Sai Krishna Colony
SAIVIKRANTH REAL ESTATE PRIVATE LIMITED · Mahabubnagar · RERA P01400004089
SAI KRISHNA COLONY is a plotted development in Eklaspur, Narayanpet Mandal, Mahabubnagar District. It is being developed by SAIVIKRANTH REAL ESTATE PRIVATE LIMITED on **29663.45 sqmts** of land, with plots as the stated unit type; the number and sizes of plots are not disclosed. The project is registered under TG-RERA **P01400004089**, with proposed completion on **29/04/2027**.
More from Saivikranth Real Estate Pvt Ltd · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SAI KRISHNA COLONY |
| Project type | Plotted development RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registered land is described by survey numbers below |
| TG-RERA registration | P01400004089 |
| Registration validity | Certificate states validity from 15/02/2022 to 29/12/2026; it records no extension |
| Registered promoter | SAIVIKRANTH REAL ESTATE PRIVATE LIMITED RERA filing |
| RERA status | The record identifies this as a registered project. The registration end date is distinct from the stated proposed completion date; current status beyond the supplied certificate is not established here |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Eklaspur; the title reports refer to Eklaspur Shivar [header; doc:216476 p2; doc:216478 p2] |
| Mandal | Narayanpet [header; doc:REGCERT-30030 p1] |
| District | Mahabubnagar [header; doc:REGCERT-30030 p1] |
| PIN | 509127 in the project header and registration certificate; the certificate’s promoter-office field separately states PIN 509210 [header; doc:REGCERT-30030 p1] |
| Project survey numbers / subdivisions | 212/A, 213/A1, 214/A, 216, 217/A and 218/A [header; doc:REGCERT-30030 p1] |
| Total / net site area | 29663.45 sqmts total and 29663.45 sqmts net; affected area reported as 0 RERA filing |
| Boundaries | North: ROAD; South, East and West: OTHERS LAND RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | DTCP is named in the project information RERA filing |
| Principal approval number / date | Approval number not disclosed in the supplied record. “Approved Date” is 30/12/2021; this is not identified here as a plan number RERA filing |
| Approved built-up area | 18292 sqmts RERA filing |
| Mortgage area | 2841 sqmts declared in the RERA record RERA filing |
| Layout / plot count and plot sizes | Not disclosed in the supplied project information; no layout drawing or plot schedule is available here [documents; layout status in hmda] |
| Building / floor configuration | Not applicable to the recorded plotted-development offering; no building or floor schedule is supplied RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots; the supplied RERA project record classifies the project as plotted development RERA filing |
| RERA plot count / plot-size range | Not disclosed in the supplied data RERA filing |
| Booked / available counts | Not disclosed in the supplied data RERA filing |
| Construction / infrastructure stage | RERA amenity data reports internal roads and footpaths, sewerage, storm-water drains, street lighting and aggregate recreational open space at 80%; these are declared progress figures, not independent site verification RERA amenities |
| Proposed completion date | 29/04/2027 [header; fields: Project Information] |
| Registration validity | 15/02/2022–29/12/2026, as stated on the registration certificate; this is separate from the proposed completion date |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied record; the project is a plotted development Document index |
2. The project story
SAI KRISHNA COLONY is registered as a plotted development in Eklaspur, Narayanpet Mandal, Mahabubnagar District, Telangana. The registered land description covers 212/A, 213/A1, 214/A, 216, 217/A and 218/A, with a stated total and net area of 29663.45 sqmts. The offering is plots rather than apartments or houses; the available evidence does not establish the number, dimensions or booking status of individual plots. [header; fields: Project Information; fields: Land Details]
The project record gives 18292 sqmts as approved built-up area, but does not provide a layout plan, plot schedule or approval number in the supplied documents to explain the site arrangement. RERA-filed amenity progress shows several infrastructure items at 80%; those percentages are promoter-reported project information, not independently verified completion. The proposed completion date is 29/04/2027. No completion or occupancy certificate is included in the supplied material. RERA filing
3. Master plan, architecture & building design
The project is a plotted layout, not a documented apartment or villa development. The supplied RERA record states a site area of 29663.45 sqmts and approved built-up area of 18292 sqmts. The record also gives the project survey numbers and identifies DTCP as the authority, but the approval number is not disclosed in the supplied information. RERA filing
No approved layout drawing, plot schedule, road-width schedule, land-use breakdown, park-area measurement or drawing-derived site arrangement is available in the supplied material. The HMDA public-layout lookup is recorded as unavailable and no LP number is present in the RERA record; this is a source limitation, not evidence of approval or refusal. [documents; hmda]
4. Homes, configurations & floor plans
The RERA record identifies a plotted-development project, but the supplied data does not state the plot count, plot-size bands, or booked and available plot counts. The floor-plan input contains one drawing, but it is still pending scan and has 0 measured drawings; therefore no software-measured carpet areas or plot dimensions can be reported. RERA filing
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
5. Parking & vehicle circulation
The RERA amenity schedule lists open parking as available, but does not give a parking count or plot-wise allocation. The vendor-provided specification lists Open Parking (1338 sqm) and Covered Parking (119 numbers); this is vendor information, not a RERA-filed parking schedule in the supplied record. The project’s RERA record does not establish parking ownership or allocation to individual plot purchasers. [amenities; vendor]
Internal roads and footpaths are listed in the RERA amenity schedule at 80% declared progress. Road widths, vehicle entry and exit locations, driveway layout, pedestrian segregation, accessible parking and EV charging are not established by the supplied evidence. [amenities; vendor]
6. Amenities, recreation & open spaces
The RERA amenity schedule records the following facilities and progress. Percentages are project-declared progress figures; independent completion verification is not supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | RERA amenity schedule | 80% declared; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Components named; capacity not stated | RERA amenity schedule | 80% declared; not independently verified |
| Storm Water Drains | Size not stated | RERA amenity schedule | 80% declared; not independently verified |
| Street Lighting | Quantity / specification not stated | RERA amenity schedule | 80% declared; not independently verified |
| Green Strip/TOT LOT/Park | Area and quantity not stated | RERA amenity schedule | 0% declared; not independently verified |
| Aggregate area of recreational Open Space | Area not stated | RERA amenity schedule | 80% declared; not independently verified |
| Community Buildings | Not described | RERA amenity schedule | 0% declared |
| Solid Waste Management and Disposal | Not described | RERA amenity schedule | 0% declared |
| Water Conservation, Rain water Harvesting | Not described | RERA amenity schedule | 0% declared |
The vendor lists a “Green Strip/TOT LOT/Park” and open parking, but does not provide dimensions or capacities for these facilities. These are vendor-supplied descriptions, not evidence of delivery. Promoter website
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drainage, street lighting, and a sewerage system described as chambers, lines, septic tank and STP. It reports water supply at 0% and sewerage, storm-water drains and street lighting at 80%. The record does not state water sources, storage or treatment capacity, STP capacity, reuse arrangements, rainwater-harvesting capacity, electrical supply or backup details. RERA amenities
The same schedule reports 0% for treatment and disposal of sewage and sullage water, water conservation/rainwater harvesting, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. No capacities, technical specifications or completion certificates for these services are included. RERA amenities
8. Location, access & connectivity
The registered location is Eklaspur, Narayanpet Mandal, Mahabubnagar District, with project PIN 509127 in the project header and certificate. [header; doc:REGCERT-30030 p1]
A location record gives a sampled nearest Outer Ring Road interchange distance of 77.6 km. The supplied data does not identify a project approach road, public-transport service, or other measured landmark distances. The vendor describes the location as Narayanpet/Eklaspur and identifies Eklaspur as a nearby landmark, without giving a measured distance. [location; vendor]
9. Developer & development status
The registered promoter is SAIVIKRANTH REAL ESTATE PRIVATE LIMITED, a private limited company. The supplied corporate record identifies the entity as U70100TG2020PTC141829 and GSTIN 36ABDCS9842B1ZA. The project record gives the promoter address as B, DWARAKA HILLS COLONY, Eklaspur, Narayanpet, Mahabubnagar, 509127; no official contact details or company website are supplied. [corporate; parties; header]
The promoter’s Form B declaration names SAIVIKRANTH REAL ESTATEPT LTD and declares the project land free from encumbrances; its completion-period field is blank in the OCR extraction. The project record separately states a proposed completion date of 29/04/2027. RERA progress percentages for infrastructure are promoter-declared; no independent site-progress verification is provided. [header; amenities]
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C records registration under section 5 for SAI KRISHNA COLONY, P01400004089, with validity stated as 15/02/2022 to 29/12/2026; it includes a separate-account condition. |
| Authority / approval information | The project information names DTCP and gives approved date 30/12/2021; no approval number is disclosed in the supplied data. RERA filing |
| Layout approval / plan | A RERA document entry requests a layout approval letter or stamped layout plan, but the supplied extraction does not contain an approved layout drawing or LP number. |
| Title reports filed with RERA | Title-report documents address the project survey land, including the report for Sy.Nos. 212/A, 213/A1, 214/A, 217/A and 218/A and the separate report for Sy.No. 216. |
| Form B declaration | Promoter declaration states the land is free from encumbrances; the OCR contains alternative title-basis wording and a blank completion-period field. |
| Completion / occupancy certificate | Not identified in the supplied documents. Document index |
| Public layout lookup | HMDA DPMS lookup is recorded as unavailable from the public internet; no LP number is present in the RERA record. HMDA |
1. Project at a glance
Project identity
Registered project name: SAI KRISHNA COLONY
Project type: Plotted development
Phase / registered portion: Phase not separately identified in the supplied record; registered land is described by survey numbers below
TG-RERA registration: P01400004089
Registration validity: Certificate states validity from 15/02/2022 to 29/12/2026; it records no extension
Registered promoter: SAIVIKRANTH REAL ESTATE PRIVATE LIMITED
RERA status: The record identifies this as a registered project. The registration end date is distinct from the stated proposed completion date; current status beyond the supplied certificate is not established here
Land and geographic identity
Locality / revenue village: Eklaspur; the title reports refer to Eklaspur Shivar [header; doc:216476 p2; doc:216478 p2]
Mandal: Narayanpet [header; doc:REGCERT-30030 p1]
District: Mahabubnagar [header; doc:REGCERT-30030 p1]
PIN: 509127 in the project header and registration certificate; the certificate’s promoter-office field separately states PIN 509210 [header; doc:REGCERT-30030 p1]
Project survey numbers / subdivisions: 212/A, 213/A1, 214/A, 216, 217/A and 218/A [header; doc:REGCERT-30030 p1]
Total / net site area: 29663.45 sqmts total and 29663.45 sqmts net; affected area reported as 0
Boundaries: North: ROAD; South, East and West: OTHERS LAND
Development identity
Sanctioning authority: DTCP is named in the project information
Principal approval number / date: Approval number not disclosed in the supplied record. “Approved Date” is 30/12/2021; this is not identified here as a plan number
Approved built-up area: 18292 sqmts
Mortgage area: 2841 sqmts declared in the RERA record
Layout / plot count and plot sizes: Not disclosed in the supplied project information; no layout drawing or plot schedule is available here [documents; layout status in hmda]
Building / floor configuration: Not applicable to the recorded plotted-development offering; no building or floor schedule is supplied
Offering and status
Unit type: Plots; the supplied RERA project record classifies the project as plotted development
RERA plot count / plot-size range: Not disclosed in the supplied data
Booked / available counts: Not disclosed in the supplied data
Construction / infrastructure stage: RERA amenity data reports internal roads and footpaths, sewerage, storm-water drains, street lighting and aggregate recreational open space at 80%; these are declared progress figures, not independent site verification
Proposed completion date: 29/04/2027 [header; fields: Project Information]
Registration validity: 15/02/2022–29/12/2026, as stated on the registration certificate; this is separate from the proposed completion date
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied record; the project is a plotted development
2. The project story
SAI KRISHNA COLONY is registered as a plotted development in Eklaspur, Narayanpet Mandal, Mahabubnagar District, Telangana. The registered land description covers 212/A, 213/A1, 214/A, 216, 217/A and 218/A, with a stated total and net area of 29663.45 sqmts. The offering is plots rather than apartments or houses; the available evidence does not establish the number, dimensions or booking status of individual plots. [header; fields: Project Information; fields: Land Details]
The project record gives 18292 sqmts as approved built-up area, but does not provide a layout plan, plot schedule or approval number in the supplied documents to explain the site arrangement. RERA-filed amenity progress shows several infrastructure items at 80%; those percentages are promoter-reported project information, not independently verified completion. The proposed completion date is 29/04/2027. No completion or occupancy certificate is included in the supplied material.
3. Master plan, architecture & building design
The project is a plotted layout, not a documented apartment or villa development. The supplied RERA record states a site area of 29663.45 sqmts and approved built-up area of 18292 sqmts. The record also gives the project survey numbers and identifies DTCP as the authority, but the approval number is not disclosed in the supplied information.
No approved layout drawing, plot schedule, road-width schedule, land-use breakdown, park-area measurement or drawing-derived site arrangement is available in the supplied material. The HMDA public-layout lookup is recorded as unavailable and no LP number is present in the RERA record; this is a source limitation, not evidence of approval or refusal. [documents; hmda]
4. Homes, configurations & floor plans
The RERA record identifies a plotted-development project, but the supplied data does not state the plot count, plot-size bands, or booked and available plot counts. The floor-plan input contains one drawing, but it is still pending scan and has 0 measured drawings; therefore no software-measured carpet areas or plot dimensions can be reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
5. Parking & vehicle circulation
The RERA amenity schedule lists open parking as available, but does not give a parking count or plot-wise allocation. The vendor-provided specification lists Open Parking (1338 sqm) and Covered Parking (119 numbers); this is vendor information, not a RERA-filed parking schedule in the supplied record. The project’s RERA record does not establish parking ownership or allocation to individual plot purchasers. [amenities; vendor]
Internal roads and footpaths are listed in the RERA amenity schedule at 80% declared progress. Road widths, vehicle entry and exit locations, driveway layout, pedestrian segregation, accessible parking and EV charging are not established by the supplied evidence. [amenities; vendor]
6. Amenities, recreation & open spaces
The RERA amenity schedule records the following facilities and progress. Percentages are project-declared progress figures; independent completion verification is not supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | RERA amenity schedule | 80% declared; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Components named; capacity not stated | RERA amenity schedule | 80% declared; not independently verified |
| Storm Water Drains | Size not stated | RERA amenity schedule | 80% declared; not independently verified |
| Street Lighting | Quantity / specification not stated | RERA amenity schedule | 80% declared; not independently verified |
| Green Strip/TOT LOT/Park | Area and quantity not stated | RERA amenity schedule | 0% declared; not independently verified |
| Aggregate area of recreational Open Space | Area not stated | RERA amenity schedule | 80% declared; not independently verified |
| Community Buildings | Not described | RERA amenity schedule | 0% declared |
| Solid Waste Management and Disposal | Not described | RERA amenity schedule | 0% declared |
| Water Conservation, Rain water Harvesting | Not described | RERA amenity schedule | 0% declared |
The vendor lists a “Green Strip/TOT LOT/Park” and open parking, but does not provide dimensions or capacities for these facilities. These are vendor-supplied descriptions, not evidence of delivery.
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drainage, street lighting, and a sewerage system described as chambers, lines, septic tank and STP. It reports water supply at 0% and sewerage, storm-water drains and street lighting at 80%. The record does not state water sources, storage or treatment capacity, STP capacity, reuse arrangements, rainwater-harvesting capacity, electrical supply or backup details.
The same schedule reports 0% for treatment and disposal of sewage and sullage water, water conservation/rainwater harvesting, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. No capacities, technical specifications or completion certificates for these services are included.
8. Location, access & connectivity
The registered location is Eklaspur, Narayanpet Mandal, Mahabubnagar District, with project PIN 509127 in the project header and certificate. [header; doc:REGCERT-30030 p1]
A location record gives a sampled nearest Outer Ring Road interchange distance of 77.6 km. The supplied data does not identify a project approach road, public-transport service, or other measured landmark distances. The vendor describes the location as Narayanpet/Eklaspur and identifies Eklaspur as a nearby landmark, without giving a measured distance. [location; vendor]
9. Developer & development status
The registered promoter is SAIVIKRANTH REAL ESTATE PRIVATE LIMITED, a private limited company. The supplied corporate record identifies the entity as U70100TG2020PTC141829 and GSTIN 36ABDCS9842B1ZA. The project record gives the promoter address as B, DWARAKA HILLS COLONY, Eklaspur, Narayanpet, Mahabubnagar, 509127; no official contact details or company website are supplied. [corporate; parties; header]
The promoter’s Form B declaration names SAIVIKRANTH REAL ESTATEPT LTD and declares the project land free from encumbrances; its completion-period field is blank in the OCR extraction. The project record separately states a proposed completion date of 29/04/2027. RERA progress percentages for infrastructure are promoter-declared; no independent site-progress verification is provided. [header; amenities]
10. Approvals, official records & documents
TG-RERA registration certificate: Form C records registration under section 5 for SAI KRISHNA COLONY, P01400004089, with validity stated as 15/02/2022 to 29/12/2026; it includes a separate-account condition.
Authority / approval information: The project information names DTCP and gives approved date 30/12/2021; no approval number is disclosed in the supplied data.
Layout approval / plan: A RERA document entry requests a layout approval letter or stamped layout plan, but the supplied extraction does not contain an approved layout drawing or LP number.
Title reports filed with RERA: Title-report documents address the project survey land, including the report for Sy.Nos. 212/A, 213/A1, 214/A, 217/A and 218/A and the separate report for Sy.No. 216.
Form B declaration: Promoter declaration states the land is free from encumbrances; the OCR contains alternative title-basis wording and a blank completion-period field.
Completion / occupancy certificate: Not identified in the supplied documents.
Public layout lookup: HMDA DPMS lookup is recorded as unavailable from the public internet; no LP number is present in the RERA record.
Frequently asked questions
Is SAI KRISHNA COLONY registered with Telangana RERA?
Yes. SAI KRISHNA COLONY is registered with the Telangana Real Estate Regulatory Authority as P01400004089; the registration status is New Project.
Who is the developer of SAI KRISHNA COLONY?
The promoter named in the RERA registration is SAIVIKRANTH REAL ESTATE PRIVATE LIMITED.
Where is SAI KRISHNA COLONY located?
SAI KRISHNA COLONY is in EKLASPUR, Narayanpet, Mahabubnagar, Telangana (509127).
When will SAI KRISHNA COLONY be completed?
The promoter's proposed date of completion filed with RERA is 29/04/2027. This is the promoter's declaration, not a guarantee.