Sri Balaji Apartments

MANASA SAROVAR CONSTRUCTIONS · Hyderabad · RERA P02500006326

SRI BALAJI APARTMENTS is a residential apartments project in HIMAYATH NAGAR, Himayatha Nagar mandal, Hyderabad district. The registered promoter is MANASA SAROVAR CONSTRUCTIONS. The project has a site extent of 342.88 sq. m. and one proposed residential building with 1 stilt + 5 upper floors, comprising 10 homes: five 2BHK and five 3BHK. Its TG-RERA registration is P02500006326, and the proposed completion date is 10 February 2026.

More from Manasa Sarovar Constructions · 5 projects →

01What we found

Period endedTG-RERA registration ran to 10 Feb 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from gharpe.com
Nallakunta, Himayatha Nagar, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameSRI BALAJI APARTMENTS RERA record
Project typeResidential apartments RERA record RERA filing
Phase / registered portionA single building is recorded; a separate phase designation is not disclosed. The registration covers the project on Survey Nos. 15, 16, 17, 18, 19 and 20. RERA record
TG-RERA registrationP02500006326 RERA record
Registration validity7 July 2023 to 10 February 2026; the registration certificate says “2 years.” This is the registration period, not a current statement of completion or occupancy. RERA record
Registered promoterMANASA SAROVAR CONSTRUCTIONS RERA record Corporate record
RERA statusThe supplied record identifies the project as “New Project” and provides the registration certificate. A current post-expiry extension or renewed registration is not shown in the supplied record. RERA record

Land and geographic identity

FieldProject record
LocalityHIMAYATH NAGAR in the RERA project information; the registration certificate identifies locality as Nallakunta (Sultan Bazar). RERA record RERA filing
Revenue villageNallakunta (Sultan Bazar), as recorded for the project; title documents refer to Nallakunta. RERA record Land records
Mandal / district / PINHimayatha Nagar / Hyderabad / 500044 RERA record
Project survey numbers15, 16, 17, 18, 19 and 20; no subdivision numbers are disclosed. RERA record Land records
Plot identifierPlot No. 24
Site extent342.88 sq. m. total and net area in the RERA land record. RERA filing Land records
BoundariesEast: Plot No. 23; West: Lingampalli Garden and Lane; North: house on Plot No. 14; South: 40-ft-wide road. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval5388/GHMC/SEC/2023-BP, approved 10 February 2023; file no. 012459/GHMC/6090/SEC2/2022-BP. Approvals record
Approved built-up area884.55 sq. m. residential upper-floor area, as stated in the building permit extraction. Approvals record
Building count and floorsOne proposed residential building; 1 stilt + 5 upper floors. The permit states a building height of 15.00 m. RERA filing
Parking provision in sanctionStilt parking area 164.66 sq. m.; total parking area 176.9, as recorded in the permit extraction. The number of parking spaces is not supplied.
Unit counts10 units in the RERA unit record: five 2BHK and five 3BHK. The building permit requires that the sanctioned unit count not be increased without prior GHMC approval. RERA unit table

Offering and status

FieldProject record
RERA-listed configurations2BHK: 5 units; 3BHK: 5 units. RERA unit table RERA unit details
RERA saleable area2BHK: 94.76 sq. m.; 3BHK: 130.52 sq. m. RERA unit table RERA unit details
Booked / availablePortal-derived counts show 0 booked and 5 available in each configuration (10 available in total). The portal record has no as-of date, so treat counts as indicative. RERA unit table RERA unit details
Construction stageRERA amenities/infrastructure progress entries supplied here show 0% for each listed item; these are portal declarations, not an independent site inspection. No separate verified construction-stage assessment is supplied. RERA amenities
Completion datePromoter’s Form B undertaking and the permit record state completion by 10 February 2026. No revised completion date is supplied.
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. The permit states that an occupancy certificate is required before occupation. Document index

2. The project story

SRI BALAJI APARTMENTS is a residential apartment project registered for one building on Plot No. 24, across Survey Nos. 15, 16, 17, 18, 19 and 20, in the Nallakunta (Sultan Bazar) revenue-village record, Himayatha Nagar mandal, Hyderabad district. The GHMC building permit describes a single residential building with a stilt level and five upper floors. RERA record Land records

The RERA unit record lists ten apartments: five 2BHK and five 3BHK. It reports all ten as available and none booked, but does not provide an as-of date. The promoter’s Form B declares a completion undertaking of 10 February 2026. The evidence supplied does not establish that construction has been independently inspected as complete, nor does it include an occupancy or completion certificate. RERA unit table RERA unit details Document index

3. Master plan, architecture & building design

The filed project is a single residential building on a recorded site area of 342.88 sq. m. The GHMC permit extraction describes a 1-stilt + 5-upper-floor configuration, a height of 15.00 m, 884.55 sq. m. of residential upper-floor area and a stilt parking area of 164.66 sq. m. It also records total parking area as 176.9. These are permit-derived figures; no separate FSI-counted area, building-footprint measurement or gross built-up-area figure is supplied. Land records

The building permit records one building and requires construction to follow the sanctioned plan. It also states that any construction modification requires prior approval and that the sanctioned unit count may not be increased without GHMC approval. Detailed evidence about flats per floor, lifts, stairs, building entrances, internal circulation, landscaping or common-area layout is not available in the supplied extracts.

The permit extract lists G1/623/CZ/CIR-09/2012 as the approved layout / LRS proceeding / subdivision number, but a stamped layout drawing or layout-approval document is not available here. The HMDA layout lookup is reported as unavailable through the public portal; that is not evidence that approval was refused. Approvals record HMDA

4. Homes, configurations & floor plans

The RERA record lists ten homes across two configurations. Saleable area below is the filed figure. Carpet-area ranges and loading are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; the drawing-based measurements are identified as needing review where noted. Saleable area and carpet area are different measures: saleable area may include the home’s proportionate common-area share, while the measured carpet figure excludes balcony and utility areas. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50594.76 sq. m.52.3–53.1 sq. m. (median 52.7 sq. m.; software-measured)44% (software-measured)
3BHK505130.52 sq. m.79.9–86.0 sq. m. (median 83.0 sq. m.; software-measured)36% (software-measured)

The drawing extraction includes a 2BHK typical plan and a 3BHK first-floor plan. The extracted 2BHK example shows two bedrooms, living, dining/kitchen, two toilets, balcony and utility; the 3BHK example shows three bedrooms, living/dining, kitchen, toilet, balcony and utility. These are drawing-derived descriptions, not a guarantee that every unit has the same orientation or arrangement. RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction records 164.66 sq. m. of stilt parking area and total parking area of 176.9, and states that the stilt and any cellar approved for parking must be used exclusively for vehicle parking. The supplied permit facts do not state a number of car or two-wheeler spaces, visitor or accessible spaces, a parking-allocation schedule, or details of ramps and vehicle entry/exit circulation.

Parking arrangements for an individual apartment cannot be established from the supplied documents. A parking area shown or stated in the permit does not, by itself, establish an exclusive parking allocation to a particular buyer.

6. Amenities, recreation & open spaces

The RERA amenity record includes listed project infrastructure and shows 0% progress for each item except rainwater harvesting, which is marked available “YES” but also carries 0% in the supplied record. These portal entries are not independent verification of completion. The permit separately specifies a rainwater-harvesting pit and garbage house. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not suppliedRERA amenity record0% recorded; not independently verified RERA amenities
Green strip / tot lot / parkSize not suppliedRERA amenity record0% recorded; not independently verified RERA amenities
Community buildingsNo further description or size suppliedRERA amenity record0% recorded; not independently verified RERA amenities
Water conservation / rainwater harvestingPermit specifies 1 rainwater-harvesting pitRERA amenity record; GHMC building permitRERA record says “YES” and 0%; permit requires a pit. Completion not independently verified RERA amenities
Garbage houseTo be made within the premises; size not suppliedGHMC building permitRequired by permit; completion not independently verified

No separate clubhouse or indoor recreation facility is evidenced in the supplied RERA amenity record. The vendor-listed “Kids play area” and other promotional amenities are not treated here as sanctioned or delivered facilities. RERA amenities Promoter website

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and electrical meter/substation/receiving-station infrastructure. Each is recorded at 0% progress in the supplied data. The record does not provide capacities, designs or independent completion verification. RERA amenities

The GHMC permit requires construction of a rainwater-harvesting structure, provision of space for a transformer and a garbage house. It also states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before issue of the occupancy certificate, and that an occupancy certificate is compulsory before occupation. These are permit conditions; the supplied evidence does not establish that the required facilities, NOC or occupancy certificate have been completed or obtained.

No project-specific evidence supplied here establishes water sources or storage capacity, STP capacity or reuse arrangements, electrical backup, lift count or capacity, fire equipment details, CCTV, security arrangements, accessibility features or accessible circulation. RERA amenities Document index

8. Location, access & connectivity

The registered project location is recorded as Nallakunta (Sultan Bazar), Himayatha Nagar mandal, Hyderabad district, PIN 500044; the RERA project information also identifies the locality as HIMAYATH NAGAR. The site boundary record identifies a 40-ft-wide road along the south side. RERA record RERA filing RERA filing

A supplied location record gives HITEC City at 12.6 km. No other measured access distances, public-transport details or project-specific route information are supplied from the official project record. Location record

9. Developer & development status

The registered promoter is MANASA SAROVAR CONSTRUCTIONS, recorded as a partnership. Its GSTIN is 36ABNFM9036G1ZW. The RERA record names Mallikarjun Vuppalancha and Ramakrishna Gade as authorized signatories. The promoter’s project office is recorded at Dayanand Nagar, Nallakunta, Himayatha Nagar, Hyderabad, PIN 500044; the registration certificate also contains a promoter-office entry with incomplete locality fields. No official project website or contact details are supplied here. Corporate record Parties record RERA record

The building permit identifies one proposed residential building with 1 stilt + 5 upper floors. The promoter’s Form B declares a completion date of 10 February 2026. The RERA amenity record reports 0% progress for its listed infrastructure items; neither that entry nor the completion undertaking is an independent site inspection. No occupancy or completion certificate is included in the supplied documents. RERA amenities Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500006326; issued 7 July 2023; valid to 10 February 2026 as stated in the certificate
Evidence and scopeForm C for SRI BALAJI APARTMENTS; covers Survey Nos. 15, 16, 17, 18, 19 and 20.
GHMC building permit order
Identifier / date5388/GHMC/SEC/2023-BP; approved 10 February 2023; file no. 012459/GHMC/6090/SEC2/2022-BP
Evidence and scopePermit extraction describes one residential building, 1 stilt + 5 upper floors.
Layout / LRS / subdivision identifier
Identifier / dateG1/623/CZ/CIR-09/2012
Evidence and scopeListed in the building-permit extraction; a separate stamped layout drawing is not included.
Promoter Form B declaration
Identifier / dateDated 30 May 2023
Evidence and scopePromoter declaration covering title, encumbrance statement, separate-account undertakings and completion by 10 February 2026.
Legal title search report
Identifier / dateDated 2 June 2023
Evidence and scopeAdvocate’s title report in the supplied documents, including title-chain and GHMC-mortgage references.
Approved floor-plan document
Identifier / date330615
Evidence and scopeFloor-plan drawing source used for software-measured configuration areas; not a RERA area disclosure.
Occupancy / completion certificates
Identifier / dateNot supplied
Evidence and scopeNo certificate is included in the supplied project documents. Document index

Frequently asked questions

Is SRI BALAJI APARTMENTS registered with Telangana RERA?

Yes. SRI BALAJI APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P02500006326; the registration status is New Project.

Who is the developer of SRI BALAJI APARTMENTS?

The promoter named in the RERA registration is MANASA SAROVAR CONSTRUCTIONS.

Where is SRI BALAJI APARTMENTS located?

SRI BALAJI APARTMENTS is in HIMAYATH NAGAR, Nallakunta (Sultan Bazar), Himayatha Nagar, Hyderabad, Telangana (500044).

When will SRI BALAJI APARTMENTS be completed?

The promoter's proposed date of completion filed with RERA is 10/02/2026. This is the promoter's declaration, not a guarantee.

More projects in Nallakunta