Sign in

Ananda Villas

Magna Meadows LLP · Sangareddy · RERA P01100004487

ANANDA VILLAS is a residential project described in the approved-permission record as a draft layout with housing, in KOLLUR, RC PURAM, Sangareddy. It is being developed by registered promoter Magna Meadows LLP. The project has a total site area of 26861.45 sq.m and net site area of 25181.67 sq.m; the project record lists 9 proposed building units, while the RERA unit record lists 10 VILLA units, each with a saleable area of 621.77 sq.m. It is registered under TG-RERA registration P01100004487, issued 02/05/2022, and has a proposed completion date of 22/08/2027.

01What we found

RegisteredTG-RERA - valid till 22 Apr 2027
25documents on file - each fact links to its page
11court cases on this project's land (survey 192, Kollur)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameANANDA VILLAS RERA record
Project typeResidential; the approved-permission record describes a draft layout with housing. RERA record
Phase / registered portionNot separately identified as a numbered phase. The registration and approval records identify the project land as Sy.Nos. 192/AA8/A and 192/A6/A.
TG-RERA registrationP01100004487; issued 02/05/2022, valid through 22/04/2027, subject to extension by the Authority. This is registration validity, not the stated project completion deadline.
Registered promoterMagna Meadows LLP, an LLP. RERA record Corporate record
RERA statusRegistration certificate is on file; the portal record labels the project “New Project.” Registration alone does not establish construction completion or an occupancy certificate. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageKOLLUR; the approval records also use “Kollur-ORRGC Village.” RERA record RERA filing
MandalRC PURAM in the project record; approval documents use Ramachandrapuram / Ramachandrapuram-ORRGC. RERA record RERA filing
DistrictSangareddy; approval documents also spell this “Sanga Reddy.” RERA record
PIN502300 RERA record
Project survey numbers / subdivisions192/AA8/A and 192/A6/A RERA record Land records
Site areaTotal site area 26861.45 sq.m; master-plan road-affected area 1679.78 sq.m; net site area 25181.67 sq.m in the approval record. RERA filing
Boundaries as filedNorth: ROAD WIDTH - 12; South: CTS NO -; East: ROAD WIDTH - 12; West: ROAD WIDTH - 12. RERA filing
Boundary / extent qualificationThe site schedule and boundaries above are the project-filed details; their independent survey verification is not shown in this Overview evidence. RERA filing

Development identity

ItemRecord
Principal sanctioning authorityHyderabad Metropolitan Development Authority (HMDA). Approvals record
Principal approvalLayout Permit 000196/LO/Plg/HMDA/2021, dated 22 April, 2021; the record describes it as a draft layout with housing and says technical approval was forwarded to the local body for final sanction. Approvals record
Building-permission recordTellapur Municipality proceedings Proc.No.3928/TP/2021, dated 12.05.2021, refer to HMDA-approved plans for the specified land. Approvals record
Approved built-up area25315.23 sq.m in the project record. RERA filing
Building / unit scaleThe RERA project information records 9 proposed building units; the unit record lists 10 villas. The available evidence does not explain this count relationship. RERA filing RERA unit table
Floor configuration / height / parking levelsNot disclosed in the supplied project record. The building-permission extract concerns individual residential buildings but does not provide a floor schedule here.
Approved versus RERA-declared unit countThe project’s land-details field gives 9 total and proposed building units; the RERA unit record gives 10 VILLA units. RERA filing RERA unit details

Offering and status

ItemRecord
RERA-filed unit typeVILLA, 10 units. RERA unit details
RERA-filed saleable area621.77 sq.m per unit as recorded; no measured carpet area is available. RERA unit details RERA unit table
Booked / available0 booked; 10 available in the portal-derived unit record. The record supplies no as-of date, so these counts are indicative. RERA unit table
Construction stageNo verified construction-progress percentage or site-stage evidence is supplied. The RERA amenity/infrastructure entries report 0% progress where a percentage is given. RERA amenities
Completion dateThe project record states a proposed completion date of 22/08/2027. The registration certificate remains valid to 22/04/2027; these are separate dates. RERA record
Other completion undertaking in fileForm B under the different name M/S Magna Infratech LLP states a completion undertaking ending 28th June 2027. The supplied evidence does not establish that this declaration is for this registered project and promoter, so it is not treated here as the project’s completion date.
Occupancy / completion certificateNo occupancy certificate or completion certificate is identified in the supplied records. No tower-wise or phase-wise OC status is stated. Document index

2. The project story

ANANDA VILLAS is registered as a residential development on land in Kollur village, RC PURAM mandal, Sangareddy district, comprising survey subdivisions 192/AA8/A and 192/A6/A. The project evidence identifies a draft layout with housing rather than a conventional apartment-tower scheme. Its RERA unit schedule records 10 villas; the project land-details field separately records 9 building units. RERA record Land records RERA unit details RERA filing

HMDA’s 22 April 2021 document grants technical approval to the draft layout with housing and forwards it to the local body for final sanction. Tellapur Municipality’s 12 May 2021 proceedings concern building permission and refer to HMDA-approved plans. The supplied evidence does not establish the final-layout release, completed construction, or any occupancy certification. The project’s proposed completion date is 22/08/2027; no independently verified construction-stage assessment is available. RERA record

3. Master plan, architecture & building design

The sanctioned/technical approval evidence is for a draft layout with housing on the two project survey subdivisions. HMDA’s approval records 25181.67 sq.m net site area, 26861.45 sq.m total site area and 1679.78 sq.m master-plan road-affected area. The project record lists 25315.23 sq.m as approved built-up area; the supplied evidence does not identify whether this is gross built-up, FSI-counted, or another area measure, so it should be read only as the field’s stated approved built-up area. RERA filing

The approval extract records 15826.66 sq.m as plotted area and 6326.22 sq.m as layout road area. It separately records a park figure of 3035.56 sq.m on page 3 and, on page 4, open space/park area of 2759.34 sq.m, plus utility area of 268.67 sq.m, as areas to be handed over to the local body. These are approval-document entries, not a single reconciled area statement.

The drawing-derived layout summary reads 15826.66 sq.m for plots, 6326.22 sq.m for roads and 3028.11 sq.m for parks/open space, against a 25181.67 sq.m net layout area. These are software-read measurements from the approved layout drawing and require checking against the drawing. Layout record

The approved layout identifies mortgage security over plots 1, 11, 12 and 25, covering 1490 sq.m; the approval states these mortgaged plots/area are not permitted for sale while mortgaged to HMDA. The approval also describes the layout with housing as being issued without enclosing the site with a compound wall. Land records Layout record

The layout approval records a total site area of 26861.45 sq.m, including a 1679.78 sq.m master-plan road-affected area, and a net site area of 25181.67 sq.m. It also records land for plotted area, layout roads, park/open space and utility purposes; the approval conditions require specified roads, open space and utility area to be handed over to the local body through registered gift deed before final layout release.

Detailed floor plans, villa footprints, floor-by-floor arrangement, building heights, setbacks, internal room layouts and parking-level drawings are not available in readable form in the supplied evidence. The floor-plan record says 13 drawings are present, with 12 scans pending measurement and one with no flats; no software-measured plans are available. Floor plans

4. Homes, configurations & floor plans

The TG-RERA unit record lists one configuration, VILLA, with 10 units. The figures below are RERA-filed/portal-derived; the booking record has no stated as-of date. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Villa10010621.77 sq.m per unitNot availableNot supplied

The supplied floor-plan drawings have not been software-measured, so no drawing-based carpet area, room dimensions, orientation, balcony or utility measurements can be reported. Floor plans RERA saleable area and carpet area are distinct measures; the supplied evidence gives the former but not the latter. No common-area loading figure is provided. RERA unit details Floor plans

5. Parking & vehicle circulation

The RERA unit record marks the villa configuration as mortgaged, while the layout approval identifies the mortgage area as plots 1, 11, 12 and 25, totalling 1490 sq.m, in favour of HMDA. The approval says those mortgaged plots/area cannot be sold while the mortgage remains in place. RERA unit table

The promoter’s website material supplied for this review describes parking as “Open Parking.” This is a promoter-marketed description, not a verified count or unit-allocation schedule. Promoter website The evidence does not establish the number of parking spaces, visitor or accessible parking, individual-unit allocation, ramps, vehicle entrances/exits, pedestrian separation or EV charging. A parking bay shown in a plan, if any, would not by itself establish exclusive ownership.

6. Amenities, recreation & open spaces

The RERA amenity schedule includes infrastructure and facility categories, but the supplied progress entries are 0% where stated. The approval requires development of the amenity area before final-layout release; the evidence does not establish delivery or independent completion of any facility. RERA amenities

Internal roads & footpaths
Description / sizeLayout infrastructure; no separate dimensions supplied in this entry
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Water supply
Description / sizeNo source, capacity or storage details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Sewerage
Description / sizeChambers, lines, septic tank and STP appear in the schedule; capacities are not supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Storm-water drains
Description / sizeNo capacity or engineering details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Green strip / tot lot / park
Description / sizeApproval records park/open-space areas; see layout figures in section 3
Evidence sourceRERA schedule and HMDA approval RERA amenities
Declared progress / verified statusListed in schedule; 0% recorded; completion not independently verified
Street lighting
Description / sizeNo specification supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Community buildings
Description / sizeNo building size, function or capacity supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Sewage and sullage treatment/disposal
Description / sizeNo process, capacity or reuse details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; progress not established
Solid-waste management and disposal
Description / sizeNo system or capacity supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; progress not established
Water conservation / rainwater harvesting
Description / sizeNo capacity or design details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Energy management
Description / sizeNo system details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; progress not established
Fire protection and fire-safety requirements
Description / sizeNo system details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; progress not established
Electrical meter room / sub-station / receiving station
Description / sizeNo capacity or equipment details supplied
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed “YES”; 0% recorded; completion not independently verified
Recreational open space
Description / sizeNo separate size in this schedule entry
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusListed; progress not established
Landscaped gardens, walking/jogging paths, children’s play areas, amphitheatre, relaxation zone, community spaces and 24-hour security
Description / sizePromoter-marketed descriptions; no sizes or capacities supplied
Evidence sourcePromoter website material Promoter website
Declared progress / verified statusMarketing claims only; no RERA progress or independent completion evidence supplied

7. Utilities, building services & safety

The RERA schedule lists water supply, sewerage (including chambers, lines, septic tank and STP), storm-water drains, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station, solid-waste management, energy management and fire-safety requirements. It does not supply capacities, engineering details or independently verified completion evidence; the listed progress entries are 0% where provided. RERA amenities

Tellapur Municipality’s permission extract directs the permission holder to install fire equipment as per National Building Code rules. This records a condition of permission, not proof that the equipment has been installed or that the project has received statutory fire clearance.

No verified details are supplied for water source or storage, STP capacity or treated-water reuse, storm-water harvesting capacity, electrical supply or backup, lifts, accessible circulation, security systems, waste segregation, fire-tender access or emergency egress. These facilities and compliance status cannot be inferred from the amenity schedule or promotional descriptions. RERA amenities Document index

8. Location, access & connectivity

The registered location is KOLLUR, RC PURAM, Sangareddy, Telangana, 502300; the approval records refer to Kollur-ORRGC Village and Ramachandrapuram-ORRGC mandal. RERA record The supplied geocode is 17.5063197, 78.3052508. Location record

The location dataset identifies the nearest sampled Outer Ring Road interchange at approximately 5.5 km. Location record The promoter website separately claims access and travel times for ORR, Neopolis, Financial District, Gachibowli and the airport, and makes claims about nearby hospitals, schools and a radial road. These are promoter-marketed claims, not independently measured connectivity evidence for this Overview. Promoter website

9. Developer & development status

The registered promoter is Magna Meadows LLP, an LLP, with GSTIN 36ABHFM9956B1ZZ. The project record gives the promoter address as MAGNUS OPUS, A BLOCK, KOLLUR, KOLLUR, RC PURAM, Sangareddy, 502300. The RERA registration certificate records a promoter office at Village: Gachi Bowli, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500032. Corporate record Parties record

The RERA file identifies KONDALA RAO MADADI as authorized signatory and GADDAM KAVYA REDDY, JOGINIPALLY RAVINDER RAO and BADDAM PADMAJA as partners. Parties record No independent construction-progress assessment or completed-works evidence is supplied. The RERA record states proposed completion on 22/08/2027, while registration validity runs through 22/04/2027. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100004487, issued 02/05/2022
What the supplied evidence establishesForm C certificate for ANANDA VILLAS, registered under section 5; validity through 22/04/2027, subject to extension.
HMDA layout approval
Identifier / date000196/LO/Plg/HMDA/2021, 22 April, 2021
What the supplied evidence establishesTechnical approval for a draft layout with housing on Sy.Nos. 192/AA8/A and 192/A6/A, forwarded to the local body for final sanction; includes conditions on development, mortgage plots and handover of areas.
HMDA application reference
Identifier / date039392/ZOA/LO/U6/HMDA/24092020
What the supplied evidence establishesApplication/reference number cited in the layout approval.
Tellapur Municipality building-permission proceedings
Identifier / dateProc.No.3928/TP/2021, 12.05.2021
What the supplied evidence establishesPermission proceedings concerning the project land and HMDA-referenced plans; the extract says the permission is not proof of land title.
Registered layout mortgage reference
Identifier / date7740/2021, 15.02.2021
What the supplied evidence establishesApproval extract identifies a simple mortgage over plots 1, 11, 12 and 25, stated extent 1490 sq.m, in favour of HMDA.
Road-affected-area gift deed reference
Identifier / date9984/2021, 27.02.2021
What the supplied evidence establishesApproval extract refers to handing over road-affected area stated as 1679.73 Sq.mtr.
Registration-filed encumbrance statement
Identifier / dateDocument 207899
What the supplied evidence establishesOCR does not provide readable EC details, property schedule, transaction rows or certification result.
Occupancy / completion certificate
Identifier / dateNot identified in supplied records
What the supplied evidence establishesNo project- or tower-specific OC or completion certificate is provided in the evidence reviewed. Document index

The approval and registration records identify the project land, promoter, authorities and principal permit references. The supplied file does not include readable approved floor-plan details, a final-layout release record or an occupancy/completion certificate. Document index

Frequently asked questions

Is ANANDA VILLAS registered with Telangana RERA?

Yes. ANANDA VILLAS is registered with the Telangana Real Estate Regulatory Authority as P01100004487; the registration status is New Project.

Who is the developer of ANANDA VILLAS?

The promoter named in the RERA registration is Magna Meadows LLP.

Where is ANANDA VILLAS located?

ANANDA VILLAS is in KOLLUR, RC PURAM, Sangareddy, Telangana (502300).

When will ANANDA VILLAS be completed?

The promoter's proposed date of completion filed with RERA is 22/08/2027. This is the promoter's declaration, not a guarantee.

More projects in Kollur