Rainbow Township
SRI NIDHI BUILDERS AND DEVELOPERS · Mahabubnagar · RERA P01400006736
RAINBOW TOWNSHIP is a plotted development in BHOOTHPUR, Bhoothpur Mandal, Mahabubnagar District, developed by registered promoter Sri Nidhi Builders And Developers. The project covers 22462.56 sq.mts and comprises 67 residential plots; no tower, block or floor configuration is stated. Plot sizes range from 118.47 sq.m to 484.56 sq.m. It is registered under TG-RERA number P01400006736, with a proposed completion date of 29/09/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | RAINBOW TOWNSHIP RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; registration covers the plotted project recorded against Survey Nos. 38/P, 39/P and 40/P |
| TG-RERA registration | P01400006736 |
| Registration validity | 22/08/2023–29/09/2025; certificate says “2 years” and that extension is subject to Authority approval under the Act and Rules |
| Registered promoter | Sri Nidhi Builders And Developers |
| RERA status | Registered; supplied certificate states validity through 29/09/2025. No extension is recorded in the supplied certificate. Current status is not independently established here. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | BHOOTHPUR; BHOOTHPUR Revenue Village RERA record RERA filing |
| Mandal | Bhoothpur Mandal, as stated in the tentative-layout approval |
| District | Mahabubnagar; the layout documents also spell it “Mahaboobnagar” RERA record |
| PIN | 509382 RERA record |
| Project survey numbers / subdivisions | 38/P, 39/P and 40/P |
| Site extent | RERA land record: total area 22462.56 sq.mts and net area 22462.56 sq.mts RERA filing |
| Layout-plan area | 22462.07 sq.mt in the proposed layout plan; its area statement gives total net layout 22462.08 sq.mt |
| Boundaries | East: 10 05 METERS WIDE ROAD; West: OPEN PLOTS; North: LAND OF KONDAIAH; South: 12 19 METERS WIDE ROAD RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Bhoothpur Municipality / Municipal Corporation for the tentative-layout approval; the RERA record names DTCP as authority RERA filing |
| Principal approval | Application No. 008263/LO/DTCP/3106/0006/2022, dated 30 September, 2022 Approvals record |
| Layout-plan reference | TS/048135/2022, dated 02-08-2022 |
| Approved built-up area | 14548.61 sqmts, as recorded in the RERA fields RERA filing |
| Buildings / floor configuration | Not applicable as a plotted layout; no building count, floors or parking levels are disclosed in the supplied project record. |
| Plots | 67 plots, shown on the layout plan and tentative-layout approval |
| Parking | Layout plan states PROPOSED NUMBER OF PARKINGS 0; no common parking area is allocated in its land-use table. |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Residential plots RERA record |
| Plot count / sizes | 67 plots. Drawing-derived schedule contains 67 plot sizes, from 118.47 sq.m to 484.56 sq.m; these are software-read from the layout drawing and should be checked against it. Layout record |
| Booked / available | Not disclosed in the supplied evidence. |
| Construction stage | No independently verified site-progress information supplied. The layout approval requires the applicant to carry out infrastructure and other works. |
| Completion date | RERA-filed proposed completion date: 29/09/2025 RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate supplied. The project is a plotted layout; the supplied record does not establish a project-wide completion certificate. Document index |
2. The project story
- RAINBOW TOWNSHIP is a 67-plot residential layout recorded in TG-RERA under P01400006736. Its registered land identity is Survey Nos. 38/P, 39/P and 40/P, at BHOOTHPUR Revenue Village, Bhoothpur Mandal, Mahabubnagar District. The layout plan sets out plot areas, internal roads, open space, social-infrastructure land and utility land.
- The tentative-layout approval describes infrastructure and development works to be undertaken by the applicant, including road formation, storm-water drains, underground drainage, internal water-supply pipelines, an overhead tank, an assured water source, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval requirements or proposed works; the supplied evidence does not independently verify that they have been completed.
- The RERA record gives 29/09/2025 as the proposed completion date. That completion date is distinct from the registration-validity period, which the supplied certificate gives as ending on 29/09/2025. No extension order, site-progress certification or occupancy/completion certificate is included in the supplied documents. RERA filing
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The layout plan identifies 67 plots on an overall stated layout area of 22462.07 sq.mt. Its area statement reports total net layout 22462.08 sq.mt and allocates the land as follows.
| Layout use | Area | Plan percentage |
|---|---|---|
| Plotted Area | 14547.84 | 64.77% |
| Road Area | 5020.52 | 22.35% |
| Organized open space/park Area | 2021.60 | 9.00% |
| Social Infrastructure Area | 647.17 | 2.88% |
| Utility Area | 224.95 | 1.00% |
| Amenity Area | 0.00 | 0.00% |
| Total net layout | 22462.08 | 100.00% |
- The drawing lists road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The supplied extracts do not describe building footprints, floors, residential building configurations or a separate clubhouse/amenity building. The layout plan records a mortgage area of 2236.53; the RERA land-details fields separately record mortgage area 2236.64 sqmts. RERA filing
4. Homes, configurations & floor plans
- The RERA-filed offering is plots, not apartments. The layout drawing identifies 67 plots. Software extraction of the plot schedule gives sizes from 118.47 sq.m (141.7 sq yd) to 484.56 sq.m (579.5 sq yd), with a median of 183.95 sq.m (220.0 sq yd). These are drawing-derived measurements, not RERA-filed saleable-area figures; the schedule should be verified against the drawing. Layout record
| Plot-size band | Number of plots |
|---|---|
| 100–150 sq yd (84–125 sq.m) | 2 |
| 150–200 sq yd (125–167 sq.m) | 11 |
| 200–250 sq yd (167–209 sq.m) | 26 |
| 250–300 sq yd (209–251 sq.m) | 5 |
| 300–400 sq yd (251–334 sq.m) | 19 |
| 400–500 sq yd (334–418 sq.m) | 3 |
| 500–1000 sq yd (418–836 sq.m) | 1 |
- The supplied floor-plan data contains two layout sheets and no apartment floor plans. No RERA-filed booked/available plot counts or unit-specific saleable-area schedule is supplied. Floor plans Document index
5. Parking & vehicle circulation
- The layout plan records PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00. No resident or visitor parking allocation, accessible parking, parking bay schedule, EV charging provision or legally documented plot-specific parking arrangement is included in the supplied evidence.
- The plan identifies internal road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The tentative-layout approval requires roads to be opened for access to neighbouring sites and says the layout owner/developer shall not construct a compound wall or fencing around the site.
6. Amenities, recreation & open spaces
The table below describes facilities identified in the RERA-filed tentative-layout approval and layout plan. The supplied record does not independently confirm completed delivery; the amenity-status fields show 0% progress where recorded. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 2021.60; 9.00% in the layout-plan area statement | Reserved on plan; completion not independently verified | |
| Social infrastructure land | 647.17; 2.88% | Land allocation shown; facility details and delivery not established | |
| Utility land | 224.95; 1.00% | Land allocation shown; completion not independently verified | |
| Internal roads | 5020.52; 22.35% of layout area | Road area shown; approval calls for road formation; completion not independently verified | |
| Community buildings | No size or facility details supplied | RERA amenities | No progress recorded |
| Green strip / tot lot / park | Listed in RERA amenities data; no separate size or completion evidence beyond the layout’s open-space allocation | RERA amenities | Listed; completion not independently verified |
7. Utilities, building services & safety
The tentative-layout approval describes the following proposed infrastructure works: internal water-supply pipelines, an overhead tank, a water reservoir, an assured water-supply source, underground drainage lines, a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer and rainwater-harvesting pits. It also lists solid-waste management. These are requirements or proposed provisions in the approval record; capacities, detailed specifications and completed status are not supplied.
| Service | Evidence in the supplied record |
|---|---|
| Water | Internal water-supply pipelines, overhead tank, water reservoir and assured water-supply source are specified in the tentative-layout approval; capacity and delivery status are not established. |
| Sewerage and drainage | Underground drainage lines, common septic tank/STP and storm-water drains are specified; capacity, commissioning and completion status are not established. |
| Electrical | Electrical supply lines, street lights and transformer are specified; capacity and completion status are not established. |
| Rainwater management | Rainwater-harvesting pits are specified; number, capacity and completion status are not supplied. |
| Waste | Solid-waste management is listed; the operating arrangement and completion status are not supplied. |
| Fire, lifts and accessibility | No project-specific fire-system, lift or accessibility details are established in the supplied record. RERA amenities |
8. Location, access & connectivity
- The registered project location is BHOOTHPUR, BHOOTHPUR Revenue Village, Bhoothpur Mandal, Mahabubnagar District, PIN 509382. The RERA land record gives the site boundaries as east 10 05 METERS WIDE ROAD, west OPEN PLOTS, north LAND OF KONDAIAH, and south 12 19 METERS WIDE ROAD. RERA record RERA filing
- The tentative-layout plan lists internal road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The available location data records the Financial District (Nanakramguda) at 1.2 km from the supplied geocoded point; the evidence does not provide project-specific public-transport details or verified travel times. Location record
9. Developer & development status
- The registered legal promoter is SRI NIDHI BUILDERS AND DEVELOPERS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AEEFS5279P1Z5. KANDUR SHARAT BABU is recorded as authorized signatory and PALUSA SRIDHAR GOUD as partner. Parties record Corporate record
- The RERA registration certificate lists the promoter office as “Village: Mandal: District: Mahabubnagar, Pin: 509001.” The project-header promoter address is B, RAM NAGAR, BHOOTHPUR, BHOOTHPUR, Mahabubnagar, 509382. No official telephone, email or company website is supplied. Parties record
- In Form B, the authorized signatory declares that the project would be completed within the stated period 29/09/2025, and makes declarations concerning land title, encumbrances, project funds, approvals and accounts. These are promoter declarations, not independent verification of title or project completion.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for RAINBOW TOWNSHIP, registration P01400006736, issued 22/08/2023, with validity stated through 29/09/2025; no extension is recorded in the supplied certificate. |
| Layout-plan reference | Proposed plot layout for Survey Nos. 38/P, 39/P and 40/P; reference TS/048135/2022, dated 02-08-2022. |
| Tentative-layout approval | Bhoothpur Municipality / Municipal Corporation approval, application No. 008263/LO/DTCP/3106/0006/2022, dated 30 September, 2022; describes a 67-plot tentative layout. |
| Form B declaration | Promoter affidavit by authorized signatory KANDUR SHARAT BABU for RAINBOW TOWNSHIP, including declared completion date 29/09/2025 and project-funds undertakings. |
| Occupancy/completion certificate | None supplied. The available project evidence does not establish a project-wide completion certificate. Document index |
The tentative-layout approval states that it is not proof of land title and requires infrastructure and other works to be carried out by the applicant.
1. Project at a glance
Project identity
Registered project name: RAINBOW TOWNSHIP
Project type: Plotted development
Phase / registered portion: Phase not separately identified; registration covers the plotted project recorded against Survey Nos. 38/P, 39/P and 40/P
TG-RERA registration: P01400006736
Registration validity: 22/08/2023–29/09/2025; certificate says “2 years” and that extension is subject to Authority approval under the Act and Rules
Registered promoter: Sri Nidhi Builders And Developers
RERA status: Registered; supplied certificate states validity through 29/09/2025. No extension is recorded in the supplied certificate. Current status is not independently established here.
Land and geographic identity
Locality / revenue village: BHOOTHPUR; BHOOTHPUR Revenue Village
Mandal: Bhoothpur Mandal, as stated in the tentative-layout approval
District: Mahabubnagar; the layout documents also spell it “Mahaboobnagar”
PIN: 509382
Project survey numbers / subdivisions: 38/P, 39/P and 40/P
Site extent: RERA land record: total area 22462.56 sq.mts and net area 22462.56 sq.mts
Layout-plan area: 22462.07 sq.mt in the proposed layout plan; its area statement gives total net layout 22462.08 sq.mt
Boundaries: East: 10 05 METERS WIDE ROAD; West: OPEN PLOTS; North: LAND OF KONDAIAH; South: 12 19 METERS WIDE ROAD
Development identity
Sanctioning authority: Bhoothpur Municipality / Municipal Corporation for the tentative-layout approval; the RERA record names DTCP as authority
Principal approval: Application No. 008263/LO/DTCP/3106/0006/2022, dated 30 September, 2022
Layout-plan reference: TS/048135/2022, dated 02-08-2022
Approved built-up area: 14548.61 sqmts, as recorded in the RERA fields
Buildings / floor configuration: Not applicable as a plotted layout; no building count, floors or parking levels are disclosed in the supplied project record.
Plots: 67 plots, shown on the layout plan and tentative-layout approval
Parking: Layout plan states PROPOSED NUMBER OF PARKINGS 0; no common parking area is allocated in its land-use table.
Offering and status
Unit type: Residential plots
Plot count / sizes: 67 plots. Drawing-derived schedule contains 67 plot sizes, from 118.47 sq.m to 484.56 sq.m; these are software-read from the layout drawing and should be checked against it.
Booked / available: Not disclosed in the supplied evidence.
Construction stage: No independently verified site-progress information supplied. The layout approval requires the applicant to carry out infrastructure and other works.
Completion date: RERA-filed proposed completion date: 29/09/2025
Occupancy / completion certificate: No occupancy or completion certificate supplied. The project is a plotted layout; the supplied record does not establish a project-wide completion certificate.
2. The project story
- RAINBOW TOWNSHIP is a 67-plot residential layout recorded in TG-RERA under P01400006736. Its registered land identity is Survey Nos. 38/P, 39/P and 40/P, at BHOOTHPUR Revenue Village, Bhoothpur Mandal, Mahabubnagar District. The layout plan sets out plot areas, internal roads, open space, social-infrastructure land and utility land.
- The tentative-layout approval describes infrastructure and development works to be undertaken by the applicant, including road formation, storm-water drains, underground drainage, internal water-supply pipelines, an overhead tank, an assured water source, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval requirements or proposed works; the supplied evidence does not independently verify that they have been completed.
- The RERA record gives 29/09/2025 as the proposed completion date. That completion date is distinct from the registration-validity period, which the supplied certificate gives as ending on 29/09/2025. No extension order, site-progress certification or occupancy/completion certificate is included in the supplied documents.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The layout plan identifies 67 plots on an overall stated layout area of 22462.07 sq.mt. Its area statement reports total net layout 22462.08 sq.mt and allocates the land as follows.
| Layout use | Area | Plan percentage |
|---|---|---|
| Plotted Area | 14547.84 | 64.77% |
| Road Area | 5020.52 | 22.35% |
| Organized open space/park Area | 2021.60 | 9.00% |
| Social Infrastructure Area | 647.17 | 2.88% |
| Utility Area | 224.95 | 1.00% |
| Amenity Area | 0.00 | 0.00% |
| Total net layout | 22462.08 | 100.00% |
- The drawing lists road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The supplied extracts do not describe building footprints, floors, residential building configurations or a separate clubhouse/amenity building. The layout plan records a mortgage area of 2236.53; the RERA land-details fields separately record mortgage area 2236.64 sqmts.
4. Homes, configurations & floor plans
- The RERA-filed offering is plots, not apartments. The layout drawing identifies 67 plots. Software extraction of the plot schedule gives sizes from 118.47 sq.m (141.7 sq yd) to 484.56 sq.m (579.5 sq yd), with a median of 183.95 sq.m (220.0 sq yd). These are drawing-derived measurements, not RERA-filed saleable-area figures; the schedule should be verified against the drawing.
100–150 sq yd (84–125 sq.m): 2
150–200 sq yd (125–167 sq.m): 11
200–250 sq yd (167–209 sq.m): 26
250–300 sq yd (209–251 sq.m): 5
300–400 sq yd (251–334 sq.m): 19
400–500 sq yd (334–418 sq.m): 3
500–1000 sq yd (418–836 sq.m): 1
- The supplied floor-plan data contains two layout sheets and no apartment floor plans. No RERA-filed booked/available plot counts or unit-specific saleable-area schedule is supplied.
5. Parking & vehicle circulation
- The layout plan records PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00. No resident or visitor parking allocation, accessible parking, parking bay schedule, EV charging provision or legally documented plot-specific parking arrangement is included in the supplied evidence.
- The plan identifies internal road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The tentative-layout approval requires roads to be opened for access to neighbouring sites and says the layout owner/developer shall not construct a compound wall or fencing around the site.
6. Amenities, recreation & open spaces
The table below describes facilities identified in the RERA-filed tentative-layout approval and layout plan. The supplied record does not independently confirm completed delivery; the amenity-status fields show 0% progress where recorded.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Open space / park | 2021.60; 9.00% in the layout-plan area statement | Reserved on plan; completion not independently verified | |
| Social infrastructure land | 647.17; 2.88% | Land allocation shown; facility details and delivery not established | |
| Utility land | 224.95; 1.00% | Land allocation shown; completion not independently verified | |
| Internal roads | 5020.52; 22.35% of layout area | Road area shown; approval calls for road formation; completion not independently verified | |
| Community buildings | No size or facility details supplied | No progress recorded | |
| Green strip / tot lot / park | Listed in RERA amenities data; no separate size or completion evidence beyond the layout’s open-space allocation | Listed; completion not independently verified |
7. Utilities, building services & safety
The tentative-layout approval describes the following proposed infrastructure works: internal water-supply pipelines, an overhead tank, a water reservoir, an assured water-supply source, underground drainage lines, a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer and rainwater-harvesting pits. It also lists solid-waste management. These are requirements or proposed provisions in the approval record; capacities, detailed specifications and completed status are not supplied.
Water: Internal water-supply pipelines, overhead tank, water reservoir and assured water-supply source are specified in the tentative-layout approval; capacity and delivery status are not established.
Sewerage and drainage: Underground drainage lines, common septic tank/STP and storm-water drains are specified; capacity, commissioning and completion status are not established.
Electrical: Electrical supply lines, street lights and transformer are specified; capacity and completion status are not established.
Rainwater management: Rainwater-harvesting pits are specified; number, capacity and completion status are not supplied.
Waste: Solid-waste management is listed; the operating arrangement and completion status are not supplied.
Fire, lifts and accessibility: No project-specific fire-system, lift or accessibility details are established in the supplied record.
8. Location, access & connectivity
- The registered project location is BHOOTHPUR, BHOOTHPUR Revenue Village, Bhoothpur Mandal, Mahabubnagar District, PIN 509382. The RERA land record gives the site boundaries as east 10 05 METERS WIDE ROAD, west OPEN PLOTS, north LAND OF KONDAIAH, and south 12 19 METERS WIDE ROAD.
- The tentative-layout plan lists internal road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The available location data records the Financial District (Nanakramguda) at 1.2 km from the supplied geocoded point; the evidence does not provide project-specific public-transport details or verified travel times.
9. Developer & development status
- The registered legal promoter is SRI NIDHI BUILDERS AND DEVELOPERS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AEEFS5279P1Z5. KANDUR SHARAT BABU is recorded as authorized signatory and PALUSA SRIDHAR GOUD as partner.
- The RERA registration certificate lists the promoter office as “Village: Mandal: District: Mahabubnagar, Pin: 509001.” The project-header promoter address is B, RAM NAGAR, BHOOTHPUR, BHOOTHPUR, Mahabubnagar, 509382. No official telephone, email or company website is supplied.
- In Form B, the authorized signatory declares that the project would be completed within the stated period 29/09/2025, and makes declarations concerning land title, encumbrances, project funds, approvals and accounts. These are promoter declarations, not independent verification of title or project completion.
10. Approvals, official records & documents
TG-RERA registration: Form C for RAINBOW TOWNSHIP, registration P01400006736, issued 22/08/2023, with validity stated through 29/09/2025; no extension is recorded in the supplied certificate.
Layout-plan reference: Proposed plot layout for Survey Nos. 38/P, 39/P and 40/P; reference TS/048135/2022, dated 02-08-2022.
Tentative-layout approval: Bhoothpur Municipality / Municipal Corporation approval, application No. 008263/LO/DTCP/3106/0006/2022, dated 30 September, 2022; describes a 67-plot tentative layout.
Form B declaration: Promoter affidavit by authorized signatory KANDUR SHARAT BABU for RAINBOW TOWNSHIP, including declared completion date 29/09/2025 and project-funds undertakings.
Occupancy/completion certificate: None supplied. The available project evidence does not establish a project-wide completion certificate.
The tentative-layout approval states that it is not proof of land title and requires infrastructure and other works to be carried out by the applicant.
Frequently asked questions
Is RAINBOW TOWNSHIP registered with Telangana RERA?
Yes. RAINBOW TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01400006736; the registration status is New Project.
Who is the developer of RAINBOW TOWNSHIP?
The promoter named in the RERA registration is SRI NIDHI BUILDERS AND DEVELOPERS.
Where is RAINBOW TOWNSHIP located?
RAINBOW TOWNSHIP is in BHOOTHPUR, Mahabubnagar, Telangana (509382).
When will RAINBOW TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 29/09/2025. This is the promoter's declaration, not a guarantee.
More projects in Mahabubnagar