Prakara Prime

Gaddamidi · Rangareddy · RERA P02400003408

Prakara Prime is a residential apartment project in Shadnagar, Ranga Reddy District; the mandal is not disclosed. It is being developed by the registered promoter Mr./Ms. Gaddamidi Ravi Shankar on a site of 805.99 sqmts, with one residential building described as Stilt + 5 upper floors and 25 2BHK (“DOUBLE BEDROOM FLAT”) units. The project is registered under TG-RERA number P02400003408, with a proposed completion before 6 June, 2024.

01What we found

Period endedTG-RERA registration ran to 6 Jun 2024 - check its extension on TG-RERA
15documents on file - each fact links to its page
5court cases on this project's land (survey 139, 145, 150, 151, Shadnagar)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project namePrakara Prime RERA record
Project typeResidential apartment project; TG-RERA category recorded as apartment RERA record RERA filing
Phase / registered portionNo phase name or separate phase identifier disclosed; registration is for the project recorded as Prakara Prime
TG-RERA registrationP02400003408
Registration validity24/09/2021 to 06/06/2024; certificate records a two-year validity period and says extension would require Authority action under the Act and Rules
Registered promoterMr./Ms. Gaddamidi Ravi Shankar; the project filing also names G. Ravi Shanker, Srinivas Dasamanthula and Ramesh Pidparthy as applicants
Entity typeNot disclosed in the supplied project record Corporate record
RERA statusThe certificate’s stated validity ended 06/06/2024. The certificate record says “extended: false”; no extension is evidenced in the supplied material

Land and geographic identity

FieldProject record
LocalityShadnagar; the building-permit document describes the site as Solipur, Shadnagar RERA record
Revenue villageSolipur is named in the filed title declaration and building-permit document; village identity should be checked against the registered parcel particulars
MandalNot disclosed in the supplied project identity record Land records
DistrictRanga Reddy RERA record Land records
PIN509216 RERA record
Survey numbers / subdivisions recorded for the project139/P, 104/P, 145, 145/P, 150/P and 151/P RERA record
Site extent805.99 sqmts total and net area in the project land record and building-permit extraction Land records
BoundariesNorth: P; South: P; East: P; West: P Land records
Separately stated land extent in Form BThe declarants state ownership of 964.00 Sq yds for Plot Nos. 92, 93 and 94 in the listed survey numbers

Development identity

FieldProject record
Sanctioning authorityMunicipal Council, Shadnagar; the permit records DTCP technical clearance
Principal building-permit referenceFile No. Lr. D.Dis. No. 587/ 22020/HRO/ H1; application G1/19/B1/2020; proceedings Ir.D.Dis.No.587/2020/HRO/H1; permit date 07.06.2021 Approvals record
Approved building formResidential building described as Stilt + 5 upper floors
Height in permit extraction14.50 smts (as recorded)
Building countOne building/unit in the project fields; one residential building is described in the permit extraction RERA filing
Approved built-up area2128.30 sqmts in the project fields RERA filing
Area figures separately stated in permit extractionResidential Building/Apartment Area: 348.8 m2; Stilt Area: 390.5 m2
Parking floors / provisionPermit extraction includes “Parking Floors” and a stilt area; parking-space count and allocation are not supplied
Unit count25 “DOUBLE BEDROOM FLAT” units filed with TG-RERA; the approved-plan unit total is recorded as 1 in the project fields, without clarifying that field’s unit of count RERA unit details RERA filing

Offering and status

FieldProject record
RERA-filed configuration2BHK / “DOUBLE BEDROOM FLAT” RERA unit table RERA unit details
RERA-filed saleable area72.28 sqm per unit RERA unit table
Booked / available0 booked; 25 available as last read from the TG-RERA portal. The portal record has no as-of date, so counts are indicative RERA unit table
Construction stageNot established by a current progress report or site inspection in the supplied material RERA amenities
Promoter-declared completion deadlineBefore 6 June, 2024 in Form B
Occupancy certificateForm–1A records Occupancy Certificate 0002/0C/3066/2023, issued by Shadnagar Municipality on 21.03.2023, for Prakara Prime; the certificate extraction describes overall completion but does not specify tower-wise scope

2. The project story

Prakara Prime is registered as a residential apartment project in the Shadnagar locality, with the building-permit document identifying the site as Solipur, Shadnagar, Ranga Reddy District. The project filing identifies survey numbers 139/P, 104/P, 145, 145/P, 150/P and 151/P and records a site area of 805.99 sqmts. RERA record Land records

The permit describes one residential building with a stilt and five upper floors. The RERA unit schedule lists 25 double-bedroom flats. The project record shows no units booked and 25 available, but does not provide an as-of date for that portal inventory. RERA unit details RERA unit table

An architect’s Form–1A records an occupancy certificate dated 21.03.2023 and certifies completion of construction work. This is a filed certificate, not an independent site inspection in this review. The supplied material does not provide current construction-progress evidence or clarify whether the certificate covers any distinct phase or tower subdivision.

3. Master plan, architecture & building design

The building-permit extraction describes a residential building of Stilt + 5 upper floors, with a stated height of 14.50 smts. It records site and net area as 805.99 sqmts and separately lists a residential building/apartment area of 348.8 m2 and a stilt area of 390.5 m2. The project fields state an approved built-up area of 2128.30 sqmts; these are separately reported figures and should not be treated as interchangeable area measures. RERA filing

The filing records one building and one building unit in the approved-plan field, while the RERA unit schedule lists 25 flats. The supplied documents do not include extractable floor-plan measurements, flat-per-floor arrangements, lift or stair details, building footprint, internal circulation drawings, landscaped-area quantities, or a phase plan. Two floor-plan drawings are recorded as awaiting measurement; no software-measured carpet area is available. RERA filing RERA unit details Floor plans

4. Homes, configurations & floor plans

TG-RERA records 25 “DOUBLE BEDROOM FLAT” units. The filed saleable area is 72.28 sqm per unit. Booked and available counts are portal-read values without an as-of date. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (“DOUBLE BEDROOM FLAT”)2502572.28 sqmNot available; drawings are pending measurementNot supplied

No software-measured carpet area or room dimensions are available. The supplied floor-plan record explains that carpet area measured from drawing geometry would be a software measurement, not a RERA disclosure, and should be checked against the drawing. Saleable area and carpet area are different measures; no loading figure is supplied for this project. Floor plans RERA unit details

5. Parking & vehicle circulation

The building-permit extraction identifies parking floors and a stilt area of 390.5 m2, and its conditions state that the area earmarked for vehicle parking should not be converted to another use. The supplied record does not establish the number of parking spaces, whether they are covered or open, visitor or accessible provision, ramp and driveway arrangements, EV charging, or unit-specific parking allocations. A drawn or earmarked space alone does not establish exclusive ownership.

6. Amenities, recreation & open spaces

TG-RERA’s amenity record includes the following project-facility categories. The entries marked “YES” are availability fields in the filing; the progress percentages shown are 0. They do not independently verify completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not suppliedTG-RERA amenity record RERA amenities0%; no independent completion verification
Green strip / tot lot / parkSize and quantity not suppliedTG-RERA amenity record RERA amenities0%; no independent completion verification
Community buildingsDetails not suppliedTG-RERA amenity record RERA amenities0%; no independent completion verification
Aggregate recreational open spaceArea not suppliedTG-RERA amenity record RERA amenities0%; no independent completion verification

7. Utilities, building services & safety

The building-permit conditions require provision for water supply, drainage and sewerage disposal, storm-water drainage, a transformer, garbage chute, rainwater-harvesting structures and a septic tank or STP of suitable size. The permit extraction also records an ETP proposal. These are permit conditions or proposal references; the supplied material does not establish capacities or verify installation or operation.

TG-RERA’s amenity record marks water supply, sewerage (including chamber, lines, septic tank or STP), water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES”; each is listed with 0% progress. The permit also requires two separate on-site bins for dry and wet waste and tree planting. RERA amenities

The permit requires compliance with fire-service norms and fire-safety requirements, but the supplied evidence does not document fire-system specifications, clearance, lifts, backup power, CCTV, access control, accessibility features, or installed service capacities.

8. Location, access & connectivity

The project is identified in Shadnagar, Ranga Reddy District, PIN 509216; its building-permit document locates it at Solipur, Shadnagar. A project-location record provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459. RERA record Location record

The supplied project-location data does not identify approach roads, public-transport services, or measured distances to landmarks. No travel-time or connectivity claim is established in this Overview.

9. Developer & development status

The TG-RERA certificate names Mr./Ms. Gaddamidi Ravi Shankar as promoter. The building-permit application names G. Ravi Shanker, Srinivas Dasamanthula and Ramesh Pidparthy; Form B is signed by G. Ravi Shankar, Srinivas Dasamanthula and Ramesh Pidparthy. The legal entity type and a complete corporate profile are not disclosed in the supplied project record. Corporate record

Form B contains the declarants’ undertaking to complete the project before 6 June 2024. The project registration certificate separately states validity through 06/06/2024. Form–1A records an occupancy certificate dated 21.03.2023 and certifies construction completion; no current progress report or independent site verification is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400003408; issued 24/09/2021; valid through 06/06/2024
What the supplied document recordsForm C registration certificate for Prakara Prime, with conditions including a separate-account requirement.
Building permit
Identifier / dateFile No. Lr. D.Dis. No. 587/ 22020/HRO/ H1; permit date 07.06.2021
What the supplied document recordsMunicipal Council, Shadnagar permit for a residential building described as Stilt + 5 upper floors; document records DTCP technical clearance and states that technical clearance is not proof of land title.
Application and technical-clearance references
Identifier / dateApplication G1/19/B1/2020; proceedings / DTCP technical-clearance reference Ir.D.Dis.No.587/2020/HRO/H1
What the supplied document recordsReferences associated with the building-permit record.
Occupancy certificate recorded in Form–1A
Identifier / date0002/0C/3066/2023, dated 21.03.2023
What the supplied document recordsForm–1A records an Occupancy Certificate issued by Shadnagar Municipality and certifies completion of construction work for Prakara Prime.
Form B declaration
Identifier / dateDeclaration dated “__ day of August, 2021”
What the supplied document recordsPromoter-side declarations include land ownership, encumbrance and completion undertakings.
Layout-plan document
Identifier / dateDocument ID 181090 Document index
What the supplied document recordsListed in the RERA document register as a layout plan, but extraction is unavailable; no layout plan content is established here.
Encumbrance statement
Identifier / dateDocument ID 181589 Document index
What the supplied document recordsFiled encumbrance statement; current encumbrance position is not established by this overview.

Frequently asked questions

Is Prakara Prime registered with Telangana RERA?

Yes. Prakara Prime is registered with the Telangana Real Estate Regulatory Authority as P02400003408; the registration status is New Project.

Who is the developer of Prakara Prime?

The promoter named in the RERA registration is Gaddamidi.

Where is Prakara Prime located?

Prakara Prime is in Shadnagar, Rangareddy, Telangana (509216).

When will Prakara Prime be completed?

The promoter's proposed date of completion filed with RERA is 06/06/2024. This is the promoter's declaration, not a guarantee.