Sign in

Omkara

SATYA SAI INFRA AND DEVELOPERS · Sangareddy · RERA P01100009154

OMKARA is a residential plotted development in ZAHEERABAD, ZAHEERABAD Mandal, Sangareddy District, developed by registered promoter SATYA SAI INFRA AND DEVELOPERS. The project covers 56,069.02 sq. m and comprises 214 plots; building or floor counts and plot configurations are not stated in the supplied RERA unit schedule data. It is registered under TG-RERA number P01100009154, with a proposed completion date of 18/12/2025.

01What we found

RegisteredTG-RERA
29documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameOMKARA RERA record
Project typePlotted development / residential plotted layout RERA record RERA filing
Phase / registered portionNo phase designation disclosed; registration is for the project identified with Survey No. 19/PART RERA record
TG-RERA registrationP01100009154 RERA record
Registration validityCertificate states 19/12/2023 to 18/12/2025; no extension is recorded in the supplied certificate
RERA statusNew Project; registered under TG-RERA RERA record RERA filing
Registered promoterSATYA SAI INFRA AND DEVELOPERS RERA record Corporate record

Land and geographic identity

FieldRecord
LocalityZAHEERABAD RERA record
Revenue villageZAHEERABAD Revenue Village; also rendered in the registration record as Zaheerabad RERA record
MandalZAHEERABAD RERA record
DistrictSangareddy RERA record
PIN502220 RERA record
Project survey number(s)19/PART RERA record Land records
Registered site extentRERA land details state 56,069.02 sq. m RERA filing
Total / net land areaRERA record states total and net area as 56,069.02 sq. m RERA filing
Approved layout extentTentative layout plan states 13 Acer 34.18 Gts 67058 Sq. Yds
Boundaries in RERA filingEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: 60 MT WIDE EXISTING ROAD RERA filing

Development identity

FieldRecord
Sanctioning authorityZAHEERABAD Municipality/Municipal Corporation Approvals record
Principal approvalTentative Layout Plan No. 0011/LO/3057/2023, dated 12/19/2023 3:16:48 PM Approvals record
Application number009827/LO/DTCP/3057/0021/2023 Approvals record
Approved built-up areaNot disclosed in the supplied layout approval; the RERA record lists 32173.34 sq. m as “Approved Built up Area,” but its applicability to a plotted layout is not explained in the supplied material RERA filing
Buildings / floorsNo building count, floor configuration or parking levels disclosed in the supplied project records. The approval is for a plotted layout, not a multi-storey building plan
Layout plot count214 No's in the tentative approval; the drawing schedule also states 214 plots Layout record
Mortgage areaRERA filing: 4905.55 sq. m; approval document: 0 Acer 48.49 Gts 5867 Sq. Yds RERA filing

Offering and status

FieldRecord
Unit typePlots RERA filing
Plot count214 Layout record
RERA-filed plot size range / saleable areasNot provided in the supplied RERA unit schedule data. Plot schedule sizes are software-read from the approved drawing; see sections 3–4 Layout record
Booked / available countsNot disclosed in the supplied evidence RERA unit table
Declared project completion date18/12/2025 RERA record RERA filing
Construction / development stageRERA record shows 80% completeness; the supplied evidence does not establish independently verified site progress RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The approval on file is a tentative layout plan
Registration validity vs completion deadlineRegistration certificate validity ends 18/12/2025; the recorded proposed completion date is also 18/12/2025. These are separate certificate and project-deadline fields RERA filing

2. The project story

  • OMKARA is registered as a plotted residential development in ZAHEERABAD Revenue Village, ZAHEERABAD Mandal, Sangareddy District, on Survey No. 19/PART. Its RERA registration identifies 214 plots, and the municipal approval document is for a tentative residential layout plan. RERA record
  • The layout plan allocates land to plots, roads, open space, utilities and social infrastructure. Its conditions place responsibility for infrastructure and layout development on the applicant and describe works including roads, drainage, water supply, electricity, landscaping, park development and rainwater harvesting. These are approval conditions and proposed works; the supplied records do not independently confirm their completion.
  • The RERA record gives a completeness figure of 80% and a proposed completion date of 18/12/2025. No site inspection evidence or occupancy/completion certificate is supplied, so these records do not establish independently verified progress or certified completion. RERA record RERA filing

3. Master plan, architecture & building design

  • The supplied approval is a tentative plotted-layout plan for 13 Acer 34.18 Gts 67058 Sq. Yds, with 214 plots. The drawing-derived area statement reports a net layout area of 56,066.84 sq. m; its use breakdown is read from the approved layout drawing and should be checked against the drawing. Layout record
Layout useAreaShare of drawing’s net layout areaEvidence
Plots32,172.25 sq. m57.4%Software-measured from approved layout drawing Layout record
Roads16,821.73 sq. m30.0%Software-measured from approved layout drawing Layout record
Parks / open space5,048.50 sq. m9.0%Software-measured from approved layout drawing Layout record
Utilities563.08 sq. m1.0%Software-measured from approved layout drawing Layout record
Social infrastructure1,463.32 sq. m2.6%Software-measured from approved layout drawing Layout record
Amenities0.00 sq. m0.0%Software-measured from approved layout drawing Layout record
  • The tentative approval separately specifies 9% open space, 2.61% social infrastructure, 1% utilities, 30% roads and 57.38% plotted area. The approved layout conditions require roads to remain accessible to neighbouring sites and prohibit a compound wall/fencing around the site; they also state that development of infrastructure is the applicant’s responsibility.
  • The supplied layout drawing has two sheets. No building arrangement, floor levels, building footprints or building-specific plans are available in the supplied evidence; this is a plotted layout. Layout record Document index

4. Homes, configurations & floor plans

  • This is a plotted development, not an apartment offering. A RERA unit schedule with booked/available counts or RERA-filed plot saleable areas was not supplied. RERA filing RERA unit table
  • The approved layout drawing’s plot schedule states 214 plots. Software extraction identifies sizes for all 214 plots; these are drawing-measured figures, not a RERA-filed unit schedule. Layout record
Drawing-derived plot size bandPlot count
0–100 sq. yd1
100–150 sq. yd38
150–200 sq. yd144
200–250 sq. yd21
300–400 sq. yd8
400–500 sq. yd1
500–1000 sq. yd1
  • The software-measured smallest, median and largest plot areas are 82.4 sq. m, 137.92 sq. m and 564.53 sq. m, respectively. The drawing’s plot-area totals match its plotted-area statement, but the extraction is expressly subject to verification against the drawing. Layout record
  • No apartment floor plans or measured carpet areas are available; the supplied floor-plan record contains two layout sheets and no measured flats. Floor plans

5. Parking & vehicle circulation

  • No separate car or two-wheeler parking count, visitor or accessible parking provision, parking level, vehicle ramp, or plot-specific parking allocation is disclosed in the supplied project evidence. The tentative approval identifies roads as 30% of layout area and requires roads to remain accessible to neighbouring sites; it does not establish parking ownership or an allocation to any plot. Layout record

6. Amenities, recreation & open spaces

  • The RERA-filed amenity record lists proposed/progress fields for layout infrastructure. Percentages are as recorded in that filing; they are not independent completion verification. RERA amenities
Internal roads & footpaths
Description / sizeLayout roads and footpaths
Evidence sourceRERA amenity filing RERA amenities; tentative approval
Declared progress / verified status30% declared; not independently verified
Water supply
Description / sizeWater supply
Evidence sourceRERA amenity filing RERA amenities; approval conditions specify internal pipelines and overhead tank
Declared progress / verified status20% declared; not independently verified
Sewerage
Description / sizeChambers, lines, septic tank / STP
Evidence sourceRERA amenity filing RERA amenities; approval conditions specify underground drainage lines and common septic tank / STP
Declared progress / verified status10% declared; not independently verified
Storm-water drains
Description / sizeStorm-water drainage
Evidence sourceRERA amenity filing RERA amenities; approval conditions include storm-water drains
Declared progress / verified status0% declared; not independently verified
Green strip / tot lot / park
Description / sizeOpen space; approval states 1 Acer 9.9 Gts (9%) reserved for open space
Evidence sourceRERA amenity filing RERA amenities; approval
Declared progress / verified status0% declared; not independently verified
Street lighting
Description / sizeStreet lighting
Evidence sourceRERA amenity filing RERA amenities; approval conditions include street lights
Declared progress / verified status0% declared; not independently verified
Water conservation / rainwater harvesting
Description / sizeRainwater harvesting
Evidence sourceRERA amenity filing RERA amenities; approval conditions include harvesting pits
Declared progress / verified status0% declared; not independently verified
Electrical meter room / sub-station / receiving station
Description / sizeElectrical infrastructure
Evidence sourceRERA amenity filing RERA amenities; approval conditions refer to transformer and electrical supply lines
Declared progress / verified status10% declared; not independently verified
Community buildings
Description / sizeNo size or description supplied
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Treatment and disposal of sewage and sullage water
Description / sizeNo size or description supplied
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Solid-waste management and disposal
Description / sizeApproval conditions refer to solid-waste management
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Energy management
Description / sizeNo description supplied
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Fire protection and fire-safety requirements
Description / sizeNo systems or specifications supplied
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
Aggregate recreational open space
Description / sizeNo separate quantity in this filing field
Evidence sourceRERA amenity filing RERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified
  • The approval requires the applicant to hand over specified open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout.

7. Utilities, building services & safety

  • The tentative approval describes the layout development works as including an assured water source, internal water-supply pipelines and an overhead tank; underground drainage and a common septic tank/STP; storm-water drains; electrical supply lines, transformer and street lights; solid-waste management; and rainwater-harvesting pits. These are stated approval requirements, not evidence that the works are complete. No capacities, operating details or completion certificates are supplied.
  • The RERA amenity filing records water supply at 20%, sewerage at 10%, electrical meter room/sub-station/receiving station at 10%, and several other infrastructure items at 0%; these are promoter-filed progress figures, not independent verification. RERA amenities
  • No project-specific details are supplied for backup power, EV charging, CCTV, access control, fire equipment, accessible circulation or building lifts.

8. Location, access & connectivity

  • The registered location is ZAHEERABAD Revenue Village, ZAHEERABAD Mandal, Sangareddy District, PIN 502220. The RERA filing lists the southern boundary as a 60 MT WIDE EXISTING ROAD; the other three boundaries are recorded as “OTHERS LAND.” RERA record RERA filing
  • The available location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459. It lists Financial District (Nanakramguda) at 1.2 km as an anchor, but the supplied evidence does not establish a project-specific route or travel time. Location record
  • No verified public-transport information or additional approach-road details are supplied.

9. Developer & development status

  • The registered promoter is SATYA SAI INFRA AND DEVELOPERS, recorded as a partnership. Its GSTIN is 36AEYFS4835B1ZM. The RERA record lists an address at PALM MEADOWS, KOMPALLY, ZAHEERABAD, ZAHEERABAD, ZAHEERABAD, Sangareddy, 502220; a separate promoter-office field on the registration certificate gives only “Village: Mandal: District: Medchal-Malkajgiri, Pin: 500100.” No official website or contact details are supplied. Corporate record Parties record
  • The promoter’s Form B declaration includes undertakings concerning project funds, audit, pending approvals and non-discrimination in allotment; its completion-period entry and verification date are blank in the supplied extraction. These are promoter declarations, not independent confirmations.
  • The RERA record gives a proposed completion date of 18/12/2025 and 80% completeness, without supplied independent site verification. RERA record
  • No occupancy or completion certificate is supplied.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for OMKARA, registration P01100009154, valid 19/12/2023–18/12/2025
Principal layout approvalTentative Layout Plan No. 0011/LO/3057/2023, issued by ZAHEERABAD Municipality/Municipal Corporation; dated 12/19/2023 3:16:48 PM
Application number009827/LO/DTCP/3057/0021/2023
Layout drawingTwo-sheet approved layout drawing; plot schedule and area statement are software-read and should be checked against the drawing Layout record Document index
Form B declarationPromoter declaration filed for OMKARA; the extracted completion-period and verification-date fields are blank
Completion / occupancy recordNo completion certificate or occupancy certificate supplied
Other approval referencesReceipt Nos. TS/25294/2023 and TS/25295/2023 dated 30 August, 2023, and TS/25508/2023 dated 27 September, 2023
  • The approval is expressly a Tentative Layout Plan. Its conditions include infrastructure-development requirements and require registration of the proposed project under the Telangana RERA Rules before applying for final layout.

Frequently asked questions

Is OMKARA registered with Telangana RERA?

Yes. OMKARA is registered with the Telangana Real Estate Regulatory Authority as P01100009154; the registration status is New Project.

Who is the developer of OMKARA?

The promoter named in the RERA registration is SATYA SAI INFRA AND DEVELOPERS.

Where is OMKARA located?

OMKARA is in ZAHEERABAD, Sangareddy, Telangana (502220).

When will OMKARA be completed?

The promoter's proposed date of completion filed with RERA is 18/12/2025. This is the promoter's declaration, not a guarantee.

More projects in Zaheerabad