Sign in

Riddhis Valentino

RIDDHI BUILDERS AND DEVELOPERS · Rangareddy · RERA P02400000164

RIDDHIS VALENTINO is a residential apartment project in KONDAPUR, Kondapur Village, Ranga Reddy District; the mandal is not disclosed in the RERA project fields. The registered promoter is RIDDHI BUILDERS AND DEVELOPERS. The project covers 2,841 sq m and comprises one building described as “Cellar + Stilt + 5,” with 63 apartments: 53 2BHK units of 103.72 sq m each and 10 3BHK units of 166.5 sq m each. Its TG-RERA registration number is P02400000164, and the proposed completion date is 05/04/2023.

More from Riddhi Builders And Developers · 3 projects →

01What we found

Period endedTG-RERA registration ran to 5 Apr 2023 - check its extension on TG-RERA
20documents on file - each fact links to its page
11court cases on this project's land (survey 99, Kondapur)
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldRecord
Registered project nameRIDDHIS VALENTINO RERA record
Project typeResidential apartment project RERA record
Phase / registered portionOne registered project portion; the RERA record identifies the land as “99 OF PART” and the site as Plot Nos. 71–81. RERA record RERA filing
TG-RERA registrationP02400000164 RERA record
Registration validity17/01/2019 to 05/04/2023; certificate states four years. No extension is recorded in the supplied certificate.
Registered promoterRIDDHI BUILDERS AND DEVELOPERS; partnership, as recorded in the RERA project information. RERA record RERA filing
RERA status“On-Going Project” in the project record. RERA record
Construction deadline in RERA recordProposed and revised proposed completion: 05/04/2023. This is separate from registration validity. RERA record

Land and geographic identity

FieldRecord
LocalityKONDAPUR RERA record
Revenue villageKondapur Village RERA record
MandalNot disclosed in the RERA project fields; a land-record lookup associates Kondapur with Serilingampalle mandal, but this does not establish the project parcel’s mandal. Land records
DistrictRanga Reddy RERA record
PIN500084 RERA record
Project survey identification“99 OF PART” in the RERA record; the GHMC building permit extraction transcribes it as “199 (PART).” RERA filing
Plot identificationPlot Nos. 71–81 RERA filing
Registered site extent2,841 sq m; net area also recorded as 2,841.00 sq m. RERA filing
Boundaries in RERA recordNorth: 40 wide road; South: Plot No. 74; East: Plot Nos. 76 and 77; West: Plot No. 79. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC), Town Planning Section Approvals record
Principal building permitLL/C11/03373/2017, dated 16 April 2017 Approvals record
Related file number1/C11/02422/2012 Approvals record
Approved built-up area7,082.30 sq m in the RERA approval summary; the permit extraction records residential area as 7,082.30 sq m. Approvals record
Building count / configurationOne building; permit describes “Cellar + Stilt + 5.” RERA filing
Height14.39 m, as recorded in the permit extraction
Parking area / levelsPermit records parking floors area of 1,789.68 sq m and requires the cellar and stilt approved for parking to be used exclusively for vehicle parking. A number of parking spaces is not supplied.
UnitsRERA unit record: 63 total apartments—53 2BHK and 10 3BHK. RERA unit table RERA unit table

Offering and status

FieldRecord
RERA-filed configurations and saleable area2BHK: 53 units, 103.72 sq m each; 3BHK: 10 units, 166.5 sq m each. RERA unit table RERA unit table
Booked / available2BHK: 39 booked / 14 available; 3BHK: 5 booked / 5 available. The portal-derived counts have no supplied as-of date and are indicative. RERA unit table
Construction stageRERA QPR extract records water supply at 90%, sewerage at 85%, green strip/tot-lot/park at 65%, rainwater harvesting at 45%, and electrical meter room/sub-station/receiving station at 60%. These are filed progress percentages, not independent site verification. RERA amenities
Completion datesOriginal and revised proposed completion: 05/04/2023. RERA record
Occupancy / completion certificateNo completion or occupancy certificate is supplied; the GHMC permit extraction records completion as not certified. Scope: the single building covered in the supplied project record.

2. The project story

RIDDHIS VALENTINO is registered as a residential apartment project at Kondapur Village, Ranga Reddy District, on the RERA-identified portion of Survey No. 99, covering Plot Nos. 71–81 and a recorded site extent of 2,841 sq m. The project record describes one building, rather than a multi-tower development. RERA record RERA filing RERA unit table

GHMC’s extracted building permit describes a proposed building with a cellar, stilt and five upper floors, with residential use and no commercial area recorded. The RERA filing lists 63 apartments in two configurations: 2BHK and 3BHK. RERA unit table

The RERA record’s completion date is 05/04/2023, while its status remains “On-Going Project.” The supplied records do not establish current physical construction progress through an independent site inspection and do not include an occupancy or completion certificate. The available infrastructure percentages are portal-filed progress figures only. RERA record RERA amenities

3. Master plan, architecture & building design

The project’s RERA land record gives a total and net site area of 2,841 sq m. The GHMC permit extraction also records a net area of 2,841 sq m and one proposed residential building. Approved residential area is recorded as 7,082.30 sq m; this is the permit’s residential-area figure, not a carpet or saleable-area figure. The same permit records parking floors area of 1,789.68 sq m and stilt area of 1,518.94 sq m. RERA filing

The permit describes the building as “Cellar + Stilt + 5,” with a building height of 14.39 m. It records no commercial area, no “Others” area and road-affected area of 0.00 sq m. The RERA summary lists one building and one proposed building unit; the apartment inventory separately lists 63 homes. RERA filing RERA unit table

The permit extraction also identifies a 145.25 sq m tot-lot, 110 rainwater-harvesting structures and 140 trees. It specifies setbacks of Front 8 m, Rear 9 m, Side 1 10 m and Side 11 10 m.

The supplied material does not establish the number of apartments per floor, building footprint, lift and stair layout, or detailed internal circulation. A RERA-uploaded floor-plan document is identified as doc 21681, but the supplied drawing-derived dataset covers three drawings, with two measured and one scan pending; it does not provide a complete building-design schedule. Document index Floor plans

4. Homes, configurations & floor plans

The RERA inventory records 53 2BHK and 10 3BHK apartments. Portal-derived booking and availability counts are indicative because the record supplies no as-of date. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK533914103.72 sq mSoftware-measured: median 74.3 sq m; range 58.0–78.5 sq m across 11 measured designs28%
3BHK1055166.5 sq mNot suppliedNot supplied

RERA saleable area is the filed unit-area measure. The 2BHK carpet figures are software measurements from floor-plan drawings, not RERA disclosures; the drawing dataset says the measurements need review. Carpet area is distinct from saleable area, which may include the home’s share of common areas. The 2BHK drawing dataset also identifies utility space separately; it should not be treated as carpet area. RERA unit details Floor plans

No RERA-filed 1BHK inventory is shown. The floor-plan dataset includes one software-measured 1BHK design (72.5 sq m carpet-area median), but it is not matched to a RERA-filed configuration and should not be treated as part of the registered sale inventory. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction records 1,789.68 sq m of parking floors area and requires the approved cellar and stilt to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not state a number of car or two-wheeler spaces, visitor or accessible spaces, or a unit-by-unit parking allocation.

The promoter’s marketing specifications list covered parking, but the supplied evidence does not establish an exclusive legal allocation for a particular apartment. The permit also refers to an existing 40-foot-wide metal road to be laid with bitumen before an occupancy certificate is issued. Detailed ramp, driveway, pedestrian-separation and vehicle-entry arrangements are not supplied. Promoter website

6. Amenities, recreation & open spaces

The permit identifies a tot-lot and periphery greenery as requirements, and records 145.25 sq m for the tot-lot and 140 trees. The RERA progress extract gives filed completion percentages for selected common works. Marketing-listed facilities are separately identified below and are not established by the supplied records as sanctioned or delivered. RERA amenities Promoter website

Landscape/open space — Tot-lot
Description / size145.25 sq m
Evidence sourceGHMC building permit extraction
Declared progress / verified statusPermit requirement; green strip/tot-lot/park reported at 65% in the RERA progress extract. Not independently verified complete. RERA amenities
Landscape/open space — Trees and periphery greenery
Description / size140 trees recorded; tree planting and a peripheral greenery strip specified
Evidence sourceGHMC building permit extraction
Declared progress / verified statusPermit condition; completion not independently verified.
Sports/recreation — Children’s play area
Description / sizePromoter marketing lists children’s play areas and rides; no size supplied
Evidence sourcePromoter marketing Promoter website
Declared progress / verified statusMarketing claim; no supplied RERA progress or independent completion verification.
Sports/recreation — Basketball court / kids skate zone
Description / sizeListed in promoter marketing; no size supplied
Evidence sourcePromoter marketing Promoter website
Declared progress / verified statusMarketing claim; no supplied RERA progress or independent completion verification.
Clubhouse/indoor — Clubhouse and indoor games
Description / sizeListed in promoter marketing; no size supplied
Evidence sourcePromoter marketing Promoter website
Declared progress / verified statusMarketing claim; RERA progress extract reports community buildings at 0%. No independent completion verification. Promoter website RERA amenities
Clubhouse/indoor — Gym, yoga/meditation and multipurpose/banquet facilities
Description / sizeListed in promoter marketing; no sizes supplied
Evidence sourcePromoter marketing Promoter website
Declared progress / verified statusMarketing claims; no supplied RERA progress or independent completion verification.
Landscape/open space — Swimming pool, gardens and sit-out areas
Description / sizeListed in promoter marketing; no sizes supplied
Evidence sourcePromoter marketing Promoter website
Declared progress / verified statusMarketing claims; no supplied RERA progress or independent completion verification.

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterRERA progress extract marks water supply “YES” and reports 90%. The GHMC permit requires public water connections to be provided only on production of an occupancy certificate. Source, storage and treatment capacity are not supplied. RERA amenities
Sewerage and treatmentRERA progress extract marks sewerage “YES” and reports 85%; “Treatment and Disposal of Sewage and Sullage Water” is recorded at 0%. The permit calls for an ETP. Capacity, reuse arrangements and independent completion verification are not supplied. RERA amenities
Storm water and rainwaterStorm-water drains are recorded at 0% in the RERA progress extract. Water conservation/rainwater harvesting is marked “YES” at 45%; the permit requires rainwater-harvesting structures and records 110 RWHPs. RERA amenities
ElectricalElectrical meter room/sub-station/receiving station is marked “YES” at 60% in the RERA progress extract. The permit requires space for a transformer. Supply capacity and backup are not established by the permit extract. RERA amenities
Lifts and circulationNo lift count or capacity is established in the supplied permit extraction. Promoter marketing specifications state an 8-passenger lift and list three lifts and three stairways; these are marketing specifications, not independent verification of installed facilities. Promoter website
Fire and life safetyThe RERA progress extract records fire protection and fire-safety requirements at 0%. The permit requires services including fire safety to be executed under qualified technical personnel’s supervision. No completion certificate or independent fire-clearance evidence is supplied. RERA amenities
WasteThe permit requires a garbage house within the premises. Solid-waste management and disposal are recorded at 0% in the RERA progress extract. RERA amenities
Security and accessibilityCCTV and a secured compound wall are listed in promoter marketing. The supplied evidence does not establish installed access-control, accessibility or accessible-circulation provisions. Promoter website

8. Location, access & connectivity

The registered location is KONDAPUR, Kondapur Village, Ranga Reddy District, PIN 500084. The RERA record identifies the site by Survey No. “99 OF PART” and Plot Nos. 71–81; the supplied parcel boundary description identifies a 40 wide road to the north. RERA record RERA filing

The location dataset gives the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel-centroid location. Location record

The promoter’s website describes the project as near Chirec Public School, with Hi-Tech City/Shilparamam less than 4 km away and Botanical Garden in close vicinity. These are promoter-provided descriptions; no measured distance for the school or Botanical Garden is supplied. Promoter website

9. Developer & development status

The registered promoter is RIDDHI BUILDERS AND DEVELOPERS, recorded as a partnership. The project record names Nahar Dharmender Kumar as authorized signatory and Arvind Kumar Jain, Kanti Lal Kanti Lal and Nahar Navnit Kumar as partners. The promoter’s office address is recorded at Ashok Asha Apartments, Kimitee Enclave, Masjid Banda, Kondapur, Ranga Reddy, PIN 500084. RERA filing Parties record

The registration certificate records the project as valid from 17/01/2019 to 05/04/2023, while the RERA project record gives 05/04/2023 as both the proposed and revised proposed completion date and describes the project as “On-Going Project.” No extension order or occupancy/completion certificate is included in the supplied material. RERA record

The promoter’s Form B declaration includes a completion undertaking, but the date is left as “xx-xx-xXXX.” It also declares that the land is free from encumbrances and makes undertakings on project funds, audit and pending approvals. These are promoter declarations, not independent verification.

10. Approvals, official records & documents

RecordDetails and scope
TG-RERA registration certificateForm C records project P02400000164, RIDDHIS VALENTINO, registered to Riddhi Builders and Developers; validity stated as 17/01/2019 to 05/04/2023.
GHMC building permit orderPermit LL/C11/03373/2017, dated 16 April 2017, for a proposed residential building at Kondapur Village; related file 1/C11/02422/2012. The extracted plan describes Cellar + Stilt + 5 and records approved residential area of 7,082.30 sq m.
Commencement / completion / occupancyThe permit document is filed under “Commencement Certificates for each building in each phase.” Its extracted contents include a building permit order and conditions concerning commencement, completion notice and occupancy certificate. The extraction says completion is not certified; no occupancy certificate is supplied.
RERA title and encumbrance filingsRERA filing includes a title report (doc 21683), plot-level title documents (docs 9097–9108) and an encumbrance statement (doc 9109). This overview indexes those filed materials; it does not make a title or encumbrance determination. Document index
RERA plans and sale documentsA floor-plan record is identified as doc 21681; the supplied drawing dataset reports three drawings, two measured and one scan pending. A blank Agreement for Sale template is doc 21680, and a blank/template allotment letter is doc 21679. Document index Floor plans
Other filed declarationForm B affidavit-cum-declaration by Dharmender Kumar as authorized signatory for the promoter. Its completion-date field is incomplete.

Frequently asked questions

Is RIDDHIS VALENTINO registered with Telangana RERA?

Yes. RIDDHIS VALENTINO is registered with the Telangana Real Estate Regulatory Authority as P02400000164; the registration status is On-Going Project.

Who is the developer of RIDDHIS VALENTINO?

The promoter named in the RERA registration is RIDDHI BUILDERS AND DEVELOPERS.

Where is RIDDHIS VALENTINO located?

RIDDHIS VALENTINO is in KONDAPUR, Rangareddy, Telangana (500084).

When will RIDDHIS VALENTINO be completed?

The promoter's proposed date of completion filed with RERA is 05/04/2023. This is the promoter's declaration, not a guarantee.

More projects in Rangareddy