RAINBOW TOWNSHIP is a plotted development in BHOOTHPUR, Bhoothpur Mandal, Mahabubnagar District, developed by registered promoter Sri Nidhi Builders And Developers. The project covers 22462.56 sq.mts and comprises 67 residential plots; no tower, block or floor configuration is stated. Plot sizes range from 118.47 sq.m to 484.56 sq.m. It is registered under TG-RERA number P01400006736, with a proposed completion date of 29/09/2025.

01What we found

Period endedTG-RERA registration ran to 29 Sep 2025 - check its extension on TG-RERA
32documents on file - each fact links to its page
1court case on this project's land (survey 38, Bhoothpur)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bhoothpur, Mahabubnagar · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameRAINBOW TOWNSHIP RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase not separately identified; registration covers the plotted project recorded against Survey Nos. 38/P, 39/P and 40/P
TG-RERA registrationP01400006736
Registration validity22/08/2023–29/09/2025; certificate says “2 years” and that extension is subject to Authority approval under the Act and Rules
Registered promoterSri Nidhi Builders And Developers
RERA statusRegistered; supplied certificate states validity through 29/09/2025. No extension is recorded in the supplied certificate. Current status is not independently established here.

Land and geographic identity

FieldProject record
Locality / revenue villageBHOOTHPUR; BHOOTHPUR Revenue Village RERA record RERA filing
MandalBhoothpur Mandal, as stated in the tentative-layout approval
DistrictMahabubnagar; the layout documents also spell it “Mahaboobnagar” RERA record
PIN509382 RERA record
Project survey numbers / subdivisions38/P, 39/P and 40/P
Site extentRERA land record: total area 22462.56 sq.mts and net area 22462.56 sq.mts RERA filing
Layout-plan area22462.07 sq.mt in the proposed layout plan; its area statement gives total net layout 22462.08 sq.mt
BoundariesEast: 10 05 METERS WIDE ROAD; West: OPEN PLOTS; North: LAND OF KONDAIAH; South: 12 19 METERS WIDE ROAD RERA filing

Development identity

FieldProject record
Sanctioning authorityBhoothpur Municipality / Municipal Corporation for the tentative-layout approval; the RERA record names DTCP as authority RERA filing
Principal approvalApplication No. 008263/LO/DTCP/3106/0006/2022, dated 30 September, 2022 Approvals record
Layout-plan referenceTS/048135/2022, dated 02-08-2022
Approved built-up area14548.61 sqmts, as recorded in the RERA fields RERA filing
Buildings / floor configurationNot applicable as a plotted layout; no building count, floors or parking levels are disclosed in the supplied project record.
Plots67 plots, shown on the layout plan and tentative-layout approval
ParkingLayout plan states PROPOSED NUMBER OF PARKINGS 0; no common parking area is allocated in its land-use table.

Offering and status

FieldProject record
Unit typeResidential plots RERA record
Plot count / sizes67 plots. Drawing-derived schedule contains 67 plot sizes, from 118.47 sq.m to 484.56 sq.m; these are software-read from the layout drawing and should be checked against it. Layout record
Booked / availableNot disclosed in the supplied evidence.
Construction stageNo independently verified site-progress information supplied. The layout approval requires the applicant to carry out infrastructure and other works.
Completion dateRERA-filed proposed completion date: 29/09/2025 RERA filing
Occupancy / completion certificateNo occupancy or completion certificate supplied. The project is a plotted layout; the supplied record does not establish a project-wide completion certificate. Document index

2. The project story

  • RAINBOW TOWNSHIP is a 67-plot residential layout recorded in TG-RERA under P01400006736. Its registered land identity is Survey Nos. 38/P, 39/P and 40/P, at BHOOTHPUR Revenue Village, Bhoothpur Mandal, Mahabubnagar District. The layout plan sets out plot areas, internal roads, open space, social-infrastructure land and utility land.
  • The tentative-layout approval describes infrastructure and development works to be undertaken by the applicant, including road formation, storm-water drains, underground drainage, internal water-supply pipelines, an overhead tank, an assured water source, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. These are approval requirements or proposed works; the supplied evidence does not independently verify that they have been completed.
  • The RERA record gives 29/09/2025 as the proposed completion date. That completion date is distinct from the registration-validity period, which the supplied certificate gives as ending on 29/09/2025. No extension order, site-progress certification or occupancy/completion certificate is included in the supplied documents. RERA filing

3. Master plan, architecture & building design

This is a plotted layout rather than a multi-storey building project. The layout plan identifies 67 plots on an overall stated layout area of 22462.07 sq.mt. Its area statement reports total net layout 22462.08 sq.mt and allocates the land as follows.

Layout useAreaPlan percentage
Plotted Area14547.8464.77%
Road Area5020.5222.35%
Organized open space/park Area2021.609.00%
Social Infrastructure Area647.172.88%
Utility Area224.951.00%
Amenity Area0.000.00%
Total net layout22462.08100.00%
  • The drawing lists road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The supplied extracts do not describe building footprints, floors, residential building configurations or a separate clubhouse/amenity building. The layout plan records a mortgage area of 2236.53; the RERA land-details fields separately record mortgage area 2236.64 sqmts. RERA filing

4. Homes, configurations & floor plans

  • The RERA-filed offering is plots, not apartments. The layout drawing identifies 67 plots. Software extraction of the plot schedule gives sizes from 118.47 sq.m (141.7 sq yd) to 484.56 sq.m (579.5 sq yd), with a median of 183.95 sq.m (220.0 sq yd). These are drawing-derived measurements, not RERA-filed saleable-area figures; the schedule should be verified against the drawing. Layout record
Plot-size bandNumber of plots
100–150 sq yd (84–125 sq.m)2
150–200 sq yd (125–167 sq.m)11
200–250 sq yd (167–209 sq.m)26
250–300 sq yd (209–251 sq.m)5
300–400 sq yd (251–334 sq.m)19
400–500 sq yd (334–418 sq.m)3
500–1000 sq yd (418–836 sq.m)1
  • The supplied floor-plan data contains two layout sheets and no apartment floor plans. No RERA-filed booked/available plot counts or unit-specific saleable-area schedule is supplied. Floor plans Document index

5. Parking & vehicle circulation

  • The layout plan records PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00. No resident or visitor parking allocation, accessible parking, parking bay schedule, EV charging provision or legally documented plot-specific parking arrangement is included in the supplied evidence.
  • The plan identifies internal road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The tentative-layout approval requires roads to be opened for access to neighbouring sites and says the layout owner/developer shall not construct a compound wall or fencing around the site.

6. Amenities, recreation & open spaces

The table below describes facilities identified in the RERA-filed tentative-layout approval and layout plan. The supplied record does not independently confirm completed delivery; the amenity-status fields show 0% progress where recorded. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park2021.60; 9.00% in the layout-plan area statementReserved on plan; completion not independently verified
Social infrastructure land647.17; 2.88%Land allocation shown; facility details and delivery not established
Utility land224.95; 1.00%Land allocation shown; completion not independently verified
Internal roads5020.52; 22.35% of layout areaRoad area shown; approval calls for road formation; completion not independently verified
Community buildingsNo size or facility details suppliedRERA amenitiesNo progress recorded
Green strip / tot lot / parkListed in RERA amenities data; no separate size or completion evidence beyond the layout’s open-space allocationRERA amenitiesListed; completion not independently verified

7. Utilities, building services & safety

The tentative-layout approval describes the following proposed infrastructure works: internal water-supply pipelines, an overhead tank, a water reservoir, an assured water-supply source, underground drainage lines, a common septic tank/STP, storm-water drains, electrical supply lines, street lights, a transformer and rainwater-harvesting pits. It also lists solid-waste management. These are requirements or proposed provisions in the approval record; capacities, detailed specifications and completed status are not supplied.

ServiceEvidence in the supplied record
WaterInternal water-supply pipelines, overhead tank, water reservoir and assured water-supply source are specified in the tentative-layout approval; capacity and delivery status are not established.
Sewerage and drainageUnderground drainage lines, common septic tank/STP and storm-water drains are specified; capacity, commissioning and completion status are not established.
ElectricalElectrical supply lines, street lights and transformer are specified; capacity and completion status are not established.
Rainwater managementRainwater-harvesting pits are specified; number, capacity and completion status are not supplied.
WasteSolid-waste management is listed; the operating arrangement and completion status are not supplied.
Fire, lifts and accessibilityNo project-specific fire-system, lift or accessibility details are established in the supplied record. RERA amenities

8. Location, access & connectivity

  • The registered project location is BHOOTHPUR, BHOOTHPUR Revenue Village, Bhoothpur Mandal, Mahabubnagar District, PIN 509382. The RERA land record gives the site boundaries as east 10 05 METERS WIDE ROAD, west OPEN PLOTS, north LAND OF KONDAIAH, and south 12 19 METERS WIDE ROAD. RERA record RERA filing
  • The tentative-layout plan lists internal road widths of 10.00M, 12.00M, 18.28M, 60.96 MT and 200'-0". The available location data records the Financial District (Nanakramguda) at 1.2 km from the supplied geocoded point; the evidence does not provide project-specific public-transport details or verified travel times. Location record

9. Developer & development status

  • The registered legal promoter is SRI NIDHI BUILDERS AND DEVELOPERS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AEEFS5279P1Z5. KANDUR SHARAT BABU is recorded as authorized signatory and PALUSA SRIDHAR GOUD as partner. Parties record Corporate record
  • The RERA registration certificate lists the promoter office as “Village: Mandal: District: Mahabubnagar, Pin: 509001.” The project-header promoter address is B, RAM NAGAR, BHOOTHPUR, BHOOTHPUR, Mahabubnagar, 509382. No official telephone, email or company website is supplied. Parties record
  • In Form B, the authorized signatory declares that the project would be completed within the stated period 29/09/2025, and makes declarations concerning land title, encumbrances, project funds, approvals and accounts. These are promoter declarations, not independent verification of title or project completion.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for RAINBOW TOWNSHIP, registration P01400006736, issued 22/08/2023, with validity stated through 29/09/2025; no extension is recorded in the supplied certificate.
Layout-plan referenceProposed plot layout for Survey Nos. 38/P, 39/P and 40/P; reference TS/048135/2022, dated 02-08-2022.
Tentative-layout approvalBhoothpur Municipality / Municipal Corporation approval, application No. 008263/LO/DTCP/3106/0006/2022, dated 30 September, 2022; describes a 67-plot tentative layout.
Form B declarationPromoter affidavit by authorized signatory KANDUR SHARAT BABU for RAINBOW TOWNSHIP, including declared completion date 29/09/2025 and project-funds undertakings.
Occupancy/completion certificateNone supplied. The available project evidence does not establish a project-wide completion certificate. Document index

The tentative-layout approval states that it is not proof of land title and requires infrastructure and other works to be carried out by the applicant.

Frequently asked questions

Is RAINBOW TOWNSHIP registered with Telangana RERA?

Yes. RAINBOW TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01400006736; the registration status is New Project.

Who is the developer of RAINBOW TOWNSHIP?

The promoter named in the RERA registration is SRI NIDHI BUILDERS AND DEVELOPERS.

Where is RAINBOW TOWNSHIP located?

RAINBOW TOWNSHIP is in BHOOTHPUR, Mahabubnagar, Telangana (509382).

When will RAINBOW TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 29/09/2025. This is the promoter's declaration, not a guarantee.