Sign in

Royal Heart S County

M/s ROYAL HEART DEVELOPERS · Rangareddy · RERA P02400005560

ROYAL HEART S COUNTY is a residential apartment project located at THUKKUGUDA MUNCIPALITY-ORRGC, Thukkuguda Muncipality-ORRGC Mandal, Ranga Reddy district. It is being developed by the registered promoter M/s ROYAL HEART DEVELOPERS on a site of 5,807.73 Sq. Mt., with one building of 1Stilt + 5 Upper floors. The project has 136 apartments: 110 2BHK units with a saleable area of 106.52 sq m and 26 3BHK units with a saleable area of 139.01 sq m. Its TG-RERA registration number is P02400005560, and the proposed completion is 15/02/2029.

01What we found

RegisteredTG-RERA - valid till 15 Oct 2028
37documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameROYAL HEART S COUNTY RERA record
Project type / useResidential apartment project RERA record RERA filing
Phase / registered portionThe registration identifies survey 208/PART; no phase name or separately identified phase is disclosed.
TG-RERA registrationP02400005560, granted 20/12/2022; registration certificate states validity through 15/10/2028, unless extended. RERA record
Registered promoterM/s ROYAL HEART DEVELOPERS RERA record
RERA statusRegistered; certificate records a five-year registration period. Registration validity is not the same as the project’s completion deadline or an occupancy certificate.

Land and geographic identity

ItemProject record
Locality / location as registeredTHUKKUGUDA MUNCIPALITY-ORRGC RERA record RERA filing
Revenue villageMankhal-ORRGC Village in the HMDA technical approval; the RERA project record describes Thukkuguda Muncipality-orrgc. RERA record
MandalThukkuguda Muncipality-ORRGC Mandal in the HMDA technical approval; not disclosed in the canonical identity fields. Land records
District / PINRanga Reddy / 501359 RERA record
Project survey number(s) and subdivision(s)208/PART
Registered site extent5,807.73 Sq. Mt. in the HMDA technical approval; the RERA land record states total and net area 5807.73 sqmts. RERA filing
Boundaries in RERA land recordEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal technical approval052102/SMD/R1/U6/HMDA/01022022, dated 15/10/2022 Approvals record
Building identified in approvalA (ROYAL HEART DEVELOPERS)
Sanctioned floor configuration1Stilt + 5 Upper floors; no basement or podium is stated in the supplied approval extract.
Approved area figuresThe approval lists Built up Area 14592.56 and Proposed Built-up Area 18215.06; the RERA project record lists approved built-up area 18215.06 sqmts. The supplied extract does not clarify the basis for the two figures. RERA filing
Mortgage area in approval / RERA recordApproval: 1470.11 Sq.mts; RERA record: 1470.10 sqmts. The approval describes the mortgage as 10.07% of built-up area, in favour of HMDA. RERA filing
Building and unit countsOne building; 136 RERA-filed units: 110 2BHK and 26 3BHK. The approval states that sanctioned units must not be increased without prior approval. RERA filing RERA unit table
Parking levels / countThe approval describes the stilt as exclusively for vehicle parking. No total parking-space count or separate visitor/accessibility count is supplied.

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK apartments RERA unit table
RERA-filed saleable areas2BHK: 106.52 sq m; 3BHK: 139.01 sq m RERA unit table
Booked / availablePortal-derived counts show 0 booked / 110 available 2BHK units and 0 booked / 26 available 3BHK units. These figures are indicative: the portal extract has no as-of date. RERA unit table
Construction stageNo current, independently verified construction-stage information is supplied. The RERA record labels the project “New Project”; that label is not a site-progress assessment. RERA filing
Completion datesThe RERA Form-B declaration states 15 October 2028 as the promoter’s completion undertaking; the project header separately records proposed completion 15/02/2029. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The HMDA approval requires completion and a “Fit for Occupancy” certificate before occupation.

2. The project story

ROYAL HEART S COUNTY is recorded with TG-RERA as a residential apartment project on survey 208/PART, at THUKKUGUDA MUNCIPALITY-ORRGC, Ranga Reddy district. The HMDA technical approval describes an open plot in Mankhal-ORRGC Village and one residential building, identified as A (ROYAL HEART DEVELOPERS), with 1 stilt + 5 upper floors. RERA record

The RERA filing lists 136 apartments: 110 two-bedroom and 26 three-bedroom units. It records all 136 as available and none booked in the supplied portal snapshot, but the snapshot is undated and should be treated as indicative rather than a current inventory confirmation. No reliable site-progress evidence is supplied here, so the project’s present construction stage cannot be established. RERA unit table

The promoter’s Form-B declaration gives a completion undertaking of 15 October 2028; the project header also records 15/02/2029 as proposed completion. No occupancy or completion certificate is provided. The HMDA approval states that occupation is permitted only after completion in accordance with the technically approved plans and issue of a “Fit for Occupancy” certificate by the Executive Authority. RERA record

3. Master plan, architecture & building design

The HMDA technical approval describes one residential building, 1Stilt + 5 Upper floors, on an approved site extent of 5,807.73 Sq. Mt. No basement or podium is identified in the supplied extract. The record does not provide a reliable building footprint, floor-by-floor apartment arrangement, flats per floor, tower height beyond the approval’s listed 14.99, lift or stair details, or internal circulation drawings.

The area figures should be read as separately labelled records: HMDA’s approval parameters list Built up Area 14592.56 and Proposed Built-up Area 18215.06; the RERA land/building record gives approved built-up area 18215.06 sqmts. No FSI-counted area, carpet-area schedule, or drawing-derived building-area analysis is supplied. RERA filing

The approval calls for the stilt/cellar to be used exclusively for vehicle parking, without partition walls or rolling shutters, and prohibits construction or parking in setback areas. It also refers to a tot-lot to be fenced and maintained as greenery before occupancy certification. The supplied material does not establish the layout, size, or completion status of that open space.

4. Homes, configurations & floor plans

The TG-RERA filing lists 110 two-bedroom and 26 three-bedroom apartments. The supplied approved floor-plan drawing review records two drawings, both marked as having no flats; no software-measured carpet-area or room-dimension results are available. Accordingly, no drawing-based carpet area can be reported. RERA unit table Floor plans RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1100110106.52 sq mNot measured from supplied drawingsNot supplied
3BHK26026139.01 sq mNot measured from supplied drawingsNot supplied

Saleable area is the area disclosed in the RERA filing; it is not a measured carpet area. The supplied floor-plan review notes that carpet area measured from drawing geometry would be software-measured and distinct from RERA saleable area, which includes the home’s share of common areas. No such measurement is available for these drawings. The booking and availability counts are an undated portal snapshot, not a current unit-level confirmation. RERA unit table Floor plans

5. Parking & vehicle circulation

The HMDA technical approval states that the stilt is to be used exclusively for vehicle parking, without partition walls or rolling shutters, and that no parking or construction is to be placed in setback areas. It does not state the number of car or two-wheeler spaces, whether visitor or accessible spaces are provided, or the arrangement of ramps, entry/exit routes, or internal driveways.

The RERA unit record marks both apartment configurations as mortgaged, while the HMDA approval states that the mortgaged built-up area may be registered only after an Occupancy Certificate and that flats in the mortgage to HMDA must not be sold. Unit-specific mortgage or parking allocations are not supplied; a parking bay or building-level provision should not be read as an exclusive unit entitlement. RERA unit table

6. Amenities, recreation & open spaces

The supplied RERA amenity record lists 14 categories, including internal roads and footpaths, water supply, sewerage, storm-water drains, a green strip/tot-lot/park, street lighting, community buildings, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, fire protection, and electrical meter/sub-station/receiving-station provision. The supplied records show 0% progress for the listed items; no independent completion verification is provided. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsListed; no size or specification suppliedRERA amenity record RERA amenities0%; not independently verified
Water supplyListed; no source, storage, or capacity suppliedRERA amenity record RERA amenities0%; not independently verified
Sewerage / sewage and sullage treatment and disposalListed; no plant capacity or technical details suppliedRERA amenity record RERA amenities0%; not independently verified
Storm-water drainsListed; no dimensions or details suppliedRERA amenity record RERA amenities0%; not independently verified
Green strip / tot-lot / parkListed; no area or dimensions suppliedRERA amenity record RERA amenities; HMDA condition0% in RERA record; HMDA requires tot-lot fencing and greenery before occupancy certification
Street lightingListed; no specification suppliedRERA amenity record RERA amenities0%; not independently verified
Community buildingsListed; no description or size suppliedRERA amenity record RERA amenities0%; not independently verified
Solid-waste management and disposalListed; no system details suppliedRERA amenity record RERA amenities0%; not independently verified
Water conservation / rainwater harvestingListed in RERA; HMDA approval calls for rainwater-harvesting structures/percolation pitRERA amenities0% in RERA record; completion not verified
Energy managementListed; no system details suppliedRERA amenity record RERA amenities0%; not independently verified
Fire protection and fire safetyListed; no system details suppliedRERA amenity record RERA amenities0%; not independently verified
Electrical meter room / sub-station / receiving stationListed; HMDA approval also requires provision for a transformerRERA amenities0% in RERA record; completion not independently verified

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage and sewage/sullage treatment and disposal, storm-water drainage, water conservation/rainwater harvesting, solid-waste management, energy management, fire protection, and electrical meter/sub-station/receiving-station provision. Each item’s supplied progress value is 0%; no capacities, system designs, operating information, or independent verification are provided. RERA amenities

The HMDA approval specifically calls for rainwater-harvesting structures, provision for a transformer and garbage house, and an ETP. It also says the applicant is responsible for structural safety and safety requirements under the National Building Code of 2005; it requires a commencement notice before works begin and a completion notice and occupancy certificate after completion. These are approval conditions, not evidence that the works or systems are complete or that occupancy certification has been obtained.

The supplied material does not specify water source or storage capacity, STP/ETP capacity or reuse, backup-power capacity, lift count or capacity, fire-system equipment, escape-stair arrangement, CCTV/access-control systems, or accessibility provisions. RERA amenities

8. Location, access & connectivity

The registered project location is THUKKUGUDA MUNCIPALITY-ORRGC, Ranga Reddy district, PIN 501359, on 208/PART. The HMDA approval describes the site as an open plot in Mankhal-ORRGC Village, within Thukkuguda Muncipality-ORRGC Mandal. RERA record Land records

The supplied location record identifies Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. This is a supplied mapped distance; no route or travel-time basis is stated. Location record

The approval refers to an 18 mt. road width and requires formation of a BT road before release of the Occupancy Certificate. The evidence does not establish the present road condition or completion of that requirement. No public-transport details or independently verified travel times are supplied.

9. Developer & development status

The registered promoter is M/s ROYAL HEART DEVELOPERS, recorded in the RERA project information as a Partnership. The supplied corporate record identifies GSTIN 36AATFR7575C1ZN; the project record does not disclose a verified company/LLP-style corporate identifier. RERA record RERA filing Corporate record

The promoter’s listed address is SECOND FLOOR,SREE KALLEM CHARAN TEJA, SRISAILAM ROAD, MANKHAL-ORRGC, THUKKUGUDA MUNCIPALITY-ORRGC, Ranga Reddy, 501359. The RERA filing identifies CHEREDDY KISHORE REDDY as authorized signatory. The evidence pack supplies the promoter website, but no verified project-specific contact details. Parties record RERA filing

The supplied records do not establish current construction progress. The promoter’s Form-B declaration undertakes completion by 15 October 2028; no completion or occupancy certificate is supplied. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM ‘C’ registration certificate for P02400005560, project ROYAL HEART S COUNTY, promoter M/S Royal Heart Developers, survey 208/PART; issued 20/12/2022, valid through 15/10/2028 unless extended.
HMDA technical building approvalTechnical approval 052102/SMD/R1/U6/HMDA/01022022, dated 15/10/2022, for a residential building at survey 208/PART; approval extract records 1Stilt + 5 Upper floors.
Approved plan / layout materialA layout-plan item appears in the supplied document list, but it is not extracted; the supplied evidence does not provide a readable approved layout drawing. Document index
Promoter Form-B declarationForm-B affidavit by CHEREDDY KISHORE REDDY, authorized signatory for M/s ROYAL HEART DEVELOPERS, verified at Hyderabad on 26.11.2022; includes the promoter’s title, encumbrance, account and completion declarations.
Occupancy / completion certificateNone supplied. The HMDA technical approval states that an occupancy certificate is compulsory before occupation.
Layout lookupHMDA DPMS approved-layout lookup is recorded as unavailable from the public internet; this is a portal-access limitation, not evidence of approval refusal. HMDA

The approval document contains detailed conditions, including requirements concerning local-authority sanction/release, commencement and completion notices, parking, rainwater harvesting, transformer and garbage-house provision, the tot-lot, and occupancy certification. Their full scope belongs with the approval review; the summary above identifies the principal record and building description.

Frequently asked questions

Is ROYAL HEART S COUNTY registered with Telangana RERA?

Yes. ROYAL HEART S COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02400005560; the registration status is New Project.

Who is the developer of ROYAL HEART S COUNTY?

The promoter named in the RERA registration is M/s ROYAL HEART DEVELOPERS.

Where is ROYAL HEART S COUNTY located?

ROYAL HEART S COUNTY is in THUKKUGUDA MUNCIPALITY-ORRGC, Rangareddy, Telangana (501359).

When will ROYAL HEART S COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 15/02/2029. This is the promoter's declaration, not a guarantee.

More projects in Rangareddy