PARAMOUNT COLONY-II is a plotted development in BADEPALLY(JADCHERLA) Municipality, Jadcherla mandal, Mahabubnagar district. The registered promoter is BHAVARI DEVI JHAWAR. The project record gives a site area of 7,928 sq.m and the tentative layout provides 20 plots; buildings, towers and floors are not disclosed. TG-RERA registration number P01400007368 is recorded as valid from 08/12/2023 to 18/03/2025, and the promoter-declared completion date is 18/03/2025.

01What we found

Period endedTG-RERA registration ran to 18 Mar 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Badepally, Jadcherla, Mahabubnagar · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project namePARAMOUNT COLONY-II RERA record
Project typePlotted development / tentative residential layout RERA record
Phase or registered portionProject registration is for the portion recorded as Sy. No. 126/PART; a more specific phase description is not disclosed. RERA filing
TG-RERA registrationP01400007368
Registration validity08/12/2023 to 18/03/2025; the supplied certificate records no extension. This is the registration-validity period, not confirmation of completion or an occupancy/completion certificate.
Registered promoterBHAVARI DEVI JHAWAR (also rendered “Bhavari Devi Jhawar” on the certificate). Entity type is recorded as “Others”; the description says “BAVARI DEVI JHAWAR AND OTHERS.” RERA record RERA filing
RERA status in supplied recordThe project is registered; its recorded registration end date has passed, and no extension is recorded in the supplied certificate.

Land and geographic identity

ItemRecord
Registered localityBADEPALLY(JADCHERLA) Municipality, Mahaboobnagar RERA filing
Revenue village in project recordBadepally(jadcherla) RERA filing
Revenue village in tentative-layout documentBureddipally Revenue Village
MandalJadcherla RERA record
DistrictMahabubnagar RERA record
PIN509301 RERA record
Project survey identity126/PART in the registration record; the layout document describes Sy. Nos 126/P.
Registered site extent7,928 sq.m total and 7,928.00 sq.m net in the project record. RERA filing
Boundaries in project recordEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityBADEPALLY(JADCHERLA) Municipality/Municipal Corporation; the registration fields identify DTCP as the authority name. Approvals record
Principal layout approvalTentative Layout Plan 0012/LO/3068/2022, dated 19 March, 2022; application 004077/LO/DTCP/3068/0013/2021. Approvals record
Layout extent stated in approval1 Acer 38.36 Gts 9481 Sq. Yds
Approved built-up area4,725 sq.m is recorded in the project fields; the supplied material does not identify it as the built-up area of buildings in this plotted layout. RERA filing
Plots in approved tentative layout20 No's, according to the layout approval and its schedule. Layout record
Buildings, floors and parking levelsNot disclosed in the supplied project record; this is a plotted layout, not an evidenced apartment-building scheme. Document index
Authority-mortgaged plotsThe approval document identifies plots 20, 19, 17 and 18 as mortgaged in favour of the Municipality/Municipal Corporation.

Offering and status

ItemRecord
OfferingPlots; the layout drawing provides a schedule of 20 plots. RERA record Layout record
RERA unit counts, booked/available counts and saleable areasNot available in the supplied RERA unit data.
Drawing-derived plot sizesSoftware-read from the layout drawing: 168.62–803.45 sq.m (smallest to largest); the drawing-based size distribution is summarised below. Layout record
Promoter-declared completion date18/03/2025 in the Form B declaration.
Revised completion dateNone supplied.
Construction/development stageNo independently verified site-progress record is supplied. The approval requires the applicant to carry out infrastructure and development works.
Occupancy/completion certificateNo occupancy/completion certificate is identified in the supplied documents; no building or tower scope is disclosed. Document index

2. The project story

PARAMOUNT COLONY-II is recorded with TG-RERA as a plotted development in the Jadcherla area of Mahabubnagar district. The project record identifies the registered land as Sy. No. 126/PART, while the tentative-layout approval describes Sy. Nos 126/P and calls the revenue village Bureddipally; the project record gives Badepally(jadcherla). These identifiers are retained as stated in their respective records. RERA record RERA filing

The filed layout approval is for 20 plots, with roads, open space/park, utilities and social-infrastructure land shown in its area statement. The drawing-derived schedule also contains 20 plots, but plot sizes and size bands here are software-read from the drawing, not RERA-filed unit measurements. Layout record

The approval describes a tentative layout and makes development works the applicant’s responsibility. Its listed works include road formation, drainage, water-supply infrastructure, electrical lines and street lighting, park development and rainwater-harvesting pits. The supplied record does not independently establish which works have been completed, and the Form B completion undertaking is a promoter declaration rather than a site-progress verification.

3. Master plan, architecture & building design

The supplied plan evidence concerns a plotted layout, not an apartment-building design. The tentative layout approval states a total layout extent of 1 Acer 38.36 Gts 9481 Sq. Yds and records 20 plots. Its land-use statement allocates the site as follows:

Layout useArea as printed in approvalShare
Plotted area1 Acer 6.7 Gts 5651 Sq. Yds59.6%
Roads0 Acer 21.82 Gts 2640 Sq. Yds27.84%
Open space (park)0 Acer 7.06 Gts 855 Sq. Yds9.01%
Social infrastructure0 Acer 1.98 Gts 240 Sq. Yds2.53%
Utilities0 Acer 0.79 Gts 96 Sq. Yds1.01%

The drawing-derived layout data identifies 20 plots and reports sizes from 168.62 sq.m to 803.45 sq.m. The plotted-area total in the drawing’s area statement is 4,724.47 sq.m. These are drawing-derived/software-read figures, not RERA-filed saleable areas. Layout record

The approval document describes a mortgage over plots 20, 19, 17 and 18 in favour of the Municipality/Municipal Corporation. The drawing-derived record separately reports a mortgaged area of 830.06 sq.m; the approval’s land-use table prints “Mortgage Area (17.54%) of plotted area” with an area of 0 Acer 0 Gts 0 Sq. Yds. Layout record

No building count, floor configuration, building footprint, apartment circulation, lifts or building parking levels are evidenced for this plotted development. The layout approval requires infrastructure and development works and specifies that open space, utilities and roads are to be handed over to the Municipality by registered gift deed before release of the final layout.

4. Homes, configurations & floor plans

This is recorded as a plotted project, so the relevant offering is plots rather than apartment configurations. RERA unit-type counts, booked/available plot counts and RERA-filed saleable areas are not present in the supplied data.

The approved layout document states 20 No's of plots. The layout drawing schedule is also software-read as 20 plots; plot areas are software-measured/read from the drawing and should be checked against the original drawing. Layout record

Plot-size bandPlotsEvidence
200–250 sq.yd (167–209 sq.m)9Software-read from layout drawing Layout record
250–300 sq.yd (209–251 sq.m)9Software-read from layout drawing Layout record
300–400 sq.yd (251–334 sq.m)1Software-read from layout drawing Layout record
500–1000 sq.yd (418–836 sq.m)1Software-read from layout drawing Layout record

The supplied floor-plan set contains two sheets, each identified as a layout sheet with no flats; it contains no apartment floor-plan measurements. Floor plans

5. Parking & vehicle circulation

No resident, visitor or accessible parking count, parking level, EV provision, or plot-wise parking allocation is established in the supplied data. The project is a plotted layout; the available approval material describes layout roads and road accessibility, not exclusive parking rights or unit-level parking allotments. Document index

The tentative-layout conditions require roads to be opened for access to neighbouring sites and prohibit a compound wall or fencing around the site. This is an approval condition, not confirmation of completed road works.

6. Amenities, recreation & open spaces

The tentative-layout approval lists land reserved for a park/open space, social infrastructure and utilities. It also specifies development works for the layout. The supplied progress percentages in the amenity record are 0; no independent completion verification is provided. RERA amenities

Landscape/open space
FacilityOpen space / park
Description / size0 Acer 7.06 Gts 855 Sq. Yds; 9.01%
Evidence sourceTentative-layout approval
Declared progress / verified statusReserved in approval; completion not independently verified.
Convenience/community
FacilitySocial infrastructure site
Description / size0 Acer 1.98 Gts 240 Sq. Yds; 2.53%
Evidence sourceTentative-layout approval
Declared progress / verified statusReserved in approval; no facility-specific completion evidence supplied.
Landscape/open space
FacilityAvenue plantation and park development
Description / sizeWorks listed as layout-development requirements; no area or quantity beyond the park allocation is supplied.
Evidence sourceTentative-layout approval
Declared progress / verified statusRequired/listed works; completion not independently verified.

A separate vendor record lists a swimming pool and gym, but those are not evidenced in the supplied project’s RERA-filed layout approval or amenity schedule; they are not treated here as approved or delivered project facilities. Promoter website

7. Utilities, building services & safety

The approval document lists the following infrastructure works for the layout: road formation with black top; storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines, street lights and a transformer; avenue plantation; park development; and rainwater-harvesting pits. It also lists water reservoir, septic tank, sewerage treatment plant and solid-waste management among the utility provisions. These are approval requirements or specified works; the supplied evidence does not verify their completion or provide capacities.

The separate amenity record marks “Water Supply,” “Sewerage (Chamber, Lines, Septic Tank, STP),” “Storm Water Drains,” “Street Lighting,” “Internal Roads & Footpaths,” and “Aggregate area of recreational Open Space” as available “YES,” while recording 0 progress. No source, storage capacity, treatment capacity, electrical-load information, backup power, fire-system details, security systems or accessibility features are supplied. RERA amenities

8. Location, access & connectivity

The registered location is BADEPALLY(JADCHERLA) Municipality, Mahaboobnagar, in Jadcherla mandal, Mahabubnagar district, PIN 509301. The registration record gives the revenue village as Badepally(jadcherla); the tentative-layout document identifies Bureddipally Revenue Village. RERA filing

The layout approval identifies a road boundary to the west, requires layout roads to be opened for access to neighbouring sites, and provides for internal roads as part of development. No public-transport details or measured distances to local facilities are supplied. RERA filing

The location data gives Financial District (Nanakramguda) — 1.2 km from the supplied cadastral-parcel centroid. Location record A separate vendor record describes the project as being in Paramount Hills, Toli Chowki, Hyderabad and lists schools, malls and other landmarks; these are vendor-supplied details, not used to define the registered project location. Promoter website

9. Developer & development status

The registered promoter is BHAVARI DEVI JHAWAR; the RERA record describes the organization type as “Others” and gives “BAVARI DEVI JHAWAR AND OTHERS” as the description. A project-registration document separately identifies GOPAL DAS JHAWAR as the Form B declarant and promoter, and a filed authorization letter says he was authorized to sign and submit project papers for PARAMOUNT COLONY 2. RERA record RERA filing

The promoter’s Form B declaration undertakes completion by 18/03/2025. The registration certificate runs from 08/12/2023 to 18/03/2025 and records no extension. No verified construction-progress update, revised completion date or occupancy/completion certificate is supplied.

The registered office field gives an address at GUNJ, BADEPALLY(JADCHERLA) Municipality, Mahaboobnagar, with Jadcherla, Mahabubnagar, Telangana, PIN 509301. A separate corporate registration identifier, entity number, official website and official contact details are not established by the supplied material. RERA filing Corporate record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for PARAMOUNT COLONY-II, registration P01400007368, issued 08/12/2023, valid to 18/03/2025; no extension is recorded on the certificate.
Principal layout approval0012/LO/3068/2022, tentative layout approval dated 19 March, 2022, issued by BADEPALLY(JADCHERLA) Municipality/Municipal Corporation; application 004077/LO/DTCP/3068/0013/2021.
Approval-related instruments and receiptsMortgage Deed 4560/2022 dated 14 March, 2022; receipts TS/8889/2021 and TS/8890/2021 dated 12 November, 2021, and TS/14974/2021 dated 08 March, 2022.
RERA Form B declarationPromoter-declared title basis, encumbrance statement and completion undertaking to 18/03/2025.
Layout drawingLayout drawing filed as document 323583; the supplied record identifies two layout sheets and drawing-derived plot schedule/area data. Layout record
Occupancy/completion certificateNone identified in the supplied documents. Document index
Other project-specific official recordsNo other approval, completion, or occupancy record is established in the supplied material. Document index

The tentative-layout approval states that the permission is not proof of title and requires the applicant to complete the specified layout works and hand over designated areas as set out in its conditions.

Frequently asked questions

Is PARAMOUNT COLONY-II registered with Telangana RERA?

Yes. PARAMOUNT COLONY-II is registered with the Telangana Real Estate Regulatory Authority as P01400007368; the registration status is New Project.

Who is the developer of PARAMOUNT COLONY-II?

The promoter named in the RERA registration is BHAVARI DEVI JHAWAR.

Where is PARAMOUNT COLONY-II located?

PARAMOUNT COLONY-II is in BADEPALLY(JADCHERLA) Municipality , Mahaboobnagar, Jadcherla, Mahabubnagar, Telangana (509301).

When will PARAMOUNT COLONY-II be completed?

The promoter's proposed date of completion filed with RERA is 18/03/2025. This is the promoter's declaration, not a guarantee.

More projects in Badepally