Sign in

Silver Oaks

SHATHABDI TOWNSHIPS PVT LTD · Rangareddy · RERA P02400000343

SILVER OAKS is a plotted development in Tooprakhurd, Maheshwaram Mandal, Ranga Reddy District, developed by registered promoter Shathabdi Townships Pvt Ltd. The project covers 86,860.89 sq.m. and is a residential open-plot layout; the supplied records do not establish a total plot count or building and floor configuration. The offering is residential plots, with individual plot sizes not supplied. It is registered with TG-RERA under P02400000343, with proposed completion recorded as 30/09/2019.

More from Shathabdi Townships Pvt Ltd · 3 projects →

01What we found

Period endedTG-RERA registration ran to 30 Sep 2019 - check its extension on TG-RERA
12documents on file - each fact links to its page
12court cases on this project's land (survey 158, 159, 222, 223, Maheshwaram)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSILVER OAKS RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionThe registration is for the project covering the listed survey numbers; a separate phase designation is not disclosed.
TG-RERA registrationP02400000343
Registration validityCertificate states 20/02/2019 to 30/09/2019, unless extended by the Authority. The certificate records no extension. This is registration validity, not an occupancy certificate.
Registered promoterShathabdi Townships Pvt Ltd
RERA status in project recordOn-Going Project RERA record

Land and geographic identity

ItemProject record
Locality / revenue villageTooprakhurd (also written as Tooprakhurd / Thupra Khurd in filed records); the RERA identity fields separately give Maheshwaram as village. The project’s filed location is Tooprakhurd, Maheshwaram Mandal. RERA record RERA filing
MandalMaheshwaram RERA record
DistrictRanga Reddy RERA record
PIN501359 RERA record
Project survey numbers158/P, 159/P, 222/P and 223/P RERA record
Total/site area86,860.89 sq.m. RERA filing
Net area59,111.40 sq.m., as recorded in the RERA land details. RERA filing
BoundariesEast: N; West: N; North: N; South: N. The boundary entries are recorded as “N”; descriptive adjoining properties are not disclosed. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout approvalHMDA layout permit 000195/LO/Plg/HMDA/2018, dated 19 September 2018; the file includes a draft layout letter. Approvals record
Final layout releaseFinal Layout Letter for the same survey numbers and permit, dated 22 January 2021.
Approved built-up areaNot disclosed for this plotted layout; the RERA field lists 499962.01 under “Approved Built up Area (In Sqmts)” without a reconciled explanation in the supplied record. RERA filing
Buildings / floorsNot applicable to the plotted-layout offering as evidenced here; no building count or sanctioned floor configuration is supplied. Individual plot construction is subject to separate building permission.
Parking levelsNot disclosed for the layout.
Plot countThe draft approval identifies plots 246 to 279 as 34 plots mortgaged in favour of HMDA; the supplied records do not establish the total saleable plot count.

Offering and status

ItemProject record
What is offeredPlots in a residential layout; individual plot sizes, unit inventory and saleable-size range are not supplied.
Booked / available countsNot disclosed in the supplied project data.
Construction / completion statusAn architect’s completion certificate filed for the project states 100% completion of estimated project cost; the Final Layout Letter also records an architect’s certificate stating the layout was completed in all aspects. These are filed certifications, not an independent site inspection in this report.
Original / revised completion date30/09/2019 / 30/09/2019, as recorded in the project fields; the promoter’s Form B also undertakes completion by 30/09/2019. RERA record
Occupancy / completion certificationThe Final Layout Letter records an HMDA occupancy certificate number 039203/LT/SMD/FLT/U6/HMDA/18092020, dated 22-01-2021. This is recorded in the layout approval document; it is not a statement that individual plot houses have occupancy certificates.

2. The project story

SILVER OAKS is registered as a plotted development in Tooprakhurd, Maheshwaram Mandal, Ranga Reddy District, over survey numbers 158/P, 159/P, 222/P and 223/P. The filed HMDA layout material describes a residential open-plot layout, not an apartment or villa project. Individual building permissions are to be considered separately under the applicable building rules; the final layout conditions state that the sites are for residential dwelling houses. RERA record

HMDA’s record includes a draft layout approval dated 19 September 2018 and a Final Layout Letter dated 22 January 2021. The layout document records roads, open spaces and social-infrastructure areas, and says the associated areas were handed over to the local authority by registered gift deed. The completion material filed for the project reports completion, including an architect’s certificate stating 100% completion of estimated project cost. Those are document-based certifications; no independent site inspection or plot-by-plot delivery status is supplied here.

3. Master plan, architecture & building design

This is a plotted layout, so the relevant design evidence concerns the site layout, roads, open spaces and utility reservations rather than building footprints or apartment plans. The HMDA draft layout material identifies a total site area of 86,860.89 sq.m. and records a 59,111.40 sq.m. net area in the RERA land details. The draft letter also lists 27,749.49 sq.m. as road-affected area and describes roads, open space and social-infrastructure handovers. RERA filing

The draft layout drawing depicts road widths marked 12.20m and 10.06m, while the HMDA draft letter describes roads as “11 mts and above.” A separate legible, dimensioned sanctioned drawing or complete plot schedule is not available in the supplied extracts.

The draft approval identifies plots 246 to 279—34 plots measuring 7,551.889 sq.m.—as mortgaged in favour of HMDA. The Final Layout Letter records a registered gift deed for roads, open spaces and social-infrastructure areas (Document No. 2142/2019, dated 31-01-2019) and a relinquishment deed for mortgaged plots (Document No. 145/2021, dated 01/04/2021).

The draft letter lists layout infrastructure including black-top roads, storm-water drains, underground drainage lines, a common septic tank, internal water-supply pipelines, an overhead tank, electrical lines, street lights, a transformer, avenue planting, park development, rainwater-harvesting pits and underground utility ducting. The final letter also refers to water supply, sewerage, drainage, street lighting and rainwater-harvesting structures. These are approval-document descriptions; delivered condition is addressed separately below.

4. Homes, configurations & floor plans

This is a plotted development, not an apartment configuration. The supplied records do not provide a complete plot schedule, plot-size bands, total plot count, booked/available inventory or plot-wise RERA saleable areas. The draft HMDA record identifies plots 246–279 as the 34 plots mortgaged to HMDA; it does not establish the project’s total plot inventory.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Residential plotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicableNot applicable

No floor-plan drawing for individual homes is supplied. The two drawings recorded in the floor-plan review remain unmeasured, with two scans pending; therefore no software-measured carpet area or room dimensions can be reported. Floor plans

5. Parking & vehicle circulation

The supplied records do not establish resident or visitor parking counts, accessible spaces, parking allocation to individual plots, or parking levels. The draft HMDA letter identifies plots 246–279 as mortgaged plots, not parking spaces.

The draft approval describes internal roads and requires roads to remain open for access to neighbouring lands; the drawing extract shows road widths marked 12.20m and 10.06m. No separate evidence of pedestrian separation, ramps, EV charging or an individual plot’s exclusive parking entitlement is supplied.

6. Amenities, recreation & open spaces

The approval records refer to park/open space and community or social-infrastructure land. The progress entries below are project-filed amenity data; they are not independent verification of present site condition.

Landscape / open space
FacilityGreen strip / tot lot / park
Description / sizeSize not specified in the amenity entry. The draft letter records 2,200.5 sq.m. as open space; it also records an organised open-space area of 5,948.82 sq.m. (8.00%).
Evidence sourceDraft HMDA layout letter; RERA-filed amenity data
Declared progress / verified statusAmenity data reports 100%; not independently site-verified. RERA amenities
Landscape / open space
FacilityAvenue planting / park development
Description / sizeQuantities and dimensions not stated.
Evidence sourceDraft HMDA layout letter
Declared progress / verified statusListed as a layout provision; completion not independently verified.
Convenience / community
FacilitySocial-infrastructure area
Description / size2,200.50 sq.m., as stated in the draft letter’s handover condition.
Evidence sourceDraft HMDA layout letter
Declared progress / verified statusHandover by registered gift deed is recorded in the Final Layout Letter; no specific facility schedule is supplied.
Clubhouse / indoor
FacilityClubhouse, swimming pool, gym
Description / sizeSizes and capacities not supplied.
Evidence sourceThird-party vendor listing Promoter website
Declared progress / verified statusListed by vendor only; not established as sanctioned, RERA-declared or delivered.
Sports / recreation
FacilityChildren’s play area
Description / sizeSize and equipment not supplied.
Evidence sourceThird-party vendor listing Promoter website
Declared progress / verified statusListed by vendor only; not established as sanctioned, RERA-declared or delivered.

The RERA-filed amenity list reports internal roads and footpaths, water supply and sewerage at 95%, and green strip/tot lot/park and street lighting at 100%. Other listed items, including storm-water drains, community buildings, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management and recreational open-space aggregate area, show 0% in that data. These percentages are recorded declarations, not an independent condition survey. RERA amenities

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterThe draft approval calls for a protected water-supply system, an overhead tank and sumps; the layout utility list also refers to internal water-supply lines and an assured water source. The RERA-filed amenity data reports water supply at 95%. Storage capacity and source details are not supplied. RERA amenities
Sewerage and drainageThe draft approval lists underground drainage lines and a common septic tank; the RERA-filed amenity list describes sewerage (chambers, lines, septic tank, STP) at 95%. The separate entries for storm-water drains and treatment/disposal of sewage and sullage water show 0% in the progress data. No treatment capacity or reuse details are supplied. RERA amenities
Rainwater managementRainwater-harvesting pits/structures are listed in the draft and final layout material; the RERA-filed progress entry for water conservation/rainwater harvesting is 0%. RERA amenities
ElectricalThe draft approval lists electrical supply lines, street lights and a transformer. The RERA-filed progress data reports street lighting at 100% and electrical meter room/sub-station/receiving station at 0%. Capacity and backup supply are not disclosed. RERA amenities
Waste managementSolid-waste management and disposal are listed in the RERA-filed amenity data at 0%. A specific system or capacity is not supplied. RERA amenities
Fire and life safetyFire-protection and fire-safety requirements appear in the architect’s listed project works, but the supplied material does not establish specific systems, clearances or completed provision for this plotted layout. RERA amenities
Accessibility and securitySpecific accessibility provisions, CCTV, access-control or security arrangements are not disclosed.

8. Location, access & connectivity

The registered project location is Tooprakhurd, Maheshwaram Mandal, Ranga Reddy District, Telangana, PIN 501359, on survey numbers 158/P, 159/P, 222/P and 223/P. RERA record

The HMDA material describes internal roads and requires them to remain open for access to neighbouring lands. The location data supplies one measured connectivity reference: Outer Ring Road (nearest sampled interchange, approx) — 10.6 km. Location record

No project-specific public-transport details or verified distances to schools, hospitals, airports or other landmarks are supplied. The statements about nearby schools, airports, restaurants, bus stops and railway stations appear only in a third-party vendor listing and are not quantified or independently verified here. Promoter website

9. Developer & development status

The registered promoter is Shathabdi Townships Pvt Ltd, identified in the project record as a company. The supplied data gives promoter and authorised-signatory names but does not provide a verifiable corporate registration number, official contact details or company website for this project. Corporate record Parties record

The promoter’s Form B, dated 19 November 2018, declares legal title, states that the land is free from encumbrances, and undertakes completion by 30/09/2019. These are promoter declarations in the RERA filing.

An architect’s certificate filed for SILVER OAKS states 100% completion of estimated project cost. The Final Layout Letter records an architect’s certificate stating completion in all aspects and identifies the HMDA occupancy certificate number and date. The supplied evidence does not give plot-wise possession, sale, or individual-house construction status.

10. Approvals, official records & documents

TG-RERA Registration Certificate
Identifier / dateP02400000343; issued 20/02/2019; validity through 30/09/2019 unless extended
What the supplied document recordsForm C registration for SILVER OAKS; the certificate records no extension.
HMDA draft layout letter
Identifier / date000195/LO/Plg/HMDA/2018; 19 September 2018
What the supplied document recordsDraft layout approval for survey numbers 158/P, 159/P, 222/P and 223/P; includes conditions, road/open-space/social-infrastructure handovers and HMDA mortgage plots.
HMDA final layout release
Identifier / dateSame permit number; 22 January 2021; file No. 039203/LT/SMD/FLT/U6/HMDA/18092020
What the supplied document recordsFinal Layout Letter for the project survey numbers; records gift and relinquishment deeds and an occupancy certificate number/date.
Registered gift deed referenced in final letter
Identifier / dateDocument No. 2142/2019, dated 31-01-2019
What the supplied document recordsRoads, open spaces and social-infrastructure area recorded as handed over to the local authority.
Registered relinquishment deed referenced in final letter
Identifier / dateDocument No. 145/2021, dated 01/04/2021
What the supplied document recordsRelinquishment concerning mortgaged plots in favour of HMDA.
Occupancy certificate reference in final letter
Identifier / date039203/LT/SMD/FLT/U6/HMDA/18092020, dated 22-01-2021
What the supplied document recordsCertificate number and date recorded in the Final Layout Letter.
Architect’s certificate
Identifier / dateTS-RERA P02400000343
What the supplied document recordsProject architect’s filing states 100% completion of estimated project cost and lists infrastructure works.
Promoter Form B declaration
Identifier / date19 November 2018
What the supplied document recordsPromoter declarations and completion undertaking; authorised signatory identified as K Srinivas Reddy.
Draft layout drawing and layout-plan extract
Identifier / dateNo legible approval number in the drawing extract
What the supplied document recordsShows road-width labels and utility features; the extract does not itself legibly establish approval particulars.

Frequently asked questions

Is SILVER OAKS registered with Telangana RERA?

Yes. SILVER OAKS is registered with the Telangana Real Estate Regulatory Authority as P02400000343; the registration status is On-Going Project.

Who is the developer of SILVER OAKS?

The promoter named in the RERA registration is SHATHABDI TOWNSHIPS PVT LTD.

Where is SILVER OAKS located?

SILVER OAKS is in TOOPRAKHURD, Maheshwaram, Rangareddy, Telangana (501359).

When will SILVER OAKS be completed?

The promoter's proposed date of completion filed with RERA is 30/09/2019. This is the promoter's declaration, not a guarantee.

More projects in Maheshwaram