Prestion Green Ville
PRESTON DEVELOPERS · Sangareddy · RERA P01100001724
PRESTION GREEN VILLE is a plotted development in KOLLUR, RC PURAM mandal, Sangareddy District, developed by registered promoter PRESTON DEVELOPERS. The RERA land record states 40,481 sq m total land and 37,030.00 sq m net land; the supplied record does not disclose a plot count or plot-size configurations, and no towers or floor configuration are supplied. Its TG-RERA registration number is P01100001724, and the proposed completion date is 30/04/2019.
More from Preston Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | PRESTION GREEN VILLE RERA record |
| Project type | Plotted development / open-plots layout RERA record RERA filing |
| Phase / registered portion | No separate phase designation is disclosed; the registration is presented for the plotted project RERA record |
| TG-RERA registration number | P01100001724 |
| Registration validity | Certificate states commencement on 18/02/2020 and expiry on 30/04/2019; it also records “0 years.” The recorded dates are reproduced as filed, not reconciled here. No extension is recorded in the supplied certificate. |
| Registered promoter | PRESTON DEVELOPERS RERA record |
| RERA status | Project record describes it as On-Going Project RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | KOLLUR / Kollur Village RERA record RERA filing |
| Mandal | RC PURAM in the RERA project record; the HMDA draft layout permit identifies Ramchandrapuram RERA record |
| District | Sangareddy RERA record |
| PIN | 502032 RERA record |
| Project survey numbers and subdivisions | 267/A3, 267/A5, 268/AA3, 268/AA4, 268/C RERA record. The draft layout permit lists 267/A3, 267/A5, 268/AA4, 268/A4. |
| Site extent | RERA land record: 40,481 sq m total, 37,030.00 sq m net, with 3,451 sq m affected by road widening/FTL/nala widening. The draft permit states 37030.14 Sq Mtrs; Ac.10-00Gts. RERA filing |
| Boundaries | East: PWD ROAD; West: NEIGHBOURS LAND; North: NEIGHBOURS LAND; South: 30 FTR ROAD RERA filing |
| HMDA-permit land allocation | Open space Pocket A 2375.25 Sqmts; Pocket B 538.25 Sq mts; social infrastructure 925.75 Sq mts; Green Belt 982.75 Sq.mts; roads 9905.61 Sq.mts; area affected under 30 mts Master Plan Road 3451.47 Sq mts. |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | Draft Layout Permit 06/LO/Plg/HMDA/2017, dated 28-02-2017; file no. 204191/LO/PIg./HMDA/2016 Approvals record |
| Approved built-up area | 19,596 sq m is recorded in the RERA project fields; its measurement basis is not further specified there. RERA filing |
| Buildings / floors | Not disclosed; this is a plotted development, and no building count or floor configuration is supplied. RERA filing |
| Parking | The draft permit identifies 9 mortgaged plots (Plot Nos. 13 to 21) covering 3056.97 Sq.Mtrs; no project parking-space count or parking-level plan is supplied. RERA filing |
| Approved versus RERA-declared plot count | RERA-filed plot count is not available in the supplied project record. A promoter brochure claims 51 plots, but it is not confirmed as this project’s RERA filing. Promoter website |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Plots; individual plot sizes and saleable-size range are not disclosed in the supplied RERA data. RERA filing |
| Booked / available | Counts not disclosed in the supplied project data. RERA record |
| Construction / development stage | RERA record labels the project On-Going Project and records 70% completeness; this is a filed progress figure, not an independently verified site measurement. RERA record |
| Original / revised completion date | Both recorded as 30/04/2019 in the project fields. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is evidenced in the supplied documents. The record identifies an ongoing plotted project; certificate status is not otherwise established. RERA record Document index |
2. The project story
- PRESTION GREEN VILLE is registered as a plotted development in Kollur Village, Sangareddy District. The project is associated with survey subdivisions 267/A3, 267/A5, 268/AA3, 268/AA4 and 268/C in the TG-RERA certificate. The supplied HMDA draft-layout document identifies an open-plots layout and gives a permit extent of 37030.14 Sq Mtrs; Ac.10-00Gts. RERA record
- The RERA project record describes the development as ongoing and reports 70% completeness. That is a project-filed status; the supplied evidence does not independently verify the current on-site condition. The HMDA document describes a draft layout permit with development works and handover conditions, rather than evidence that all works or the final layout release have been completed. RERA record
- The intended offering is plots. The supplied project filing does not establish the number of saleable plots, their dimensions, or booked and available inventory. RERA filing
3. Master plan, architecture & building design
- The available HMDA document is a Draft Layout Permit for an open-plots layout. It records the following land components: open-space Pockets A and B, social infrastructure, Green Belt, roads, and an area affected under a 30 mts Master Plan Road. The permit states that the listed open-space, social-infrastructure, Green Belt, roads and affected-road areas are to be handed over to the Local Body by registered deed before release of the final layout plan.
- The RERA record reports total land of 40,481 sq m, net land of 37,030.00 sq m, and 3,451 sq m affected area. The permit states an extent of 37030.14 Sq Mtrs; Ac.10-00Gts. The supplied materials do not provide a complete plot schedule or drawing-derived layout plan from which plot arrangement, plot dimensions, internal-road geometry, or open-space configuration can be described further. RERA filing
- The RERA fields record 19,596 sq m as approved built-up area and 3,057 sq m as mortgage area; no measurement basis for the built-up figure is specified. The project is a plotted layout, and no building count, floor configuration, building footprint, or tower design is disclosed. RERA filing
- The draft permit restricts sale of Plot Nos. 13 to 21, identified as nine plots mortgaged in favour of the Metropolitan Commissioner, HMDA, over 3056.97 Sq.Mtrs. It also states that construction in plots is not to be allowed until final layout is issued by HMDA.
4. Homes, configurations & floor plans
- This is a plotted project; the supplied RERA data contains no unit-type inventory table, plot dimensions, plot-size bands, or booked/available counts. Accordingly, a plot configuration and area table cannot be completed from the supplied records. RERA filing RERA record
- Two drawing files are recorded, but neither has been measured; both are listed as scans pending. No software-measured carpet-area or room measurements are available. Floor plans
- The project is therefore described by its plot offering, not apartment configurations. RERA-filed plot saleable areas and individual plot allocations are not disclosed in the evidence supplied for this section. RERA filing Floor plans
5. Parking & vehicle circulation
- No count of resident, visitor, accessible, or other parking spaces is established in the supplied project record. No parking levels, bays, ramps, vehicle-entry arrangements, pedestrian separation, EV charging, or unit-specific parking allocations are evidenced. RERA filing Document index
- The HMDA draft permit identifies Plot Nos. 13 to 21—nine plots, 3056.97 Sq.Mtrs—as mortgaged in favour of the Metropolitan Commissioner, HMDA. These are plots subject to the permit’s mortgage condition, not a disclosed parking provision.
6. Amenities, recreation & open spaces
The RERA amenity record reports infrastructure and facility items with progress percentages. These are filing entries; the supplied material does not independently verify completion on site. The HMDA draft permit also sets out layout land allocations and planned development works. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Water supply | Size or capacity not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Size or capacity not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Storm-water drains | Size not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Green strip / tot lot / park | HMDA permit separately lists Pocket A 2375.25 Sqmts, Pocket B 538.25 Sq mts, and Green Belt 982.75 Sq.mts | RERA amenities | RERA record: 100%; HMDA permit identifies areas for handover before final layout release; completion not independently verified |
| Street lighting | Quantity not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Community buildings | Size or capacity not stated | RERA amenity record RERA amenities | Listed as available: YES; progress 0% |
| Treatment and disposal of sewage and sullage water | Size or capacity not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Solid-waste management and disposal | Size or capacity not stated | RERA amenity record RERA amenities | Progress 0%; availability not stated |
| Water conservation / rainwater harvesting | Quantity not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Energy management | Not stated | RERA amenity record RERA amenities | Progress 0%; availability not stated |
| Fire protection and fire-safety requirements | Not stated | RERA amenity record RERA amenities | Progress 0%; availability not stated |
| Electrical meter room / sub-station / receiving station | Size or capacity not stated | RERA amenity record RERA amenities | 100% recorded; not independently verified |
| Aggregate recreational open space | Not stated in the RERA amenity record | RERA amenity record RERA amenities | Progress 0%; the HMDA permit separately lists open-space areas above |
The HMDA permit also specifies road formation with black top, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are permit-listed development works; the supplied document does not establish their completed status.
7. Utilities, building services & safety
- The HMDA draft permit lists planned layout services including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage lines and a common septic tank/STP; storm-water channels; electrical supply lines, street lights and a transformer; and rainwater-harvesting pits. It also directs that natural rainwater flow not be obstructed and that storm-water channels be constructed where necessary. No capacities or independently verified completion evidence are supplied.
- The RERA amenity record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and the electrical meter room/sub-station/receiving station at 100% progress. Those are declared progress entries, not independent verification. The same record lists fire protection and fire-safety requirements at 0%; it does not provide detailed fire-system specifications or a clearance. RERA amenities
- No project-specific evidence is supplied for lift or vertical-transport systems, backup power, EV charging, CCTV, access control, solid-waste arrangements, or accessible circulation. The project is a plotted layout; apartment-building services are not described in the evidence provided. Document index RERA amenities
8. Location, access & connectivity
- The registered location is KOLLUR, RC PURAM mandal, Sangareddy District, PIN 502032. The RERA land record gives PWD ROAD as the eastern boundary and 30 FTR ROAD as the southern boundary. RERA record RERA filing
- The HMDA draft permit identifies a 30 mts Master Plan Road and records 3451.47 Sq mts as the area affected by it. The supplied location record identifies a sampled Outer Ring Road interchange at 5.5 km; this is the recorded approximate distance, not a travel-time estimate. Location record
- A developer brochure gives further connectivity and landmark claims, but it is not confirmed as this project’s RERA filing; those claims are not used as established project access facts in this overview. Promoter website
9. Developer & development status
- The registered promoter is PRESTON DEVELOPERS. The RERA project fields identify its organization type as a Partnership; the registration certificate gives the promoter office as Village: Gachi Bowli, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032. RERA record RERA filing
- The project record names promoter members DEVIREDDY RANDHIR REDDY, SOLIPURAM PALLAVI REDDY, DEVIREDDY KAMALA REDDY, DEVIREDDY SRILATHA REDDY and SOLIPURAM NARAYAN REDDY, and identifies BODDU PRARTHANA REDDY as authorized signatory. Parties record
- The RERA record reports 70% project completeness and lists the project as ongoing. The supplied evidence does not independently verify the site progress, and no occupancy/completion certificate is included. RERA record Document index
10. Approvals, official records & documents
| Reference and scope | P01100001724, FORM ‘C’, issued 18/02/2020; project name PRESTION GREEN VILLE; promoter Preston Developers |
|---|---|
| What the supplied record establishes | Registration record for the project and its stated conditions. The certificate records validity through 30/04/2019 and “0 years.” |
| Reference and scope | 06/LO/Plg/HMDA/2017, dated 28-02-2017; file no. 204191/LO/PIg./HMDA/2016 |
|---|---|
| What the supplied record establishes | Draft open-plots layout permit for the stated land and extent, with development, mortgage and final-layout conditions. It expressly states that the permission is not proof of land title. |
| Reference and scope | Declaration dated 25/02/2019, signed/declared by BODDU PRARTHANA REDDY |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, fund handling, approvals and a completion undertaking of 31/03/2019. |
| Reference and scope | Document 40360 |
|---|---|
| What the supplied record establishes | Title-search report concerning the project land and development agreement; see the title and land review for the chain and source details. |
| Reference and scope | Document 40362 |
|---|---|
| What the supplied record establishes | Filed encumbrance information; this overview does not treat it as a current certificate. |
| Reference and scope | Document 40363 |
|---|---|
| What the supplied record establishes | The supplied record is a filing slot/instruction; no extracted layout drawing is available here. |
| Reference and scope | No final layout release, completion certificate or occupancy certificate is evidenced in the supplied documents. Document index |
|---|---|
| What the supplied record establishes | Status not established by the materials provided. |
The public HMDA approved-layout lookup is recorded as unavailable from the supplied evidence; that limitation does not establish approval refusal or final-layout status. HMDA
1. Project at a glance
Project identity
Registered project name: PRESTION GREEN VILLE
Project type: Plotted development / open-plots layout
Phase / registered portion: No separate phase designation is disclosed; the registration is presented for the plotted project
TG-RERA registration number: P01100001724
Registration validity: Certificate states commencement on 18/02/2020 and expiry on 30/04/2019; it also records “0 years.” The recorded dates are reproduced as filed, not reconciled here. No extension is recorded in the supplied certificate.
Registered promoter: PRESTON DEVELOPERS
RERA status: Project record describes it as On-Going Project
Land and geographic identity
Locality / revenue village: KOLLUR / Kollur Village
Mandal: RC PURAM in the RERA project record; the HMDA draft layout permit identifies Ramchandrapuram
District: Sangareddy
PIN: 502032
Project survey numbers and subdivisions: 267/A3, 267/A5, 268/AA3, 268/AA4, 268/C. The draft layout permit lists 267/A3, 267/A5, 268/AA4, 268/A4.
Site extent: RERA land record: 40,481 sq m total, 37,030.00 sq m net, with 3,451 sq m affected by road widening/FTL/nala widening. The draft permit states 37030.14 Sq Mtrs; Ac.10-00Gts.
Boundaries: East: PWD ROAD; West: NEIGHBOURS LAND; North: NEIGHBOURS LAND; South: 30 FTR ROAD
HMDA-permit land allocation: Open space Pocket A 2375.25 Sqmts; Pocket B 538.25 Sq mts; social infrastructure 925.75 Sq mts; Green Belt 982.75 Sq.mts; roads 9905.61 Sq.mts; area affected under 30 mts Master Plan Road 3451.47 Sq mts.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: Draft Layout Permit 06/LO/Plg/HMDA/2017, dated 28-02-2017; file no. 204191/LO/PIg./HMDA/2016
Approved built-up area: 19,596 sq m is recorded in the RERA project fields; its measurement basis is not further specified there.
Buildings / floors: Not disclosed; this is a plotted development, and no building count or floor configuration is supplied.
Parking: The draft permit identifies 9 mortgaged plots (Plot Nos. 13 to 21) covering 3056.97 Sq.Mtrs; no project parking-space count or parking-level plan is supplied.
Approved versus RERA-declared plot count: RERA-filed plot count is not available in the supplied project record. A promoter brochure claims 51 plots, but it is not confirmed as this project’s RERA filing.
Offering and status
Unit type: Plots; individual plot sizes and saleable-size range are not disclosed in the supplied RERA data.
Booked / available: Counts not disclosed in the supplied project data.
Construction / development stage: RERA record labels the project On-Going Project and records 70% completeness; this is a filed progress figure, not an independently verified site measurement.
Original / revised completion date: Both recorded as 30/04/2019 in the project fields.
Occupancy / completion certificate: No occupancy or completion certificate is evidenced in the supplied documents. The record identifies an ongoing plotted project; certificate status is not otherwise established.
2. The project story
- PRESTION GREEN VILLE is registered as a plotted development in Kollur Village, Sangareddy District. The project is associated with survey subdivisions 267/A3, 267/A5, 268/AA3, 268/AA4 and 268/C in the TG-RERA certificate. The supplied HMDA draft-layout document identifies an open-plots layout and gives a permit extent of 37030.14 Sq Mtrs; Ac.10-00Gts.
- The RERA project record describes the development as ongoing and reports 70% completeness. That is a project-filed status; the supplied evidence does not independently verify the current on-site condition. The HMDA document describes a draft layout permit with development works and handover conditions, rather than evidence that all works or the final layout release have been completed.
- The intended offering is plots. The supplied project filing does not establish the number of saleable plots, their dimensions, or booked and available inventory.
3. Master plan, architecture & building design
- The available HMDA document is a Draft Layout Permit for an open-plots layout. It records the following land components: open-space Pockets A and B, social infrastructure, Green Belt, roads, and an area affected under a 30 mts Master Plan Road. The permit states that the listed open-space, social-infrastructure, Green Belt, roads and affected-road areas are to be handed over to the Local Body by registered deed before release of the final layout plan.
- The RERA record reports total land of 40,481 sq m, net land of 37,030.00 sq m, and 3,451 sq m affected area. The permit states an extent of 37030.14 Sq Mtrs; Ac.10-00Gts. The supplied materials do not provide a complete plot schedule or drawing-derived layout plan from which plot arrangement, plot dimensions, internal-road geometry, or open-space configuration can be described further.
- The RERA fields record 19,596 sq m as approved built-up area and 3,057 sq m as mortgage area; no measurement basis for the built-up figure is specified. The project is a plotted layout, and no building count, floor configuration, building footprint, or tower design is disclosed.
- The draft permit restricts sale of Plot Nos. 13 to 21, identified as nine plots mortgaged in favour of the Metropolitan Commissioner, HMDA, over 3056.97 Sq.Mtrs. It also states that construction in plots is not to be allowed until final layout is issued by HMDA.
4. Homes, configurations & floor plans
- This is a plotted project; the supplied RERA data contains no unit-type inventory table, plot dimensions, plot-size bands, or booked/available counts. Accordingly, a plot configuration and area table cannot be completed from the supplied records.
- Two drawing files are recorded, but neither has been measured; both are listed as scans pending. No software-measured carpet-area or room measurements are available.
- The project is therefore described by its plot offering, not apartment configurations. RERA-filed plot saleable areas and individual plot allocations are not disclosed in the evidence supplied for this section.
5. Parking & vehicle circulation
- No count of resident, visitor, accessible, or other parking spaces is established in the supplied project record. No parking levels, bays, ramps, vehicle-entry arrangements, pedestrian separation, EV charging, or unit-specific parking allocations are evidenced.
- The HMDA draft permit identifies Plot Nos. 13 to 21—nine plots, 3056.97 Sq.Mtrs—as mortgaged in favour of the Metropolitan Commissioner, HMDA. These are plots subject to the permit’s mortgage condition, not a disclosed parking provision.
6. Amenities, recreation & open spaces
The RERA amenity record reports infrastructure and facility items with progress percentages. These are filing entries; the supplied material does not independently verify completion on site. The HMDA draft permit also sets out layout land allocations and planned development works.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not stated | RERA amenity record | 100% recorded; not independently verified |
| Water supply | Size or capacity not stated | RERA amenity record | 100% recorded; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Size or capacity not stated | RERA amenity record | 100% recorded; not independently verified |
| Storm-water drains | Size not stated | RERA amenity record | 100% recorded; not independently verified |
| Green strip / tot lot / park | HMDA permit separately lists Pocket A 2375.25 Sqmts, Pocket B 538.25 Sq mts, and Green Belt 982.75 Sq.mts | RERA record: 100%; HMDA permit identifies areas for handover before final layout release; completion not independently verified | |
| Street lighting | Quantity not stated | RERA amenity record | 100% recorded; not independently verified |
| Community buildings | Size or capacity not stated | RERA amenity record | Listed as available: YES; progress 0% |
| Treatment and disposal of sewage and sullage water | Size or capacity not stated | RERA amenity record | 100% recorded; not independently verified |
| Solid-waste management and disposal | Size or capacity not stated | RERA amenity record | Progress 0%; availability not stated |
| Water conservation / rainwater harvesting | Quantity not stated | RERA amenity record | 100% recorded; not independently verified |
| Energy management | Not stated | RERA amenity record | Progress 0%; availability not stated |
| Fire protection and fire-safety requirements | Not stated | RERA amenity record | Progress 0%; availability not stated |
| Electrical meter room / sub-station / receiving station | Size or capacity not stated | RERA amenity record | 100% recorded; not independently verified |
| Aggregate recreational open space | Not stated in the RERA amenity record | RERA amenity record | Progress 0%; the HMDA permit separately lists open-space areas above |
The HMDA permit also specifies road formation with black top, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, overhead tank, assured water-supply source, electrical supply lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are permit-listed development works; the supplied document does not establish their completed status.
7. Utilities, building services & safety
- The HMDA draft permit lists planned layout services including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage lines and a common septic tank/STP; storm-water channels; electrical supply lines, street lights and a transformer; and rainwater-harvesting pits. It also directs that natural rainwater flow not be obstructed and that storm-water channels be constructed where necessary. No capacities or independently verified completion evidence are supplied.
- The RERA amenity record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and the electrical meter room/sub-station/receiving station at 100% progress. Those are declared progress entries, not independent verification. The same record lists fire protection and fire-safety requirements at 0%; it does not provide detailed fire-system specifications or a clearance.
- No project-specific evidence is supplied for lift or vertical-transport systems, backup power, EV charging, CCTV, access control, solid-waste arrangements, or accessible circulation. The project is a plotted layout; apartment-building services are not described in the evidence provided.
8. Location, access & connectivity
- The registered location is KOLLUR, RC PURAM mandal, Sangareddy District, PIN 502032. The RERA land record gives PWD ROAD as the eastern boundary and 30 FTR ROAD as the southern boundary.
- The HMDA draft permit identifies a 30 mts Master Plan Road and records 3451.47 Sq mts as the area affected by it. The supplied location record identifies a sampled Outer Ring Road interchange at 5.5 km; this is the recorded approximate distance, not a travel-time estimate.
- A developer brochure gives further connectivity and landmark claims, but it is not confirmed as this project’s RERA filing; those claims are not used as established project access facts in this overview.
9. Developer & development status
- The registered promoter is PRESTON DEVELOPERS. The RERA project fields identify its organization type as a Partnership; the registration certificate gives the promoter office as Village: Gachi Bowli, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032.
- The project record names promoter members DEVIREDDY RANDHIR REDDY, SOLIPURAM PALLAVI REDDY, DEVIREDDY KAMALA REDDY, DEVIREDDY SRILATHA REDDY and SOLIPURAM NARAYAN REDDY, and identifies BODDU PRARTHANA REDDY as authorized signatory.
- The RERA record reports 70% project completeness and lists the project as ongoing. The supplied evidence does not independently verify the site progress, and no occupancy/completion certificate is included.
10. Approvals, official records & documents
| Reference and scope | P01100001724, FORM ‘C’, issued 18/02/2020; project name PRESTION GREEN VILLE; promoter Preston Developers |
|---|---|
| What the supplied record establishes | Registration record for the project and its stated conditions. The certificate records validity through 30/04/2019 and “0 years.” |
| Reference and scope | 06/LO/Plg/HMDA/2017, dated 28-02-2017; file no. 204191/LO/PIg./HMDA/2016 |
|---|---|
| What the supplied record establishes | Draft open-plots layout permit for the stated land and extent, with development, mortgage and final-layout conditions. It expressly states that the permission is not proof of land title. |
| Reference and scope | Declaration dated 25/02/2019, signed/declared by BODDU PRARTHANA REDDY |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, fund handling, approvals and a completion undertaking of 31/03/2019. |
| Reference and scope | Document 40360 |
|---|---|
| What the supplied record establishes | Title-search report concerning the project land and development agreement; see the title and land review for the chain and source details. |
| Reference and scope | Document 40362 |
|---|---|
| What the supplied record establishes | Filed encumbrance information; this overview does not treat it as a current certificate. |
| Reference and scope | Document 40363 |
|---|---|
| What the supplied record establishes | The supplied record is a filing slot/instruction; no extracted layout drawing is available here. |
| Reference and scope | No final layout release, completion certificate or occupancy certificate is evidenced in the supplied documents. |
|---|---|
| What the supplied record establishes | Status not established by the materials provided. |
The public HMDA approved-layout lookup is recorded as unavailable from the supplied evidence; that limitation does not establish approval refusal or final-layout status.
Frequently asked questions
Is PRESTION GREEN VILLE registered with Telangana RERA?
Yes. PRESTION GREEN VILLE is registered with the Telangana Real Estate Regulatory Authority as P01100001724; the registration status is On-Going Project.
Who is the developer of PRESTION GREEN VILLE?
The promoter named in the RERA registration is PRESTON DEVELOPERS.
Where is PRESTION GREEN VILLE located?
PRESTION GREEN VILLE is in KOLLUR, RC PURAM, Sangareddy, Telangana (502032).
When will PRESTION GREEN VILLE be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2019. This is the promoter's declaration, not a guarantee.