Opus Blues

Manju Mythri Infra · Sangareddy · RERA P01100004464

Opus Blues is a residential apartment project in Kollur, RC PURAM, Sangareddy, developed by the registered promoter Manju Mythri Infra. The project covers 6,171.44 sq. m and comprises 1 building with 1Cellar + 1Stilt + 10 Upper floors. It has 97 homes: 79 2BHK and 18 3BHK apartments. Its TG-RERA registration number is P01100004464, and the proposed completion date in the RERA project record is 26/10/2027.

More from Manju Mythri Infra · 2 projects →

01What we found

RegisteredTG-RERA - valid till 26 Jun 2027
25documents on file - each fact links to its page
1court case on this project's land (survey 156, Kollur)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered project nameOpus Blues RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase is not separately identified in the supplied registration record. The record covers one building; see the sanctioned building configuration below. RERA record
TG-RERA registrationP01100004464
Registration validity02/05/2022 to 26/06/2027; the certificate states five years. This is registration validity, not the project completion deadline.
Registered promoterManju Mythri Infra
RERA statusRegistered; the supplied certificate does not record an extension. Registration status alone does not establish construction completion or occupancy certification.

Land and geographic identity

FieldProject record
LocalityKollur / Kollur-ORRGC RERA record
Revenue villageKOLLUR; approval documents refer to Kollur-ORRGC Village. RERA record
MandalRC PURAM in the RERA project record; approval documents use Ramchandrapuram-ORRGC / Ramachandapuram. RERA record
DistrictSangareddy; approval documents spell this “Sanga Reddy.” RERA record
PIN502300 RERA record
Project survey numbers and subdivisions98/A1, 98/A2, 98/B1, 98/B2, 156/E1, 156/E2 RERA record
Registered site extent6,171.44 sq. m in the project record and 2021/2024 HMDA technical approvals. RERA record
Total / net land area6,171.44 sq. m total and net area in the RERA land details; affected area is recorded as 0 sq. m. Land records
Boundaries (RERA-filed)North: Sy no 99; South: Sy 98 Part; East: Agriculture Land; West: Sy no 100. Land records

Development identity

FieldProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the 2021 and 2024 technical approvals identify Tellapur Municipality as the authority for local sanction/release. Approvals record
Principal technical approvalHMDA approval 035504/ZOA/R1/U6/HMDA/18032020, dated 26/06/2021. Approvals record
Later technical approval on fileHMDA approval 059014/ZOA/R1/U6/HMDA/12012023, dated 25/07/2024. Approvals record
Approved built-up areaThe 2024 technical approval lists Built up Area 12325.57 and separately Proposed Built-up Area 13672.77. The supplied record does not further explain the relationship between these figures.
Building / tower count1 building / tower in the RERA land details. RERA filing
Sanctioned floor configuration on later approvalBlock A (MANJU): 1Cellar + 1Stilt + 10 Upper floors.
Earlier approved configuration on fileBlock A: 1 Cellar + 1 Stilt + 8 Upper Floors in the 2021 HMDA technical approval and Tellapur Municipality proceedings.
Parking levelsThe 2024 approval states the cellar and stilt are approved for vehicle parking. Parking-space counts and unit allocations are not established in the supplied data.
Unit counts97 total in the RERA unit record: 79 2BHK and 18 3BHK. The RERA project information records one building. RERA unit table RERA unit table

Offering and status

FieldProject record
RERA-filed unit types and saleable area2BHK: 79 units, 120.16 sq. m each as filed; 3BHK: 18 units, 175.58 sq. m each as filed. RERA unit table RERA unit table
Booked / availablePortal-derived counts show 0 booked / 79 available 2BHK and 0 booked / 18 available 3BHK. These figures are indicative: the portal record supplied here has no as-of date. RERA unit table
Construction stageA verified site-progress percentage or construction-stage description is not provided. RERA record Document index
Completion timelineThe RERA project record states proposed completion 26/10/2027; the promoter’s Form B declaration undertakes completion by 26-06-2027. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The approvals describe requirements for a future occupancy certificate; that is not evidence one has been issued. Document index

The project story

Opus Blues is registered with TG-RERA as a residential apartment project at Kollur, Sangareddy, on the six listed survey subdivisions. The RERA record identifies one building and 97 apartments: 79 two-bedroom and 18 three-bedroom units. RERA record Land records RERA unit table

The project file includes HMDA technical approval for Block A, with a later approval describing a cellar, stilt and 10 upper floors. The supplied approvals also record an earlier cellar, stilt and 8-upper-floor configuration. Tellapur Municipality proceedings dated 27.12.2021 describe building permission for the earlier configuration. These documents establish approval records, not the current on-site construction stage. No independently verified progress measurement or occupancy certificate is supplied. Document index

Master plan, architecture & building design

The RERA land record gives a site area of 6,171.44 sq. m, with the same amount shown as net area and 0 area affected by road widening/FTL/nala widening. The RERA record lists one building. Land records RERA filing

The 2024 HMDA technical approval describes residential Block A (MANJU) with 1Cellar + 1Stilt + 10 Upper floors. It records an approved built-up area of 12325.57 and a separate proposed built-up area of 13672.77; the supplied extraction does not label either figure as carpet area, saleable area or FSI-counted area.

The 2021 HMDA technical approval describes 1Cellar + 1Stilt + 8 Upper floors and lists Built up Area 9435.39 and Proposed Built-up Area 10897.52. Tellapur Municipality’s 2021 proceedings also describe a cellar, stilt and 8 upper floors. The 2024 approval requires the cellar and stilt to remain for parking and says the approved internal circulation pattern and parking areas are not to be changed.

The available material does not provide a drawing-derived building footprint, number of flats per floor, lift or stair count, residential floor-by-floor distribution, or a measured open-space schedule. The 2024 approval identifies a 18 mt. road-width figure and the 2021 approval records a 30 m Wide proposed master plan road; detailed access and circulation conditions are indexed in Approvals.

Homes, configurations & floor plans

The unit counts and saleable areas below are TG-RERA filing figures. The portal-derived booked and available counts are indicative because no as-of date accompanies them. RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK79079120.16 sq. mNot measured in supplied drawing reviewNot supplied
3BHK18018175.58 sq. mNot measured in supplied drawing reviewNot supplied

The drawing review reports eight drawings in total, with three scans pending, five containing no flats, and 0 measured. Accordingly, no software-measured carpet or room dimensions can be reported from this evidence. RERA saleable area is the filed unit-area measure; the supplied material does not provide carpet area, balcony or utility areas, or a loading figure. Floor plans

Parking & vehicle circulation

The 2024 HMDA technical approval states that the cellar and stilt are for vehicle parking and are not to be converted or misused for other purposes. The 2021 technical approval similarly specifies parking use for the cellar.

The supplied project data does not establish the number of sanctioned parking bays, visitor or accessible spaces, two-wheeler provision, EV charging, ramp configuration, or parking allocations to individual apartments. A parking-space count or exclusive unit entitlement should therefore not be inferred from the approval description alone. Document index RERA amenities

Amenities, recreation & open spaces

The RERA amenities record lists the following project facilities and infrastructure. Its progress fields show 0% where supplied; the record does not establish independent completion verification. The 2024 HMDA approval also requires open space to be maintained with greenery and identifies a tot-lot. RERA amenities

Community buildings
Description / sizeListed; no size or capacity supplied
Evidence sourceRERA amenities record
Declared progress / verified status“YES”; progress shown as 0%; completion not independently verified
Green strip / tot-lot / park
Description / sizeListed; no area supplied
Evidence sourceRERA amenities record; 2024 HMDA approval
Declared progress / verified status“YES”; progress shown as 0%; approval requires open-space greenery and identifies a tot-lot
Internal roads and footpaths
Description / sizeListed; no dimensions supplied here
Evidence sourceRERA amenities record
Declared progress / verified statusProgress shown as 0%; completion not independently verified
Street lighting
Description / sizeListed; no quantity supplied
Evidence sourceRERA amenities record
Declared progress / verified statusProgress shown as 0%; completion not independently verified
Water conservation / rainwater harvesting
Description / sizeListed; no capacity supplied
Evidence sourceRERA amenities record; HMDA approvals
Declared progress / verified status“YES”; progress shown as 0%; approval documents require rainwater-harvesting structures
Community recreation and clubhouse facilities
Description / sizePromoter website lists a 4,500 sft clubhouse and facilities including a banquet hall, gym, meditation/yoga, indoor games, library, amphitheatre, guest rooms, party hall with terrace and multipurpose room. These are promoter-marketed claims, not established as RERA-filed or delivered facilities by the supplied records.
Evidence sourcePromoter website data Promoter website
Declared progress / verified statusNo project progress or independent completion status supplied

Utilities, building services & safety

The RERA amenities record marks water supply, sewerage, green space/tot-lot, community buildings, rainwater harvesting, fire protection and an electrical meter room/sub-station/receiving station as available, while the progress fields shown are 0%. These entries describe filed facility status; they do not establish completed or independently verified services. RERA amenities

The HMDA approval conditions require a site STP, rainwater harvesting, a transformer and garbage house, water-recycling provisions, storm-water and sewerage arrangements, and appropriate placement of water supply and sewerage disposal sources. The 2024 approval additionally calls for a refuse chute and garbage-disposal system, solar water heating and solar outdoor lighting. These are approval conditions or provisions, not confirmation of installation or operation.

The approvals also refer to fire-service/NOC conditions, fire-resistant swing doors for collapsible lifts, emergency lighting in corridors and stairs, and automatic sprinklers if the basement area exceeds 200 Sq.Mts. A generator is specified in the 2021 technical approval. The supplied information does not give lift counts or capacities, water-storage capacity, STP capacity, backup capacity, CCTV/access-control details, or accessibility specifications.

Location, access & connectivity

The registered project location is KOLLUR, RC PURAM, Sangareddy, Telangana 502300, with survey numbers 98/A1, 98/A2, 98/B1, 98/B2, 156/E1 and 156/E2. The approvals refer to Kollur-ORRGC Village and Ramachandrapuram-ORRGC / Ramachandapuram. RERA record

The location data supplies an approximate 5.5 km distance to the nearest sampled Outer Ring Road interchange. A geocode record is also supplied, but it is a location point rather than a verified project-access route. No verified distance or travel time to public transport, schools, hospitals or business districts is provided. Location record

Developer & development status

TG-RERA identifies Manju Mythri Infra as the registered promoter and describes the entity as a Partnership. Its GSTIN is 36ABEFM1216H1ZL. RERA record Corporate record

The registration certificate gives the promoter office as Village: YOUSUFGUDA BASTHI, Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500045. The project record separately gives a promoter address at Pragathi Nagar Colony, Kollur-ORRGC Village, Kollur, RC PURAM, Sangareddy, 502300. A promoter website is supplied at manjumythriinfra.com/projects/opus-blues/. Parties record

The registration record sets proposed completion at 26/10/2027; Form B records a promoter undertaking to complete by 26-06-2027. No verified construction-progress percentage or occupancy certificate is supplied, so the completion timeline should not be read as confirmation of delivery or occupancy. RERA record Document index

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100004464, issued 02/05/2022; valid through 26/06/2027
What the supplied record establishesRegistration of Opus Blues and the stated registration conditions.
HMDA technical approval
Identifier / date035504/ZOA/R1/U6/HMDA/18032020, 26/06/2021
What the supplied record establishesTechnical approval for a residential building on the listed project surveys, with cellar, stilt and 8 upper floors; local building-plan sanction is addressed to the executive authority.
Tellapur Municipality building-permission proceedings
Identifier / dateProc.No. 4828/TP/2021, 27.12.2021
What the supplied record establishesBuilding permission for a residential building described as cellar, stilt and 8 upper floors; the document states permission is not proof of land title.
Later HMDA technical approval
Identifier / date059014/ZOA/R1/U6/HMDA/12012023, 25/07/2024
What the supplied record establishesTechnical approval for Block A (MANJU), cellar, stilt and 10 upper floors, with parking and other approval conditions.
Promoter Form B declaration
Identifier / date04/08/2022
What the supplied record establishesPromoter declaration concerning title, encumbrances, project funds, approvals and completion undertaking.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe supplied approval record describes requirements for an occupancy certificate; no issued certificate is included in the evidence reviewed. Document index
Approved layout plan
Identifier / dateNot established in the supplied material
What the supplied record establishesNo layout approval number or layout drawing is available in the supplied project records. HMDA Document index

Frequently asked questions

Is Opus Blues registered with Telangana RERA?

Yes. Opus Blues is registered with the Telangana Real Estate Regulatory Authority as P01100004464; the registration status is New Project.

Who is the developer of Opus Blues?

The promoter named in the RERA registration is Manju Mythri Infra.

Where is Opus Blues located?

Opus Blues is in Kollur, RC PURAM, Sangareddy, Telangana (502300).

When will Opus Blues be completed?

The promoter's proposed date of completion filed with RERA is 26/10/2027. This is the promoter's declaration, not a guarantee.