Sign in

Sai Nivas

GPR CONSTRUCTIONS · Rangareddy · RERA P02400008898

SAI NIVAS is a residential apartment project in BALAPUR, Balapur mandal, Ranga Reddy district. The registered promoter is GPR CONSTRUCTIONS. The project is on 417.99 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK units, each with a saleable area of 68.52 sq. m. Its TG-RERA registration number is P02400008898, effective 27/06/2023, and its proposed completion date is 30/11/2026.

More from Gpr Constructions · 2 projects →

01What we found

RegisteredTG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Nadergul, Balapur, Ranga Reddy · geocoded — approximate.

Project at a glance

Project identity

ItemProject record
Registered nameSAI NIVAS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionA new project; the registration record describes the project, but a separate phase designation is not disclosed. RERA record
TG-RERA registrationP02400008898, effective 27/06/2023 RERA record
Registration validity27/06/2023 through 26/06/2026; the certificate says registration may be extended by the Authority under the Act and Rules.
Registered promoterGPR CONSTRUCTIONS RERA record RERA filing
RERA statusProject status is recorded as New Project. The registration certificate records registration under section 5. RERA filing

Land and geographic identity

ItemProject record
Locality / plotBALAPUR; Plot No. 13 RERA record RERA filing
Revenue villageNadergul (also written “Nadargul” in the cadastral record) RERA record Cadastral map
Mandal / district / PINBalapur / Ranga Reddy / 501510 RERA record
Project survey number(s)Survey No. 188; no subdivision is stated in the project record. RERA record Land records
Registered site extent417.99 sq. m; the building-permit order describes the proposed site on Plot No. 13 in Survey No. 188. RERA filing
Total / net / affected areaTotal area 417.99 sq. m; net area 417.99 sq. m; road-widening/FTL/nala-affected area recorded as 0 sq. m. RERA filing
Boundaries as filedEast: “MT WIDE MAINROAD”; West: “OTHERS LAND”; North: “RAIN WATER HARVESTING”; South: “OPEN PLOT”. RERA filing

Development identity

ItemProject record
Sanctioning authorityBuilding-permit order 003731/BP/HMDA/0760/SMD/2023, issued by Badangpet Municipal Corporation on 27 June 2023; the order requires a fit-for-occupancy certificate by HMDA before occupation. Approvals record
Principal building configurationOne residential building, 1 Stilt + 5 upper floors, with stated height 14.5 m.
Approved areaThe order states Total Built up Area (In Sq.mts) 1,357.92 and Built-up Area 1,122.75 Sq.mts. These are the order’s separately labelled figures.
Building / block countOne building/block is reflected in the project record; one tower is recorded in the unit summary. RERA unit table
Parking levelsStilt is designated for vehicle parking in the building-permit conditions. Parking-space counts and unit-wise allocations are not established in the supplied record.
Unit count10 units are recorded for the project; the approved-plan unit field also records 1 proposed building unit. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; saleable area 68.52 sq. m per unit. RERA unit table RERA unit details
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the portal record provides no as-of date, so these counts are indicative. RERA unit table
Proposed completion30/11/2026 in the project header. RERA record
Promoter-declared completion dateForm B records 26-06-2026 as the completion undertaking.
Registration validity versus completionRegistration validity ends 26/06/2026 as stated on the certificate; the header separately records proposed completion as 30/11/2026. RERA record
Construction stageNo independently verified construction-progress measurement is supplied. The RERA amenity schedule records 0% against its listed items. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate for this project is included in the supplied documents; the building-permit order requires an occupancy certificate before occupation. Document index

The project story

SAI NIVAS is recorded with TG-RERA as a residential apartment project in Balapur, on Plot No. 13 in Survey No. 188, Nadergul village, Balapur mandal, Ranga Reddy district. The building permit describes one residential building with a stilt level and five upper floors. RERA record Land records

The RERA unit schedule records ten 3BHK apartments, each with a filed saleable area of 68.52 sq. m. Its latest captured booking figures show no units booked and ten available, but the source record has no as-of date. The supplied material does not establish construction progress through an independent site inspection; the RERA amenity schedule shows 0% progress for the listed items. RERA unit table RERA amenities

The header gives a proposed completion date of 30/11/2026, while the promoter’s Form B undertaking states 26-06-2026. These are distinct completion-related entries in the supplied record; neither is evidence that the building is complete or occupied. No project occupancy certificate is included. RERA record Document index

Master plan, architecture & building design

The building-permit order describes a single residential building on a 417.99 sq. m site, configured as 1 Stilt + 5 upper floors, with a stated building height of 14.5 m. It separately lists total built-up area as 1,357.92 sq. m and built-up area as 1,122.75 sq. m; the supplied extraction does not define those two area labels further.

The RERA record describes one building unit and the unit schedule records ten apartments. The supplied material does not provide a verified floor-by-floor apartment arrangement, footprint, number of flats per floor, lift or stair details, internal circulation, or landscaped/open-space plan for this project. RERA filing RERA unit table Document index

The order identifies stilt space as exclusively for vehicle parking and lists a transformer space, garbage house, STP, rainwater-harvesting structures, generator, water tanks and fire-fighting installations among the proposed provisions. These are approval-document requirements or listed provisions, not confirmation that they have been installed or completed.

Homes, configurations & floor plans

The RERA filing records ten 3BHK units, all shown as available in the captured portal data, with a saleable area of 68.52 sq. m per unit. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1001068.52 sq. mNot suppliedNot supplied

The supplied floor-plan measurement data relates to 2BHK drawings, which are not listed as a configuration in the TG-RERA unit schedule. Software measurement of those drawings gives a median carpet area of 65.3 sq. m (range 58.9–68.5 sq. m; median 703 sq. ft). This is drawing-derived, not a RERA-filed configuration or disclosure; the source flags the measurements as needing review. It does not provide a drawing-based carpet measurement for the filed 3BHK configuration. Floor plans RERA unit details

Carpet area and saleable area are different measures: the supplied measurement note says software-measured carpet area is smaller than RERA saleable area, which also includes the home’s share of common areas. The supplied project material does not give a verified 3BHK room schedule or room dimensions. Floor plans

Parking & vehicle circulation

The building-permit conditions designate the stilt exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record does not establish the number of sanctioned parking spaces, visitor or accessible spaces, unit-wise parking allocations, parking dimensions, ramp arrangements, or separate pedestrian circulation.

Although a vendor listing mentions a parking lot and covered car parking, that listing does not establish approved counts or legal allocation to any apartment. Promoter website

Amenities, recreation & open spaces

The RERA amenity schedule lists the following provisions and reports 0% progress for each listed item. The building-permit order separately identifies a tot-lot and several building services. The supplied documents do not establish that any facility is complete or independently verified on site. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripBuilding-permit order lists a tot-lot; no size is supplied for this project in the extracted order.Required by the order; completion not verified.
Green Strip/TOT LOT/ParkRERA amenity schedule entry; no size supplied.RERA amenities0%; completion not verified.
Community buildingsNo size or further description supplied.RERA amenities0%; completion not verified.
Internal roads & footpathsNo dimensions supplied.RERA amenities0%; completion not verified.
Street lightingNo further description supplied.RERA amenities0%; completion not verified.

A vendor listing also mentions a swimming pool, gym, children’s play area and clubhouse. These are vendor-listed features; the supplied RERA amenity schedule and building-permit extraction do not establish their approval, size or delivery status. Promoter website RERA amenities

Utilities, building services & safety

The building-permit order lists a transformer, garbage house, STP, rainwater-harvesting structures, generator, separate underground static water storage tank of 25,000 lts., separate terrace tank of 25,000 lts. capacity, and fire-fighting installations. These are recorded as approval-document provisions; the supplied record does not verify installation, operating capacity beyond the stated tank figures, or completion.

The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting/water conservation, and an electrical meter room/sub-station/receiving station as available “YES,” while showing 0% progress for the listed items. The schedule does not specify water source, STP capacity, treated-water reuse, drainage capacity, power-backup capacity, lift provision, fire-system details, CCTV, waste segregation status, or accessibility arrangements. RERA amenities

The permit also requires a garbage house with dry and wet waste segregation, rainwater-harvesting structures, and fire-fighting installations. These requirements do not by themselves establish completed works or statutory compliance.

Location, access & connectivity

The registered location is BALAPUR, revenue village Nadergul, Balapur mandal, Ranga Reddy district, PIN 501510. The project parcel centroid is recorded at 17.290081932778286, 78.56531770091246. RERA record Cadastral map

The building-permit order specifies a 4.5mts. road width and refers to a minimum approach-road width as indicated in the plan. The location data records the nearest sampled Outer Ring Road interchange at approximately 5.8 km. No other measured distances or public-transport details are supplied. Location record

Developer & development status

The TG-RERA record identifies GPR CONSTRUCTIONS as the registered promoter and describes the organization as a Proprietorship. The project record names SANKIREDDY SWATHI as authorized signatory; the Form B affidavit is made by her in connection with SAI NIVAS and identifies GPR CONSTRUCTIONS in the proprietor signature block. RERA record RERA filing Parties record

The promoter’s recorded address is B, GURRAM GUDA, NADERGUL, BALAPUR, Balapur, Ranga Reddy, 501510. The supplied material does not identify an official project website or public contact details. Parties record RERA filing

The project record gives a proposed completion date of 30/11/2026; the Form B declaration states a completion undertaking of 26-06-2026. The registration certificate is valid through 26/06/2026. These are recorded separately from physical progress, for which no independent construction measurement or occupancy certificate is supplied. RERA record Document index

Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm “C” for SAI NIVAS, registration P02400008898, valid from 27/06/2023 through 26/06/2026.
Principal building permit003731/BP/HMDA/0760/SMD/2023, dated 27 June 2023, issued by Badangpet Municipal Corporation for a residential building on Plot No. 13, Survey No. 188, Nadergul.
Earlier building-approval recordDocument 189739 is an approval for a different residential building in Survey No. 119, Zaheerabad, issued to M/S SRI DHARANI DEVELOPERS. It is not identified in its extracted contents as an approval for SAI NIVAS.
Promoter declarationForm B for SAI NIVAS, identifying GPR CONSTRUCTIONS and recording the promoter’s stated completion undertaking and project-fund declarations.
Occupancy / completion evidenceNo project occupancy or completion certificate is included in the supplied documents. The building-permit order requires an occupancy certificate before occupation. Document index

The evidence supplied here does not establish a separate approved-layout document, a project-specific completion certificate, or a project occupancy certificate.

Frequently asked questions

Is SAI NIVAS registered with Telangana RERA?

Yes. SAI NIVAS is registered with the Telangana Real Estate Regulatory Authority as P02400008898; the registration status is New Project.

Who is the developer of SAI NIVAS?

The promoter named in the RERA registration is GPR CONSTRUCTIONS.

Where is SAI NIVAS located?

SAI NIVAS is in BALAPUR, Nadergul, Rangareddy, Telangana (501510).

When will SAI NIVAS be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Nadargul