Sign in

Patel Towers

RAICHANDANI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200004159

PATEL TOWERS is a commercial project in GHMC L B NAGAR, Uppal Mandal, Medchal-Malkajgiri District. The registered promoter developing it is RAICHANDANI CONSTRUCTIONS, recorded as a partnership. The project has a total site area of 4169.04 sq m and one building with 2 Cellar + Ground + 4 upper floors, containing 72 shops; the RERA unit schedule records SHOP units with a saleable area of 127.04 sq m per unit. It is registered under TG-RERA P02200004159, and the promoter’s completion undertaking is 24 January 2028.

More from Raichandani Constructions · 20 projects →

01What we found

RegisteredTG-RERA - valid till 24 Jan 2028
18documents on file - each fact links to its page
10court cases on this project's land (survey 102, Ghmc L B Nagar)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRERA-filed / recorded information
Registered project namePATEL TOWERS RERA record
Project typeCommercial project; the RERA unit schedule records shops. RERA record RERA filing RERA unit table
Phase / registered portionPhase not separately identified in the supplied record. RERA record
TG-RERA registrationP02200004159, Form C; registered 25 February 2022 and valid to 24 January 2028. Registration validity is distinct from the completion date and the building’s OC status. RERA record
Registered promoterRAICHANDANI CONSTRUCTIONS; the RERA record identifies it as a partnership. RERA record RERA filing Parties record
RERA statusThe supplied registration record shows the registration period above. It does not establish an extension.

Land and geographic identity

ItemRERA-filed / recorded information
LocalityGHMC L B NAGAR in the project identity record; the title and building-permit documents identify Nagole Village / Nagole. RERA record RERA filing
Revenue villageNagole Village is stated in the title and building-permit material. The project identity field separately says “Ghmc L B Nagar”; the record does not provide a reconciliation of these location labels. RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500068. RERA record RERA filing
Survey number and subdivisionSurvey No. 102/3/II. RERA record Land records
Plot / municipal identifiers2-3-248, 2-3-250, 2-3-251 and Plot No. 15, as recorded in the project land fields and registration certificate. The building permit describes the site at Nagole. RERA filing
Site extentTotal area: 4169.04 sq m; net area in the project land record: 3677.27 sq m. The building permit also states a net area of 3669.42 m²; the supplied record does not reconcile the two net-area figures. RERA filing Land records
Road-affected area491.77 sq m; the building permit says this portion is to be surrendered to GHMC free of cost. RERA filing
BoundariesEast: ROAD AND NEIGHBOURS LAND; west: MAIN ROAD; north: NEIGHBOURS LAND; south: ROAD AND PLOT NO 14. RERA filing

Development identity

ItemRERA-filed / sanctioned information
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permitPermit No. 1/C3/00076/2022, File No. 1/C3/05633/2020, approved 24 January 2022. Approvals record
Building and useBuilding A-1 (COMM), for commercial use. The permit specifies 2 Cellar + Ground + 4 upper floors and height 14.99 m.
Approved built-up areaThe project fields record approved built-up area of 17380.84 sq m. The permit extraction separately lists ground-floor commercial area 2,236.42 m², upper-floor commercial area 9,570.89 m², and cellar parking area 4,944.07 m². RERA filing
Building / tower countOne building / one tower is recorded. RERA filing RERA unit table
Parking levelsTwo cellar levels are included in the sanctioned floor configuration; the permit says cellar parking is approved for parking use.
Unit countsThe RERA filing records 72 shops; the sanctioned unit count is also described in the permit as not to be increased without prior GHMC approval, but a separately extracted sanctioned unit-count figure is not supplied. RERA unit table

Offering and status

ItemRERA-filed / recorded information
Unit type and saleable areaSHOP; 127.04 sq m saleable area per unit in the supplied RERA unit schedule. RERA unit table RERA unit details
Booked / available12 booked; 60 available, as last read from the TG-RERA portal. The portal record supplied here has no as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageThe supplied Form 1A architect certificate records completion and a GHMC occupancy certificate for the building, dated 9 January 2026.
Completion dateThe promoter’s Form B declaration states a completion undertaking of 24 January 2028. This is the declared completion timeline, not the RERA registration validity date.
Occupancy certificateGHMC OC No. 003507/GHMC/01866/SWOC/LBN1/2025, dated 09.01.2026; the Form 1A certificate records it for the building.

2. The project story

PATEL TOWERS is recorded with TG-RERA as a commercial project on Survey No. 102/3/II, in land described in the title and sanction material as Nagole Village, Uppal Mandal, Medchal-Malkajgiri District. The project record lists a total site area of 4169.04 sq m, with 491.77 sq m road-affected. RERA record Land records

The sanctioned scheme is one commercial building, Building A-1 (COMM), with two cellar levels, a ground floor and four upper floors. The RERA unit schedule lists 72 shops, of which 12 were recorded as booked and 60 as available when the portal figures were read; the record does not provide an as-of date for those counts. RERA unit table

The supplied architect’s Form 1A certificate records project completion and a GHMC occupancy certificate for the building dated 9 January 2026. The promoter’s Form B separately gives 24 January 2028 as its completion undertaking. These records describe different milestones: the registration remains recorded as valid through 24 January 2028, while the Form 1A states an OC has been issued for the building.

3. Master plan, architecture & building design

The GHMC building permit identifies one commercial building, Building A-1 (COMM), with 2 Cellar + Ground + 4 upper floors and a stated height of 14.99 m. The sanctioned drawing-derived permit extraction gives ground-floor commercial area as 2,236.42 m², upper-floor commercial area as 9,570.89 m², and cellar parking area as 4,944.07 m². These are separately stated permit figures; the record does not label them as carpet area or saleable area.

The RERA project fields record approved built-up area of 17380.84 sq m. The permit extraction also lists “Proposed Covered builtup area 1,346,532.20” without a clear unit or reconciled definition in the supplied extract; it is not used here as an area measurement. RERA filing

The permit records a site area of 4169.04 m² and net area of 3669.42 m²; the RERA land record gives net area of 3677.27 sq m. A layout-plan document is listed in the RERA file, but its extraction is unavailable, so this overview cannot describe detailed building footprint, internal circulation, floor-by-floor unit arrangement, landscaped-area layout, or common-area distribution from that drawing. Land records Document index

4. Homes, configurations & floor plans

The RERA unit schedule is commercial, not residential: it records 72 units filed as SHOP. The supplied floor-plan index contains two drawings, but neither is measured or identified as containing shop layouts, so no software-measured carpet area or room dimensions are available. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
SHOP721260127.04 sq m per unitNot availableNot supplied

The recorded saleable area is the RERA-filed figure. No drawing-based carpet measurement is supplied; therefore, no carpet-area comparison or loading figure can be stated. Booking and availability counts are portal figures without an as-of date in the supplied record. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit includes two cellar levels and identifies 4,944.07 m² as cellar parking area. It requires approved cellar parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The record does not provide a sanctioned number of car or two-wheeler spaces, visitor or accessible-space counts, ramp details, parking allocation by shop, or EV-charging provision.

The RERA unit schedule marks the shops as mortgaged, but that does not establish an individual buyer’s parking allocation or exclusive parking rights. RERA unit table

6. Amenities, recreation & open spaces

The project filing records some facilities as available or complete in its amenity schedule; these are filing-status entries, not independent site-verification findings. The GHMC permit also imposes conditions for a tot-lot, rainwater-harvesting structure, transformer space, garbage house and peripheral greenery. RERA amenities

Green strip / tot-lot / park
Description / sizePermit extraction lists tot-lot area as 0 m² and records 70 trees; permit conditions require the tot-lot to be fenced and maintained as greenery and a peripheral greenery strip to be maintained.
Evidence sourceRERA amenities
Declared progress / verified statusAmenity schedule records 100%; no independent verification supplied.
Water conservation / rainwater harvesting
Description / sizePermit requires a rainwater-harvesting structure (percolation pit); permit extraction lists 1 RWHP.
Evidence sourceRERA amenities
Declared progress / verified statusAmenity schedule records 100%; no independent verification supplied.
Transformer space
Description / sizeSpace for a transformer is listed in the permit.
Declared progress / verified statusPermit requirement; completion not independently verified.
Garbage house
Description / sizeRequired within the premises by the permit.
Declared progress / verified statusPermit requirement; completion not independently verified.

No RERA-filed evidence supplied here establishes a clubhouse, pool, gym or children’s play area as a sanctioned or delivered project facility.

7. Utilities, building services & safety

The RERA amenity schedule records water supply, sewerage, energy management, fire protection and fire-safety requirements, and rainwater harvesting at 100%; it records the electrical meter room/substation/receiving station at 80%. These are portal-declared progress entries and are not independent verification of installation or operation. RERA amenities

The GHMC permit requires a rainwater-harvesting structure, transformer space and garbage house. It also requires a Fire NOC before issue of the occupancy certificate and states that an occupancy certificate is compulsory before occupation. The supplied Form 1A records a GHMC OC for the building dated 9 January 2026; the underlying fire-clearance document is not included in the supplied evidence.

The supplied records do not specify water source or storage capacity, STP capacity or reuse arrangements, storm-water infrastructure details, electrical supply or backup capacity, lift count/capacity, fire-system equipment, security systems, waste-processing capacity, or accessibility features. The RERA amenity schedule records sewerage as available at 100%, but “treatment and disposal of sewage and sullage water” at 0%; no further technical detail is supplied. RERA amenities

8. Location, access & connectivity

The registered project identity gives GHMC L B NAGAR, Uppal Mandal, Medchal-Malkajgiri District, PIN 500068; the title and GHMC building permit identify Nagole Village / Nagole and Survey No. 102/3/II. The supplied location data provides a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. RERA record RERA filing Location record

The permit refers to 18 mt. road widths and the site boundaries include a main road and other roads. No approach-road name, public-transport route, or independently measured travel time is supplied. RERA filing

9. Developer & development status

The registered promoter is RAICHANDANI CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AASFR4124J2ZT. The RERA record lists the promoter’s address as S B TOWERS, ROAD NO 1, NAGOLE MAIN ROAD, GHMC L B NAGAR, Uppal, Medchal-Malkajgiri, 500068. RERA filing Corporate record Parties record

The RERA project filing identifies Deepak Lal D Raichandani as an authorized signatory; the GHMC permit identifies M/s Raichandani Constructions as the developer through DGPA holders and names Amit Bhawani as owner/applicant.

The promoter’s Form B, dated 28 January 2022, declares a completion undertaking of 24 January 2028 and includes undertakings concerning project funds, accounts and pending approvals. The supplied Form 1A records completion and the GHMC OC for the building dated 9 January 2026. No independent physical-site progress report is supplied in this overview’s evidence.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004159, Form C, issued 25 February 2022; valid through 24 January 2028
What the supplied record establishesRegistration certificate for PATEL TOWERS, with registration conditions including a separate-account requirement.
GHMC building permit
Identifier / datePermit 1/C3/00076/2022; File No. 1/C3/05633/2020; 24 January 2022
What the supplied record establishesConditional permission for Building A-1 (COMM), 2 Cellar + Ground + 4 upper floors; includes a requirement to surrender the road-affected portion to GHMC free of cost.
Architect’s completion certificate / OC record
Identifier / dateGHMC OC No. 003507/GHMC/01866/SWOC/LBN1/2025, dated 09.01.2026; Form 1A dated 10.01.2026
What the supplied record establishesArchitect’s certificate records completion of the project and the GHMC occupancy certificate for the building.
Form B promoter declaration
Identifier / dateDated 28 January 2022
What the supplied record establishesPromoter declaration concerning title basis, encumbrances, project accounts, approvals and a completion undertaking.
Advocate’s land-title search report
Identifier / dateDocument 213570
What the supplied record establishesTitle report concerning the stated 4988 sq.yds at Nagole Village, Survey No. 102/3/II, including a development agreement/GPA and road-widening reference.
Layout-plan filing
Identifier / dateDocument 213571
What the supplied record establishesLayout-plan item is listed in the RERA document set, but its extraction is unavailable. Document index

Frequently asked questions

Is PATEL TOWERS registered with Telangana RERA?

Yes. PATEL TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02200004159; the registration status is New Project.

Who is the developer of PATEL TOWERS?

The promoter named in the RERA registration is RAICHANDANI CONSTRUCTIONS.

Where is PATEL TOWERS located?

PATEL TOWERS is in GHMC L B NAGAR, Uppal, Medchal-Malkajgiri, Telangana (500068).

When will PATEL TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 24/01/2028. This is the promoter's declaration, not a guarantee.