PEARL CASCADE is a residential apartment project at Plot No. 141, Bandlaguda Jagir Village, Gandipet Mandal, Ranga Reddy District. The registered promoter is B Goutham Reddy And Other. The project has a registered land extent of 805.49 sq. m, one residential building, 10 units and a 3BHK configuration; the filed plan describes 1 Stilt + 5 upper floors. It is registered under TG-RERA number P02400008347, with a proposed completion date of 30/11/2026.

01What we found

Period endedTG-RERA registration ran to 9 Jun 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
6court cases on this project's land (survey 14, 31, 33, 34, Bandlaguda)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered namePEARL CASCADE RERA record
Project type / phaseResidential apartment project; registered portion or phase description not separately disclosed RERA record
TG-RERA registrationP02400008347
Registration validity07/06/2024 to 09/06/2026, unless extended by the Authority
Registered promoterB Goutham Reddy And Other; RERA record identifies the organization type as “Others,” described as joint owners. Legal entity type beyond that is not established in the supplied record RERA record RERA filing
RERA statusRegistered; current status beyond the certificate’s stated validity is not established here

Land and geographic identity

FieldProject record
Locality / sitePlot No. 141, Bandlaguda Jagir Village
Revenue villageBandlaguda Jagir Village; also recorded as Bandlaguda and Bandlaguda Jagir
Mandal / district / PINGandipet / Ranga Reddy / 500058 RERA record
Project survey numbers as recordedSy. Nos. 14/P, 30/P, 31/P, 32/P, 33/P, 34/P, 36/P, 37/P and 38/P
Survey-number variation in a filed planThe plan extraction lists 14/P, 30/P, 31/P, 32/P, 33/P, 34/P, 36/P, 37/P and “SURVEY NO- 208”; the approval order lists 34/Р and 37/Р in OCR. These are reproduced as recorded, not independently resolved
Registered site extent805.49 sq. m RERA filing
Net / total areaRERA land details record total and net area as 805.49 sq. m, with 0 sq. m affected by road widening/FTL/nala widening RERA filing
BoundariesEast: 40 Feet Wide Road; West: land in Survey Nos. 38P and 39P; North: Plot No. 142; South: Plot No. 140 RERA filing

Development identity

FieldProject record
Sanctioning authorityBuilding permission order issued by Bandlaguda Jagir Municipal Corporation; the filed plan identifies HMDA as the authority and states delegation to the municipal corporation
Principal building approvalBA.NO: 031722/SKP/R1/U6/HMDA/12122019; order dated 10.09.2020
Other plan identifierD-2021; plan extraction records approval date 08-Jul-2020
Approved built-up areaThe RERA record lists approved built-up area as 1866.15 sq. m RERA filing. The filed plan separately states “Total Built Up Area: 2374.38 Sq.mt” and “Total Net BUA Area: 1066.15 Sq.mt”; these are distinct plan labels
Buildings / floorsOne residential building. The filed plan describes 1 Stilt + 5 upper floors; the municipal permission order separately describes residential construction as 1 Stilt + 4 Floors and records parking floors as 1 Stilt +5 Floors
Parking provision in planRequired parking area 410.55 sq. m; proposed parking area 508.20 sq. m; stilt floor 508.23 sq. m
Units10 units in the RERA unit record; the plan extraction also records 10 units RERA unit table

Offering and status

FieldProject record
Unit type3BHK RERA unit table
RERA saleable area186.61 sq. m per recorded configuration RERA unit table
Booked / available0 booked / 10 available in the portal-derived record; no as-of date is provided, so counts are indicative RERA unit table
Construction stageNo verified current construction-progress measurement or site inspection is supplied. The RERA amenity-progress entries shown are 0%; this is not independent verification of site condition RERA amenities
Completion datesForm B promoter declaration: completion on or before 09.09.2026. Project header: proposed completion 30/11/2026 RERA record
Occupancy certificateNot established in the supplied evidence. The building permission requires an occupancy certificate before occupation

Registration validity, the promoter’s declared completion undertaking and the project-header proposed completion date are separate records; none establishes that an occupancy certificate has been issued.

2. The project story

PEARL CASCADE is recorded with TG-RERA as a residential apartment project on Plot No. 141 in Bandlaguda Jagir Village, Gandipet Mandal, Ranga Reddy District. Its registered land extent is 805.49 sq. m, and the RERA unit record identifies one 3BHK configuration with 10 units RERA filing RERA unit table.

The filed building plan describes one residential building, with stilt parking and upper residential floors. The plan extraction gives a 1 Stilt + 5 upper floors configuration, while the municipal permission order describes 1 Stilt + 4 residential floors and separately refers to parking floors; the supplied overview evidence does not resolve the floor-description scope. The project is registered, but the supplied materials do not establish current construction progress, completed units or an occupancy-certified portion. The promoter’s Form B states a completion undertaking of 09.09.2026; the project record separately lists 30/11/2026 as the proposed completion date RERA record.

3. Master plan, architecture & building design

The registered site is a single 805.49 sq. m residential plot. The filed plan identifies one building and records a total built-up area of 2374.38 sq. m, total net BUA of 1066.15 sq. m, and a plan field for “Total Proposed Net BUA Area: 1066.16.” The RERA project fields separately report approved built-up area of 1866.15 sq. m; these labels are retained as stated and are not interchangeable RERA filing.

The plan depicts stilt parking and upper residential floors. Its stated floor areas are: stilt 508.23 sq. m; first through fifth floors 373.23 sq. m each. The municipal permission order describes the residential building as 1 Stilt + 4 Floors and records parking floors as 1 Stilt +5 Floors. No supplied drawing-derived data establishes flats per floor, lift/stair arrangement, building footprint, internal circulation, landscaping or common-area distribution. The plan extraction lists a septic tank as a utility.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010186.61 sq. mNot availableNot supplied

Unit counts, booking status and saleable area are from the TG-RERA-derived unit record; booking counts have no stated as-of date RERA unit table. The RERA floor-plan material includes two drawings, but both are scans pending measurement; no software-measured carpet area or room dimensions are supplied Floor plans. Carpet area is therefore not stated here. It is a different measure from RERA saleable area, which can include a proportionate share of common areas; no loading figure is provided.

5. Parking & vehicle circulation

The filed plan records required parking area of 410.55 sq. m, proposed parking area of 508.20 sq. m and a stilt floor area of 508.23 sq. m. The available evidence does not establish the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation to particular units, or the arrangement of vehicle ramps and internal driveways. The plan’s parking provision does not by itself establish exclusive ownership or a unit-specific allotment.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 infrastructure and facility categories, each with a reported progress value of 0%. These are portal-recorded progress entries, not an independent site inspection RERA amenities.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenities RERA amenities0%; not independently verified
Water SupplyDetails and capacity not statedRERA amenities RERA amenities0%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Details not stated; filed plan lists a septic tank RERA amenitiesRERA amenities; filed plan0% in amenity record; no independent completion verification
Storm Water DrainsDetails not statedRERA amenities RERA amenities0%; not independently verified
Green Strip/TOT LOT/ParkSize not stated; permission order lists “Tot-lot” RERA amenitiesRERA amenities; permission order0% in amenity record; no independent completion verification
Street LightingDetails not statedRERA amenities RERA amenities0%; not independently verified
Community BuildingsDetails not statedRERA amenities RERA amenities0%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterDetails not statedRERA amenities RERA amenities0%; not independently verified
Solid Waste Management and DisposalDetails not statedRERA amenities RERA amenities0%; not independently verified
Water Conservation, Rain Water HarvestingPermission order requires a rainwater-harvesting structure (percolation pit)RERA amenities; permission order0% in amenity record; not independently verified
Energy ManagementDetails not statedRERA amenities RERA amenities0%; not independently verified
Fire Protection and Fire Safety RequirementsSystem details not statedRERA amenities RERA amenities0%; not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails not statedRERA amenities RERA amenities0%; not independently verified
Aggregate area of recreational open spaceArea not statedRERA amenities RERA amenities0%; not independently verified

No indoor clubhouse or sports/recreation facility is established in the RERA amenity data. Vendor-listed facilities are not treated here as RERA-declared or verified project facilities.

7. Utilities, building services & safety

The filed plan lists a septic tank, and the RERA amenity record separately lists sewerage, sewage treatment/disposal, water supply, storm-water drainage and rainwater harvesting categories, each at 0% progress RERA amenities. The permission order requires a rainwater-harvesting percolation pit. Water source, storage and treatment capacity, STP provision, reuse arrangements and drainage capacity are not established by the supplied material.

The RERA amenity record includes energy management, electrical meter room/sub-station/receiving station, and fire protection/fire safety categories, each at 0% RERA amenities. The permission order requires an occupancy certificate before occupation and specifies that public water and electricity connections will be provided only upon production of an occupancy certificate. No project-specific evidence supplied here establishes lift count or capacity, power backup, fire-system design, emergency access, waste-security arrangements or accessible circulation.

8. Location, access & connectivity

The registered location is Plot No. 141, Bandlaguda Jagir Village, Gandipet Mandal, Ranga Reddy District, PIN 500058 RERA record. Recorded site boundaries include a 40 Feet Wide Road on the east, Plot No. 142 to the north and Plot No. 140 to the south RERA filing. The filed plan refers to a 12.00 / 12M WIDE ROAD.

The supplied location record gives a distance of 9.7 km to Financial District (Nanakramguda) Location record. No public-transport routes or further independently supported connectivity distances are provided.

9. Developer & development status

The TG-RERA certificate identifies B Goutham Reddy And Other as promoter; the project fields describe the organization type as “Others” and “Joint Owners.” The supplied evidence does not establish a company registration number, legal entity type beyond that description, registered office, official contact details or official website RERA filing Corporate record.

In Form B dated 03rd Day of May, 2024, Mr. B. Goutham Reddy declares legal title to the project land, states that it is free from encumbrances, and undertakes completion on or before 09.09.2026. The project record separately lists 30/11/2026 as the proposed completion date RERA record. The supplied evidence does not establish present construction progress or issuance of an occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsPEARL CASCADE; registration P02400008347; validity 07/06/2024–09/06/2026 unless extended by the Authority
Building plan / approval
DetailsFile No. 031722/SKP/R1/U6/HMDA/12122019; approval identifier D-2021; plan extraction records 08-Jul-2020 and identifies HMDA, delegated to Bandlaguda Jagir Municipal Corporation
Building permission order
DetailsBA.NO: 031722/SKP/R1/U6/HMDA/12122019; Bandlaguda Jagir Municipal Corporation; dated 10.09.2020; conditional permission for Plot No. 141
Form B promoter declaration
DetailsAffidavit-cum-declaration by Mr. B. Goutham Reddy, dated 03rd Day of May, 2024
RERA floor-plan drawings
DetailsTwo drawings recorded; scans pending measurement
SourceFloor plans
Layout approval document
DetailsFiled under the layout-plan document category; extracted plan information describes the proposed residential building and plot
Occupancy / completion certificate
DetailsNot present in the supplied evidence; the permission order states an occupancy certificate is compulsory before occupation

Frequently asked questions

Is PEARL CASCADE registered with Telangana RERA?

Yes. PEARL CASCADE is registered with the Telangana Real Estate Regulatory Authority as P02400008347; the registration status is New Project.

Who is the developer of PEARL CASCADE?

The promoter named in the RERA registration is B Goutham Reddy and Other.

Where is PEARL CASCADE located?

PEARL CASCADE is in Bandlaguda Jagir Village, Bandlaguda, Gandipet, Rangareddy, Telangana (500058).

When will PEARL CASCADE be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.