Shiv Shakti Heights

CHIRAG RAJ · Sangareddy · RERA P01100006623

SHIV SHAKTI HEIGHTS is a residential apartment project in POTHIREDDYPALLI, SANGAREDDY Mandal, Sangareddy District, developed by registered promoter Chirag Raj Reddy. It is on a total land area of 682.63 sq. m and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK units, each with a saleable area of 124.48 sq. m. The TG-RERA registration number is P01100006623, and the proposed completion date is 11-11-2025.

01What we found

Period endedTG-RERA registration ran to 11 Nov 2025 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSHIV SHAKTI HEIGHTS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. The registered site is described as Plot Nos. 19, 20 and 21 in Survey No. 6. RERA record
TG-RERA registrationP01100006623; granted under section 5; issued 26/07/2023. RERA record
Registration validityCertificate states 26/07/2023 to 11/11/2025; no extension is recorded in the supplied certificate. This is registration validity, not an occupancy certificate. RERA record
Registered promoterChirag Raj Reddy (also recorded in project fields as CHIRAG RAJ). RERA record Corporate record
RERA status in supplied recordRegistration certificate issued; its stated validity ended 11/11/2025. The supplied record does not establish a later extension or current registration status.

Land and geographic identity

FieldProject record
Revenue villagePothireddypalli (also rendered Pothreddipalle in project documents). RERA record Land records
LocalityPOTHIREDDYPALLI / Pothireddipalli; Plot Nos. 19, 20 and 21. RERA record RERA filing
Mandal / district / PINSANGAREDDY Mandal; Sangareddy District; 502001. RERA record RERA filing
Project survey number(s)Survey No. 6; no project subdivision is disclosed in the supplied registration identity. RERA record Land records
Registered site area682.63 sq. m total area; 17.73 sq. m affected by road widening/FTL/Nala widening; 664.90 sq. m net area. RERA filing
Building-permit site extent664.90 Sq. Mt.
BoundariesEast: Plot No. 22; West: Road; North: Plot Nos. 16, 17 and 18; South: Road. RERA filing

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); building permit order delegates plan release to Sangareddy Municipality / Municipal Corporation. Approvals record
Principal approval004773/BP/HMDA/0910/SKP/2022, dated 11 November 2022; related proceedings 001754/BP/HMDA/SKP/2022. Approvals record
Approved built-up areaThe permit extraction records 1,964.33 sq. m total built-up area and 1,601.50 sq. m as “A (PROP) built-up area”; these are separately stated figures in the approval record.
Building count / configurationOne proposed residential building; 1 Stilt + 5 upper floors. RERA filing
Parking levels / provisionStilt is stated to be exclusively for vehicle parking; no sanctioned parking-space count is supplied here. The permit prohibits parking or construction in setback areas.
UnitsRERA record lists 20 2BHK units; the project fields show one building. RERA unit table RERA filing

Offering and status

FieldProject record
Unit type and RERA saleable area2BHK; 124.48 sq. m saleable area per unit. RERA unit table
Booked / availablePortal figures read as 0 booked / 20 available; the portal extract has no as-of date, so counts are indicative. RERA unit table
Promoter-declared completion date11-11-2025, stated in the Form-B declaration and registration record.
Construction stageThe supplied evidence does not provide a verified site-progress assessment or construction-stage percentage. Document index
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. HMDA’s permit says an occupancy certificate is required before occupation. Document index

2. The project story

SHIV SHAKTI HEIGHTS is registered as a residential apartment project on Plot Nos. 19, 20 and 21 in Survey No. 6, Pothireddypalli village, Sangareddy Mandal and District. The registered development is a single building, sanctioned for a stilt level and five upper floors, with 20 RERA-listed 2BHK apartments. RERA record Land records RERA unit table

The RERA filing lists all 20 units as available when the supplied portal figures were read, but provides no as-of date for that inventory. The documents identify the development as proposed and record the promoter’s completion undertaking as 11 November 2025; they do not establish present construction progress or that the building is complete. No occupancy/completion certificate is supplied. RERA unit table Document index

3. Master plan, architecture & building design

The filed site identity is Survey No. 6, Plot Nos. 19, 20 and 21, with a registered total area of 682.63 sq. m and net area of 664.90 sq. m after the stated 17.73 sq. m affected area. The building permit describes one residential building with 1 Stilt + 5 upper floors. It records total built-up area of 1,964.33 sq. m and separately identifies 1,601.50 sq. m as “A (PROP) built-up area”; the supplied evidence does not define these two area labels further. RERA filing

The RERA-filed building-permit material includes the approved building configuration, but the supplied layout-plan entry is not extracted and no detailed floor-by-floor architectural schedule is available. The available evidence does not establish flats per floor, lift or stair count, building footprint, circulation arrangements, open-space area, or a phase-wise plan.

The filed 2BHK saleable area is 124.48 sq. m. Separate software measurement of the supplied drawing geometry gives a median carpet area of 61.5 sq. m across eight measured flat designs, with a range of 59.8–65.0 sq. m; this is a drawing-based measurement, not a RERA-filed carpet-area disclosure, and the drawing measurement is marked as needing review. The areas are different measures and should not be treated as interchangeable. RERA unit table Floor plans RERA unit details

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020124.48 sq. mMedian 61.5 sq. m; range 59.8–65.0 sq. m51%

The unit count, booking figures and saleable area are from the TG-RERA record; booked and available counts are indicative because the supplied portal extract has no as-of date. Carpet-area figures are software-measured from floor-plan drawing geometry, not RERA-filed, and the measurement review is flagged as needed. Saleable area and carpet area are distinct; the supplied drawing-measurement notes say saleable area also includes the home’s share of common areas. RERA unit table RERA unit details Floor plans

The measured typical-plan example identifies two bedrooms, living room, dining area, kitchen, two toilets and a utility area. Its room-level measurements are drawing-derived, not RERA disclosures: bedrooms 2.9 × 3.27 m and 2.95 × 3.31 m; living 2.9 × 5.06 m; dining 2.9 × 2.95 m; kitchen 2.34 × 2.95 m; toilets 1.65 × 1.74 m and 1.46 × 1.93 m; utility 1.31 × 1.92 m. RERA unit details

5. Parking & vehicle circulation

The HMDA permit states that the stilt level is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and that parking is not permitted in setback areas. The supplied evidence does not state the sanctioned number of parking spaces, visitor or accessible-space provision, two-wheeler count, ramp configuration, or unit-by-unit parking allocation. A parking bay or general parking provision in a permit does not by itself establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity schedule records the following items. Its progress column is 0 for each listed facility; this is the filed schedule value and does not independently establish on-site completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo dimensions suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Water SupplyListed as available: YESRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Listed as available: YESRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Storm Water DrainsListed as available: YESRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Green Strip/TOT LOT/ParkListed as available: YESRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Street LightingNo dimensions suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Community BuildingsNo description or size suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Treatment and Disposal of Sewage and Sullage WaterNo capacity suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Solid Waste Management and DisposalNo details suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Water Conservation, Rain Water HarvestingListed as available: YESRERA amenity schedule RERA amenities; HMDA permitProgress recorded as 0; permit requires rainwater-harvesting structures; completion not independently verified
Energy ManagementNo details suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Fire Protection and Fire Safety RequirementsNo system details suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Electrical Meter Room, Sub-Station, Receiving StationListed as available: YESRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified
Aggregate area of recreational open spaceNo area suppliedRERA amenity schedule RERA amenitiesProgress recorded as 0; completion not independently verified

7. Utilities, building services & safety

The HMDA approval requires rainwater-harvesting structures, an STP, CCTV cameras, and a transformer; the permit extraction also lists a garbage house. These are approval-record requirements or listed provisions, not confirmation that they have been installed or are operational. The RERA amenity schedule separately marks water supply, sewerage, storm-water drains and rainwater harvesting as “YES,” with progress recorded as 0. RERA amenities

The supplied records do not specify water source or storage capacity, STP capacity or reuse arrangements, storm-water design details, electrical backup capacity, lift provision or capacity, fire-system details, waste-segregation arrangements, or accessible circulation. HMDA’s permit states that an occupancy certificate is compulsory before occupation and identifies completion-notice and occupancy-certificate requirements.

8. Location, access & connectivity

The registered location is Pothireddypalli village, SANGAREDDY Mandal, Sangareddy District, Telangana, PIN 502001, on Plot Nos. 19, 20 and 21 in Survey No. 6. The filed boundaries identify roads on the west and south, and Plot No. 22 to the east and Plot Nos. 16, 17 and 18 to the north. RERA record RERA filing RERA filing

The building-permit record specifies an approach-road width of 4.5mts. and requires the approach road indicated in the plan to be developed and maintained as a black-topped road before release of occupancy. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 20.4 km. No other measured route distances or public-transport details are supplied. Location record

9. Developer & development status

The TG-RERA-registered promoter is Chirag Raj Reddy; the registration certificate names Chirag Raj Reddy, and the filed Form-B declaration is by Chirag Raj Reddy as promoter. The entity type and corporate identifiers are not disclosed in the supplied project evidence. The promoter address recorded in the project pack is SukhaKartha Residency, Bank Colony, Pothireddypalli, Sangareddy, Telangana 502001. Corporate record

The promoter’s Form-B declaration gives 11-11-2025 as the project completion undertaking. The supplied evidence does not establish a revised completion date, construction-progress percentage, or tower-wise progress, and includes no occupancy or completion certificate. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100006623; issued 26/07/2023; stated validity through 11/11/2025
Scope and evidenceForm C certificate for SHIV SHAKTI HEIGHTS, Survey No. 6, Plot Nos. 19, 20 and 21.
HMDA building-permit approval
Identifier / date004773/BP/HMDA/0910/SKP/2022; 11 November 2022
Scope and evidenceBuilding construction approval for a residential building of 1 Stilt + 5 upper floors on Survey No. 6.
HMDA proceedings
Identifier / date001754/BP/HMDA/SKP/2022; 11 November 2022
Scope and evidenceBuilding-permit order record.
Form-B promoter declaration
Identifier / date12-05-2023
Scope and evidencePromoter declaration including title and encumbrance statements and completion undertaking of 11-11-2025.
Building-plan / layout material
Identifier / dateLayout-plan document ID 326494
Scope and evidenceListed as layout-plan material; no extracted layout approval details are available in the supplied record.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceThe available permit requires an occupancy certificate before occupation; the supplied documents do not include one.

Frequently asked questions

Is SHIV SHAKTI HEIGHTS registered with Telangana RERA?

Yes. SHIV SHAKTI HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P01100006623; the registration status is New Project.

Who is the developer of SHIV SHAKTI HEIGHTS?

The promoter named in the RERA registration is CHIRAG RAJ.

Where is SHIV SHAKTI HEIGHTS located?

SHIV SHAKTI HEIGHTS is in POTHIREDDYPALLI, SANGAREDDY, Telangana (502001).

When will SHIV SHAKTI HEIGHTS be completed?

The promoter's proposed date of completion filed with RERA is 11/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Pothreddipalle