Radhe Govind Towers
RG ATTAL BUILDERS LLP · Nizamabad · RERA P03100009187
RADHE GOVIND TOWERS is a residential apartment project at Nyalkal Road, Nizamabad, Nizamabad District. The registered promoter is RG ATTAL BUILDERS LLP. The project has a land area of 2386.82 sq. m. and one residential building with 1 Stilt + 5 upper floors, containing 55 2BHK units with a saleable area of 115.25 m². It is registered under TG-RERA No. P03100009187, with a proposed completion date of 18/11/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | RADHE GOVIND TOWERS RERA record RERA filing |
| Project type / use | Residential apartment project RERA filing |
| Phase / registered portion | No separate phase name or phase-wise scope is disclosed; the registration describes one building. RERA record |
| TG-RERA registration | P03100009187; recorded as registered from 19 July 2024. RERA record Approvals record |
| Registration validity | The registration certificate states validity from 19/07/2024 to 18/07/2027, unless extended by the Authority. |
| Registered promoter | RG ATTAL BUILDERS LLP RERA record Corporate record |
| RERA status | The supplied record identifies the project as “New Project”; the registration certificate is on file. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / address in project records | Nyalkal Road, Nizamabad |
| Revenue village | NIZAMABAD is stated in the building approval; NIZAMABAD SHIVAR is stated in the filed drawing extract. The RERA land-details field does not disclose a village. Land records |
| Mandal | Not disclosed in the supplied project record. Land records |
| District / PIN | Nizamabad District; PIN 503001 in the project header and registration project location. RERA record |
| Project survey number(s) / subdivision(s) | Survey No. 708; the title material also refers to 708/1 and NALA Survey No. 708/1. Land records |
| Registered site extent | The project record gives 2386.82 sq. m. as total land area. RERA filing Land records |
| Building-permit site area and net area | Site area 2386.82 m²; road-affected area 115.2 m²; net area 2271.62 m², as stated in the building approval. |
| Boundaries in RERA land details | East: EXISTING ROAD; West: EXISTING ROAD; North: EXISTING ROAD; South: 18 MT WIDE EXISTING ROAD. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Nizamabad Municipality/Municipal Corporation, as identified on the building construction approval. |
| Principal building approval | Permit No. 0094/BP/3072/2024, approved 19 July, 2024. The document also states file No. 004856/BP/DTCP/3072/0045/2023. |
| Other drawing identifier on file | TS/017361/2023, dated 04-03-2023, appears on the filed drawing record. |
| Approved built-up area | The approval states residential upper-floor area 4,779.65 m² and stilt parking area 1,104.06 m². It also records approved built-up area 5,910.25 m² in the project filing. RERA filing |
| Building count and configuration | One residential building; 1 Stilt + 5 upper floors; stated height 14.98 m. |
| Parking levels | Stilt parking is shown in the building approval. A cellar is not identified in the supplied building-approval extract. |
| Unit count | The TG-RERA project record lists 55 2BHK units; the filed drawing extract also states 55 units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed unit type and saleable area | 2BHK; saleable area 115.25 m². RERA unit table |
| Booked / available | 0 booked / 55 available in the portal data supplied; the portal count has no as-of date and is indicative. RERA unit table |
| Construction stage | The supplied information does not establish the current physical construction stage or independently verified site progress. RERA amenities |
| Completion dates | Form B states a completion undertaking of 18/07/2027; the project header gives proposed completion 18/11/2027. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records; its status is not established here. Document index |
2. The project story
RADHE GOVIND TOWERS is recorded with TG-RERA as a residential apartment project on Survey No. 708 in Nizamabad, with related title material also referring to Survey No. 708/1. The filed building approval describes a single residential building at Nyalkal Road, comprising one stilt level and five upper floors. RERA record Land records
The RERA unit schedule identifies 55 2BHK apartments, with 0 booked and 55 available in the supplied portal data. Those counts are indicative because the record provides no count-as-of date. The project is registered, but the supplied evidence does not establish current construction progress or the issue of an occupancy/completion certificate. RERA unit table Document index
The registration certificate runs through 18/07/2027 unless extended. Separately, the promoter’s Form B states a completion undertaking of 18/07/2027, while the project header records a proposed completion date of 18/11/2027. RERA record
3. Master plan, architecture & building design
The building approval describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.98 m. It records residential upper-floor area of 4,779.65 m² and stilt parking area of 1,104.06 m². The project filing separately records approved built-up area of 5,910.25 m²; these are the figures as stated in the supplied approval and RERA record, not a software-derived measurement. RERA filing
The approval records a 120.89 m² tot-lot, one rainwater-harvesting structure, transformer space and a garbage house. Its conditions also require the tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued.
The filed drawing extract identifies 1.50 m internal road, 4.50 m driveway, 6.61 m passage and 2.00 m passage, and shows 18.00 MT wide existing and 24.00 MT wide proposed road references. It records plot area 2386.82 sq. m., road-affected area 115.20, net plot area 2271.62, and vacant plot area 1141.04.
The supplied material does not establish a complete architectural schedule for lifts, stairs, floor-by-floor apartment distribution, building entries, or detailed common-area and circulation arrangements. The drawing extract is filed as a layout-plan document; this Overview does not treat it as evidence of completed construction. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 55 | 0 | 55 | 115.25 m² | 59.9–77.0 m²; median 60.5 m² | 47% |
The 2BHK unit count, booking status and saleable area are TG-RERA filing values; portal counts are indicative because no as-of date is supplied. RERA unit table RERA unit details
Carpet figures are software measurements from the filed floor-plan drawing 518474, not RERA disclosures, and are flagged as needing review. The drawing-based measurement for a sample 2BHK includes living/dining, two bedrooms, foyer, kitchen and two toilets; the illustrated unit also has a balcony and utility, which are excluded from the measured carpet area. Floor plans RERA unit details
The measured carpet area and RERA-filed saleable area describe different area bases: the drawing measurement is the software-measured internal carpet area, while the RERA saleable figure is the filed saleable area. The supplied data states that saleable area also counts the home’s share of common areas; no unit-specific carpet-area disclosure is established in the RERA record. Floor plans RERA unit details
The drawing-based records also identify 1BHK layouts, measured at 47.9 m² carpet area, but mark that configuration as not present in the TG-RERA filing. It is therefore not included as a RERA-filed purchase configuration in the table. Floor plans RERA unit details
5. Parking & vehicle circulation
The building approval identifies 1,104.06 m² of stilt parking area and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extract does not state a sanctioned count of car or two-wheeler spaces.
The filed drawing extract records “PROPOSED NUMBER OF PARKINGS 1”; the meaning of that count is not further specified in the supplied material. A vendor record claims 55 covered parking spaces and open parking (1130 sqm), but these are third-party listing details, not established here as sanctioned or legally allocated spaces. Promoter website
No unit-by-unit parking allocation, visitor or accessible-space schedule, mechanical parking arrangement, or parking allotment terms are established by the supplied records. A drawn or listed parking provision does not, by itself, establish an exclusive right for a particular apartment. Document index Promoter website
6. Amenities, recreation & open spaces
| Description / size | 120.89 m² |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition requires it to be fenced and maintained as greenery before issue of occupancy certificate; completion is not established. |
| Description / size | Green Strip is listed; peripheral planting and greenery maintenance are referenced in the filed drawing conditions. |
|---|---|
| Evidence source | Filed drawing extract |
| Declared progress / verified status | Required/listed in the record; completion is not established. |
| Description / size | Listed in vendor amenity information; no size or capacity supplied. |
|---|---|
| Evidence source | Third-party vendor record |
| Declared progress / verified status | Marketing/listing claims only; not established as sanctioned or delivered. Promoter website |
| Description / size | Listed in the RERA amenity record; no size or facility details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%; completion is not established. RERA amenities |
| Description / size | Listed in the RERA amenity record. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. RERA amenities |
| Description / size | Listed in the RERA amenity record; no area supplied there. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. RERA amenities |
The RERA amenity record also lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. Those items are addressed as services in the next section. RERA amenities
7. Utilities, building services & safety
The building approval requires a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. It lists one rainwater-harvesting structure. These are approval requirements or recorded provisions; completion is not established.
The filed drawing extract lists a septic tank, STP, WTP, rainwater harvesting and a distribution transformer. The RERA amenity record marks water supply, sewerage and rainwater harvesting as “YES,” but records 0% progress for the listed amenities; it does not provide capacities or establish completed operation. RERA amenities
Fire protection and fire safety, storm-water drainage, sewage/sullage treatment, solid-waste management, energy management and an electrical meter room/sub-station/receiving station appear in the RERA amenity schedule, without supplied technical specifications or verified completion status. The supplied evidence does not establish water source or storage capacity, backup-power capacity, lift provision or capacity, CCTV/security systems, accessibility arrangements, or EV-charging facilities. RERA amenities Document index
The building permit requires adherence to the sanctioned plan, submission of commencement notice before construction, completion notice after construction and an occupancy certificate before occupation. These are recorded conditions; the supplied documents do not establish that construction has been completed or an occupancy certificate issued.
8. Location, access & connectivity
The project record places RADHE GOVIND TOWERS at Nyalkal Road, Nizamabad, District Nizamabad, PIN 503001. The building approval identifies the site at Survey/Premises No. 708 and records existing roads along the north, east and west boundaries and an 18 MT wide existing road to the south. RERA record RERA filing
The filed drawing extract additionally refers to an 18.00 MT wide existing road, a 24.00 MT wide proposed road, a 4.50 MT wide driveway, a 1.50 m internal road, and passages of 6.61 m and 2.00 m.
The supplied location evidence does not establish project-specific public-transport access, landmark distances or travel times. The third-party listing’s locality and connectivity statements are not used here as verified project-location information. Location record Promoter website
9. Developer & development status
The registered legal promoter is RG ATTAL BUILDERS LLP, an LLP. The supplied corporate identifier is GSTIN 36ABIFR8454J1ZL. The promoter address recorded in the project data is SAI KRISHNA TOWER, SUBHASH NAGAR, NYALKAL ROAD, WARD NO. 7, NIZAMABAD, Nizamabad, 503001. The supplied material does not provide an official project website or contact details for the promoter. Corporate record Parties record RERA record
The project filing identifies ATTAL PRANAY as authorized signatory and ATTAL SATISH as partner. Form B, signed by ATTAL PRANAY as authorized signatory, declares a completion date of 18/07/2027. Parties record
The supplied evidence describes one building and one registered project scope; it does not provide a verified construction-progress percentage or establish current site completion. Registration validity, the promoter’s completion undertaking and the project-header proposed completion date are separate records: the registration certificate runs to 18/07/2027 unless extended, Form B states 18/07/2027, and the header gives 18/11/2027. No occupancy/completion certificate is included in the supplied evidence. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P03100009187; commencement 19/07/2024; stated end 18/07/2027, unless extended |
|---|---|
| What it establishes in this Overview | Registration of RADHE GOVIND TOWERS under RG ATTAL BUILDERS LLP and the stated registration period and conditions. |
| Identifier / date | Permit 0094/BP/3072/2024; 19 July, 2024; Nizamabad Municipality/Municipal Corporation |
|---|---|
| What it establishes in this Overview | Approval for one residential building at Survey No. 708, with 1 Stilt + 5 upper floors. |
| Identifier / date | 004856/BP/DTCP/3072/0045/2023 |
|---|---|
| What it establishes in this Overview | File reference printed on the building approval. |
| Identifier / date | TS/017361/2023; 04-03-2023 |
|---|---|
| What it establishes in this Overview | Filed drawing record with building configuration, area and selected site/road details. |
| Identifier / date | Dated as transcribed in the record: “20, 0:2,6.” |
|---|---|
| What it establishes in this Overview | Promoter declaration includes title/encumbrance assertions, statutory undertakings and a completion undertaking of 18/07/2027. |
| Identifier / date | No separately evidenced commencement notice, occupancy certificate or completion certificate supplied |
|---|---|
| What it establishes in this Overview | Their issue/status is not established by the available documents. Document index |
1. Project at a glance
Project identity
Registered project name: RADHE GOVIND TOWERS
Project type / use: Residential apartment project
Phase / registered portion: No separate phase name or phase-wise scope is disclosed; the registration describes one building.
TG-RERA registration: P03100009187; recorded as registered from 19 July 2024.
Registration validity: The registration certificate states validity from 19/07/2024 to 18/07/2027, unless extended by the Authority.
Registered promoter: RG ATTAL BUILDERS LLP
RERA status: The supplied record identifies the project as “New Project”; the registration certificate is on file.
Land and geographic identity
Locality / address in project records: Nyalkal Road, Nizamabad
Revenue village: NIZAMABAD is stated in the building approval; NIZAMABAD SHIVAR is stated in the filed drawing extract. The RERA land-details field does not disclose a village.
Mandal: Not disclosed in the supplied project record.
District / PIN: Nizamabad District; PIN 503001 in the project header and registration project location.
Project survey number(s) / subdivision(s): Survey No. 708; the title material also refers to 708/1 and NALA Survey No. 708/1.
Registered site extent: The project record gives 2386.82 sq. m. as total land area.
Building-permit site area and net area: Site area 2386.82 m²; road-affected area 115.2 m²; net area 2271.62 m², as stated in the building approval.
Boundaries in RERA land details: East: EXISTING ROAD; West: EXISTING ROAD; North: EXISTING ROAD; South: 18 MT WIDE EXISTING ROAD.
Development identity
Sanctioning authority: Nizamabad Municipality/Municipal Corporation, as identified on the building construction approval.
Principal building approval: Permit No. 0094/BP/3072/2024, approved 19 July, 2024. The document also states file No. 004856/BP/DTCP/3072/0045/2023.
Other drawing identifier on file: TS/017361/2023, dated 04-03-2023, appears on the filed drawing record.
Approved built-up area: The approval states residential upper-floor area 4,779.65 m² and stilt parking area 1,104.06 m². It also records approved built-up area 5,910.25 m² in the project filing.
Building count and configuration: One residential building; 1 Stilt + 5 upper floors; stated height 14.98 m.
Parking levels: Stilt parking is shown in the building approval. A cellar is not identified in the supplied building-approval extract.
Unit count: The TG-RERA project record lists 55 2BHK units; the filed drawing extract also states 55 units.
Offering and status
RERA-filed unit type and saleable area: 2BHK; saleable area 115.25 m².
Booked / available: 0 booked / 55 available in the portal data supplied; the portal count has no as-of date and is indicative.
Construction stage: The supplied information does not establish the current physical construction stage or independently verified site progress.
Completion dates: Form B states a completion undertaking of 18/07/2027; the project header gives proposed completion 18/11/2027.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records; its status is not established here.
2. The project story
RADHE GOVIND TOWERS is recorded with TG-RERA as a residential apartment project on Survey No. 708 in Nizamabad, with related title material also referring to Survey No. 708/1. The filed building approval describes a single residential building at Nyalkal Road, comprising one stilt level and five upper floors.
The RERA unit schedule identifies 55 2BHK apartments, with 0 booked and 55 available in the supplied portal data. Those counts are indicative because the record provides no count-as-of date. The project is registered, but the supplied evidence does not establish current construction progress or the issue of an occupancy/completion certificate.
The registration certificate runs through 18/07/2027 unless extended. Separately, the promoter’s Form B states a completion undertaking of 18/07/2027, while the project header records a proposed completion date of 18/11/2027.
3. Master plan, architecture & building design
The building approval describes one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.98 m. It records residential upper-floor area of 4,779.65 m² and stilt parking area of 1,104.06 m². The project filing separately records approved built-up area of 5,910.25 m²; these are the figures as stated in the supplied approval and RERA record, not a software-derived measurement.
The approval records a 120.89 m² tot-lot, one rainwater-harvesting structure, transformer space and a garbage house. Its conditions also require the tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued.
The filed drawing extract identifies 1.50 m internal road, 4.50 m driveway, 6.61 m passage and 2.00 m passage, and shows 18.00 MT wide existing and 24.00 MT wide proposed road references. It records plot area 2386.82 sq. m., road-affected area 115.20, net plot area 2271.62, and vacant plot area 1141.04.
The supplied material does not establish a complete architectural schedule for lifts, stairs, floor-by-floor apartment distribution, building entries, or detailed common-area and circulation arrangements. The drawing extract is filed as a layout-plan document; this Overview does not treat it as evidence of completed construction.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 55 | 0 | 55 | 115.25 m² | 59.9–77.0 m²; median 60.5 m² | 47% |
The 2BHK unit count, booking status and saleable area are TG-RERA filing values; portal counts are indicative because no as-of date is supplied.
Carpet figures are software measurements from the filed floor-plan drawing 518474, not RERA disclosures, and are flagged as needing review. The drawing-based measurement for a sample 2BHK includes living/dining, two bedrooms, foyer, kitchen and two toilets; the illustrated unit also has a balcony and utility, which are excluded from the measured carpet area.
The measured carpet area and RERA-filed saleable area describe different area bases: the drawing measurement is the software-measured internal carpet area, while the RERA saleable figure is the filed saleable area. The supplied data states that saleable area also counts the home’s share of common areas; no unit-specific carpet-area disclosure is established in the RERA record.
The drawing-based records also identify 1BHK layouts, measured at 47.9 m² carpet area, but mark that configuration as not present in the TG-RERA filing. It is therefore not included as a RERA-filed purchase configuration in the table.
5. Parking & vehicle circulation
The building approval identifies 1,104.06 m² of stilt parking area and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extract does not state a sanctioned count of car or two-wheeler spaces.
The filed drawing extract records “PROPOSED NUMBER OF PARKINGS 1”; the meaning of that count is not further specified in the supplied material. A vendor record claims 55 covered parking spaces and open parking (1130 sqm), but these are third-party listing details, not established here as sanctioned or legally allocated spaces.
No unit-by-unit parking allocation, visitor or accessible-space schedule, mechanical parking arrangement, or parking allotment terms are established by the supplied records. A drawn or listed parking provision does not, by itself, establish an exclusive right for a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | 120.89 m² |
|---|---|
| Evidence source | Building approval |
| Declared progress / verified status | Approval condition requires it to be fenced and maintained as greenery before issue of occupancy certificate; completion is not established. |
| Description / size | Green Strip is listed; peripheral planting and greenery maintenance are referenced in the filed drawing conditions. |
|---|---|
| Evidence source | Filed drawing extract |
| Declared progress / verified status | Required/listed in the record; completion is not established. |
| Description / size | Listed in vendor amenity information; no size or capacity supplied. |
|---|---|
| Evidence source | Third-party vendor record |
| Declared progress / verified status | Marketing/listing claims only; not established as sanctioned or delivered. |
| Description / size | Listed in the RERA amenity record; no size or facility details supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%; completion is not established. |
| Description / size | Listed in the RERA amenity record. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. |
| Description / size | Listed in the RERA amenity record; no area supplied there. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Progress recorded as 0%. |
The RERA amenity record also lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station. Those items are addressed as services in the next section.
7. Utilities, building services & safety
The building approval requires a rainwater-harvesting structure (percolation pit), transformer space and a garbage house. It lists one rainwater-harvesting structure. These are approval requirements or recorded provisions; completion is not established.
The filed drawing extract lists a septic tank, STP, WTP, rainwater harvesting and a distribution transformer. The RERA amenity record marks water supply, sewerage and rainwater harvesting as “YES,” but records 0% progress for the listed amenities; it does not provide capacities or establish completed operation.
Fire protection and fire safety, storm-water drainage, sewage/sullage treatment, solid-waste management, energy management and an electrical meter room/sub-station/receiving station appear in the RERA amenity schedule, without supplied technical specifications or verified completion status. The supplied evidence does not establish water source or storage capacity, backup-power capacity, lift provision or capacity, CCTV/security systems, accessibility arrangements, or EV-charging facilities.
The building permit requires adherence to the sanctioned plan, submission of commencement notice before construction, completion notice after construction and an occupancy certificate before occupation. These are recorded conditions; the supplied documents do not establish that construction has been completed or an occupancy certificate issued.
8. Location, access & connectivity
The project record places RADHE GOVIND TOWERS at Nyalkal Road, Nizamabad, District Nizamabad, PIN 503001. The building approval identifies the site at Survey/Premises No. 708 and records existing roads along the north, east and west boundaries and an 18 MT wide existing road to the south.
The filed drawing extract additionally refers to an 18.00 MT wide existing road, a 24.00 MT wide proposed road, a 4.50 MT wide driveway, a 1.50 m internal road, and passages of 6.61 m and 2.00 m.
The supplied location evidence does not establish project-specific public-transport access, landmark distances or travel times. The third-party listing’s locality and connectivity statements are not used here as verified project-location information.
9. Developer & development status
The registered legal promoter is RG ATTAL BUILDERS LLP, an LLP. The supplied corporate identifier is GSTIN 36ABIFR8454J1ZL. The promoter address recorded in the project data is SAI KRISHNA TOWER, SUBHASH NAGAR, NYALKAL ROAD, WARD NO. 7, NIZAMABAD, Nizamabad, 503001. The supplied material does not provide an official project website or contact details for the promoter.
The project filing identifies ATTAL PRANAY as authorized signatory and ATTAL SATISH as partner. Form B, signed by ATTAL PRANAY as authorized signatory, declares a completion date of 18/07/2027.
The supplied evidence describes one building and one registered project scope; it does not provide a verified construction-progress percentage or establish current site completion. Registration validity, the promoter’s completion undertaking and the project-header proposed completion date are separate records: the registration certificate runs to 18/07/2027 unless extended, Form B states 18/07/2027, and the header gives 18/11/2027. No occupancy/completion certificate is included in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P03100009187; commencement 19/07/2024; stated end 18/07/2027, unless extended |
|---|---|
| What it establishes in this Overview | Registration of RADHE GOVIND TOWERS under RG ATTAL BUILDERS LLP and the stated registration period and conditions. |
| Identifier / date | Permit 0094/BP/3072/2024; 19 July, 2024; Nizamabad Municipality/Municipal Corporation |
|---|---|
| What it establishes in this Overview | Approval for one residential building at Survey No. 708, with 1 Stilt + 5 upper floors. |
| Identifier / date | 004856/BP/DTCP/3072/0045/2023 |
|---|---|
| What it establishes in this Overview | File reference printed on the building approval. |
| Identifier / date | TS/017361/2023; 04-03-2023 |
|---|---|
| What it establishes in this Overview | Filed drawing record with building configuration, area and selected site/road details. |
| Identifier / date | Dated as transcribed in the record: “20, 0:2,6.” |
|---|---|
| What it establishes in this Overview | Promoter declaration includes title/encumbrance assertions, statutory undertakings and a completion undertaking of 18/07/2027. |
| Identifier / date | No separately evidenced commencement notice, occupancy certificate or completion certificate supplied |
|---|---|
| What it establishes in this Overview | Their issue/status is not established by the available documents. |
Frequently asked questions
Is RADHE GOVIND TOWERS registered with Telangana RERA?
Yes. RADHE GOVIND TOWERS is registered with the Telangana Real Estate Regulatory Authority as P03100009187; the registration status is New Project.
Who is the developer of RADHE GOVIND TOWERS?
The promoter named in the RERA registration is RG ATTAL BUILDERS LLP.
Where is RADHE GOVIND TOWERS located?
RADHE GOVIND TOWERS is in NIZAMABAD, Telangana (503001).
When will RADHE GOVIND TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 18/11/2027. This is the promoter's declaration, not a guarantee.