Shivantha Dhatri
SHIVANTHA INFRA · Sangareddy · RERA P01100003704
SHIVANTHA DHATRI is a residential apartment project in PASHAMYLARAM, PATANCHERU, Sangareddy. The registered promoter is Shivantha Infra. The project has a registered site extent of 667.62 sq m and one block with 1 Stilt + 5 upper floors, comprising 20 2BHK apartments with a saleable area of 80.16 m² per unit. Its TG-RERA registration number is P01100003704, and the proposed completion date is 31 December 2024.
More from Shivantha Infra · 10 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SHIVANTHA DHATRI RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the building permit covers one proposed building. RERA record |
| TG-RERA registration | P01100003704, Form C, issued 03/12/2021; valid from 03/12/2021 to 31/12/2024. The certificate records no extension. RERA record |
| Registered promoter | Shivantha Infra (also styled M/s. Shivantha Infra in project documents); entity type: partnership. RERA record Corporate record |
| RERA project status | Recorded as “New Project.” The registration validity period has ended; the supplied evidence does not establish a later extension or current registration status. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Revenue village | PASHAMYLARAM (also rendered Pashamylaram in the building permit). RERA record RERA filing |
| Locality / mandal / district / PIN | PASHAMYLARAM / PATANCHERU / Sangareddy / 502307. RERA record |
| Project survey numbers | 348, 349 and 350; no subdivisions are identified in the supplied project record. RERA record |
| Registered site extent | 667.62 sq m; the building permit records both site area and net area as 667.62 m², with road-affected area 0.00 m². RERA filing |
| Boundaries recorded in RERA filing | North: Plot No. 262; South: Plot No. 267; East: site allotted for park; West: 40 feet wide road. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | TSIIC; the permit is a TSIIC-IALA, Pashamylaram building permit order. Approvals record |
| Principal building approval | IIC/0186/2021, approved 02 September, 2021. Approvals record |
| Approved built-up area | 1,280.28 m² upper-floors area in the permit. The permit separately records coverage area of 294.43 m² and building height of 14.75 m. |
| Building count and configuration | One proposed residential building; 1 Stilt + 5 upper floors. The supplied permit lists one parking floor. |
| RERA-filed units | 20 apartments, one block/tower; the filed configuration is 2BHK. RERA unit table RERA unit details |
| Approved unit count | The supplied permit says the number of units sanctioned must not be increased without prior approval, but does not state the sanctioned unit count in the extracted data. |
| Parking count | Not established in the supplied record. The permit identifies one parking floor and states that approved cellar/stilt parking is to be used exclusively for vehicle parking; it does not provide a space count. |
Offering and status
| Item | Project record |
|---|---|
| Unit type and filed saleable area | 2BHK; 80.16 m² saleable area per unit in the RERA unit record. RERA unit table RERA unit details |
| Booked / available | 0 booked and 20 available in the portal-derived record; no as-of date is supplied, so these counts are indicative rather than a current inventory confirmation. RERA unit table |
| Construction stage | The supplied permit and registration materials describe a proposed building/project. No independently verified current construction-stage evidence is supplied. |
| Completion date | Promoter’s Form-B declaration and the registration record state 31 December 2024 as the completion date. RERA record |
| Occupancy / completion certificate | No completion certificate is recorded in the supplied building-permit extraction; the permit requires an Occupancy Certificate before occupation. The supplied evidence does not establish whether an OC was later issued. |
2. The project story
SHIVANTHA DHATRI is filed with TG-RERA as a residential apartment project in PASHAMYLARAM village, PATANCHERU mandal, Sangareddy district. The project site is identified by Survey Nos. 348, 349 and 350 and a registered extent of 667.62 sq m. The RERA filing identifies one block and 20 two-bedroom apartments. RERA record RERA filing RERA unit table
The building permit describes one proposed residential building with 1 stilt + 5 upper floors. It records an upper-floors area of 1,280.28 m² and a height of 14.75 m. These are permit-record details, not evidence of completed construction.
The promoter declared a completion date of 31 December 2024, and the RERA certificate was valid through that date. The materials supplied do not establish current construction progress, a later extension, or issuance of an occupancy or completion certificate.
3. Master plan, architecture & building design
The building-permit order identifies a site area and net area of 667.62 m², coverage area of 294.43 m² (recorded coverage 44.10%), upper-floors area of 1,280.28 m², and building height of 14.75 m. It describes a single proposed residential building configured as 1 Stilt + 5 upper floors. The extracted permit data gives front, rear and side setbacks of 3.00 m, 3.51 m, 3.50 m and 3.50 m, respectively.
The permit records one parking floor and requires cellar and stilt floors approved for parking to be used exclusively for vehicle parking. It also specifies that a tot-lot is to be maintained at not less than 5% of plot area, and lists a transformer space. A sanctioned drawing or detailed floor-by-floor plan is not available in the supplied evidence, so flat distribution by floor, lift and stair arrangements, building entry/exit locations, and detailed common-area or open-space layouts cannot be described here.
The approved plan’s upper-floors area is distinct from the RERA-filed saleable area of 80.16 m² per apartment. The supplied evidence does not provide an FSI-counted area or a separately stated gross built-up-area figure. RERA unit table
4. Homes, configurations & floor plans
The RERA record lists 20 2BHK apartments, with 0 booked and 20 available in the portal-derived count. That count has no recorded as-of date and should be confirmed against the current TG-RERA record and promoter inventory. The filed saleable area is 80.16 m² per apartment. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 80.16 m² | Software-measured median 51.5 m²; range 51.3–54.9 m² | 36% RERA unit details Floor plans |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures, and are identified as needing review against the drawing. The measurement record covers 8 flat designs. The RERA-filed saleable area and drawing-measured carpet area are different area measures; saleable area includes a share of common areas, while carpet area describes the measured apartment interior. The supplied measurement record also does not provide separate balcony or utility measurements. RERA unit details Floor plans
The drawing extraction identifies a hall, kitchen, wash area, two bedrooms, foyer and toilet in one measured flat. The extracted room dimensions are drawing-based measurements and should not be treated as a substitute for the registered agreement or a site measurement. RERA unit details
5. Parking & vehicle circulation
The building permit identifies one parking floor and states that cellar and stilt floors approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also specifies a minimum width of 4.5 m and height clearance of 5 m in the relevant permit condition.
No sanctioned parking-space count, resident or visitor allocation, accessible-space provision, parking allotment schedule, ramp arrangement, internal driveway plan, pedestrian separation or EV-charging provision is established in the supplied evidence. A parking floor in the permit does not by itself establish an exclusive parking right for any apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / play space | Permit requires a tot-lot of not less than 5% of plot area; the supplied extraction gives no plan-measured area. | Required by permit; completion is not established. | |
| Green strip / tot-lot / park | Listed among RERA amenity items. | RERA amenities | No completion evidence supplied. |
| Community buildings | Listed among RERA amenity items. | RERA amenities | No completion evidence supplied. |
| Internal roads and footpaths | Listed among RERA amenity items. | RERA amenities | No completion evidence supplied. |
| Street lighting | Listed among RERA amenity items. | RERA amenities | No completion evidence supplied. |
| Water conservation / rainwater harvesting | RERA amenity record marks this “YES”; permit requires a rainwater-harvesting structure (percolation pit). | RERA amenities | Declared and required; installation/completion is not established. |
| Swimming pool, gym, children’s play area, clubhouse and landscaped garden | Appearing in third-party vendor amenity text only; the supplied TG-RERA amenity record and permit extraction do not establish these facilities. | Promoter website | Marketing/listing claims; not verified as sanctioned or delivered facilities. |
The RERA amenity record lists 14 infrastructure and facility categories, but its supplied progress percentages are 0 and do not establish completed facilities. RERA amenities
7. Utilities, building services & safety
| Service | Supplied evidence |
|---|---|
| Water | The RERA amenity record marks water supply “YES.” The permit specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for the residential building. The source of water and completion of the tanks are not established. RERA amenities |
| Sewerage and drainage | Sewerage (chambers, lines, septic tank, STP) is marked “YES” in the RERA amenity record. Treatment and disposal of sewage/sullage and storm-water drains are also listed, but the supplied record does not establish their design, capacity or completion. RERA amenities |
| Rainwater | Rainwater harvesting is marked “YES” in the RERA amenity record; the permit requires a percolation pit. Completion is not established. RERA amenities |
| Electrical | The RERA amenity record marks an electrical meter room/sub-station/receiving station “YES.” The permit requires transformer space. Power-backup capacity and the status of electrical infrastructure are not established by the project documents supplied. RERA amenities |
| Lifts | A lift is mentioned in third-party vendor amenity text; the supplied permit extraction and RERA amenity record do not specify lift count, capacity or service-lift provision. Promoter website RERA amenities |
| Fire and life safety | Fire protection and fire-safety requirements are listed in the RERA amenity record. The supplied evidence does not establish the particular systems, clearances or completion status. RERA amenities |
| Waste and security | Solid-waste management/disposal is listed in the RERA amenity record, and the permit requires a garbage house within the premises. The vendor lists waste management and CCTV, but these are not established as completed in the supplied project records. RERA amenities Promoter website |
| Accessibility | Accessible circulation, ramps and accessible parking are not established in the supplied evidence. |
8. Location, access & connectivity
The registered project location is PASHAMYLARAM village, PATANCHERU mandal, Sangareddy district, Telangana 502307. The RERA-filed site boundaries identify a 40 feet wide road along the west and a site allotted for a park to the east. RERA record RERA filing
The supplied location record gives an approximate distance of 6.8 km to the nearest sampled Outer Ring Road interchange. This is a sampled map-based distance, not a stated travel time. No further verified public-transport details, approach-road description or nearby landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is Shivantha Infra, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AEHFS1341F1Z8. The project record names Venkanna Dharavath as authorized signatory and Sudha Rani Dharavath as partner. RERA record Corporate record Parties record
The Form-B affidavit was made by Mr. Dharavath Venkanna, authorized by Shivantha Infra, and states the promoter’s completion undertaking as 31ST DECEMBER 2024. The RERA registration certificate likewise records validity through 31/12/2024 and states no extension in the supplied certificate extraction. The promoter’s registered office is shown on the certificate as “Village: Mandal: District: Hyderabad, Pin: 500017,” with village, mandal and district fields not filled in the extraction. No official website or contact details are supplied.
The supplied documents do not establish current construction progress, completion, or issuance of an occupancy certificate. The building permit requires an Occupancy Certificate before occupation.
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA Form C certificate | Project SHIVANTHA DHATRI, registration P01100003704, issued 03/12/2021 and valid through 31/12/2024; certificate extraction records no extension. |
| Building permit order | TSIIC building permit IIC/0186/2021, dated 02 September, 2021, for a proposed residential building on Survey Nos. 348, 349 and 350 in Pashamylaram, Patancheru, Sangareddy. The extracted permit describes 1 Stilt + 5 upper floors and a site area of 667.62 m². |
| Form-B affidavit-cum-declaration | Promoter declaration identifies four landowners, references Development Agreement-cum-GPA No. 9880/2021, and states the promoter’s completion undertaking and other RERA disclosures. |
| Title report | Advocate title-search report dated 9 April 2021, concerning Survey Nos. 348, 349 and 350 at Pashamylaram; the extraction reports its stated title-chain conclusion. |
| Development Agreement-cum-GPA | Registered instrument dated 26 February 2021, Doc. No. 9880/2021, between the four named landowners and Shivantha Infra, as described in the title-report extraction. |
| Floor-plan document | RERA-filed document 184949 is identified as a layout-plan document; its drawing geometry was used for software measurement of apartment areas. The supplied extract does not provide a complete architectural drawing description. Floor plans |
| Layout approval document | RERA record lists document 184949 under a layout-plan requirement, but the supplied document entry is not extracted as a separate layout approval. Document index |
| Occupancy / completion certificate | No such certificate is established in the supplied project evidence. The permit requires an Occupancy Certificate before occupation. |
1. Project at a glance
Project identity
Registered project name: SHIVANTHA DHATRI
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the building permit covers one proposed building.
TG-RERA registration: P01100003704, Form C, issued 03/12/2021; valid from 03/12/2021 to 31/12/2024. The certificate records no extension.
Registered promoter: Shivantha Infra (also styled M/s. Shivantha Infra in project documents); entity type: partnership.
RERA project status: Recorded as “New Project.” The registration validity period has ended; the supplied evidence does not establish a later extension or current registration status.
Land and geographic identity
Revenue village: PASHAMYLARAM (also rendered Pashamylaram in the building permit).
Locality / mandal / district / PIN: PASHAMYLARAM / PATANCHERU / Sangareddy / 502307.
Project survey numbers: 348, 349 and 350; no subdivisions are identified in the supplied project record.
Registered site extent: 667.62 sq m; the building permit records both site area and net area as 667.62 m², with road-affected area 0.00 m².
Boundaries recorded in RERA filing: North: Plot No. 262; South: Plot No. 267; East: site allotted for park; West: 40 feet wide road.
Development identity
Sanctioning authority: TSIIC; the permit is a TSIIC-IALA, Pashamylaram building permit order.
Principal building approval: IIC/0186/2021, approved 02 September, 2021.
Approved built-up area: 1,280.28 m² upper-floors area in the permit. The permit separately records coverage area of 294.43 m² and building height of 14.75 m.
Building count and configuration: One proposed residential building; 1 Stilt + 5 upper floors. The supplied permit lists one parking floor.
RERA-filed units: 20 apartments, one block/tower; the filed configuration is 2BHK.
Approved unit count: The supplied permit says the number of units sanctioned must not be increased without prior approval, but does not state the sanctioned unit count in the extracted data.
Parking count: Not established in the supplied record. The permit identifies one parking floor and states that approved cellar/stilt parking is to be used exclusively for vehicle parking; it does not provide a space count.
Offering and status
Unit type and filed saleable area: 2BHK; 80.16 m² saleable area per unit in the RERA unit record.
Booked / available: 0 booked and 20 available in the portal-derived record; no as-of date is supplied, so these counts are indicative rather than a current inventory confirmation.
Construction stage: The supplied permit and registration materials describe a proposed building/project. No independently verified current construction-stage evidence is supplied.
Completion date: Promoter’s Form-B declaration and the registration record state 31 December 2024 as the completion date.
Occupancy / completion certificate: No completion certificate is recorded in the supplied building-permit extraction; the permit requires an Occupancy Certificate before occupation. The supplied evidence does not establish whether an OC was later issued.
2. The project story
SHIVANTHA DHATRI is filed with TG-RERA as a residential apartment project in PASHAMYLARAM village, PATANCHERU mandal, Sangareddy district. The project site is identified by Survey Nos. 348, 349 and 350 and a registered extent of 667.62 sq m. The RERA filing identifies one block and 20 two-bedroom apartments.
The building permit describes one proposed residential building with 1 stilt + 5 upper floors. It records an upper-floors area of 1,280.28 m² and a height of 14.75 m. These are permit-record details, not evidence of completed construction.
The promoter declared a completion date of 31 December 2024, and the RERA certificate was valid through that date. The materials supplied do not establish current construction progress, a later extension, or issuance of an occupancy or completion certificate.
3. Master plan, architecture & building design
The building-permit order identifies a site area and net area of 667.62 m², coverage area of 294.43 m² (recorded coverage 44.10%), upper-floors area of 1,280.28 m², and building height of 14.75 m. It describes a single proposed residential building configured as 1 Stilt + 5 upper floors. The extracted permit data gives front, rear and side setbacks of 3.00 m, 3.51 m, 3.50 m and 3.50 m, respectively.
The permit records one parking floor and requires cellar and stilt floors approved for parking to be used exclusively for vehicle parking. It also specifies that a tot-lot is to be maintained at not less than 5% of plot area, and lists a transformer space. A sanctioned drawing or detailed floor-by-floor plan is not available in the supplied evidence, so flat distribution by floor, lift and stair arrangements, building entry/exit locations, and detailed common-area or open-space layouts cannot be described here.
The approved plan’s upper-floors area is distinct from the RERA-filed saleable area of 80.16 m² per apartment. The supplied evidence does not provide an FSI-counted area or a separately stated gross built-up-area figure.
4. Homes, configurations & floor plans
The RERA record lists 20 2BHK apartments, with 0 booked and 20 available in the portal-derived count. That count has no recorded as-of date and should be confirmed against the current TG-RERA record and promoter inventory. The filed saleable area is 80.16 m² per apartment.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 80.16 m² | Software-measured median 51.5 m²; range 51.3–54.9 m² | 36% |
The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures, and are identified as needing review against the drawing. The measurement record covers 8 flat designs. The RERA-filed saleable area and drawing-measured carpet area are different area measures; saleable area includes a share of common areas, while carpet area describes the measured apartment interior. The supplied measurement record also does not provide separate balcony or utility measurements.
The drawing extraction identifies a hall, kitchen, wash area, two bedrooms, foyer and toilet in one measured flat. The extracted room dimensions are drawing-based measurements and should not be treated as a substitute for the registered agreement or a site measurement.
5. Parking & vehicle circulation
The building permit identifies one parking floor and states that cellar and stilt floors approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It also specifies a minimum width of 4.5 m and height clearance of 5 m in the relevant permit condition.
No sanctioned parking-space count, resident or visitor allocation, accessible-space provision, parking allotment schedule, ramp arrangement, internal driveway plan, pedestrian separation or EV-charging provision is established in the supplied evidence. A parking floor in the permit does not by itself establish an exclusive parking right for any apartment.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / play space | Permit requires a tot-lot of not less than 5% of plot area; the supplied extraction gives no plan-measured area. | Required by permit; completion is not established. | |
| Green strip / tot-lot / park | Listed among RERA amenity items. | No completion evidence supplied. | |
| Community buildings | Listed among RERA amenity items. | No completion evidence supplied. | |
| Internal roads and footpaths | Listed among RERA amenity items. | No completion evidence supplied. | |
| Street lighting | Listed among RERA amenity items. | No completion evidence supplied. | |
| Water conservation / rainwater harvesting | RERA amenity record marks this “YES”; permit requires a rainwater-harvesting structure (percolation pit). | Declared and required; installation/completion is not established. | |
| Swimming pool, gym, children’s play area, clubhouse and landscaped garden | Appearing in third-party vendor amenity text only; the supplied TG-RERA amenity record and permit extraction do not establish these facilities. | Marketing/listing claims; not verified as sanctioned or delivered facilities. |
The RERA amenity record lists 14 infrastructure and facility categories, but its supplied progress percentages are 0 and do not establish completed facilities.
7. Utilities, building services & safety
Water: The RERA amenity record marks water supply “YES.” The permit specifies a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for the residential building. The source of water and completion of the tanks are not established.
Sewerage and drainage: Sewerage (chambers, lines, septic tank, STP) is marked “YES” in the RERA amenity record. Treatment and disposal of sewage/sullage and storm-water drains are also listed, but the supplied record does not establish their design, capacity or completion.
Rainwater: Rainwater harvesting is marked “YES” in the RERA amenity record; the permit requires a percolation pit. Completion is not established.
Electrical: The RERA amenity record marks an electrical meter room/sub-station/receiving station “YES.” The permit requires transformer space. Power-backup capacity and the status of electrical infrastructure are not established by the project documents supplied.
Lifts: A lift is mentioned in third-party vendor amenity text; the supplied permit extraction and RERA amenity record do not specify lift count, capacity or service-lift provision.
Fire and life safety: Fire protection and fire-safety requirements are listed in the RERA amenity record. The supplied evidence does not establish the particular systems, clearances or completion status.
Waste and security: Solid-waste management/disposal is listed in the RERA amenity record, and the permit requires a garbage house within the premises. The vendor lists waste management and CCTV, but these are not established as completed in the supplied project records.
Accessibility: Accessible circulation, ramps and accessible parking are not established in the supplied evidence.
8. Location, access & connectivity
The registered project location is PASHAMYLARAM village, PATANCHERU mandal, Sangareddy district, Telangana 502307. The RERA-filed site boundaries identify a 40 feet wide road along the west and a site allotted for a park to the east.
The supplied location record gives an approximate distance of 6.8 km to the nearest sampled Outer Ring Road interchange. This is a sampled map-based distance, not a stated travel time. No further verified public-transport details, approach-road description or nearby landmark distances are supplied.
9. Developer & development status
The registered promoter is Shivantha Infra, identified in the project record as a partnership. The supplied corporate identifier is GSTIN 36AEHFS1341F1Z8. The project record names Venkanna Dharavath as authorized signatory and Sudha Rani Dharavath as partner.
The Form-B affidavit was made by Mr. Dharavath Venkanna, authorized by Shivantha Infra, and states the promoter’s completion undertaking as 31ST DECEMBER 2024. The RERA registration certificate likewise records validity through 31/12/2024 and states no extension in the supplied certificate extraction. The promoter’s registered office is shown on the certificate as “Village: Mandal: District: Hyderabad, Pin: 500017,” with village, mandal and district fields not filled in the extraction. No official website or contact details are supplied.
The supplied documents do not establish current construction progress, completion, or issuance of an occupancy certificate. The building permit requires an Occupancy Certificate before occupation.
10. Approvals, official records & documents
TG-RERA Form C certificate: Project SHIVANTHA DHATRI, registration P01100003704, issued 03/12/2021 and valid through 31/12/2024; certificate extraction records no extension.
Building permit order: TSIIC building permit IIC/0186/2021, dated 02 September, 2021, for a proposed residential building on Survey Nos. 348, 349 and 350 in Pashamylaram, Patancheru, Sangareddy. The extracted permit describes 1 Stilt + 5 upper floors and a site area of 667.62 m².
Form-B affidavit-cum-declaration: Promoter declaration identifies four landowners, references Development Agreement-cum-GPA No. 9880/2021, and states the promoter’s completion undertaking and other RERA disclosures.
Title report: Advocate title-search report dated 9 April 2021, concerning Survey Nos. 348, 349 and 350 at Pashamylaram; the extraction reports its stated title-chain conclusion.
Development Agreement-cum-GPA: Registered instrument dated 26 February 2021, Doc. No. 9880/2021, between the four named landowners and Shivantha Infra, as described in the title-report extraction.
Floor-plan document: RERA-filed document 184949 is identified as a layout-plan document; its drawing geometry was used for software measurement of apartment areas. The supplied extract does not provide a complete architectural drawing description.
Layout approval document: RERA record lists document 184949 under a layout-plan requirement, but the supplied document entry is not extracted as a separate layout approval.
Occupancy / completion certificate: No such certificate is established in the supplied project evidence. The permit requires an Occupancy Certificate before occupation.
Frequently asked questions
Is SHIVANTHA DHATRI registered with Telangana RERA?
Yes. SHIVANTHA DHATRI is registered with the Telangana Real Estate Regulatory Authority as P01100003704; the registration status is New Project.
Who is the developer of SHIVANTHA DHATRI?
The promoter named in the RERA registration is SHIVANTHA INFRA.
Where is SHIVANTHA DHATRI located?
SHIVANTHA DHATRI is in PASHAMYLARAM, PATANCHERU, Sangareddy, Telangana (502307).
When will SHIVANTHA DHATRI be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2024. This is the promoter's declaration, not a guarantee.