Sign in

SMR SMs VINAY HEIGHTS

SMR SM ESTATES · Rangareddy · RERA P02400004677

SMR SMs VINAY HEIGHTS is a residential apartment project in Bandlaguda Jagir, Gandipet mandal, Ranga Reddy district, developed by the registered promoter SMR SM ESTATES. The project covers 2,369.75 Sq. Mt. and comprises one residential block with Cellar + 1Stilt + 8 Upper floors, with 49 2BHK and 20 3BHK homes. It is registered under TG-RERA number P02400004677, with proposed completion on 10/02/2028.

More from Smr Sm Estates · 2 projects →

01What we found

RegisteredTG-RERA - valid till 10 Oct 2027
10documents on file - each fact links to its page
5court cases on this project's land (survey 13, Bandlaguda Jagir)
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameSMR SMs VINAY HEIGHTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for this project. RERA record
TG-RERA registrationP02400004677; Form C issued 27/06/2022, valid through 10/10/2027. This is registration validity, not the project completion deadline. RERA record
Registered promoterSMR SM ESTATES, identified in the RERA record as a partnership. RERA record Corporate record RERA filing
RERA statusThe supplied record identifies the project as a “New Project”; the registration certificate records the registration period above. The record does not state that the registration has been extended. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageBandlaguda Jagir; the approval and title materials also describe it as Bandlaguda (Jagir) or Bandlaguda Jagir Municipal Corporation. RERA record Land records
Mandal / district / PINGandipet mandal / Ranga Reddy district / 500030. RERA record
Survey number(s) and subdivision(s)Sy.No.13/A (also rendered as 13/A). Land records
Registered site extent2,369.75 Sq. Mt. in the HMDA technical approval and RERA land record. Land records
RERA area fieldsTotal area 2369.75 sqmts; net area 2369.75 sqmts; affected in road widening/FTL/nala widening 0 sqmts. RERA filing
Boundaries filed with RERAEast: 40 FEET WIDE ROAD; west: neighbours land; north: neighbours land; south: SMR SMs VINAY CASA CARINO PROJECT. RERA filing

Development identity

ItemProject record
Sanctioning / technical approval authorityHyderabad Metropolitan Development Authority (HMDA); technical approval document identifies delegation to Bandlaguda (Jagir) Municipal Corporation. Approvals record
Principal approvalTechnical Approval No. 038995/SKP/R1/UG/HMDA/11092020, approved 25/02/2021. Approvals record
Building configuration in technical approvalOne residential block, Cellar + 1Stilt + 8 Upper floors.
Approved built-up areaThe technical-approval extraction separately records Built up Area 5888.86 and Total Built up area (In Sq.mts 7743.7. The supplied extraction does not explain the distinction between these figures.
RERA-filed approved built-up area8730.94 sqmts in the RERA project fields; this is reported as filed and is not substituted for the technical-approval figures above. RERA filing
Building / unit countRERA fields show 1 total building unit as per approved plan and 1 proposed building unit as per agreement. RERA filing
UnitsRERA unit record lists 71 total units, comprising 49 2BHK and 20 3BHK homes, plus a separate 2-unit “Amenities” row that is not a home-for-sale configuration. RERA unit table

Offering and status

ItemProject record
RERA-filed homes2BHK: 49 units; saleable area 123.88 sq m each. 3BHK: 20 units; saleable area 162.71 sq m each. RERA unit table RERA unit details
Booked / availablePortal-derived counts are 15 booked / 34 available for 2BHK and 13 booked / 7 available for 3BHK. Counts are indicative: the record carries no as-of date. RERA unit table RERA unit details
Construction stageRERA amenity/infrastructure progress entries report varying percentages; these are portal-reported figures, not an independent site inspection. RERA amenities
Completion dateThe RERA header gives proposed completion 10/02/2028. The Form-B declaration instead states completion by 10.10.2027 under the cited permission; the supplied record does not resolve this difference. RERA record
Registration validityRegistration certificate states 27/06/2022 to 10/10/2027. This is separate from the header’s proposed completion date.
OC / completion certificateNo occupancy certificate or completion certificate is identified in the supplied project documents. HMDA’s technical approval states an occupancy certificate is compulsory before occupation.

2. The project story

SMR SMs VINAY HEIGHTS is registered as a residential apartment project on Sy.No.13/A, Bandlaguda Jagir, Gandipet mandal, Ranga Reddy district. The registered site extent is 2,369.75 Sq. Mt. The filed boundary on the east is a 40-foot-wide road, and the south boundary is identified as the SMR SMs VINAY CASA CARINO project. RERA record Land records RERA filing

The technical approval describes one residential block with a cellar, stilt and eight upper floors. The RERA unit schedule offers 2BHK and 3BHK homes; the RERA record reports 28 booked homes and 41 available homes, with counts undated and therefore indicative. The additional two-unit “Amenities” entry is not treated as homes for sale. RERA unit table

The submitted progress figures vary by infrastructure item—for example, internal roads and footpaths are reported at 85%, water supply at 35%, and sewerage at 90%. These are RERA-portal-reported percentages; the supplied evidence does not independently verify construction progress or establish that the building is completed or occupied. No OC is present in the supplied documents. RERA amenities

3. Master plan, architecture & building design

The supplied HMDA technical-approval extraction describes one residential block on 2,369.75 Sq. Mt., with Cellar + 1Stilt + 8 Upper floors. It records a sanctioned building height of 23.44; the unit of measurement is not specified in the extracted field. The extract does not provide a reliable building footprint, flats-per-floor schedule, lift or stair count, or a detailed internal circulation plan.

The technical-approval document gives two area entries: Built up Area 5888.86 and Total Built up area (In Sq.mts 7743.7. Separately, the RERA project fields report 8730.94 sqmts as approved built-up area. These are kept as separately labelled record entries; no reconciliation or area conversion is made here. The document also records a Mortgage Area of 891.40 sqmts in the RERA fields. RERA filing

The technical approval includes open-space and tot-lot conditions, and the extracted sanctioned parameters list a transformer, garbage house, rainwater-harvesting structures, ETP, STP, solar water-heating system, solar lighting system and refuse chute. The supplied materials do not establish the detailed location, dimensions or present delivery status of these features.

4. Homes, configurations & floor plans

The RERA filing records 2BHK and 3BHK homes. Saleable areas and unit counts below are RERA-filed; carpet-area figures are software measurements from the supplied floor-plan drawing and are not RERA disclosures. The drawing measurements require review against the drawing. Saleable area and carpet area are different measures; saleable area includes a share of common areas, while the software-measured carpet figure is based on the drawing geometry. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK491534123.88 sq m82.6–86.3 sq m; median 84.5 sq m (software-measured)32% (software-derived record)
3BHK20137162.71 sq m67.3–67.5 sq m; median 67.4 sq m (software-measured)59% (software-derived record)

The 2BHK drawing sample includes a living/dining room, two bedrooms, two toilets, a kitchen and a lobby. A measured 3BHK drawing sample includes living/dining, bedrooms, three toilets, a kitchen, a wide utility and a wide balcony; the supplied drawing measurement marks the utility and balcony as excluded from carpet area. These are drawing-based descriptions, not a guarantee that every unit has the same arrangement. RERA unit details

The RERA unit schedule also has an “AMENITIES” row of 2 units and 118.5 sq m; it is classified as a common-area/non-sale row in the record, not as additional homes. RERA unit table

5. Parking & vehicle circulation

The technical approval’s floor configuration includes a cellar and stilt, but the supplied extracted record does not establish the number of sanctioned parking spaces, their allocation to homes, visitor or accessible parking, or whether parking is surface, stilt or cellar by bay. It also does not provide ramp dimensions, vehicle entry/exit arrangements, or pedestrian separation.

The approval states that no parking or construction is to be made in setback areas. The vendor data mentions “Covered Parking,” but that is a marketing-source listing, not evidence of a sanctioned count or an exclusive parking allocation to a particular apartment. Promoter website

6. Amenities, recreation & open spaces

The RERA progress entries below are portal-reported percentages, not independent verification of completion. The approval document separately lists certain amenities and conditions; those are not evidence that the facilities have been delivered. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not statedRERA progress entry RERA amenities85% reported; not independently verified
Green strip / tot lot / parkSize not statedRERA progress entry; HMDA approval condition requires tot-lot fencing and greenery before OC RERA amenities100% reported in RERA entry; no independent completion verification
Community buildingsNo size or capacity statedRERA progress entry RERA amenities0% reported
Recreational open spaceAggregate area not statedRERA progress entry RERA amenities0% reported
Swimming pool, gym, children’s play area and clubhouseNo size or capacity statedVendor listing only Promoter websiteMarketed/listed; not shown as RERA progress or independently verified

7. Utilities, building services & safety

Water
Evidence in the supplied recordRERA progress entry reports water supply at 35%. HMDA technical approval lists a separate underground static water-storage tank of 25,000 Its. Capacity and a separate terrace tank of 25,000 Its. Capacity for residential buildings. RERA amenities
Status / limitationProgress is portal-reported. Water source and tank installation status are not independently established.
Sewerage / treatment
Evidence in the supplied recordSewerage is reported at 90%; “Treatment and Disposal of Sewage and Sullage Water” at 0%. HMDA approval lists ETP and STP. RERA amenities
Status / limitationThe progress entries do not establish operational treatment or reuse.
Storm water / harvesting
Evidence in the supplied recordStorm-water drains are reported at 65%; water conservation/rainwater harvesting at 0%. HMDA approval requires a rainwater-harvesting structure (percolation pit). RERA amenities
Status / limitationPortal-reported progress only; installation is not independently verified.
Electrical
Evidence in the supplied recordElectrical meter room/sub-station/receiving station is reported at 45%; HMDA extraction lists a transformer, solar lighting and solar water heating. RERA amenities
Status / limitationNo supply capacity or installation/operational status is established.
Vertical transportation
Evidence in the supplied recordVendor listing says “Lift.” Promoter website
Status / limitationNo lift count, capacity or service-lift details supplied.
Fire / life safety
Evidence in the supplied recordRERA progress entry reports fire protection and fire-safety requirements at 0%; HMDA approval requires the applicant to fulfil conditions of Fire Service NOCs, Airport NOCs and SEIAA clearance. RERA amenities
Status / limitationThe supplied evidence does not include those clearances or establish completed fire systems.
Waste
Evidence in the supplied recordRERA entries report solid-waste management and disposal at 0%; HMDA approval calls for a garbage house, and the technical extraction lists a refuse chute. RERA amenities
Status / limitationNo operational status or waste-handling capacity supplied.
Security / access
Evidence in the supplied recordVendor listings mention security, CCTV and intercom. Promoter website
Status / limitationMarketing-source listings only; installation and coverage are not verified.
Accessibility
Evidence in the supplied recordNo project-specific accessibility details supplied.
Status / limitationRamps and accessible circulation cannot be confirmed.

8. Location, access & connectivity

The registered project location is Bandlaguda Jagir village, Gandipet mandal, Ranga Reddy district, PIN 500030. The cadastral parcel centroid supplied for the site is 17.347854197416893, 78.38875803891464. The filed eastern boundary is a 40-foot-wide road. RERA record RERA filing Location record

The supplied location record gives one measured distance: Financial District (Nanakramguda), 8.9 km. No approach-road route, public-transport information or travel-time estimate is provided in the evidence. Location record

9. Developer & development status

The registered legal promoter is SMR SM ESTATES, recorded as a partnership, with GSTIN 36ACNFS9522N1ZA. The supplied promoter address is SMR HOUSE, 5TH FLOOR, NAGARJUNA HILLS, KISMATPUR MAIN ROAD, BANDLAGUDA JAGIR VILLAGE, Gandipet, Ranga Reddy, 500030. The RERA certificate separately lists the promoter office as Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500082. Corporate record RERA filing

The promoter’s Form-B declaration is signed by Ram Reddy Saireddy, described there as Managing Partner, and states a completion undertaking to 10.10.2027 under the cited permission. The RERA header gives proposed completion as 10/02/2028; these dates are stated separately here without interpreting the difference. The supplied record does not establish an independently verified construction stage, a revised completion order, or an OC. RERA record

10. Approvals, official records & documents

RecordReference and relevance
TG-RERA registrationForm C for P02400004677, project SMR SMs VINAY HEIGHTS, issued 27/06/2022 and valid through 10/10/2027.
HMDA technical approval038995/SKP/R1/UG/HMDA/11092020, dated 25/02/2021; technical approval for a residential block on Survey No. 13/A, subject to local-authority sanction and stated conditions.
Building-plan / commencement materialThe file is titled “Commencement Certificates for each building in each phase”; the supplied extraction describes an HMDA technical approval and does not identify a separate occupancy certificate.
RERA title reportAdvocate’s legal scrutiny report dated 21-02-2022 describing title to 3025 Sq. Yds. in Sy.No.13/A and the stated title chain.
Registered sale deedSale Deed 2651/2021, transferring 3025 Sq. Yds. in Sy.No.13/A to SMR SM Estates; deed copy in the filed title report.
Encumbrance statementsFiled statements for Survey No. 13/A include searches ending 15-07-2024 and 27-01-2022.
RERA Form-B declarationPromoter declaration concerning title, encumbrances, litigation, separate-account obligations and completion undertaking.
Layout / floor-plan recordDocument 229091 is listed as a layout-plan document; drawing-derived unit measurements are attributed to the supplied drawing and are not RERA disclosures.
OC / completion certificateNo OC or completion certificate is identified in the supplied materials. The HMDA technical approval states that an OC is compulsory before occupation.

The HMDA approval extraction also lists mortgage documents 1734/2021 and 1733/2021, dated 25-01-2021, in favour of the Metropolitan Commissioner, HMDA. Their detailed conditions and scope are for the approvals/title review.

Frequently asked questions

Is SMR SMs VINAY HEIGHTS registered with Telangana RERA?

Yes. SMR SMs VINAY HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02400004677; the registration status is New Project.

Who is the developer of SMR SMs VINAY HEIGHTS?

The promoter named in the RERA registration is SMR SM ESTATES.

Where is SMR SMs VINAY HEIGHTS located?

SMR SMs VINAY HEIGHTS is in BANDLAGUDA JAGIR VILLAGE, Gandipet, Rangareddy, Telangana (500030).

When will SMR SMs VINAY HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 10/02/2028. This is the promoter's declaration, not a guarantee.

More projects in Bandlaguda Jagir