500055
Project survey number / subdivision: SY NO 25/1/R (also shown in the building-permit extraction as 25/1/R).
Site extent: 1238.14 sq. m; the building permit records 1238.14 sq. m plot area and 1238.14 sq. m net plot area.
Road-affected / nala-affected area in permit: 0.0 sq. m / 0.0 sq. m, respectively.
Boundaries in RERA record: East: OTHERS LAND; West: 12MT WIDE ROAD; North: OTHERS LAND; South: OTHERS LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date: 2226/GHMC/KPL/2022-BP, dated 20 February 2022
Application / file numbers: Application TS/063205/2021; file 005424/GHMC/2930/KPL1/2021-BP
Approved building count and configuration: One proposed residential apartment building: 1 Cellar + 1 Stilt + 5 upper floors.
Height shown in permit extraction: 14.9 m
Approved built-up figures in supplied permit extraction: Residential upper floors: 2,612.85 sq. m; cellar: 697.47 sq. m; stilt: 460.99 sq. m; total parking area: 1,431.7 sq. m. The extraction also lists “BUILT UP AREA 2770.60” and “TOTAL BUA 4093.60”; these are reported as separately labelled in the filed extraction, not treated here as interchangeable measures.
Parking and sanctioned units: The permit extraction lists 28 proposed parkings. It lists 25 units in the layout-plan extraction; RERA unit records also show 25 units.
Offering and status
RERA-filed configurations: 2BHK: 15 units; 3BHK: 10 units.
RERA-filed saleable area: 2BHK: 118.81 sq. m; 3BHK: 134.42 sq. m.
Booking / availability: The portal-derived record shows 0 booked and 15 available 2BHK units, and 0 booked and 10 available 3BHK units. No as-of date is supplied, so treat these counts as indicative.
Construction stage: No independently verified or current site-progress figure is supplied. The RERA amenity record reports 0% against the listed infrastructure items; that is not, by itself, a verified site inspection.
Completion dates: The promoter’s Form B declaration undertakes completion by 20 February 2025; the building permit also states completion before 20 February 2025.
Occupancy / completion certificate: The permit requires an occupancy certificate before occupation. The supplied building-permit extraction states completion_certified: false; no occupancy or completion certificate is included in the supplied documents.
2. The project story
SRI OM PRIDE is recorded as a residential apartment project on a 1,238.14 sq. m site in Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district. The RERA and GHMC records identify one residential building, sanctioned as one cellar, one stilt and five upper floors. The site is identified as survey SY NO 25/1/R.
The filed offering comprises 25 homes: 15 two-bedroom apartments and 10 three-bedroom apartments. The sanctioned building permit specifies 28 proposed parking spaces. The approval also records a 62.48 sq. m tot lot and calls for rainwater-harvesting pits, a transformer space and a garbage house. These are approval-record provisions; the supplied evidence does not independently confirm that they have been completed.
The promoter’s Form B declaration and the permit set a 20 February 2025 completion deadline. The available record does not provide a verified construction-progress assessment or an occupancy certificate, so the project’s present physical completion and occupation status cannot be established from these materials.
3. Master plan, architecture & building design
The GHMC permit describes one residential apartment building with 1 Cellar + 1 Stilt + 5 upper floors, at a recorded height of 14.9 m. The permit extraction gives a site and net plot area of 1,238.14 sq. m, a 583.39 sq. m proposed coverage area, and a 654.75 sq. m vacant plot area. It separately records 2,612.85 sq. m of residential upper-floor area, 697.47 sq. m for the cellar and 460.99 sq. m for the stilt. The extraction lists 2,770.60 sq. m as “BUILT UP AREA” and 4,093.60 sq. m as “TOTAL BUA”; the source does not provide enough context here to reconcile those labels, so they should not be substituted for one another.
The filed permit lists a 62.48 sq. m tot lot and a 1,431.7 sq. m total parking area. The layout-plan extraction describes a 1.0 m wide greenery strip; the permit lists setbacks as Front 3.05, 8.57, Rear Side I 5.03 and Side II 3.04. The supplied material does not describe a multi-tower or phased arrangement.
The sanctioned layout-plan extract identifies the road-facing west boundary as a 12MT-wide road. It also lists 12.00 MT wide existing and proposed roads in the plan record. No supported floor-by-floor flat arrangement, lift count, stair count, entrance layout, landscaping plan beyond the listed tot lot/greenery conditions, or common-area distribution is available in the supplied extracts.
4. Homes, configurations & floor plans
The RERA filing records 15 2BHK and 10 3BHK units, with the saleable areas shown below. Carpet areas are software measurements from the approved floor-plan drawings, not RERA-filed carpet-area declarations; the drawing-derived measurements require verification against the drawings. Saleable area and carpet area are different measures: the supplied record notes that saleable area includes the home’s share of common areas, while the measured carpet area is smaller.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 118.81 sq. m | 59.1–71.8 sq. m; median 66.4 sq. m (software-measured) | 44% |
| 3BHK | 10 | 0 | 10 | 134.42 sq. m | 106.5–107.5 sq. m; median 106.8 sq. m (software-measured) | 21% |
The software measured five 2BHK designs and four 3BHK designs from the supplied plan drawing, “W1-H:1.5 TYPICAL - 2, 3, 4& 5 FLOOR PLAN (SCALE=1:100).” The illustrated 2BHK includes living/dining, kitchen, two bedrooms, two toilets and two balconies; the illustrated 3BHK includes living, dining, kitchen, bedrooms, toilets, a wash area and two balconies. Dimensions and room areas are drawing measurements, not RERA disclosures.
5. Parking & vehicle circulation
The GHMC permit extraction lists 28 proposed parkings and 1,431.7 sq. m total parking area. It describes the building as having a cellar and stilt; the layout approval conditions state that the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. No separate resident, visitor or accessible-space counts, EV provision, parking allocation by apartment, or current parking-completion status is supplied. A sanctioned parking bay does not, by itself, establish an exclusive right attached to a particular unit.
The approval record requires one entry and one exit to the premises, each with a minimum width of 4.5 m and 5 m height clearance. The supplied extracts do not establish the as-built ramp arrangement or pedestrian/vehicle separation.
6. Amenities, recreation & open spaces
The table below separates provisions or declarations in the supplied records from verified delivery. The RERA amenity record shows 0% progress for each listed item, while marking several items “YES”; the record gives no inspection date or independent completion verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot lot / green strip | Tot lot: 62.48 sq. m; permit also calls for a greenery strip and tree planting. | Sanctioned/conditioned; independent completion not verified. | |
| Rainwater harvesting | Permit extraction lists 4 rainwater-harvesting pits; the plan conditions also refer to a percolation pit. | Sanctioned/conditioned; independent completion not verified. | |
| Community buildings | No facility description or size supplied. | 0% recorded; no independent verification. | |
| Indoor / clubhouse facilities | No project-filed evidence of a clubhouse, gym, indoor games or spa is supplied. | Not established in the supplied RERA/approval evidence. | |
| Sports / recreation | No sports facility is identified in the supplied project approval extract beyond the tot lot. | Not independently verified. | |
| Convenience / community | The permit requires a garbage house within the premises and lists space for a transformer. | Approval conditions; completion not independently verified. |
7. Utilities, building services & safety
The building-plan approval extract lists a bore well, sump, septic tank, rainwater-harvesting pit and distribution transformer. It specifies a 30,000-litre sump in the plan parameters; the approval conditions separately call for an underground static water-storage tank and a terrace tank, each with a stated 25,000-litre capacity. The source does not establish that these facilities have been installed or commissioned.
The RERA amenity record marks water supply, sewerage (including septic tank/STP), storm-water drains, sewage and sullage treatment/disposal, rainwater harvesting, fire protection and an electrical meter room/substation/receiving station as “YES,” but records 0% progress for those items. The project approval extraction specifically lists a septic tank; it does not substantiate an STP installation. No electrical-backup capacity, lift count or capacity, CCTV specification, waste-segregation system, accessibility features or commissioned utility-service status is provided.
The approval requires a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and an automatic sprinkler system in the cellar. The building-permit order also states that an occupancy fire NOC from the Director (EV&DM) is to be obtained before issue of an occupancy certificate. These are approval requirements; the supplied materials do not verify installation, clearance or occupancy certification.
8. Location, access & connectivity
The registered project location is Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The RERA land record identifies the west boundary as a 12MT-wide road. The GHMC plan extract lists 12.00 MT wide existing and proposed roads.
A supplied location record gives an approximate 9.5 km distance to the nearest sampled Outer Ring Road interchange. This is a location-data measurement, not a travel-time claim. The supplied evidence does not provide verified distances or travel times to public transport, schools, hospitals or other landmarks.
9. Developer & development status
The registered promoter is SRI OM BUILDERS, identified as a partnership. Its GSTIN is 36ADEFS9376EIZO. The RERA record identifies OM PRAKASH CHATLA as authorized signatory and GUNASRI CHATLA and CHANDRAKALA CHATLA as partners. The project’s supplied promoter address is SWARNADHAMA NAGAR MILITARY FARM ROAD, OLD BOWENPALLY, PET BASHEERABAD, Qutballapur, Medchal-Malkajgiri, 500055.
The promoter’s Form B declaration undertakes completion by 20 February 2025. The permit contains the same completion date. No current, independently verified construction-progress figure, extension order, completion certificate or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02200008245; valid 17 May 2024–20 February 2025 |
|---|---|
| Scope and note | Form C certificate for SRI OM PRIDE, identifying SRI OM BUILDERS and the registered location/survey number. |
| Identifier / date | 2226/GHMC/KPL/2022-BP; 20 February 2022 |
|---|---|
| Scope and note | Permit for one residential building with 1 cellar, 1 stilt and 5 upper floors. |
| Identifier / date | TS/063205/2021; 005424/GHMC/2930/KPL1/2021-BP |
|---|---|
| Scope and note | Application and file references in the supplied approval extracts. |
| Identifier / date | Document 354203 |
|---|---|
| Scope and note | GHMC building-plan details, sanctioned parameters, conditions and listed site facilities. |
| Identifier / date | 7 February 2024 |
|---|---|
| Scope and note | Promoter declaration, including the 20 February 2025 completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| Scope and note | The permit requires an occupancy certificate before occupation; the supplied permit extraction says completion_certified: false. |
The registration certificate records the registration and its stated validity; it is not a conveyance deed or evidence of a buyer’s title. The supplied records do not include an occupancy or completion certificate.
Frequently asked questions
Is SRI OM PRIDE registered with Telangana RERA?
Yes. SRI OM PRIDE is registered with the Telangana Real Estate Regulatory Authority as P02200008245; the registration status is New Project.
Who is the developer of SRI OM PRIDE?
The promoter named in the RERA registration is SRI OM BUILDERS.
Where is SRI OM PRIDE located?
SRI OM PRIDE is in PET BASHEERABAD, Pet Basherbad, Qutballapur, Medchal-Malkajgiri, Telangana (500055).
When will SRI OM PRIDE be completed?
The promoter's proposed date of completion filed with RERA is 20/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Pet Basherbad