Sign in

Siyora Fort View

SIYORA FORT · Yadadri Bhuvanagiri · RERA P02000004024

SIYORA FORT VIEW is a plotted residential development in BHONGIR, Bhongir mandal, Yadadri Bhuvanagiri district, developed by the registered promoter SIYORA FORT, a partnership firm. The registered site extent is 63123.16 Sq.m, and the supplied records do not disclose a tower or block count, floors, plot count, or plot configurations. Its TG-RERA registration is P02000004024, and the promoter’s declared completion date is 12.08.2024.

01What we found

Period endedTG-RERA registration ran to 12 Aug 2024 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 6 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSIYORA FORT VIEW RERA record
Project typePlotted residential development / open-plotted layout RERA record
Phase or registered portionA phase designation is not disclosed; the registration identifies the project against Survey Nos. 432/P and 433/P.
TG-RERA registrationP02000004024
Registration validity31/01/2022 to 12/08/2024; certificate records a two-year validity period and no extension. This is the registration period, separate from the promoter’s completion undertaking.
Registered promoterSIYORA FORT, a partnership firm RERA record RERA filing Corporate record
RERA status in supplied recordRegistered; the certificate’s stated validity ended on 12/08/2024. No extension is recorded in the supplied certificate.

Land and geographic identity

FieldRecord
Locality / revenue villageThe project record identifies BHONGIR / Bhongir; the HMDA draft-layout document identifies Buvanagiri. The exact revenue-village identity is not independently verified in the supplied material. RERA record RERA filing
MandalBhongir in the project record; the draft-layout document states Buvanagiri. RERA record
DistrictYadadri Bhuvanagiri in the project record; the draft-layout document states Yadadri. RERA record
PIN508116 RERA record
Project survey numbers432/P and 433/P RERA record Land records
Registered site extent63123.16 Sq.m RERA filing
Net / total land areaProject record gives total and net area as 63123.16 sq.m. HMDA draft-layout document separately records total site area 63123.16, master-plan road affected area 63123.0, and net site area 38035.21; the source does not clarify the relationship among these figures here. RERA filing
BoundariesEast, west, north and south: OTHERS LAND. RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the draft-layout letter was forwarded to Bhongiri Municipality for further action and release of plans. Approvals record
Principal layout approvalDraft Layout Permit No. 000294/LO/Plg/HMDA/2021, dated 12 August, 2021; application No. 046890/GHT/LT/U6/HMDA/05072021. Approvals record
Approved built-up area38035.21 sq.m is recorded in the project fields as approved built-up area; the draft-layout document labels 38035.21 as net site area. The supplied records do not establish a building built-up-area schedule for this plotted layout. RERA filing
Building / floor configurationNot disclosed. This is a plotted layout; the supplied approval prohibits construction in plots until HMDA issues the final layout.
Layout areas stated in the HMDA draft-layout documentPlotted area 5231.27; open-space area 5231.27 sq.m (including utility area, in the sanctioned parameters); social-infrastructure area 1581.17 sq.m; roads area 18275.55 sq.m (28.95%). These are source labels and figures, not a reconciled land-use schedule.
Mortgage / reserved plotsHMDA document identifies Plots 32 to 34 and 36 to 81—49 plots in total—covering 8043.06 Sq.Mt., mortgaged to the Metropolitan Commissioner, HMDA.

Offering and status

FieldRecord
Unit typePlots; plot counts and RERA-filed plot-size schedule are not disclosed in the supplied RERA records. RERA record
Completion dateThe promoter’s Form B declares completion by 12.08.2024. This is a promoter undertaking, not independent verification of completion.
Registration deadlineRegistration validity ended 12/08/2024; this is distinct from the declared completion date.
Construction / development stageNo independently verified site-progress assessment is supplied. The RERA amenity records show several infrastructure items with 0% progress. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The project is a plotted layout; the HMDA document refers to final layout release after conditions are met.
Plot sizes, counts and availabilityRERA-filed plot inventory, plot-size bands, booked/available counts and as-of date are not supplied.

2. The project story

  • SIYORA FORT VIEW is registered as a plotted residential project in the Bhongir area, on Survey Nos. 432/P and 433/P. The RERA record gives a site extent of 63123.16 sq.m. HMDA’s filed document is a draft layout letter for an open-plotted layout, rather than evidence in the supplied material that final layout release or development completion has occurred. RERA record Land records
  • The HMDA document identifies roads, open space and social-infrastructure land, and includes conditions for works such as underground storm-water drainage, paved footpaths, cycling tracks and LED street lighting. It also says roads and open spaces are to be transferred to the local body by registered gift deed before final layout release, and that the applicant must complete the developmental works within three years. The supplied record does not establish that these conditions have been fulfilled.
  • A promoter-signed Form B undertaking sets 12.08.2024 as the completion date. The documents supplied do not establish actual completion, final layout release, possession status or an occupancy/completion certificate; declared timelines should therefore not be read as verified delivery.

3. Master plan, architecture & building design

  • The supplied design evidence concerns a plotted layout, not apartment or building plans. HMDA’s draft-layout letter identifies the site as 63123.16 Sq.m and labels 38035.21 as net site area. The project fields also show 38035.21 sq.m as approved built-up area, but the supplied layout document labels that same figure as net site area; no building drawings or schedule establishes an approved building built-up area. RERA filing RERA filing
  • The HMDA document reports roads area of 18275.55 sq.m (28.95%), open-space area of 5231.27 sq.m (8.29%), and social-infrastructure area of 1581.17 sq.m (2.50%) in its sanctioned parameters. Its separate land-use entries label plotted area 5231.27, open space 1581.17, social infrastructure 18275.55, and layout road area 0; these labels are reproduced as recorded and are not reconciled here.
  • The document states that residential-building ground coverage in a plot shall not exceed 25% of total plot area and that maximum height for residential use is 15 Mtrs and below. It also states that construction in plots is not to be allowed until final layout issue by HMDA. No building count, plot-by-plot arrangement, plot dimensions, floor plans, building heights in practice, or final layout plan is supplied.

4. Homes, configurations & floor plans

This is a plotted project. The supplied RERA material does not include a plot inventory with plot counts, plot-size bands, booked/available status or RERA-filed saleable areas. Accordingly, those figures cannot be confirmed from the supplied registration evidence.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

The filed drawing review records two drawings, both pending scan review; no plot layout sheets or software-measured areas are available. Third-party vendor material lists plot sizes of 1350 Sq. Ft. and 2700 Sq. Ft., but these are not established as RERA-filed inventory figures in the supplied records. Floor plans Promoter website

5. Parking & vehicle circulation

The supplied evidence does not provide a sanctioned parking count or documented plot-specific parking allocation. The project is a plotted layout, and HMDA’s draft-layout conditions identify roads and access-related works rather than individual parking spaces.

The draft-layout letter requires roads to be opened for access to neighbouring sites and says the applicant must not construct a compound wall or fencing around the site. It also specifies road widths of 18 mts and above and 60 feet and above. The materials do not establish completed roads, visitor or accessible parking, EV charging, or exclusive parking rights for any plot.

6. Amenities, recreation & open spaces

The RERA amenity record lists several items but reports 0% progress for each listed item. The HMDA draft-layout letter separately includes layout-level infrastructure and utility conditions. Neither record independently verifies completed facilities. RERA amenities

Internal roads and footpaths
Description / sizeHMDA document refers to roads area 18275.55 sq.m and requires paved footpaths.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified.
Green strip / park / open space
Description / sizeHMDA document records open-space area 5231.27 sq.m in its sanctioned parameters and refers to park development.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified.
Community buildings / social infrastructure
Description / sizeSocial-infrastructure area 1581.17 sq.m in the HMDA sanctioned parameters.
Declared progress / verified statusRERA amenity record: 0% for community buildings; completion not independently verified.
Street lighting
Description / sizeHMDA condition specifies LED lighting for all streets.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified.
Water conservation / rainwater harvesting
Description / sizeHMDA document lists rain-water harvesting pits; RERA amenity record lists water conservation and rainwater harvesting.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified.
Community recreation
Description / sizeThe RERA list includes an aggregate recreational open-space item.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: 0%; size and completion are not established.

Vendor material mentions a clubhouse, play areas, landscaped garden, seating, tree planting and gated-community features, but those are not established as sanctioned or delivered facilities in the supplied RERA and HMDA records. Promoter website

7. Utilities, building services & safety

  • HMDA’s draft-layout document lists a common septic tank/STP, internal water-supply pipelines, an overhead tank, a transformer, a transformer yard, rainwater-harvesting pits and a bio-compost unit. The RERA amenity list also includes water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation, energy management, fire-safety requirements and an electrical meter room/sub-station/receiving station. The RERA list reports 0% progress for these service items where a percentage is recorded; capacities, design details and completed status are not supplied. RERA amenities
  • The HMDA conditions specifically require an underground storm-water drainage system and shifting LT lines along the road before final layout release. No capacity data, water-source details, power-backup specification, fire-system design, security system or accessibility plan is supplied. These records do not by themselves establish completed services or statutory compliance.

8. Location, access & connectivity

  • The project record identifies Bhongir, Bhongir mandal, Yadadri Bhuvanagiri district, PIN 508116, and Survey Nos. 432/P and 433/P. HMDA’s draft-layout document uses the spelling Buvanagiri for the village and mandal. The supplied material does not independently establish a more precise street address or revenue-village match. RERA record RERA filing
  • HMDA’s conditions state that roads are to be opened for access to neighbouring sites, with road widths described as 18 mts and above and 60 feet and above. The geocoding record supplies coordinates 17.5172789, 78.8863383 and lists the nearest sampled Outer Ring Road interchange at approximately 23.1 km. Vendor connectivity statements are not used here as verified distances or access facts. Location record Promoter website

9. Developer & development status

The registered promoter is SIYORA FORT, identified in the project record as a partnership. Its GSTIN is 36AEKFS3104H1ZC. The supplied records identify Jaipal Reddy Gowrigari as authorized signatory and Srinivas Reddy Mettu as a partner. The RERA certificate lists the promoter office as Village: Nacharam, Mandal: Uppal, District: Medchal-Malkajgiri, PIN: 500076; no official promoter website or contact details are supplied. RERA record RERA filing Corporate record Parties record

The promoter’s Form B affidavit, dated 16th day of Dec 2021, declares a completion date of 12.08.2024 and states that the land is free from encumbrances. These are promoter declarations in the filed affidavit. The supplied records do not include an independently verified construction-progress report or an extension certificate.

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C registration for SIYORA FORT VIEW, registration P02000004024, covering Survey Nos. 432/P and 433/P; certificate states validity from 31/01/2022 to 12/08/2024 and records no extension.
HMDA layout approval documentHMDA draft-layout letter technically approving Draft Layout Permit No. 000294/LO/Plg/HMDA/2021, dated 12 August, 2021, for a residential open-plotted layout; application No. 046890/GHT/LT/U6/HMDA/05072021. It records conditions for further action and final layout release.
HMDA mortgage recorded in layout documentDocument No. 8160/2021, dated 3/8/2021, for the HMDA mortgage over Plots 32 to 34 and 36 to 81, totaling 8043.06 Sq.Mt.
Promoter declarationForm B affidavit by Jaipal Reddy G, for SIYORA FORT, dated 16th day of Dec 2021; includes the promoter’s completion undertaking and other declarations.
Layout / building plans and final-release evidenceThe supplied material includes the HMDA draft-layout letter, but no final layout release certificate, completed works certification, plot schedule or occupancy/completion certificate.
Public layout-portal lookupHMDA’s approved-layout lookup is reported as unavailable from the public internet in the supplied HMDA record; this is not evidence of approval refusal or of final layout release. HMDA

Frequently asked questions

Is SIYORA FORT VIEW registered with Telangana RERA?

Yes. SIYORA FORT VIEW is registered with the Telangana Real Estate Regulatory Authority as P02000004024; the registration status is New Project.

Who is the developer of SIYORA FORT VIEW?

The promoter named in the RERA registration is SIYORA FORT.

Where is SIYORA FORT VIEW located?

SIYORA FORT VIEW is in BHONGIR, Yadadri Bhuvanagiri, Telangana (508116).

When will SIYORA FORT VIEW be completed?

The promoter's proposed date of completion filed with RERA is 12/08/2024. This is the promoter's declaration, not a guarantee.

More projects in Bhongir