RIVER BREEZE is a residential apartment project in NARSINGHI MUNCIPALITY, Gandipet mandal, Ranga Reddy District. The registered promoter is PCH RIVER EDGE LLP. The project covers 8,303.77 sq. m total area and comprises one residential building with 1Cellar + 1Stilt + 14 Upper floors and 96 homes: 80 3BHK and 16 4BHK. It is registered under TG-RERA number P02400003641, with promoter-declared completion by 12 October 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | RIVER BREEZE RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers the project. RERA record |
| TG-RERA registration | P02400003641 RERA record |
| Registration validity | 03/12/2021 to 12/10/2027, stated as five years; the certificate records no extension. This is registration validity, not the project completion deadline. |
| Registered promoter | PCH RIVER EDGE LLP, an LLP RERA record Corporate record |
| RERA status | Registration certificate issued under section 5. The supplied certificate records registration as valid through 12/10/2027; it does not establish construction completion or an occupancy certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | NARSINGHI MUNCIPALITY in the RERA project record; the filed technical approval identifies Manchirevula. RERA record RERA filing |
| Revenue village | Manchirevula-ORRGC Village is stated in the technical approval; the title report and project records also refer to Manchirevula Village. |
| Mandal | Gandipet mandal in the technical approval. |
| District / PIN | Ranga Reddy District / 500075 RERA record |
| Project survey numbers | 417 and 471; no subdivision is specified in the project identity record. RERA record Land records |
| Site extent | 8,303.77 sq. m total area; 8,275.08 sq. m net area; 28.69 sq. m recorded as affected by road widening/FTL of tanks/nala widening. The technical approval states an extent of 8,275.08 Sq. Mt. RERA filing |
| Boundaries | East, west, north and south: “OTHER LAND” in the RERA land record. RERA filing |
| Site address in promoter record | Plot No. 388A, Road No. 22, Manchirevula Village, Narsinghi Municipality, Ranga Reddy, 500075. Corporate record |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval delegates building-plan sanction to Narsingi municipality. |
| Principal technical approval | 034032/SKP/R1/U6/HMDA/12022020, approved 12/10/2021. The document describes this as technical approval and says building plans are to be sanctioned by the Executive Authority in conformity with it. Approvals record |
| Building configuration in approval | One residential building: 1Cellar + 1Stilt + 14 Upper floors. |
| Approved built-up area | 41,599.13 sq. m is recorded as proposed built-up area in the approval extraction. The same extraction separately records “Built up Area 27713.06”; these are distinct figures in the filed approval, not interchangeable area measures. RERA filing |
| Height | 44.8, as recorded in the approval extraction; the supplied field does not state a unit. |
| Mortgage in approval | 4,540.37 sq. m of built-up area, described as 15.00% and mortgaged in favour of the Metropolitan Commissioner, HMDA. RERA filing |
| Units | One proposed building; 96 total units in the RERA unit record. RERA filing RERA unit table |
| Sanctioned unit count | The supplied approval extraction does not state a total sanctioned unit count. It states that sanctioned unit numbers are not to be increased without prior approval. |
Offering and status
| Item | Project record |
|---|---|
| Configurations | 3BHK and 4BHK RERA unit table |
| RERA-filed saleable areas | 3BHK: 338.08 sq. m; 4BHK: 418.0 sq. m RERA unit table |
| Bookings / availability | 3BHK: 19 booked, 61 available; 4BHK: 8 booked, 8 available. These portal counts have no supplied “as of” date and are indicative. RERA unit table |
| Construction stage | Not established by the supplied evidence; no independently verified site-progress information is provided. Document index |
| Promoter-declared completion | Form B undertakes completion by 12 October 2027. |
| Registration validity end | 12/10/2027, as stated separately in the RERA registration certificate. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The technical approval says an occupancy certificate is compulsory before occupation. |
2. The project story
RIVER BREEZE is registered as a residential apartment project on land identified by the project record as Survey Nos. 417 and 471. The filed HMDA technical approval describes a single residential building on the Manchirevula site, with a cellar, stilt and 14 upper floors. The approval extraction identifies PCH RIVER EDGE LLP as applicant/developer under a development agreement-cum-GPA and SIMCLAR PROPERTIES LLP as owner; the approval itself states that it does not confer ownership rights. RERA record Land records
The RERA unit record lists 96 apartments: 80 3BHK and 16 4BHK. Its latest supplied booking snapshot records 27 booked and 69 available overall, but has no as-of date. The evidence supplied does not establish current construction progress, completion of any building portion, or an occupancy certificate. The promoter’s Form B completion undertaking is 12 October 2027; the registration certificate separately gives registration validity through 12/10/2027. RERA unit table
3. Master plan, architecture & building design
The filed technical approval identifies one residential building, “PROP (BLDG),” configured as 1Cellar + 1Stilt + 14 Upper floors. It records a site extent of 8,275.08 Sq. Mt. and proposed built-up area of 41,599.13 sq. m. The same approval extraction also lists “Built up Area 27713.06”; it does not provide enough context here to classify that figure further, so it is retained separately rather than treated as the proposed built-up area.
The RERA land record gives total area of 8,303.77 sq. m, net area of 8,275.08 sq. m and 28.69 sq. m affected by road widening/FTL of tanks/nala widening. The approval extraction records a building height of 44.8 without a stated unit, and describes cellar and stilt as parking levels. Detailed floor plans were not available for measurement in the supplied drawing data; the two drawing records are noted as having no flats, and no measurements were produced. Consequently, the evidence supplied does not establish flats per floor, footprint, number of lifts or stairs, internal circulation, or detailed common-area layout. RERA filing Floor plans
The approval lists an open space to be maintained and developed with greenery, and includes a 4.50 Mrs buffer belt along the raw water channel and a minimum 100 ft distance from the channel to the building line. These are approval-filed conditions; this overview does not verify their implementation on site.
4. Homes, configurations & floor plans
The following counts and areas are from the TG-RERA unit record. The saleable area is the filed figure; it is not a measured carpet-area figure. Booked and available counts are portal readings without a supplied as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 80 | 19 | 61 | 338.08 sq. m | Not available | Not supplied |
| 4BHK | 16 | 8 | 8 | 418.0 sq. m | Not available | Not supplied |
The supplied floor-plan data records two drawing files but no measured flats or carpet areas. Software-measured carpet area is therefore unavailable. Carpet area, where measured from a drawing, would be a drawing-based measurement rather than a RERA-filed saleable area; the supplied data notes that saleable area also includes the home’s share of common areas. Floor plans
5. Parking & vehicle circulation
The approval identifies the cellar and stilt as parking areas and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count in the supplied extraction. No resident, visitor, accessible or two-wheeler parking counts, bay allocation to particular units, ramp details, vehicle entry/exit arrangements, pedestrian separation or EV charging provision are established by the project evidence provided. A parking bay shown in an approval would not by itself establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA amenities record lists facilities and infrastructure with progress shown as 0% for the listed items; no independent completion verification is supplied. The HMDA technical approval also specifies certain building/site provisions. The table distinguishes those filed records from evidence of delivery. RERA amenities
| Description / size | Community buildings are listed; no size or specific indoor facility is established in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified. |
| Description / size | Green Strip/TOT LOT/Park and aggregate recreational open space are listed; the technical approval names a “Tot-lot.” No size is supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified. |
| Description / size | Open space is to be maintained and developed with greenery under the technical approval. |
|---|---|
| Declared progress / verified status | Approval-filed requirement; implementation not verified. |
| Description / size | Listed in the RERA amenities record; no dimensions supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress 0%; completion not independently verified. |
| Description / size | Technical approval requires a refuse chute and proper garbage-disposal systems, and provides for a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Approval-filed provisions; completion not verified. |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage/STP, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, fire protection and safety, and an electrical meter room/substation/receiving station as available “YES”; each has progress recorded as 0%. These are RERA-recorded disclosures, not evidence of completed or independently tested services. RERA amenities
The HMDA technical approval requires rainwater-harvesting structures, a transformer, a garbage house, a sewage treatment plant, solar water-heating and solar outdoor-lighting provisions, and a refuse chute. It also states that permanent HMWS & SB and T.S. Transco connections are not to be provided until an occupancy certificate is produced. The approval refers to structural drawings/design clearance from JNTU and environmental clearance from SEIAA.
No capacities or detailed designs are supplied for water storage or treatment, STP, power backup, lifts, fire equipment, emergency access, CCTV, access control, waste segregation, or accessibility features. The evidence does not establish that these systems have been installed, commissioned or completed. RERA amenities Floor plans
8. Location, access & connectivity
The registered project identity places RIVER BREEZE in NARSINGHI MUNCIPALITY, Ranga Reddy District, PIN 500075, on Survey Nos. 417 and 471. The technical approval identifies Manchirevula-ORRGC Village in Gandipet mandal, Ranga Reddy District, and records an 18 mt. road width. RERA record Land records
The location data provides one measured connectivity point: Financial District (Nanakramguda), 1.2 km, from the project parcel centroid. No other approach-road, public-transport or landmark distances are established in the supplied location record. Location record
9. Developer & development status
The registered legal promoter is PCH RIVER EDGE LLP, an LLP, with GSTIN 36AAYFP1633L1ZM. The RERA record gives the promoter address as Plot No. 388A, Road No. 22, Manchirevula Village, Narsinghi Municipality, Ranga Reddy, 500075. It identifies SHOWRI REDDY DUGGIMPUDI as Partner and JOSEPH KIRAN KUMAR REDDY BASANI as Authorized Signatory. Corporate record Parties record RERA record
The Form B affidavit is a promoter declaration by BJ Kiran Kumar Reddy, authorised signatory, dated 23.11.2021. It undertakes completion by 12 October 2027 and includes declarations on project funds, accounts and pending approvals. This is the promoter’s filed undertaking, not independent confirmation of progress or completion.
The project record describes one building and does not identify separate phases. No current construction-progress report or occupancy/completion certificate is present in the evidence supplied. RERA filing RERA unit table Document index
10. Approvals, official records & documents
| Identifier / date | P02400003641; issued 03/12/2021; valid to 12/10/2027 |
|---|---|
| What the supplied record establishes | Form C registration for RIVER BREEZE under section 5; the certificate states the registration period and promoter conditions. |
| Identifier / date | 034032/SKP/R1/U6/HMDA/12022020; 12/10/2021 |
|---|---|
| What the supplied record establishes | Technical approval for one residential building on Survey Nos. 417 and 471; building-plan sanction is to be by the Executive Authority in conformity with the technically approved plans. |
| Identifier / date | DAGPA 14176/2019 |
|---|---|
| What the supplied record establishes | The approval identifies PCH River Edge LLP as developer under this arrangement and SIMCLAR PROPERTIES LLP as owner; the technical approval says it does not confer ownership rights. |
| Identifier / date | 23.11.2021 |
|---|---|
| What the supplied record establishes | Promoter-filed declaration and completion undertaking. |
| Identifier / date | Document 199674 |
|---|---|
| What the supplied record establishes | Advocate’s title-verification report concerning Survey Nos. 417 and 471; the supplied extraction ends before the final opinion/conclusion. |
| Identifier / date | Documents 199624, 459149 and 264359 |
|---|---|
| What the supplied record establishes | Filed encumbrance statements; the supplied record notes that the absence of an entry is not a clearance and recommends confirmation by a fresh EC. |
| Identifier / date | Not provided |
|---|---|
| What the supplied record establishes | No such certificate is included in the supplied project documents. Document index |
The approval document contains conditions concerning parking, open space, raw-water-channel setbacks and buffers, rainwater harvesting, transformer and waste provisions, and the requirement to obtain an occupancy certificate before occupation. These are summarized above; the full approval conditions remain in the filed technical approval.
1. Project at a glance
Project identity
Registered name: RIVER BREEZE
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers the project.
TG-RERA registration: P02400003641
Registration validity: 03/12/2021 to 12/10/2027, stated as five years; the certificate records no extension. This is registration validity, not the project completion deadline.
Registered promoter: PCH RIVER EDGE LLP, an LLP
RERA status: Registration certificate issued under section 5. The supplied certificate records registration as valid through 12/10/2027; it does not establish construction completion or an occupancy certificate.
Land and geographic identity
Locality: NARSINGHI MUNCIPALITY in the RERA project record; the filed technical approval identifies Manchirevula.
Revenue village: Manchirevula-ORRGC Village is stated in the technical approval; the title report and project records also refer to Manchirevula Village.
Mandal: Gandipet mandal in the technical approval.
District / PIN: Ranga Reddy District / 500075
Project survey numbers: 417 and 471; no subdivision is specified in the project identity record.
Site extent: 8,303.77 sq. m total area; 8,275.08 sq. m net area; 28.69 sq. m recorded as affected by road widening/FTL of tanks/nala widening. The technical approval states an extent of 8,275.08 Sq. Mt.
Boundaries: East, west, north and south: “OTHER LAND” in the RERA land record.
Site address in promoter record: Plot No. 388A, Road No. 22, Manchirevula Village, Narsinghi Municipality, Ranga Reddy, 500075.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval delegates building-plan sanction to Narsingi municipality.
Principal technical approval: 034032/SKP/R1/U6/HMDA/12022020, approved 12/10/2021. The document describes this as technical approval and says building plans are to be sanctioned by the Executive Authority in conformity with it.
Building configuration in approval: One residential building: 1Cellar + 1Stilt + 14 Upper floors.
Approved built-up area: 41,599.13 sq. m is recorded as proposed built-up area in the approval extraction. The same extraction separately records “Built up Area 27713.06”; these are distinct figures in the filed approval, not interchangeable area measures.
Height: 44.8, as recorded in the approval extraction; the supplied field does not state a unit.
Mortgage in approval: 4,540.37 sq. m of built-up area, described as 15.00% and mortgaged in favour of the Metropolitan Commissioner, HMDA.
Units: One proposed building; 96 total units in the RERA unit record.
Sanctioned unit count: The supplied approval extraction does not state a total sanctioned unit count. It states that sanctioned unit numbers are not to be increased without prior approval.
Offering and status
Configurations: 3BHK and 4BHK
RERA-filed saleable areas: 3BHK: 338.08 sq. m; 4BHK: 418.0 sq. m
Bookings / availability: 3BHK: 19 booked, 61 available; 4BHK: 8 booked, 8 available. These portal counts have no supplied “as of” date and are indicative.
Construction stage: Not established by the supplied evidence; no independently verified site-progress information is provided.
Promoter-declared completion: Form B undertakes completion by 12 October 2027.
Registration validity end: 12/10/2027, as stated separately in the RERA registration certificate.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The technical approval says an occupancy certificate is compulsory before occupation.
2. The project story
RIVER BREEZE is registered as a residential apartment project on land identified by the project record as Survey Nos. 417 and 471. The filed HMDA technical approval describes a single residential building on the Manchirevula site, with a cellar, stilt and 14 upper floors. The approval extraction identifies PCH RIVER EDGE LLP as applicant/developer under a development agreement-cum-GPA and SIMCLAR PROPERTIES LLP as owner; the approval itself states that it does not confer ownership rights.
The RERA unit record lists 96 apartments: 80 3BHK and 16 4BHK. Its latest supplied booking snapshot records 27 booked and 69 available overall, but has no as-of date. The evidence supplied does not establish current construction progress, completion of any building portion, or an occupancy certificate. The promoter’s Form B completion undertaking is 12 October 2027; the registration certificate separately gives registration validity through 12/10/2027.
3. Master plan, architecture & building design
The filed technical approval identifies one residential building, “PROP (BLDG),” configured as 1Cellar + 1Stilt + 14 Upper floors. It records a site extent of 8,275.08 Sq. Mt. and proposed built-up area of 41,599.13 sq. m. The same approval extraction also lists “Built up Area 27713.06”; it does not provide enough context here to classify that figure further, so it is retained separately rather than treated as the proposed built-up area.
The RERA land record gives total area of 8,303.77 sq. m, net area of 8,275.08 sq. m and 28.69 sq. m affected by road widening/FTL of tanks/nala widening. The approval extraction records a building height of 44.8 without a stated unit, and describes cellar and stilt as parking levels. Detailed floor plans were not available for measurement in the supplied drawing data; the two drawing records are noted as having no flats, and no measurements were produced. Consequently, the evidence supplied does not establish flats per floor, footprint, number of lifts or stairs, internal circulation, or detailed common-area layout.
The approval lists an open space to be maintained and developed with greenery, and includes a 4.50 Mrs buffer belt along the raw water channel and a minimum 100 ft distance from the channel to the building line. These are approval-filed conditions; this overview does not verify their implementation on site.
4. Homes, configurations & floor plans
The following counts and areas are from the TG-RERA unit record. The saleable area is the filed figure; it is not a measured carpet-area figure. Booked and available counts are portal readings without a supplied as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 80 | 19 | 61 | 338.08 sq. m | Not available | Not supplied |
| 4BHK | 16 | 8 | 8 | 418.0 sq. m | Not available | Not supplied |
The supplied floor-plan data records two drawing files but no measured flats or carpet areas. Software-measured carpet area is therefore unavailable. Carpet area, where measured from a drawing, would be a drawing-based measurement rather than a RERA-filed saleable area; the supplied data notes that saleable area also includes the home’s share of common areas.
5. Parking & vehicle circulation
The approval identifies the cellar and stilt as parking areas and requires them to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count in the supplied extraction. No resident, visitor, accessible or two-wheeler parking counts, bay allocation to particular units, ramp details, vehicle entry/exit arrangements, pedestrian separation or EV charging provision are established by the project evidence provided. A parking bay shown in an approval would not by itself establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA amenities record lists facilities and infrastructure with progress shown as 0% for the listed items; no independent completion verification is supplied. The HMDA technical approval also specifies certain building/site provisions. The table distinguishes those filed records from evidence of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse / indoor | Community buildings are listed; no size or specific indoor facility is established in the RERA amenities record. | Progress 0%; completion not independently verified. | |
| Sports / recreation | Green Strip/TOT LOT/Park and aggregate recreational open space are listed; the technical approval names a “Tot-lot.” No size is supplied. | Progress 0%; completion not independently verified. | |
| Landscape / open space | Open space is to be maintained and developed with greenery under the technical approval. | Approval-filed requirement; implementation not verified. | |
| Internal roads and footpaths | Listed in the RERA amenities record; no dimensions supplied. | Progress 0%; completion not independently verified. | |
| Street lighting | Listed in the RERA amenities record. | Progress 0%; completion not independently verified. | |
| Community buildings | Listed in the RERA amenities record. | Progress 0%; completion not independently verified. | |
| Refuse chute / garbage provision | Technical approval requires a refuse chute and proper garbage-disposal systems, and provides for a garbage house within the premises. | Approval-filed provisions; completion not verified. |
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage/STP, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, fire protection and safety, and an electrical meter room/substation/receiving station as available “YES”; each has progress recorded as 0%. These are RERA-recorded disclosures, not evidence of completed or independently tested services.
The HMDA technical approval requires rainwater-harvesting structures, a transformer, a garbage house, a sewage treatment plant, solar water-heating and solar outdoor-lighting provisions, and a refuse chute. It also states that permanent HMWS & SB and T.S. Transco connections are not to be provided until an occupancy certificate is produced. The approval refers to structural drawings/design clearance from JNTU and environmental clearance from SEIAA.
No capacities or detailed designs are supplied for water storage or treatment, STP, power backup, lifts, fire equipment, emergency access, CCTV, access control, waste segregation, or accessibility features. The evidence does not establish that these systems have been installed, commissioned or completed.
8. Location, access & connectivity
The registered project identity places RIVER BREEZE in NARSINGHI MUNCIPALITY, Ranga Reddy District, PIN 500075, on Survey Nos. 417 and 471. The technical approval identifies Manchirevula-ORRGC Village in Gandipet mandal, Ranga Reddy District, and records an 18 mt. road width.
The location data provides one measured connectivity point: Financial District (Nanakramguda), 1.2 km, from the project parcel centroid. No other approach-road, public-transport or landmark distances are established in the supplied location record.
9. Developer & development status
The registered legal promoter is PCH RIVER EDGE LLP, an LLP, with GSTIN 36AAYFP1633L1ZM. The RERA record gives the promoter address as Plot No. 388A, Road No. 22, Manchirevula Village, Narsinghi Municipality, Ranga Reddy, 500075. It identifies SHOWRI REDDY DUGGIMPUDI as Partner and JOSEPH KIRAN KUMAR REDDY BASANI as Authorized Signatory.
The Form B affidavit is a promoter declaration by BJ Kiran Kumar Reddy, authorised signatory, dated 23.11.2021. It undertakes completion by 12 October 2027 and includes declarations on project funds, accounts and pending approvals. This is the promoter’s filed undertaking, not independent confirmation of progress or completion.
The project record describes one building and does not identify separate phases. No current construction-progress report or occupancy/completion certificate is present in the evidence supplied.
10. Approvals, official records & documents
| Identifier / date | P02400003641; issued 03/12/2021; valid to 12/10/2027 |
|---|---|
| What the supplied record establishes | Form C registration for RIVER BREEZE under section 5; the certificate states the registration period and promoter conditions. |
| Identifier / date | 034032/SKP/R1/U6/HMDA/12022020; 12/10/2021 |
|---|---|
| What the supplied record establishes | Technical approval for one residential building on Survey Nos. 417 and 471; building-plan sanction is to be by the Executive Authority in conformity with the technically approved plans. |
| Identifier / date | DAGPA 14176/2019 |
|---|---|
| What the supplied record establishes | The approval identifies PCH River Edge LLP as developer under this arrangement and SIMCLAR PROPERTIES LLP as owner; the technical approval says it does not confer ownership rights. |
| Identifier / date | 23.11.2021 |
|---|---|
| What the supplied record establishes | Promoter-filed declaration and completion undertaking. |
| Identifier / date | Document 199674 |
|---|---|
| What the supplied record establishes | Advocate’s title-verification report concerning Survey Nos. 417 and 471; the supplied extraction ends before the final opinion/conclusion. |
| Identifier / date | Documents 199624, 459149 and 264359 |
|---|---|
| What the supplied record establishes | Filed encumbrance statements; the supplied record notes that the absence of an entry is not a clearance and recommends confirmation by a fresh EC. |
| Identifier / date | Not provided |
|---|---|
| What the supplied record establishes | No such certificate is included in the supplied project documents. |
The approval document contains conditions concerning parking, open space, raw-water-channel setbacks and buffers, rainwater harvesting, transformer and waste provisions, and the requirement to obtain an occupancy certificate before occupation. These are summarized above; the full approval conditions remain in the filed technical approval.
Frequently asked questions
Is RIVER BREEZE registered with Telangana RERA?
Yes. RIVER BREEZE is registered with the Telangana Real Estate Regulatory Authority as P02400003641; the registration status is New Project.
Who is the developer of RIVER BREEZE?
The promoter named in the RERA registration is PCH RIVER EDGE LLP.
Where is RIVER BREEZE located?
RIVER BREEZE is in NARSINGHI MUNCIPALITY, Rangareddy, Telangana (500075).
When will RIVER BREEZE be completed?
The promoter's proposed date of completion filed with RERA is 12/02/2028. This is the promoter's declaration, not a guarantee.