Sign in

Sowbhagya Nivas-VI

SOWBHAGYA CONSTRUCTIONS · Hanamkonda · RERA P00300008714

SOWBHAGYA NIVAS-VI is a residential apartment project in BHEEMARAM REVENUE (V), HASANPARTHY MDL, Warangal Urban. The registered promoter is SOWBHAGYA CONSTRUCTIONS. The project covers 459.66 sq.mt and comprises one residential apartment building, Building A, with 1 stilt + 5 upper floors and 10 3BHK apartments. It is registered under TG-RERA number P00300008714, and the promoter’s Form B undertaking gives 06/06/2027 as the completion date.

More from Sowbhagya Constructions · 5 projects →

01What we found

RegisteredTG-RERA - valid till 6 Jun 2027
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered nameSOWBHAGYA NIVAS-VI RERA record
Project type / registered portionResidential apartment project; phase or separately registered portion not disclosed. RERA record RERA filing
TG-RERA registrationP00300008714; registration recorded from 28 August 2024 to 6 June 2027. The certificate describes validity as two years, commencing 28/08/2024 and ending 06/06/2027, unless extended. Registration validity is not the same as the completion undertaking. RERA record Approvals record
Registered promoterSOWBHAGYA CONSTRUCTIONS; organization type recorded as partnership. RERA record RERA filing
RERA statusNew Project in the filing. Registration is recorded; no extension or later registration-status order is supplied here. RERA filing Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageBHEEMARAM / BHEEMARAM REVENUE (V); the building approval also describes the village as “Bheemaram (Includes Komatipally).” RERA record
MandalHASANPARTHY MDL in the filed layout-plan extraction; mandal is not disclosed in the canonical project fields. Land records
District / PINWarangal Urban, PIN 506015 in the project identity record. The plan extraction labels the district “HANUMAKONDA DIST.” RERA record RERA filing
Survey numbers and subdivisions211/E1 and 211/F. RERA record Land records
Registered site extent459.66 sq.mt in the filed layout-plan extraction; the RERA land record gives total area and net area as 459.66 sq.m. Land records
Boundaries in RERA recordEast: PROPOSED ROAD; West: LAND OF THIRUMAL ROA; North: LAND OF SRINIVAS; South: PLOT OF VIJAY. RERA filing

Development identity

ItemProject record
Principal building approvalBuilding permission 0054/BP/3006/2024, dated 06 June 2024, issued by GWMC Municipality/Municipal Corporation. The approval file number is 001996/BP/DTCP/3006/0069/2024. Approvals record
Building / floorsOne residential apartment building, Building A; sanctioned configuration 1 stilt + 5 upper floors. The filed plan also describes construction comprising first through fifth floors and a stilt floor.
Approved area figuresThe filed plan states total proposed built up area excluding parking: 1261.65, total proposed built up area including parking: 1502.45, and Total BUA: 1516.35; it separately lists Net BUA: 1261.65, Parking area: 240.80, and Deductions: 25.40. These are distinct figures as stated in the plan; the supplied record does not clarify their relationship.
Building height14.95 MT is stated in the plan parameters; the plan separately states 20.70mt. for building height from GL.
Unit count10 units in the filed RERA configuration record; the plan extraction also states 10. RERA unit table

Offering and status

ItemProject record
Unit type3BHK apartments. RERA unit table RERA unit details
RERA-filed saleable area148.6 sqm for the 3BHK configuration. RERA unit table RERA unit table
Booking snapshot10 booked; 0 available in the portal-derived unit record. No as-of date is supplied for these counts, so they are indicative rather than a live inventory confirmation. RERA unit table RERA unit details
Construction stageThe supplied information establishes approval and filing details, but does not provide a verified site-progress report or independently confirmed construction stage. Document index
Completion dateThe Form B promoter declaration undertakes completion by 06/06/2027. The header also records a proposed completion date of 06/10/2027; completion dates are not registration-validity dates. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. The building approval requires an occupancy certificate before occupation.

The project story

SOWBHAGYA NIVAS-VI is filed as a residential apartment development on 459.66 sq.mt in Bheemaram Revenue Village, on survey subdivisions 211/E1 and 211/F. The registered project record identifies one building and ten 3BHK apartments. Its sanctioned form is a stilt level with five upper floors; the filed plan describes residential apartment use and includes parking and building-service elements. RERA record Land records RERA unit table

The project is registered under TG-RERA number P00300008714. The promoter’s Form B undertaking gives 06/06/2027 as the completion date. The available evidence does not establish current construction progress, handover, or occupancy certification; approval and registration should not be read as evidence that the building is complete or occupied.

Master plan, architecture & building design

The filed plan identifies Building A, a residential apartment building on a stated site area of 459.66 sq.mt, with 1 stilt + 5 upper floors and a stated building height of 14.95 MT. It also records a height of 20.70mt. from GL. The plan describes a stilt floor and first through fifth floors, with the fifth floor identified as involving a TDR agreement.

The plan’s area schedule gives 1261.65 as total proposed built-up area excluding parking, 1502.45 as total proposed built-up area including parking, and 1516.35 as Total BUA. It separately lists Net BUA: 1261.65, Parking area: 240.80, and Deductions: 25.40. These labels and amounts are reported as filed; the supplied extract does not provide enough detail to reconcile the area totals. They are not carpet-area figures.

The sanctioned drawing extract identifies 10 units and shows a fifth-floor plan. It also lists rainwater harvesting, a septic tank, a lift, parking, a watchman room, an overhead water tank and a lift machine room. The supplied extracts do not establish detailed floor-by-floor unit distribution, building footprint dimensions, lift capacity, stair configuration, or independently verified completion of these elements.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10100148.6 sqmSoftware-measured range: 100.9–103.3 sqm; median 102.1 sqm31%

The unit counts, booking snapshot and saleable area are from the TG-RERA filing. The booking record has no supplied as-of date. RERA unit table RERA unit details RERA unit table

Carpet-area measurements were software-derived from two approved floor-plan drawings, not disclosed as RERA-filed carpet area; the measurement record says both measured designs need review. The measured median is 102.1 sqm (1099 sqft), with a supplied range of 100.9–103.3 sqm (1086–1112 sqft). The supplied drawing extraction identifies a 3BHK plan and lists bedrooms, living/dining, kitchen, toilets and a balcony; one listed balcony is 1.33 M. WIDE. The drawing-based carpet measurement is distinct from the RERA saleable area, which includes a share of common areas; the supplied data does not provide a separate verified breakdown of common-area loading. Floor plans RERA unit details

Parking & vehicle circulation

The building permission states that the stilt is approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters. The filed plan lists Parking area: 240.80 and includes “Parking” among the project facilities. The supplied records do not give a sanctioned count of car or two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation. A drawing or general parking provision does not establish exclusive ownership of a particular bay.

The plan records 10.05 MT wide existing road and 10.05 MT wide proposed road; the building-approval extraction separately records an 18M road width. No vehicle circulation plan, ramp detail, EV-charging installation status, or pedestrian-separation detail is provided in the extracts.

Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
LiftQuantity and capacity not statedFiled planListed in the plan; installed or operational status not verified
Watchman roomSize not statedFiled planListed in the plan; completion not verified
Green strip / tot-lot / parkSize not statedRERA amenity record RERA amenities; building approvalRERA amenity record marks this “YES” at 100%; this is a filing status, not independent site verification. Approval lists a tot-lot.
Aggregate recreational open spaceSize not statedRERA amenity record RERA amenitiesMarked “YES” at 100% in the record; completion not independently verified
Community buildingsNot statedRERA amenity record RERA amenities0% recorded
Street lightingSize / quantity not statedRERA amenity record RERA amenitiesMarked “YES” at 100% in the record; completion not independently verified

The supplied evidence does not identify a clubhouse or indoor recreation facility, or provide facility dimensions or capacities. RERA amenities

Utilities, building services & safety

The filed plan lists a septic tank, overhead water tank, rainwater harvesting, lift, lift machine room, and parking. The building approval specifies 3 RWHPs (rainwater-harvesting pits), space for a transformer, a garbage house and a tot-lot. These are plan or approval provisions; the supplied evidence does not confirm installation, capacity, operation, or completed service connections.

The approval also requires an occupancy certificate before occupation and states that a commencement notice is to be submitted before construction. Its conditions address construction-site safety and require a rainwater-harvesting structure. The evidence supplied does not specify a sewage-treatment plant, water source or treatment capacity, backup power, fire-protection system, emergency access, accessibility provisions, CCTV, or a completed waste-management system.

Location, access & connectivity

The registered project location is BHEEMARAM, Bheemaram Revenue Village, Warangal Urban, PIN 506015; the filed layout-plan extraction identifies Hasanparthy Mandal. The project occupies survey subdivisions 211/E1 and 211/F. RERA record RERA filing

The filed plan records a 10.05 MT wide existing road and a 10.05 MT wide proposed road; the building-approval extraction records an 18M road width. No public-transport details, approach-road route, or independently verified travel-time information is supplied. A location dataset lists the Financial District (Nanakramguda) at 1.2 km from a cadastral parcel centroid; this is a measured dataset distance, not a stated travel time. Location record

Developer & development status

The registered legal promoter is SOWBHAGYA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ADOFS2442K1ZO. The project record identifies partners including MUTHINENI VENKAT RAMANA RAO, MUTHINENI RAJESHWAR RAO, CHITI SANDEEP, MUTHINENI RAGHUNANDAN RAO, ERRAVALLI SUPRAJA and CHENNADI JAGADEESH; MUTHINENI VENKAT RAMANA RAO and MUTHINENI RAJESHWAR RAO are listed as authorized signatories. RERA filing Corporate record RERA record

The project is recorded as a new project, with one sanctioned apartment building and ten units. The Form B declaration, signed by MUTHINENI RAJESHWAR RAO as promoter, undertakes completion by 06/06/2027. No current construction-progress evidence or occupancy/completion certificate is supplied, so physical progress and operational status cannot be confirmed from this record. RERA filing

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300008714; validity recorded from 28/08/2024 to 06/06/2027
Scope and evidenceForm C registration certificate identifies SOWBHAGYA NIVAS-VI, Sowbhagya Constructions and survey numbers 211/E1 and 211/F.
Building-construction approval
Identifier / date0054/BP/3006/2024, approved 06 June 2024
Scope and evidenceGWMC Municipality/Municipal Corporation approval; file no. 001996/BP/DTCP/3006/0069/2024; Building A, 1 stilt + 5 upper floors.
Filed layout/building plan
Identifier / dateApproval-plan extract on file
Scope and evidenceIdentifies the site extent, survey numbers, building configuration, areas, parking and listed utilities.
Form B promoter declaration
Identifier / dateDated Aug 2024
Scope and evidencePromoter declaration includes the completion undertaking of 06/06/2027 and statements concerning title, encumbrances and project funds.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceThe building approval requires a separate occupancy certificate before occupation.

The approval record also identifies TS/4823/2024 as a payment transaction reference and records notarised affidavit number 11686/2024 dated 30 May 2024. These are approval-file references, not additional building-approval numbers.

Frequently asked questions

Is SOWBHAGYA NIVAS-VI registered with Telangana RERA?

Yes. SOWBHAGYA NIVAS-VI is registered with the Telangana Real Estate Regulatory Authority as P00300008714; the registration status is New Project.

Who is the developer of SOWBHAGYA NIVAS-VI?

The promoter named in the RERA registration is SOWBHAGYA CONSTRUCTIONS.

Where is SOWBHAGYA NIVAS-VI located?

SOWBHAGYA NIVAS-VI is in BHEEMARAM, Hanamkonda, Telangana (506015).

When will SOWBHAGYA NIVAS-VI be completed?

The promoter's proposed date of completion filed with RERA is 06/10/2027. This is the promoter's declaration, not a guarantee.

More projects in Hanamkonda