My Space Aura
SVRM INFRA · Medchal-Malkajgiri · RERA P02200006420
MY SPACE AURA is a residential apartment project in Petbasheerbad, Qutballapur mandal, Medchal-Malkajgiri district, developed by registered promoter SVRM INFRA, a partnership. The project covers 19,728.1 sq. m of land and comprises three residential blocks—Blocks A and C with 1 Cellar + 1 Stilt + 8 upper floors, and Block B with 1 Stilt + 8 upper floors—plus an amenities block with 1 Ground + 5 upper floors; its RERA unit record totals 302 units, with saleable areas from 185.34 sq. m to 339.98 sq. m, and apartment configurations are not filed. It is registered under TG-RERA number P02200006420, with proposed completion on 16/06/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MY SPACE AURA RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Not separately identified by phase; registration is for the project recorded as MY SPACE AURA. RERA record |
| TG-RERA registration | P02200006420; Form C registration issued 07/07/2023, valid through 16/02/2029; extension not recorded. Registration validity is distinct from the project completion deadline and from occupancy certification. RERA record |
| Registered promoter | SVRM INFRA, a partnership. RERA record Corporate record |
| RERA status | Registered; status in the project record is “New Project.” RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Petbasheerbad / Pet-basheerabad (as named in project and approval records) RERA record RERA filing |
| Revenue village | Petbasheerbad; also written as Pet-basheerabad in filed documents RERA record Land records |
| Mandal | Qutballapur (also written Quthbullapur / Qutubullapur in filed records) RERA record Land records |
| District | Medchal-Malkajgiri (permit extraction labels district “MEDCHAL”) RERA record |
| PIN | 500067 RERA record |
| Survey numbers and subdivisions | 25/1/EAA; 25/1/LUU; old Survey No. 25/1 RERA record Land records |
| Registered site extent | Project filing identifies total land area of 19,728.1 sq. m and net area of 17,496.90 sq. m. The GHMC permit records the same plot and net plot areas. RERA filing |
| Area affected in road widening / FTL / nala widening | RERA filing: 2,231.20 sq. m. The permit’s sanctioned-parameter extract lists road-affected area and nala-affected area as 0.0 sq. m; those are recorded here as permit figures, not reconciled. RERA filing |
| Boundaries recorded in RERA filing | North: OTHER; South: ROAD; East: OTHER; West: OTHER. RERA filing |
| GHMC permit road width | 18 mt. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Permit 5438/GHMC/KPL/2023-BP, dated 16 February, 2023; file no. 006238/GHMC/3119/KPL1/2022-BP Approvals record |
| Approved buildings and floor configurations | Block A and Block C: 1 Cellar + 1 Stilt + 8 upper floors; Block B: 1 Stilt + 8 upper floors; proposed amenities block: 1 Ground + 5 upper floors. |
| Building count | Three residential blocks (A, B and C) and one amenities block in the permit description. The amenities block is not a residential block. |
| Approved built-up area | 66,865.24 sq. m in the project filing. The GHMC permit extract also records total 63,286,228.00 without an accompanying unit in the supplied extraction; this is not used as a built-up-area figure. RERA filing |
| Parking-related approved figures | Permit records total parking area of 23,837.7 (unit not stated in the supplied extraction); it also says approved cellar and stilt areas are to be used exclusively for vehicle parking. No parking-space count is provided. |
| Unit count | 302 total units in the RERA unit record; the approved-plan unit count is not stated in the supplied evidence. RERA unit table RERA unit details |
| Mortgage area | 8,936.40 sq. m recorded in the project filing. The permit identifies 8,936.40 as mortgaged built-up area reserved in the eighth and first floors and gives deed numbers 2317/2023, 2318/2023 and 2319/2023. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Unit types and RERA-filed saleable area | The unit table does not file apartment configurations; it records unit/floor labels and saleable areas from 185.34 sq. m to 339.98 sq. m. RERA unit details RERA unit table |
| Booked / available | 62 booked; 240 available, out of 302 recorded units. These are portal-derived counts with no as-of date in the source record; treat as indicative, not a current availability guarantee. RERA unit table RERA unit details |
| Construction stage | RERA amenity/infrastructure entries report partial progress for certain items, but no overall construction-progress percentage or independently verified site-stage report is supplied. RERA amenities |
| Completion deadline | RERA project record states proposed completion 16/06/2029. The permit validity is separately stated through 16 February, 2029; the supplied record does not explain the relationship between these dates. RERA record |
| Promoter’s completion undertaking | Form B says the promoter undertakes completion within 36 months, as detailed in the Development Agreement cum General Power of Attorney; the declaration’s day in March 2023 is blank in the extraction. |
| Occupancy / completion certificate | No completion certificate or occupancy certificate is recorded in the supplied project evidence; the permit extraction marks completion certified as false. The permit requires an occupancy certificate before occupation. |
2. The project story
MY SPACE AURA is a registered residential apartment development on land identified in the project filing as Survey Nos. 25/1/EAA and 25/1/LUU, old Survey No. 25/1, in Petbasheerbad village, Qutballapur mandal, Medchal-Malkajgiri district. Its land arrangement is recorded as 19,728.1 sq. m total and 17,496.90 sq. m net. RERA record RERA filing
GHMC’s building permit describes three residential blocks—A, B and C—and a separate amenities block. Blocks A and C are approved as cellar, stilt and eight upper floors; Block B as stilt and eight upper floors; the amenities block as ground plus five upper floors. The project’s RERA unit record totals 302 units, but records unit and floor labels rather than apartment configuration names. RERA unit table RERA unit details
The registration record proposes completion on 16 June 2029. No overall construction percentage or independent site inspection is supplied. RERA’s progress entries show reported development of some infrastructure items, but those percentages should not be read as a verified measure of whole-project construction. No occupancy or completion certificate is recorded; the GHMC permit makes an occupancy certificate a prerequisite to occupation. RERA record RERA amenities
3. Master plan, architecture & building design
The GHMC building permit is the supplied sanctioned building document. It describes three residential blocks and a separate amenities block with the floor arrangements shown below. The approval extract gives building heights of 23.36 and 20.7, without identifying units or associating each value with a particular block in the extracted record.
| Building / block | Approved use as described | Sanctioned floor configuration |
|---|---|---|
| Block A and Block C | Residential | 1 Cellar + 1 Stilt + 8 upper floors |
| Block B | Residential | 1 Stilt + 8 upper floors |
| Amenities block | Amenities | 1 Ground + 5 upper floors |
The project filing reports 66,865.24 sq. m approved built-up area. This is the filed approved built-up-area figure; the supplied record does not provide a separate FSI-counted area, gross built-up-area breakdown, carpet-area total, building footprints, or block-by-block area schedule. RERA filing
The permit records a tot-lot of 1,763.29 (unit not specified in the supplied extraction), five rainwater-harvesting pits, transformer space and a garbage house. It also refers to a plan road width of 18 mt. No drawing-derived details are supplied here for lift counts, stairs, flat-per-floor arrangements, internal circulation, landscaping layout or phase organization.
4. Homes, configurations & floor plans
The RERA unit table contains 302 units, with 62 booked and 240 available as last read from the portal; no as-of date is supplied. It does not state apartment configuration names. The units are recorded through door-number and floor-label rows, so those labels are not presented as configuration counts. The RERA-filed saleable-area range is 185.34–339.98 sq. m. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Homes (configuration not filed) | 302 | 62 | 240 | 185.34–339.98 sq. m | Not supplied as a matched RERA configuration | Not supplied |
The approved floor-plan drawings identified as document 312952 were measured by software, not disclosed as RERA configuration data. The software-measured carpet-area results are: 2BHK, 58.4 sq. m (one design); 3BHK, 104.9–141.5 sq. m, median 126.7 sq. m (51 designs); and 6BHK, 126.4–132.4 sq. m, median 126.4 sq. m (four designs). These drawing-derived classifications do not match a configuration filed in the RERA unit table; verify the measured figures against the drawing before relying on them. Floor plans RERA unit details
The drawing extraction includes a measured 2BHK example with bedrooms, kitchen, toilets, balconies and utility, and a 3BHK example with bedrooms, living/dining, kitchen, toilets, balcony and utility. The supplied extract does not provide a complete room schedule for every measured layout. Carpet area is the usable internal floor area; balconies and utility areas are excluded from carpet area, while RERA saleable area is a separate filed measure that may include a share of common areas. No loading figure is supplied. RERA unit details
5. Parking & vehicle circulation
The GHMC permit records cellar and stilt portions approved for parking and requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extract records total parking area as 23,837.7, but does not state the unit in the supplied extraction or give a count of car or two-wheeler spaces.
No project-specific count for resident, visitor or accessible parking, no mechanical-parking description, and no parking allocation schedule for individual homes is supplied. The permit’s reference to parking areas does not itself establish exclusive parking ownership or a particular bay allocation to a purchaser.
6. Amenities, recreation & open spaces
The following are facilities in the GHMC permit or RERA project progress record. RERA percentages are reported progress figures; they are not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit specifies tot-lot 1763.29; unit not stated in the supplied extraction. Permit says it is to be fenced and maintained as greenery before occupancy certificate. | Permit requirement; completion not verified. RERA “Green Strip/TOT LOT/Park” progress: 5% RERA amenities. | |
| Aggregate recreational open space | Area not supplied. | RERA amenities | RERA entry marked available “YES”; reported progress 0%. |
| Community buildings | No further description or size supplied. | RERA amenities | RERA progress 0%. |
| Internal roads and footpaths | No dimensions or layout detail supplied beyond permit road width of 18 mt. | RERA amenities | RERA progress 0%. |
| Street lighting | No specification supplied. | RERA amenities | RERA progress 0%. |
No project-specific clubhouse or indoor recreation schedule, sports-facility schedule, or independently verified completed amenity list is supplied. Amenities listed in third-party/vendor material are not treated here as RERA-filed or sanctioned project facilities. RERA amenities Promoter website
7. Utilities, building services & safety
| Supplied project evidence | RERA progress record lists water supply as available “YES.” No source, storage capacity or treatment details are supplied. |
|---|---|
| Reported status | 19% progress reported RERA amenities. |
| Supplied project evidence | RERA entry covers sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water. No capacity or reuse scheme is supplied. |
|---|---|
| Reported status | Sewerage: 16%; treatment/disposal: 23% progress reported RERA amenities. |
| Supplied project evidence | RERA progress record lists storm-water drains. |
|---|---|
| Reported status | 10% progress reported RERA amenities. |
| Supplied project evidence | Permit requires rainwater-harvesting structures and records 5 pits. |
|---|---|
| Reported status | RERA water-conservation/rainwater-harvesting progress: 8% RERA amenities. |
| Supplied project evidence | Permit requires transformer space; RERA record lists electrical meter room/sub-station/receiving station. No capacity or backup details are supplied. |
|---|---|
| Reported status | RERA progress: 29% RERA amenities. |
| Supplied project evidence | Permit requires a garbage house. RERA solid-waste management/disposal progress is recorded as 0%. |
|---|---|
| Reported status | Completion not verified RERA amenities. |
| Supplied project evidence | Permit requires an occupancy fire NOC from the Director (EV&DM) before issue of occupancy certificate. RERA progress record lists fire protection and fire-safety requirements. |
|---|---|
| Reported status | RERA progress: 18%; no fire NOC is supplied RERA amenities. |
| Supplied project evidence | RERA progress entry: 0%. No project-specific system details supplied. |
|---|---|
| Reported status | Reported progress only RERA amenities. |
| Supplied project evidence | Lift details, capacities, accessible routes and ramp specifications are not supplied. |
|---|---|
| Reported status | Not disclosed in the supplied evidence. |
The permit also requires a commencement notice before construction, a completion notice after construction, and an occupancy certificate before occupation. These are permit conditions; the supplied record does not establish that the required notices, fire NOC or occupancy certificate have been issued.
8. Location, access & connectivity
The registered location is Petbasheerbad village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500067. The project filing and GHMC permit place the site in the Cantan City / Petbasheerabad locality. RERA record RERA filing
The supplied location record gives one mapped access reference: the nearest sampled Outer Ring Road interchange is approximately 3.8 km away. This is a mapped distance estimate, not a stated travel time. No project-specific public-transport information, approach-road route description or independently verified landmark-distance schedule is supplied. Location record
9. Developer & development status
The registered promoter is SVRM INFRA, recorded as a partnership, with GSTIN 36ADAFS8048R1ZA. The project filing lists Marri Mohan Reddy as authorized signatory and Venkateshwar Rao Juvvadi, Chennamaneni Ramesh Rao and Bompalli Surender as partners. The promoter address in the filing is Plot No. 35, Citizen Colony, Cantan City, Petbasheerbad, Qutballapur, Medchal-Malkajgiri, 500067. Corporate record Parties record RERA filing
Form B, signed by Marri Mohan Reddy on the promoter’s behalf, declares that SVRM INFRA has a Development Agreement cum General Power of Attorney with the landowners and undertakes completion within 36 months, along with the stated project-account, audit and approval obligations. The extracted declaration date is incomplete (“_day of March 2023”).
The RERA project record proposes completion on 16/06/2029. The supplied evidence does not provide an overall construction-progress percentage, a site-verified construction update, or an issued occupancy/completion certificate. RERA record RERA amenities
10. Approvals, official records & documents
| Reference and scope | Form C; project MY SPACE AURA, registration P02200006420, issued 07/07/2023 and valid through 16/02/2029. |
|---|---|
| Evidence status | Certificate extraction supplied. |
| Reference and scope | Permit 5438/GHMC/KPL/2023-BP, dated 16 February 2023; file no. 006238/GHMC/3119/KPL1/2022-BP. Covers the described residential blocks and amenities block. |
|---|---|
| Evidence status | Permit extraction supplied; includes conditions and plan parameters. |
| Reference and scope | Handed-over deed numbers 2317/2023, 2318/2023, 2319/2023, 2387/2023, 2388/2023 and 2389/2023, dated 30 January 2023 in the permit extraction; contractor’s all-risk policy no. 431600/44/2023/298, dated 01 February 2023. |
|---|---|
| Evidence status | Listed in the permit extraction; underlying instruments/policy are not separately extracted here. |
| Reference and scope | SVRM INFRA declaration concerning development rights, completion undertaking and other promoter obligations. |
|---|---|
| Evidence status | Extracted; declaration date is incomplete. |
| Reference and scope | Title-report documents describe the landowners’ title basis and the development arrangement with SVRM INFRA; these are not building approvals. |
|---|---|
| Evidence status | Available in the project document record as docs 312949, 312950, 312951 and 319633. Document index |
| Reference and scope | Document 312952 is listed as a layout-plan document and is the source of floor-plan drawings measured by software. |
|---|---|
| Evidence status | The document entry is marked not extracted; drawing measurements are software-derived and not RERA disclosures. Document index Floor plans |
| Reference and scope | No completion or occupancy certificate is supplied; the permit extraction marks completion certified as false and states that occupancy certification is required before occupation. |
|---|---|
| Evidence status | Not recorded in the supplied evidence. |
1. Project at a glance
Project identity
Registered project name: MY SPACE AURA
Project type: Residential apartment project
Phase / registered portion: Not separately identified by phase; registration is for the project recorded as MY SPACE AURA.
TG-RERA registration: P02200006420; Form C registration issued 07/07/2023, valid through 16/02/2029; extension not recorded. Registration validity is distinct from the project completion deadline and from occupancy certification.
Registered promoter: SVRM INFRA, a partnership.
RERA status: Registered; status in the project record is “New Project.”
Land and geographic identity
Locality: Petbasheerbad / Pet-basheerabad (as named in project and approval records)
Revenue village: Petbasheerbad; also written as Pet-basheerabad in filed documents
Mandal: Qutballapur (also written Quthbullapur / Qutubullapur in filed records)
District: Medchal-Malkajgiri (permit extraction labels district “MEDCHAL”)
PIN: 500067
Survey numbers and subdivisions: 25/1/EAA; 25/1/LUU; old Survey No. 25/1
Registered site extent: Project filing identifies total land area of 19,728.1 sq. m and net area of 17,496.90 sq. m. The GHMC permit records the same plot and net plot areas.
Area affected in road widening / FTL / nala widening: RERA filing: 2,231.20 sq. m. The permit’s sanctioned-parameter extract lists road-affected area and nala-affected area as 0.0 sq. m; those are recorded here as permit figures, not reconciled.
Boundaries recorded in RERA filing: North: OTHER; South: ROAD; East: OTHER; West: OTHER.
GHMC permit road width: 18 mt.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Permit 5438/GHMC/KPL/2023-BP, dated 16 February, 2023; file no. 006238/GHMC/3119/KPL1/2022-BP
Approved buildings and floor configurations: Block A and Block C: 1 Cellar + 1 Stilt + 8 upper floors; Block B: 1 Stilt + 8 upper floors; proposed amenities block: 1 Ground + 5 upper floors.
Building count: Three residential blocks (A, B and C) and one amenities block in the permit description. The amenities block is not a residential block.
Approved built-up area: 66,865.24 sq. m in the project filing. The GHMC permit extract also records total 63,286,228.00 without an accompanying unit in the supplied extraction; this is not used as a built-up-area figure.
Parking-related approved figures: Permit records total parking area of 23,837.7 (unit not stated in the supplied extraction); it also says approved cellar and stilt areas are to be used exclusively for vehicle parking. No parking-space count is provided.
Unit count: 302 total units in the RERA unit record; the approved-plan unit count is not stated in the supplied evidence.
Mortgage area: 8,936.40 sq. m recorded in the project filing. The permit identifies 8,936.40 as mortgaged built-up area reserved in the eighth and first floors and gives deed numbers 2317/2023, 2318/2023 and 2319/2023.
Offering and status
Unit types and RERA-filed saleable area: The unit table does not file apartment configurations; it records unit/floor labels and saleable areas from 185.34 sq. m to 339.98 sq. m.
Booked / available: 62 booked; 240 available, out of 302 recorded units. These are portal-derived counts with no as-of date in the source record; treat as indicative, not a current availability guarantee.
Construction stage: RERA amenity/infrastructure entries report partial progress for certain items, but no overall construction-progress percentage or independently verified site-stage report is supplied.
Completion deadline: RERA project record states proposed completion 16/06/2029. The permit validity is separately stated through 16 February, 2029; the supplied record does not explain the relationship between these dates.
Promoter’s completion undertaking: Form B says the promoter undertakes completion within 36 months, as detailed in the Development Agreement cum General Power of Attorney; the declaration’s day in March 2023 is blank in the extraction.
Occupancy / completion certificate: No completion certificate or occupancy certificate is recorded in the supplied project evidence; the permit extraction marks completion certified as false. The permit requires an occupancy certificate before occupation.
2. The project story
MY SPACE AURA is a registered residential apartment development on land identified in the project filing as Survey Nos. 25/1/EAA and 25/1/LUU, old Survey No. 25/1, in Petbasheerbad village, Qutballapur mandal, Medchal-Malkajgiri district. Its land arrangement is recorded as 19,728.1 sq. m total and 17,496.90 sq. m net.
GHMC’s building permit describes three residential blocks—A, B and C—and a separate amenities block. Blocks A and C are approved as cellar, stilt and eight upper floors; Block B as stilt and eight upper floors; the amenities block as ground plus five upper floors. The project’s RERA unit record totals 302 units, but records unit and floor labels rather than apartment configuration names.
The registration record proposes completion on 16 June 2029. No overall construction percentage or independent site inspection is supplied. RERA’s progress entries show reported development of some infrastructure items, but those percentages should not be read as a verified measure of whole-project construction. No occupancy or completion certificate is recorded; the GHMC permit makes an occupancy certificate a prerequisite to occupation.
3. Master plan, architecture & building design
The GHMC building permit is the supplied sanctioned building document. It describes three residential blocks and a separate amenities block with the floor arrangements shown below. The approval extract gives building heights of 23.36 and 20.7, without identifying units or associating each value with a particular block in the extracted record.
| Building / block | Approved use as described | Sanctioned floor configuration |
|---|---|---|
| Block A and Block C | Residential | 1 Cellar + 1 Stilt + 8 upper floors |
| Block B | Residential | 1 Stilt + 8 upper floors |
| Amenities block | Amenities | 1 Ground + 5 upper floors |
The project filing reports 66,865.24 sq. m approved built-up area. This is the filed approved built-up-area figure; the supplied record does not provide a separate FSI-counted area, gross built-up-area breakdown, carpet-area total, building footprints, or block-by-block area schedule.
The permit records a tot-lot of 1,763.29 (unit not specified in the supplied extraction), five rainwater-harvesting pits, transformer space and a garbage house. It also refers to a plan road width of 18 mt. No drawing-derived details are supplied here for lift counts, stairs, flat-per-floor arrangements, internal circulation, landscaping layout or phase organization.
4. Homes, configurations & floor plans
The RERA unit table contains 302 units, with 62 booked and 240 available as last read from the portal; no as-of date is supplied. It does not state apartment configuration names. The units are recorded through door-number and floor-label rows, so those labels are not presented as configuration counts. The RERA-filed saleable-area range is 185.34–339.98 sq. m.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Homes (configuration not filed) | 302 | 62 | 240 | 185.34–339.98 sq. m | Not supplied as a matched RERA configuration | Not supplied |
The approved floor-plan drawings identified as document 312952 were measured by software, not disclosed as RERA configuration data. The software-measured carpet-area results are: 2BHK, 58.4 sq. m (one design); 3BHK, 104.9–141.5 sq. m, median 126.7 sq. m (51 designs); and 6BHK, 126.4–132.4 sq. m, median 126.4 sq. m (four designs). These drawing-derived classifications do not match a configuration filed in the RERA unit table; verify the measured figures against the drawing before relying on them.
The drawing extraction includes a measured 2BHK example with bedrooms, kitchen, toilets, balconies and utility, and a 3BHK example with bedrooms, living/dining, kitchen, toilets, balcony and utility. The supplied extract does not provide a complete room schedule for every measured layout. Carpet area is the usable internal floor area; balconies and utility areas are excluded from carpet area, while RERA saleable area is a separate filed measure that may include a share of common areas. No loading figure is supplied.
5. Parking & vehicle circulation
The GHMC permit records cellar and stilt portions approved for parking and requires those areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extract records total parking area as 23,837.7, but does not state the unit in the supplied extraction or give a count of car or two-wheeler spaces.
No project-specific count for resident, visitor or accessible parking, no mechanical-parking description, and no parking allocation schedule for individual homes is supplied. The permit’s reference to parking areas does not itself establish exclusive parking ownership or a particular bay allocation to a purchaser.
6. Amenities, recreation & open spaces
The following are facilities in the GHMC permit or RERA project progress record. RERA percentages are reported progress figures; they are not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Permit specifies tot-lot 1763.29; unit not stated in the supplied extraction. Permit says it is to be fenced and maintained as greenery before occupancy certificate. | Permit requirement; completion not verified. RERA “Green Strip/TOT LOT/Park” progress: 5%. | |
| Aggregate recreational open space | Area not supplied. | RERA entry marked available “YES”; reported progress 0%. | |
| Community buildings | No further description or size supplied. | RERA progress 0%. | |
| Internal roads and footpaths | No dimensions or layout detail supplied beyond permit road width of 18 mt. | RERA progress 0%. | |
| Street lighting | No specification supplied. | RERA progress 0%. |
No project-specific clubhouse or indoor recreation schedule, sports-facility schedule, or independently verified completed amenity list is supplied. Amenities listed in third-party/vendor material are not treated here as RERA-filed or sanctioned project facilities.
7. Utilities, building services & safety
| Supplied project evidence | RERA progress record lists water supply as available “YES.” No source, storage capacity or treatment details are supplied. |
|---|---|
| Reported status | 19% progress reported. |
| Supplied project evidence | RERA entry covers sewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage water. No capacity or reuse scheme is supplied. |
|---|---|
| Reported status | Sewerage: 16%; treatment/disposal: 23% progress reported. |
| Supplied project evidence | RERA progress record lists storm-water drains. |
|---|---|
| Reported status | 10% progress reported. |
| Supplied project evidence | Permit requires rainwater-harvesting structures and records 5 pits. |
|---|---|
| Reported status | RERA water-conservation/rainwater-harvesting progress: 8%. |
| Supplied project evidence | Permit requires transformer space; RERA record lists electrical meter room/sub-station/receiving station. No capacity or backup details are supplied. |
|---|---|
| Reported status | RERA progress: 29%. |
| Supplied project evidence | Permit requires a garbage house. RERA solid-waste management/disposal progress is recorded as 0%. |
|---|---|
| Reported status | Completion not verified. |
| Supplied project evidence | Permit requires an occupancy fire NOC from the Director (EV&DM) before issue of occupancy certificate. RERA progress record lists fire protection and fire-safety requirements. |
|---|---|
| Reported status | RERA progress: 18%; no fire NOC is supplied. |
| Supplied project evidence | RERA progress entry: 0%. No project-specific system details supplied. |
|---|---|
| Reported status | Reported progress only. |
| Supplied project evidence | Lift details, capacities, accessible routes and ramp specifications are not supplied. |
|---|---|
| Reported status | Not disclosed in the supplied evidence. |
The permit also requires a commencement notice before construction, a completion notice after construction, and an occupancy certificate before occupation. These are permit conditions; the supplied record does not establish that the required notices, fire NOC or occupancy certificate have been issued.
8. Location, access & connectivity
The registered location is Petbasheerbad village, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500067. The project filing and GHMC permit place the site in the Cantan City / Petbasheerabad locality.
The supplied location record gives one mapped access reference: the nearest sampled Outer Ring Road interchange is approximately 3.8 km away. This is a mapped distance estimate, not a stated travel time. No project-specific public-transport information, approach-road route description or independently verified landmark-distance schedule is supplied.
9. Developer & development status
The registered promoter is SVRM INFRA, recorded as a partnership, with GSTIN 36ADAFS8048R1ZA. The project filing lists Marri Mohan Reddy as authorized signatory and Venkateshwar Rao Juvvadi, Chennamaneni Ramesh Rao and Bompalli Surender as partners. The promoter address in the filing is Plot No. 35, Citizen Colony, Cantan City, Petbasheerbad, Qutballapur, Medchal-Malkajgiri, 500067.
Form B, signed by Marri Mohan Reddy on the promoter’s behalf, declares that SVRM INFRA has a Development Agreement cum General Power of Attorney with the landowners and undertakes completion within 36 months, along with the stated project-account, audit and approval obligations. The extracted declaration date is incomplete (“_day of March 2023”).
The RERA project record proposes completion on 16/06/2029. The supplied evidence does not provide an overall construction-progress percentage, a site-verified construction update, or an issued occupancy/completion certificate.
10. Approvals, official records & documents
| Reference and scope | Form C; project MY SPACE AURA, registration P02200006420, issued 07/07/2023 and valid through 16/02/2029. |
|---|---|
| Evidence status | Certificate extraction supplied. |
| Reference and scope | Permit 5438/GHMC/KPL/2023-BP, dated 16 February 2023; file no. 006238/GHMC/3119/KPL1/2022-BP. Covers the described residential blocks and amenities block. |
|---|---|
| Evidence status | Permit extraction supplied; includes conditions and plan parameters. |
| Reference and scope | Handed-over deed numbers 2317/2023, 2318/2023, 2319/2023, 2387/2023, 2388/2023 and 2389/2023, dated 30 January 2023 in the permit extraction; contractor’s all-risk policy no. 431600/44/2023/298, dated 01 February 2023. |
|---|---|
| Evidence status | Listed in the permit extraction; underlying instruments/policy are not separately extracted here. |
| Reference and scope | SVRM INFRA declaration concerning development rights, completion undertaking and other promoter obligations. |
|---|---|
| Evidence status | Extracted; declaration date is incomplete. |
| Reference and scope | Title-report documents describe the landowners’ title basis and the development arrangement with SVRM INFRA; these are not building approvals. |
|---|---|
| Evidence status | Available in the project document record as docs 312949, 312950, 312951 and 319633. |
| Reference and scope | Document 312952 is listed as a layout-plan document and is the source of floor-plan drawings measured by software. |
|---|---|
| Evidence status | The document entry is marked not extracted; drawing measurements are software-derived and not RERA disclosures. |
| Reference and scope | No completion or occupancy certificate is supplied; the permit extraction marks completion certified as false and states that occupancy certification is required before occupation. |
|---|---|
| Evidence status | Not recorded in the supplied evidence. |
Frequently asked questions
Is MY SPACE AURA registered with Telangana RERA?
Yes. MY SPACE AURA is registered with the Telangana Real Estate Regulatory Authority as P02200006420; the registration status is New Project.
Who is the developer of MY SPACE AURA?
The promoter named in the RERA registration is SVRM INFRA.
Where is MY SPACE AURA located?
MY SPACE AURA is in PETBASHEERBAD, Qutballapur, Medchal-Malkajgiri, Telangana (500067).
When will MY SPACE AURA be completed?
The promoter's proposed date of completion filed with RERA is 16/06/2029. This is the promoter's declaration, not a guarantee.
More projects in Pet Basherbad