New Leaf Suryavanshi
NEW LEAF LIFE SPACES · Yadadri Bhuvanagiri · RERA P02000007858
NEW LEAF SURYAVANSHI is a plotted development in Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District. The registered promoter is NEW LEAF LIFE SPACES, a partnership. The project has a registered site extent of 24,509.79 sq.m and an open plotted layout with 74 plots; no building or apartment floor configuration is stated. It is registered with TG-RERA under P02000007858, with proposed completion on 13/12/2025.
More from New Leaf Life Spaces · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | NEW LEAF SURYAVANSHI RERA record |
| Project type / phase | Plotted development; RERA record identifies it as a new project. Phase or separately registered portion: not disclosed. RERA record RERA filing |
| TG-RERA registration | P02000007858 RERA record |
| Registration validity | 16/03/2024 to 13/12/2025; the certificate says validity may be extended by the Authority under the Act and Rules. This is the registration period, not a statement of completion or occupancy. Approvals record |
| Registered promoter | NEW LEAF LIFE SPACES, a partnership. RERA filing Corporate record |
| RERA status | The registration record shows the project as a new project. Current post-expiry registration status or extension is not established in the supplied record. RERA record Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Bhongir; the registration certificate identifies the project location as Bhongir. RERA record |
| Mandal | Bhongir. RERA record |
| District | Yadadri Bhuvanagiri. RERA record |
| PIN | 508116. RERA record |
| Project survey number and subdivision | 857p; the title and approval records also write this as Sy. No. 857/P or 857/P. RERA filing Land records |
| Registered site extent | 24,509.79 sq.m. The layout record describes this as both total and net site area; the area statement totals 24,509.78 sq.m. RERA filing |
| Boundaries recorded in RERA fields | East: “LAND QWNER LAND IN SY NOS 857 856”; West: “ROAD WIDTH 30”; North: “NATIONAL HIDH WAY HYDERABAD TO HANAMKONDA”; South: “DEVELOPER LAND IS SY NO 857 PART”. RERA filing |
| Road-widening / FTL / nala area in RERA land fields | 0 sq.m. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). Approvals record |
| Principal layout approval reference and date | 009477/LO/HMDA/2065/GHT/2023, dated 14 December, 2023; the filed document describes a TS-bPASS DRAFT LAYOUT LETTER. Approvals record |
| Layout type / plot count | Open plotted layout; 74 plots are stated in the draft layout record. |
| Approved built-up area | The layout-plan record states TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 0.00 and TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 0.00. No building or apartment floor configuration is evidenced. |
| Road and open-space framework | Layout roads: 6061.18 sq.m (24.73%); open space: 1849.33 sq.m (7.55%). |
| Other layout areas | Plotted area: 15726.96 sq.m; social infrastructure: 613.58 sq.m; utilities: 258.73 sq.m; amenities area: 0 sq.m. Layout record |
| Parking levels / approved parking count | Not applicable as a building-parking description to the evidence supplied; no car or two-wheeler parking count is disclosed. The layout plan records 0.00 common parking area. |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; the filed layout schedule is described as containing 74 plots. Plot-by-plot schedule data are software-read from the drawing. Layout record |
| Plot-size information | Drawing-derived schedule reports a smallest plot of 132.16 sq.m, median 153.29 sq.m, and largest 1651.53 sq.m; these are software-measured from the layout drawing and should be checked against it. Layout record |
| Booked / available counts | Not disclosed in the supplied project data. Document index |
| Construction stage | No independently verified site-progress record is supplied. RERA amenity progress fields show 0% where populated; that is a filed progress value, not an independent site inspection. RERA amenities |
| Completion dates | The RERA header gives proposed completion as 13/12/2025; the promoter’s Form B declaration also states a completion undertaking for 13/12/2025. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the filed HMDA document is a draft layout letter, not an occupancy certificate. Document index |
2. The project story
- NEW LEAF SURYAVANSHI is registered with TG-RERA as a plotted development on land identified as survey 857p at Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The registered site extent is 24,509.79 sq.m. The RERA-filed layout material describes an open layout with 74 plots, internal roads, open space, utility land and social-infrastructure land. RERA record RERA filing Layout record
- The available HMDA record is titled a draft layout letter and records technical approval under reference 009477/LO/HMDA/2065/GHT/2023, dated 14 December, 2023. It describes layout development rather than apartment or building construction. The record requires specified layout infrastructure and land areas to be dealt with before final layout release; the scope and conditions are indexed below.
- The RERA record gives 13/12/2025 as the proposed completion date, and the promoter’s Form B repeats that date as its undertaking. The evidence supplied does not establish physical completion, current construction progress through an independent inspection, final layout release, or an occupancy/completion certificate. RERA record Document index
3. Master plan, architecture & building design
- This is a plotted layout, not a building scheme in the supplied approval material. The layout drawing’s area statement allocates 15726.96 sq.m to plots, 6061.18 sq.m to roads, 1849.33 sq.m to organized open space/park, 613.58 sq.m to social infrastructure and 258.73 sq.m to utilities, on a stated net layout area of 24509.79 sq.m. The drawing-derived figures are presented as recorded; the plot count and plot sizes have been read from drawing text and should be checked against the drawing itself. Layout record
- The layout approval material identifies road widths including a 9.00MT WIDE MAINROAD (Access Road) and 12.19 mt. Wide InternalRoad and 9.14 mt. Wide InternalRoad. It also refers to a 60 MT WIDE EXISTING 60.00MT WIDE PROPOSED ROAD. These are approval-document descriptions, not a verified on-site measurement.
- The layout record states 74 individual subplots and 0.00 proposed built-up area, both including and excluding parking. No apartment blocks, building footprints, floor configurations, building heights, or residential/commercial building-area distribution are established in the supplied records.
4. Homes, configurations & floor plans
- The project offering recorded here is plots, not apartments. The layout drawing’s plot schedule is software-read; the supplied data report 74 plots and the following size distribution. These are drawing-derived figures, not RERA-filed carpet areas. Layout record
| Plot-size band | Number of plots |
|---|---|
| 150–200 sq yd (125–167 sq.m) | 56 |
| 200–250 sq yd (167–209 sq.m) | 12 |
| 300–400 sq yd (251–334 sq.m) | 2 |
| 500–1000 sq yd (418–836 sq.m) | 1 |
| 1000+ sq yd (836+ sq.m) | 3 |
- The supplied software-read measurements report the smallest plot as 132.16 sq.m (158.1 sq yd), the median as 153.29 sq.m (183.3 sq yd), and the largest as 1651.53 sq.m (1975.2 sq yd). Plot areas are distinct from apartment carpet or saleable areas; no apartment configuration, carpet area, or loading figure is supplied. Layout record
- The floor-plan data show two layout sheets and no measured building floor plans or flats. No plot-wise booked or available inventory count is disclosed. Floor plans Document index
5. Parking & vehicle circulation
- No car or two-wheeler parking count, visitor parking allocation, accessible parking provision, or individual buyer parking allocation is established in the supplied records. The layout drawing records 0.00 common parking area.
- The layout is served by roads shown in the approval material, including a 9.00-metre main access road and internal roads stated as 12.19 metres and 9.14 metres wide. The project documents do not establish a parking ramp, structured parking, EV charging, or an exclusive parking right attached to any plot.
6. Amenities, recreation & open spaces
- The RERA amenities record lists internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. Where a progress value is supplied, it is 0%; the record does not independently verify completion. RERA amenities
| Description / size | Layout roads: 6061.18 sq.m; road-width descriptions appear in the layout plan. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | 1849.33 sq.m; approval record states 7.55% open space. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; development not independently verified. |
| Description / size | 613.58 sq.m. The approval extraction also lists “Tot-lot” among amenities/utilities. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | 258.73 sq.m. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | Listed in the RERA amenities record; no capacity or source stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | RERA record lists sewerage (chamber, lines, septic tank, STP); the draft-layout extraction also lists a common septic tank/STP. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; approval extraction refers to rainwater-harvesting pits. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; the approval extraction also refers to a transformer and transformer yard. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed as amenity categories, with no progress percentage above 0% in the supplied RERA amenities record. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | No completion evidence supplied. |
7. Utilities, building services & safety
- The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station. The HMDA draft-layout extraction additionally lists a common septic tank/STP, overhead tank, transformer, transformer yard and rainwater-harvesting pits. These are document-listed provisions; capacities, detailed engineering design and completed operation are not established in the supplied evidence. RERA amenities
- The record also lists solid-waste management, energy management and fire-protection/fire-safety categories, but does not provide detailed systems, capacities, clearances, or evidence of implementation. No building lifts, accessible circulation details, backup-power capacity, CCTV or security-system specification is established by the RERA-filed layout material. RERA amenities Document index
8. Location, access & connectivity
- The registered location is Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508116, on survey 857p. The HMDA draft layout record names Bhongir village and mandal and identifies the district as Yadadri-Bhuvanagiri. RERA record
- The RERA land fields describe the northern boundary as “NATIONAL HIDH WAY HYDERABAD TO HANAMKONDA” and the western boundary as “ROAD WIDTH 30.” The layout drawing also records a 9.00-metre main access road, 12.19-metre and 9.14-metre internal roads, and a reference to a 60-metre existing/proposed road. These are filed descriptions; no independently verified road-access survey is supplied. RERA filing
- A location record gives the nearest sampled Outer Ring Road interchange at approximately 23.1 km. No public-transport details or verified travel times are supplied. Location record
9. Developer & development status
- The registered promoter is NEW LEAF LIFE SPACES, identified in the RERA record as a partnership, with GSTIN 36AARFN8181G1ZP. The supplied registered address is RIDDHI BUILDERS, MLA COLONY, BHONGIR, BHONGIR, Bhongir, Yadadri Bhuvanagiri, 508116. RERA filing Corporate record Parties record
- The promoter’s Form B declaration states a project-completion undertaking of 13/12/2025, and declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account for construction and land cost, with withdrawals linked to completion and professional certification. These are promoter declarations, not independent confirmation of fund use or project completion.
- The registration certificate records validity through 13/12/2025, subject to extension by the Authority under the Act and Rules. The supplied evidence does not establish an extension, final layout release, current construction progress, or an occupancy/completion certificate. Document index
10. Approvals, official records & documents
| Reference / date | P02000007858; validity 16/03/2024–13/12/2025. |
|---|---|
| What it establishes in this overview | Registered project identity, promoter, location and registration period. |
| Reference / date | 009477/LO/HMDA/2065/GHT/2023; 14 December, 2023. |
|---|---|
| What it establishes in this overview | Draft layout record for survey 857p, extent 24,509.79 sq.m, and 74 plots. The document describes itself as a draft layout letter. |
| Reference / date | Document 388723. |
|---|---|
| What it establishes in this overview | Layout area allocation, road-width descriptions and stated plot count; plot schedule and sizes are drawing-derived. Layout record |
| Reference / date | Document 402201; dated 13-12-2025 in the extraction. |
|---|---|
| What it establishes in this overview | Promoter-declared completion undertaking and other project declarations. |
| Reference / date | Documents 402206 and 403173. |
|---|---|
| What it establishes in this overview | Supplied extracts describe incomplete form material; they do not establish a completed plot-specific sale agreement or allotment. |
| Reference / date | Not supplied. |
|---|---|
| What it establishes in this overview | No such certificate or final layout release is established by the records reviewed for this overview. Document index |
1. Project at a glance
Project identity
Registered project name: NEW LEAF SURYAVANSHI
Project type / phase: Plotted development; RERA record identifies it as a new project. Phase or separately registered portion: not disclosed.
TG-RERA registration: P02000007858
Registration validity: 16/03/2024 to 13/12/2025; the certificate says validity may be extended by the Authority under the Act and Rules. This is the registration period, not a statement of completion or occupancy.
Registered promoter: NEW LEAF LIFE SPACES, a partnership.
RERA status: The registration record shows the project as a new project. Current post-expiry registration status or extension is not established in the supplied record.
Land and geographic identity
Locality / revenue village: Bhongir; the registration certificate identifies the project location as Bhongir.
Mandal: Bhongir.
District: Yadadri Bhuvanagiri.
PIN: 508116.
Project survey number and subdivision: 857p; the title and approval records also write this as Sy. No. 857/P or 857/P.
Registered site extent: 24,509.79 sq.m. The layout record describes this as both total and net site area; the area statement totals 24,509.78 sq.m.
Boundaries recorded in RERA fields: East: “LAND QWNER LAND IN SY NOS 857 856”; West: “ROAD WIDTH 30”; North: “NATIONAL HIDH WAY HYDERABAD TO HANAMKONDA”; South: “DEVELOPER LAND IS SY NO 857 PART”.
Road-widening / FTL / nala area in RERA land fields: 0 sq.m.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout approval reference and date: 009477/LO/HMDA/2065/GHT/2023, dated 14 December, 2023; the filed document describes a TS-bPASS DRAFT LAYOUT LETTER.
Layout type / plot count: Open plotted layout; 74 plots are stated in the draft layout record.
Approved built-up area: The layout-plan record states TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 0.00 and TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 0.00. No building or apartment floor configuration is evidenced.
Road and open-space framework: Layout roads: 6061.18 sq.m (24.73%); open space: 1849.33 sq.m (7.55%).
Other layout areas: Plotted area: 15726.96 sq.m; social infrastructure: 613.58 sq.m; utilities: 258.73 sq.m; amenities area: 0 sq.m.
Parking levels / approved parking count: Not applicable as a building-parking description to the evidence supplied; no car or two-wheeler parking count is disclosed. The layout plan records 0.00 common parking area.
Offering and status
Offering: Plots; the filed layout schedule is described as containing 74 plots. Plot-by-plot schedule data are software-read from the drawing.
Plot-size information: Drawing-derived schedule reports a smallest plot of 132.16 sq.m, median 153.29 sq.m, and largest 1651.53 sq.m; these are software-measured from the layout drawing and should be checked against it.
Booked / available counts: Not disclosed in the supplied project data.
Construction stage: No independently verified site-progress record is supplied. RERA amenity progress fields show 0% where populated; that is a filed progress value, not an independent site inspection.
Completion dates: The RERA header gives proposed completion as 13/12/2025; the promoter’s Form B declaration also states a completion undertaking for 13/12/2025.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the filed HMDA document is a draft layout letter, not an occupancy certificate.
2. The project story
- NEW LEAF SURYAVANSHI is registered with TG-RERA as a plotted development on land identified as survey 857p at Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, PIN 508116. The registered site extent is 24,509.79 sq.m. The RERA-filed layout material describes an open layout with 74 plots, internal roads, open space, utility land and social-infrastructure land.
- The available HMDA record is titled a draft layout letter and records technical approval under reference 009477/LO/HMDA/2065/GHT/2023, dated 14 December, 2023. It describes layout development rather than apartment or building construction. The record requires specified layout infrastructure and land areas to be dealt with before final layout release; the scope and conditions are indexed below.
- The RERA record gives 13/12/2025 as the proposed completion date, and the promoter’s Form B repeats that date as its undertaking. The evidence supplied does not establish physical completion, current construction progress through an independent inspection, final layout release, or an occupancy/completion certificate.
3. Master plan, architecture & building design
- This is a plotted layout, not a building scheme in the supplied approval material. The layout drawing’s area statement allocates 15726.96 sq.m to plots, 6061.18 sq.m to roads, 1849.33 sq.m to organized open space/park, 613.58 sq.m to social infrastructure and 258.73 sq.m to utilities, on a stated net layout area of 24509.79 sq.m. The drawing-derived figures are presented as recorded; the plot count and plot sizes have been read from drawing text and should be checked against the drawing itself.
- The layout approval material identifies road widths including a 9.00MT WIDE MAINROAD (Access Road) and 12.19 mt. Wide InternalRoad and 9.14 mt. Wide InternalRoad. It also refers to a 60 MT WIDE EXISTING 60.00MT WIDE PROPOSED ROAD. These are approval-document descriptions, not a verified on-site measurement.
- The layout record states 74 individual subplots and 0.00 proposed built-up area, both including and excluding parking. No apartment blocks, building footprints, floor configurations, building heights, or residential/commercial building-area distribution are established in the supplied records.
4. Homes, configurations & floor plans
- The project offering recorded here is plots, not apartments. The layout drawing’s plot schedule is software-read; the supplied data report 74 plots and the following size distribution. These are drawing-derived figures, not RERA-filed carpet areas.
150–200 sq yd (125–167 sq.m): 56
200–250 sq yd (167–209 sq.m): 12
300–400 sq yd (251–334 sq.m): 2
500–1000 sq yd (418–836 sq.m): 1
1000+ sq yd (836+ sq.m): 3
- The supplied software-read measurements report the smallest plot as 132.16 sq.m (158.1 sq yd), the median as 153.29 sq.m (183.3 sq yd), and the largest as 1651.53 sq.m (1975.2 sq yd). Plot areas are distinct from apartment carpet or saleable areas; no apartment configuration, carpet area, or loading figure is supplied.
- The floor-plan data show two layout sheets and no measured building floor plans or flats. No plot-wise booked or available inventory count is disclosed.
5. Parking & vehicle circulation
- No car or two-wheeler parking count, visitor parking allocation, accessible parking provision, or individual buyer parking allocation is established in the supplied records. The layout drawing records 0.00 common parking area.
- The layout is served by roads shown in the approval material, including a 9.00-metre main access road and internal roads stated as 12.19 metres and 9.14 metres wide. The project documents do not establish a parking ramp, structured parking, EV charging, or an exclusive parking right attached to any plot.
6. Amenities, recreation & open spaces
- The RERA amenities record lists internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, street lighting, water conservation/rainwater harvesting and an electrical meter room/sub-station/receiving station. Where a progress value is supplied, it is 0%; the record does not independently verify completion.
| Description / size | Layout roads: 6061.18 sq.m; road-width descriptions appear in the layout plan. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | 1849.33 sq.m; approval record states 7.55% open space. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; development not independently verified. |
| Description / size | 613.58 sq.m. The approval extraction also lists “Tot-lot” among amenities/utilities. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | 258.73 sq.m. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
| Description / size | Listed in the RERA amenities record; no capacity or source stated. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | RERA record lists sewerage (chamber, lines, septic tank, STP); the draft-layout extraction also lists a common septic tank/STP. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; approval extraction refers to rainwater-harvesting pits. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed in the RERA amenities record; the approval extraction also refers to a transformer and transformer yard. |
|---|---|
| Declared progress / verified status | RERA amenity progress: 0%; completion not independently verified. |
| Description / size | Listed as amenity categories, with no progress percentage above 0% in the supplied RERA amenities record. |
|---|---|
| Declared progress / verified status | No completion evidence supplied. |
7. Utilities, building services & safety
- The RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station. The HMDA draft-layout extraction additionally lists a common septic tank/STP, overhead tank, transformer, transformer yard and rainwater-harvesting pits. These are document-listed provisions; capacities, detailed engineering design and completed operation are not established in the supplied evidence.
- The record also lists solid-waste management, energy management and fire-protection/fire-safety categories, but does not provide detailed systems, capacities, clearances, or evidence of implementation. No building lifts, accessible circulation details, backup-power capacity, CCTV or security-system specification is established by the RERA-filed layout material.
8. Location, access & connectivity
- The registered location is Bhongir, Bhongir Mandal, Yadadri Bhuvanagiri District, Telangana, PIN 508116, on survey 857p. The HMDA draft layout record names Bhongir village and mandal and identifies the district as Yadadri-Bhuvanagiri.
- The RERA land fields describe the northern boundary as “NATIONAL HIDH WAY HYDERABAD TO HANAMKONDA” and the western boundary as “ROAD WIDTH 30.” The layout drawing also records a 9.00-metre main access road, 12.19-metre and 9.14-metre internal roads, and a reference to a 60-metre existing/proposed road. These are filed descriptions; no independently verified road-access survey is supplied.
- A location record gives the nearest sampled Outer Ring Road interchange at approximately 23.1 km. No public-transport details or verified travel times are supplied.
9. Developer & development status
- The registered promoter is NEW LEAF LIFE SPACES, identified in the RERA record as a partnership, with GSTIN 36AARFN8181G1ZP. The supplied registered address is RIDDHI BUILDERS, MLA COLONY, BHONGIR, BHONGIR, Bhongir, Yadadri Bhuvanagiri, 508116.
- The promoter’s Form B declaration states a project-completion undertaking of 13/12/2025, and declares that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account for construction and land cost, with withdrawals linked to completion and professional certification. These are promoter declarations, not independent confirmation of fund use or project completion.
- The registration certificate records validity through 13/12/2025, subject to extension by the Authority under the Act and Rules. The supplied evidence does not establish an extension, final layout release, current construction progress, or an occupancy/completion certificate.
10. Approvals, official records & documents
| Reference / date | P02000007858; validity 16/03/2024–13/12/2025. |
|---|---|
| What it establishes in this overview | Registered project identity, promoter, location and registration period. |
| Reference / date | 009477/LO/HMDA/2065/GHT/2023; 14 December, 2023. |
|---|---|
| What it establishes in this overview | Draft layout record for survey 857p, extent 24,509.79 sq.m, and 74 plots. The document describes itself as a draft layout letter. |
| Reference / date | Document 388723. |
|---|---|
| What it establishes in this overview | Layout area allocation, road-width descriptions and stated plot count; plot schedule and sizes are drawing-derived. |
| Reference / date | Document 402201; dated 13-12-2025 in the extraction. |
|---|---|
| What it establishes in this overview | Promoter-declared completion undertaking and other project declarations. |
| Reference / date | Documents 402206 and 403173. |
|---|---|
| What it establishes in this overview | Supplied extracts describe incomplete form material; they do not establish a completed plot-specific sale agreement or allotment. |
| Reference / date | Not supplied. |
|---|---|
| What it establishes in this overview | No such certificate or final layout release is established by the records reviewed for this overview. |
Frequently asked questions
Is NEW LEAF SURYAVANSHI registered with Telangana RERA?
Yes. NEW LEAF SURYAVANSHI is registered with the Telangana Real Estate Regulatory Authority as P02000007858; the registration status is New Project.
Who is the developer of NEW LEAF SURYAVANSHI?
The promoter named in the RERA registration is NEW LEAF LIFE SPACES.
Where is NEW LEAF SURYAVANSHI located?
NEW LEAF SURYAVANSHI is in BHONGIR, Yadadri Bhuvanagiri, Telangana (508116).
When will NEW LEAF SURYAVANSHI be completed?
The promoter's proposed date of completion filed with RERA is 13/12/2025. This is the promoter's declaration, not a guarantee.
More projects in Bhongir