Presidential Homes
RITVIK CONSTRUCTIONS AND DEVELOPERS · Sangareddy · RERA P01100007256
PRESIDENTIAL HOMES is a residential apartment project in SANGAREDDY MANDAL AND DISTRICT, Sangareddy, on land in Kalvakunta Village, Sangareddy Mandal, Sangareddy District. The registered promoter is RITVIK CONSTRUCTIONS AND DEVELOPERS. The project has a registered site extent of 1877.81 Sq. Yrds and one residential building with 1 Cellar + 1 Stilt + 5 upper floors, comprising 45 2BHK apartments. Its TG-RERA registration is P01100007256, and the promoter’s Form B undertaking sets completion on or before 28/09/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | PRESIDENTIAL HOMES RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name or phase number disclosed; registration is for the project recorded against Survey Nos. 227/3, 227/4 and 227. RERA record |
| TG-RERA registration | P01100007256, granted 11/11/2023; certificate states validity through 28/09/2025 and no extension is recorded in the supplied certificate. Registration validity is distinct from the completion date. RERA record Approvals record |
| Registered promoter | RITVIK CONSTRUCTIONS AND DEVELOPERS RERA record Corporate record |
| RERA status in supplied record | “On-Going Project”; the registration certificate’s stated validity ended 28/09/2025. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Revenue village | Kalvakunta Village (also described in the filed project schedule as Kalvakunta Village, Sangareddy Town and Mandal). Land records |
| Locality / mandal / district / PIN | Locality recorded as SANGAREDDY MANDAL AND DISTRICT; mandal SANGAREDDY; district Sangareddy; PIN 502001. RERA record RERA filing |
| Project survey numbers | 227/3, 227/4 and 227. Land records |
| Registered site extent | The Form B declaration and project schedule state 1877.81 Sq. Yrds. |
| Sanction-document site area | HMDA permit extraction records 1,564.52 Sq. Mt. |
| RERA land-area fields | Total area 1570.03 sqmts; area affected in road widening/FTL of tanks/nala widening 5.51 sqmts; net area 1564.52 sqmts. RERA filing Land records |
| Boundaries | East: 40 FEET WIDE ROAD; west: 33 FEET WIDE ROAD; north: 30 FEET WIDE ROAD; south: NEIGHBOURS PROPERTY. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); permit is addressed/delegated to Sangareddy Municipality / Municipal Corporation. Approvals record |
| Principal building approval | 006777/BP/HMDA/1353/SKP/2022, approved 28 September, 2022. The related proceedings number is 001503/BP/HMDA/SKP/2022. Approvals record |
| Approved built-up area | Permit extraction lists Total Built up Area (In Sq.mts) 5,684.34 and Proposed Built-up Area 3,507.20; these are distinct figures as stated in the approval record. |
| Building count / floors | One residential building: 1 Cellar + 1 Stilt + 5 upper floors. RERA filing |
| Parking level | Permit conditions specify the cellar/stilt for vehicle parking; a sanctioned parking-space count is not supplied in the extracted record. |
| Unit counts | RERA filing records 45 2BHK apartments; the land-details fields list 1 total building unit and 1 proposed building unit, not an apartment count. RERA unit table RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 45 units. RERA unit table RERA unit table |
| RERA-filed saleable area | 98.11 sq.m for the listed 2BHK configuration. RERA unit table RERA unit table |
| Booked / available | Portal snapshot lists 0 booked / 45 available; no as-of date is supplied, so these counts are indicative rather than a current availability confirmation. RERA unit table RERA unit table |
| Construction stage | No independently verified construction-stage percentage or site progress is supplied. The project is listed as “On-Going Project.” RERA record RERA amenities |
| Completion deadline | Promoter’s Form B undertaking: completion on or before 28/09/2025. This is a promoter declaration, not evidence that completion occurred. |
| Occupancy / completion certificate | The supplied permit requires an occupancy certificate before occupation; no project occupancy or completion certificate is included in the supplied records. |
2. The project story
PRESIDENTIAL HOMES is recorded with TG-RERA as a residential apartment project on land in Kalvakunta Village, Sangareddy, comprising Survey Nos. 227/3, 227/4 and 227. Its HMDA permit describes one residential building with a cellar, stilt and five upper floors. The RERA filing lists 45 two-bedroom apartments. RERA record Land records RERA unit table
The promoter’s Form B affidavit undertakes completion on or before 28/09/2025. That date is a declared deadline; the supplied materials do not establish the project’s present physical completion or independently verified construction progress. The permit says an occupancy certificate is compulsory before occupation, and no such certificate is included in the supplied project documents.
3. Master plan, architecture & building design
The supplied HMDA building-permit extraction describes one residential building on a site area of 1,564.52 Sq. Mt., with 1 Cellar + 1 Stilt + 5 upper floors. It lists a total built-up area of 5,684.34 sq.m and a proposed built-up area of 3,507.20 sq.m; the extracted record does not further explain the scope distinction between those two figures.
The RERA land record gives total land area of 1570.03 sqmts, affected area of 5.51 sqmts, and net area of 1564.52 sqmts. It also identifies road boundaries on three sides. No verified drawing-derived information is supplied on building footprint, flats per floor, tower height, lift or stair arrangement, internal circulation, open-space dimensions, or phase-wise organization. RERA filing Land records
4. Homes, configurations & floor plans
The RERA filing lists 45 2BHK apartments, all shown as available in the supplied portal snapshot. The recorded saleable area is 98.11 sq.m. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 45 | 0 | 45 | 98.11 sq.m | 51.2–63.4 sq.m; median 58.5 sq.m | 40% |
Carpet-area figures and the 40% loading figure are software measurements from floor-plan drawings, not RERA-filed disclosures; the measurement record says the drawing geometry needs review. RERA saleable area and software-measured carpet area are different measures, and the supplied measurement note states that saleable area also includes the home’s share of common areas. One measured drawing example shows a master bedroom, bedroom, hall, kitchen, two toilets and a wash area; these are drawing-based room labels and dimensions, not a specification for every apartment. Floor plans RERA unit details
The supplied drawing measurement record also identifies a 1BHK configuration, but it is not listed in the RERA configuration data. No unit count or RERA saleable area for that drawing-measured configuration is established here. Floor plans RERA unit details
5. Parking & vehicle circulation
The HMDA permit extraction states that the cellar/stilt is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit record does not provide a count of car or two-wheeler spaces, nor does it identify visitor or accessible spaces, parking allocation by apartment, ramps, EV charging or pedestrian separation. A parking bay shown in a drawing, if any, would not by itself establish exclusive ownership or allocation.
The RERA filing’s unit data does not specify parking allocations or space counts. RERA unit table
6. Amenities, recreation & open spaces
The RERA amenity record marks water supply, sewerage, green strip/tot lot/park, rainwater harvesting and an electrical meter room/substation/receiving station as available; the listed progress percentages are 0. This is a filing record, not independent confirmation of installation or completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Size not supplied | RERA amenity record RERA amenities | Marked available; 0% listed; completion not independently verified |
| Community buildings | No size or facility detail supplied | RERA amenity record RERA amenities | 0% listed |
| Internal roads and footpaths | No dimensions supplied | RERA amenity record RERA amenities | 0% listed |
| Street lighting | No specification supplied | RERA amenity record RERA amenities | 0% listed |
Promoter-vendor material mentions a swimming pool, gym, children’s play area and clubhouse, but these are vendor-listed claims and are not established by the supplied RERA amenity record as sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The HMDA permit extraction lists a transformer, garbage house, sewage treatment plant (STP) and rainwater-harvesting structures among the project’s amenities/utilities. Its conditions require rainwater-harvesting structures and an STP as per standard specification; the supplied record does not establish capacities or completed installation.
| Evidence in supplied record | RERA amenity record marks water supply available; vendor material also lists water supply and borewell. RERA amenities Promoter website |
|---|---|
| Status / limitation | No source yield, storage or treatment capacity supplied; installation not independently verified. |
| Evidence in supplied record | Permit lists an STP and requires provision of an STP; RERA lists sewerage and storm-water drains. RERA amenities |
|---|---|
| Status / limitation | No STP capacity, reuse detail or verified completion status supplied. |
| Evidence in supplied record | Permit requires rainwater-harvesting structures; RERA amenity record marks water conservation/rainwater harvesting available. RERA amenities |
|---|---|
| Status / limitation | No capacity or independent completion evidence supplied. |
| Evidence in supplied record | Permit extraction lists a transformer; RERA lists an electrical meter room/substation/receiving station as available. RERA amenities |
|---|---|
| Status / limitation | Capacity and energisation status not supplied. |
| Evidence in supplied record | RERA amenity record lists fire protection/fire-safety requirements; vendor material lists fire-fighting/fire-safety systems. RERA amenities Promoter website |
|---|---|
| Status / limitation | Specific systems, clearances and completed status are not established by the supplied information. |
| Evidence in supplied record | Permit lists a garbage house; RERA lists solid-waste management and disposal. RERA amenities |
|---|---|
| Status / limitation | Waste process and completion status not supplied. |
| Evidence in supplied record | Vendor material lists a lift, power backup, CCTV and security. Promoter website |
|---|---|
| Status / limitation | These are vendor-listed claims; lift number/capacity, backup capacity and independently verified status are not supplied. |
8. Location, access & connectivity
The registered project location is Kalvakunta Village, Sangareddy Mandal, Sangareddy District, Telangana 502001; the RERA locality field reads SANGAREDDY MANDAL AND DISTRICT. The parcel is bounded by 40-feet, 33-feet and 30-feet wide roads on the east, west and north respectively, according to the RERA land details. RERA record RERA filing RERA filing
A supplied location record places the cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km as a connectivity anchor. The record does not provide a route, travel time or public-transport information. Location record
9. Developer & development status
The registered promoter is RITVIK CONSTRUCTIONS AND DEVELOPERS, recorded as a partnership. Its GSTIN is 36ABAFR4030Q1ZZ. The project record names Pamulapati Veda Vaibhav as partner and Pamulapati Param Jyothi as authorized signatory. Corporate record Parties record RERA filing
The registration certificate lists the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500084,” without a village, mandal or street address. The project record separately gives an address at Sahasra AureliJa Residency, Golden Tulipi Estate, Kalvakunta Village, Sangareddy, but does not identify it as the registered office. Parties record
The promoter’s Form B affidavit sets a completion undertaking of 28/09/2025. No construction-progress percentage, updated completion schedule or occupancy certificate is supplied; the registration certificate states validity through 28/09/2025 and records no extension.
10. Approvals, official records & documents
| Identifier / date | P01100007256; issued 11/11/2023; valid through 28/09/2025 as stated in the certificate |
|---|---|
| What the supplied record establishes | Registration for PRESIDENTIAL HOMES and its stated registration conditions. |
| Identifier / date | 006777/BP/HMDA/1353/SKP/2022; 28 September, 2022 |
|---|---|
| What the supplied record establishes | Permit extraction describes one residential building on Survey Nos. 227/3, 227/4 and 227 at Kalvakunta Village, with 1 Cellar + 1 Stilt + 5 upper floors. |
| Identifier / date | 001503/BP/HMDA/SKP/2022 |
|---|---|
| What the supplied record establishes | Related proceedings number recorded in the permit extraction. |
| Identifier / date | Verified at Hyderabad on 31-01-2023 |
|---|---|
| What the supplied record establishes | Promoter declaration of development rights, project-account obligations and completion undertaking on or before 28/09/2025. |
| Identifier / date | 300723 |
|---|---|
| What the supplied record establishes | Drawing-based measurements were made from the supplied floor-plan material; the measurement record notes one drawing scan pending and that measurements need review. Floor plans |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The HMDA permit states that an occupancy certificate is compulsory before occupation; no certificate is included in the reviewed project-document set. |
1. Project at a glance
Project identity
Registered project name: PRESIDENTIAL HOMES
Project type: Residential apartment project
Phase / registered portion: No separate phase name or phase number disclosed; registration is for the project recorded against Survey Nos. 227/3, 227/4 and 227.
TG-RERA registration: P01100007256, granted 11/11/2023; certificate states validity through 28/09/2025 and no extension is recorded in the supplied certificate. Registration validity is distinct from the completion date.
Registered promoter: RITVIK CONSTRUCTIONS AND DEVELOPERS
RERA status in supplied record: “On-Going Project”; the registration certificate’s stated validity ended 28/09/2025.
Land and geographic identity
Revenue village: Kalvakunta Village (also described in the filed project schedule as Kalvakunta Village, Sangareddy Town and Mandal).
Locality / mandal / district / PIN: Locality recorded as SANGAREDDY MANDAL AND DISTRICT; mandal SANGAREDDY; district Sangareddy; PIN 502001.
Project survey numbers: 227/3, 227/4 and 227.
Registered site extent: The Form B declaration and project schedule state 1877.81 Sq. Yrds.
Sanction-document site area: HMDA permit extraction records 1,564.52 Sq. Mt.
RERA land-area fields: Total area 1570.03 sqmts; area affected in road widening/FTL of tanks/nala widening 5.51 sqmts; net area 1564.52 sqmts.
Boundaries: East: 40 FEET WIDE ROAD; west: 33 FEET WIDE ROAD; north: 30 FEET WIDE ROAD; south: NEIGHBOURS PROPERTY.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); permit is addressed/delegated to Sangareddy Municipality / Municipal Corporation.
Principal building approval: 006777/BP/HMDA/1353/SKP/2022, approved 28 September, 2022. The related proceedings number is 001503/BP/HMDA/SKP/2022.
Approved built-up area: Permit extraction lists Total Built up Area (In Sq.mts) 5,684.34 and Proposed Built-up Area 3,507.20; these are distinct figures as stated in the approval record.
Building count / floors: One residential building: 1 Cellar + 1 Stilt + 5 upper floors.
Parking level: Permit conditions specify the cellar/stilt for vehicle parking; a sanctioned parking-space count is not supplied in the extracted record.
Unit counts: RERA filing records 45 2BHK apartments; the land-details fields list 1 total building unit and 1 proposed building unit, not an apartment count.
Offering and status
RERA-filed configuration: 2BHK, 45 units.
RERA-filed saleable area: 98.11 sq.m for the listed 2BHK configuration.
Booked / available: Portal snapshot lists 0 booked / 45 available; no as-of date is supplied, so these counts are indicative rather than a current availability confirmation.
Construction stage: No independently verified construction-stage percentage or site progress is supplied. The project is listed as “On-Going Project.”
Completion deadline: Promoter’s Form B undertaking: completion on or before 28/09/2025. This is a promoter declaration, not evidence that completion occurred.
Occupancy / completion certificate: The supplied permit requires an occupancy certificate before occupation; no project occupancy or completion certificate is included in the supplied records.
2. The project story
PRESIDENTIAL HOMES is recorded with TG-RERA as a residential apartment project on land in Kalvakunta Village, Sangareddy, comprising Survey Nos. 227/3, 227/4 and 227. Its HMDA permit describes one residential building with a cellar, stilt and five upper floors. The RERA filing lists 45 two-bedroom apartments.
The promoter’s Form B affidavit undertakes completion on or before 28/09/2025. That date is a declared deadline; the supplied materials do not establish the project’s present physical completion or independently verified construction progress. The permit says an occupancy certificate is compulsory before occupation, and no such certificate is included in the supplied project documents.
3. Master plan, architecture & building design
The supplied HMDA building-permit extraction describes one residential building on a site area of 1,564.52 Sq. Mt., with 1 Cellar + 1 Stilt + 5 upper floors. It lists a total built-up area of 5,684.34 sq.m and a proposed built-up area of 3,507.20 sq.m; the extracted record does not further explain the scope distinction between those two figures.
The RERA land record gives total land area of 1570.03 sqmts, affected area of 5.51 sqmts, and net area of 1564.52 sqmts. It also identifies road boundaries on three sides. No verified drawing-derived information is supplied on building footprint, flats per floor, tower height, lift or stair arrangement, internal circulation, open-space dimensions, or phase-wise organization.
4. Homes, configurations & floor plans
The RERA filing lists 45 2BHK apartments, all shown as available in the supplied portal snapshot. The recorded saleable area is 98.11 sq.m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 45 | 0 | 45 | 98.11 sq.m | 51.2–63.4 sq.m; median 58.5 sq.m | 40% |
Carpet-area figures and the 40% loading figure are software measurements from floor-plan drawings, not RERA-filed disclosures; the measurement record says the drawing geometry needs review. RERA saleable area and software-measured carpet area are different measures, and the supplied measurement note states that saleable area also includes the home’s share of common areas. One measured drawing example shows a master bedroom, bedroom, hall, kitchen, two toilets and a wash area; these are drawing-based room labels and dimensions, not a specification for every apartment.
The supplied drawing measurement record also identifies a 1BHK configuration, but it is not listed in the RERA configuration data. No unit count or RERA saleable area for that drawing-measured configuration is established here.
5. Parking & vehicle circulation
The HMDA permit extraction states that the cellar/stilt is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit record does not provide a count of car or two-wheeler spaces, nor does it identify visitor or accessible spaces, parking allocation by apartment, ramps, EV charging or pedestrian separation. A parking bay shown in a drawing, if any, would not by itself establish exclusive ownership or allocation.
The RERA filing’s unit data does not specify parking allocations or space counts.
6. Amenities, recreation & open spaces
The RERA amenity record marks water supply, sewerage, green strip/tot lot/park, rainwater harvesting and an electrical meter room/substation/receiving station as available; the listed progress percentages are 0. This is a filing record, not independent confirmation of installation or completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Size not supplied | RERA amenity record | Marked available; 0% listed; completion not independently verified |
| Community buildings | No size or facility detail supplied | RERA amenity record | 0% listed |
| Internal roads and footpaths | No dimensions supplied | RERA amenity record | 0% listed |
| Street lighting | No specification supplied | RERA amenity record | 0% listed |
Promoter-vendor material mentions a swimming pool, gym, children’s play area and clubhouse, but these are vendor-listed claims and are not established by the supplied RERA amenity record as sanctioned or delivered facilities.
7. Utilities, building services & safety
The HMDA permit extraction lists a transformer, garbage house, sewage treatment plant (STP) and rainwater-harvesting structures among the project’s amenities/utilities. Its conditions require rainwater-harvesting structures and an STP as per standard specification; the supplied record does not establish capacities or completed installation.
| Evidence in supplied record | RERA amenity record marks water supply available; vendor material also lists water supply and borewell. |
|---|---|
| Status / limitation | No source yield, storage or treatment capacity supplied; installation not independently verified. |
| Evidence in supplied record | Permit lists an STP and requires provision of an STP; RERA lists sewerage and storm-water drains. |
|---|---|
| Status / limitation | No STP capacity, reuse detail or verified completion status supplied. |
| Evidence in supplied record | Permit requires rainwater-harvesting structures; RERA amenity record marks water conservation/rainwater harvesting available. |
|---|---|
| Status / limitation | No capacity or independent completion evidence supplied. |
| Evidence in supplied record | Permit extraction lists a transformer; RERA lists an electrical meter room/substation/receiving station as available. |
|---|---|
| Status / limitation | Capacity and energisation status not supplied. |
| Evidence in supplied record | RERA amenity record lists fire protection/fire-safety requirements; vendor material lists fire-fighting/fire-safety systems. |
|---|---|
| Status / limitation | Specific systems, clearances and completed status are not established by the supplied information. |
| Evidence in supplied record | Permit lists a garbage house; RERA lists solid-waste management and disposal. |
|---|---|
| Status / limitation | Waste process and completion status not supplied. |
| Evidence in supplied record | Vendor material lists a lift, power backup, CCTV and security. |
|---|---|
| Status / limitation | These are vendor-listed claims; lift number/capacity, backup capacity and independently verified status are not supplied. |
8. Location, access & connectivity
The registered project location is Kalvakunta Village, Sangareddy Mandal, Sangareddy District, Telangana 502001; the RERA locality field reads SANGAREDDY MANDAL AND DISTRICT. The parcel is bounded by 40-feet, 33-feet and 30-feet wide roads on the east, west and north respectively, according to the RERA land details.
A supplied location record places the cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km as a connectivity anchor. The record does not provide a route, travel time or public-transport information.
9. Developer & development status
The registered promoter is RITVIK CONSTRUCTIONS AND DEVELOPERS, recorded as a partnership. Its GSTIN is 36ABAFR4030Q1ZZ. The project record names Pamulapati Veda Vaibhav as partner and Pamulapati Param Jyothi as authorized signatory.
The registration certificate lists the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500084,” without a village, mandal or street address. The project record separately gives an address at Sahasra AureliJa Residency, Golden Tulipi Estate, Kalvakunta Village, Sangareddy, but does not identify it as the registered office.
The promoter’s Form B affidavit sets a completion undertaking of 28/09/2025. No construction-progress percentage, updated completion schedule or occupancy certificate is supplied; the registration certificate states validity through 28/09/2025 and records no extension.
10. Approvals, official records & documents
| Identifier / date | P01100007256; issued 11/11/2023; valid through 28/09/2025 as stated in the certificate |
|---|---|
| What the supplied record establishes | Registration for PRESIDENTIAL HOMES and its stated registration conditions. |
| Identifier / date | 006777/BP/HMDA/1353/SKP/2022; 28 September, 2022 |
|---|---|
| What the supplied record establishes | Permit extraction describes one residential building on Survey Nos. 227/3, 227/4 and 227 at Kalvakunta Village, with 1 Cellar + 1 Stilt + 5 upper floors. |
| Identifier / date | 001503/BP/HMDA/SKP/2022 |
|---|---|
| What the supplied record establishes | Related proceedings number recorded in the permit extraction. |
| Identifier / date | Verified at Hyderabad on 31-01-2023 |
|---|---|
| What the supplied record establishes | Promoter declaration of development rights, project-account obligations and completion undertaking on or before 28/09/2025. |
| Identifier / date | 300723 |
|---|---|
| What the supplied record establishes | Drawing-based measurements were made from the supplied floor-plan material; the measurement record notes one drawing scan pending and that measurements need review. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The HMDA permit states that an occupancy certificate is compulsory before occupation; no certificate is included in the reviewed project-document set. |
Frequently asked questions
Is PRESIDENTIAL HOMES registered with Telangana RERA?
Yes. PRESIDENTIAL HOMES is registered with the Telangana Real Estate Regulatory Authority as P01100007256; the registration status is On-Going Project.
Who is the developer of PRESIDENTIAL HOMES?
The promoter named in the RERA registration is RITVIK CONSTRUCTIONS AND DEVELOPERS.
Where is PRESIDENTIAL HOMES located?
PRESIDENTIAL HOMES is in SANGAREDDY MANDAL AND DISTRICT, SANGAREDDY, Telangana (502001).
When will PRESIDENTIAL HOMES be completed?
The promoter's proposed date of completion filed with RERA is 28/09/2025. This is the promoter's declaration, not a guarantee.