Moiz Housing Project - I
MOIZ HOUSING PROJECTS · Hyderabad · RERA P02500001006
MOIZ HOUSING PROJECT - I is a residential apartment project in Kamlapuri Colony, Shaikpet mandal, Hyderabad district, developed by registered promoter MOIZ HOUSING PROJECTS, a partnership. It is on 547.57 sq m of land and comprises one proposed residential Building A with a stilt and five upper floors. The RERA filing records 10 homes, all 3BHK. Its TG-RERA registration number is P02500001006, and the stated completion date is 03/11/2024.
More from Moiz Housing Projects · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MOIZ HOUSING PROJECT - I RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not disclosed; the RERA registration is for MOIZ HOUSING PROJECT - I. |
| TG-RERA registration | P02500001006; issued 12/07/2019, valid to 03/11/2024. The available certificate says it was not extended; registration validity is distinct from the stated construction completion date. Approvals record |
| Registered promoter | MOIZ HOUSING PROJECTS; partnership. RERA filing Corporate record |
| RERA status in available record | The certificate records registration through 03/11/2024. No extension is recorded in the supplied evidence; current status should be confirmed directly with TG-RERA. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | KAMLAPURI COLONY; the RERA certificate also identifies Shaikpet locality. RERA record RERA filing |
| Revenue village | RERA project fields do not disclose a revenue village. The GHMC building-permit order identifies Shaikpet Village; the title material also uses Shaikpet and Yousufguda/Yousuffguda descriptions. RERA filing |
| Mandal / district / PIN | Shaikpet / Hyderabad / 500081. RERA record RERA filing |
| Survey identity | Survey No. 133; the GHMC permit describes old Survey No. 347 corresponding to new Survey No. 133. No project subdivision is disclosed in the RERA land fields. RERA filing |
| Site address reference | Plot No. 8-3-678/132,133/1. RERA filing |
| Registered site extent | 547.57 sq m total and net area; the permit records road-affected area as 0 sq m. RERA filing |
| Boundaries | North: 12 FEET ROAD; South: EXISTING BUILDING; East and West: OPEN LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order No. 2/C19/17239/2018; file No. 2/C19/18646/2018; approved 03 November, 2018. Approvals record |
| Building / configuration | One proposed residential Building A, sanctioned as stilt plus five upper floors. The permit states height 14.99 m. |
| Approved built-up area | Residential: 1,342.80 m²; stilt: 263.41 m². The permit separately lists site area 547.57 m². |
| Sanctioned parking level | The permit identifies the stilt as parking; it does not provide a parking-space count. |
| Unit counts | GHMC permit: the number of sanctioned units is not stated in the supplied extraction. RERA filing: 10 3BHK units. RERA unit table |
| Layout approval | Layout/subdivision reference LRS27072016024821 is listed in the permit. A separate approved layout plan is not available in the supplied material. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed offering | 10 units, all recorded as 3BHK; filed saleable area 134.28 m² per unit. RERA unit table RERA unit table |
| Booked / available | 0 booked and 10 available in the portal data supplied; no as-of date is provided, so these counts are indicative rather than a live availability check. RERA unit table |
| Construction stage | No verified site-progress or construction-stage record is supplied. Document index |
| Completion deadline | The RERA certificate and GHMC permit state completion by 03/11/2024. This is separate from the registration validity date. |
| Revised completion date | No revised completion date is disclosed in the supplied evidence. Approvals record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied or recorded in the reviewed documents; certificate status should be confirmed with GHMC and TG-RERA. Document index |
2. The project story
MOIZ HOUSING PROJECT - I is registered as a residential apartment project at Kamlapuri Colony, in the Shaikpet mandal of Hyderabad. The RERA record identifies Survey No. 133, with the GHMC permit linking the site to old Survey No. 347 and new Survey No. 133. The permit describes one proposed building, Building A, with a stilt and five upper floors. RERA record RERA filing
The RERA filing records ten 3BHK homes, with none shown as booked in the supplied portal snapshot. No construction-progress evidence or occupancy/completion certificate is included, so the project’s physical completion and current handover status cannot be established from these materials. The stated completion deadline was 03/11/2024; that date is not itself evidence that construction was completed or that an occupancy certificate was issued. RERA unit table
3. Master plan, architecture & building design
The GHMC permit describes a single proposed residential building, Building A, on a 547.57 m² site, with a stilt and five upper residential floors. It records 1,342.80 m² of residential built-up area and 263.41 m² for the stilt, with a stated building height of 14.99 m. These are permit figures; the supplied evidence does not provide a separately identified FSI-counted area, carpet-area schedule, floor-by-floor unit arrangement, or building footprint.
The permit lists two rainwater-harvesting structures, 25 trees and a compound wall of 88.23 running metres; it records the tot-lot area as 0 m². A separate approved layout drawing was not available in the supplied material, and the building-permit extraction does not establish the number of flats per floor, lift or stair arrangements, common-area distribution, or detailed circulation.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 134.28 m² | Not supplied | Not supplied |
The RERA filing identifies only the 3BHK configuration and gives its saleable area as 134.28 m². The available floor-plan extraction does not provide a measured drawing-based carpet area for that RERA-filed configuration. RERA unit table RERA unit table RERA unit details
A software measurement of two 2BHK designs from the drawing file reports carpet area of 78.2–78.4 m² (median 78.3 m²). This is a drawing-based software measurement, not a RERA-filed unit configuration or area disclosure; the 2BHK is not listed in the supplied RERA unit schedule. The measured example includes living/dining, bedrooms, toilets, kitchen and a utility; the utility is excluded from the software carpet-area calculation. Verify any drawing measurement against the original plan. RERA unit details Floor plans
Carpet area and saleable area are different measurements: the supplied drawing-measurement note describes RERA saleable area as also including the home’s share of common areas. No unit-specific balcony, utility, or loading schedule is supplied for the RERA-filed 3BHK homes. Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit identifies the stilt as a parking level and states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking. The supplied permit extraction does not state the number of car or two-wheeler spaces, and no approved parking plan or unit-wise parking allocation is available here.
The RERA unit record marks the 3BHK units as mortgaged, but it does not establish an individual buyer’s parking entitlement. Visitor, accessible or EV-charging spaces, parking circulation, ramps and pedestrian separation are not documented in the supplied project records. A space shown on a plan, if any, would not by itself establish exclusive ownership or allocation. RERA unit table
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | Two structures; permit specifies a percolation pit. | GHMC building permit | Required by the permit; completion is not independently verified. |
| Transformer space | Space to be provided on site. | GHMC building permit | Permit condition; completion is not independently verified. |
| Garbage house | Required within the premises. | GHMC building permit | Permit condition; completion is not independently verified. |
| Trees | 25 listed. | GHMC building permit | Permit figure; planting and current status are not verified. |
| Tot-lot / recreational open space | Permit records 0 m² for tot-lot. | GHMC building permit | Permit figure. |
| Community buildings | RERA amenities record shows 0%. | RERA amenities record RERA amenities | No completion evidence supplied. |
The vendor material lists a range of facilities, including a clubhouse, swimming pool, gym, children’s play area, landscaped garden and indoor games. These are vendor claims, not established by the supplied GHMC permit or RERA amenities record; their project-specific approval, provision and delivery are not evidenced here. Promoter website
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting percolation pit, transformer space and a garbage house. It also requires that the sanctioned plan be followed and that an occupancy certificate be obtained before occupation. These are permit requirements, not proof that the facilities have been installed or that statutory compliance has been completed.
The RERA amenities record marks water supply, sewerage, water conservation/rainwater harvesting, energy management, fire protection and fire safety, and electrical meter room/sub-station/receiving station as “YES” and 100%. The same record reports 0% for storm-water drains, street lighting, solid-waste management and treatment/disposal of sewage and sullage water. No supporting service-capacity schedules or independent completion verification are supplied. RERA amenities
The supplied project records do not specify water sources or storage capacity, STP capacity or reuse arrangements, electrical supply or backup capacity, lift numbers or capacities, fire-system details, CCTV/security arrangements, or accessibility provisions. Vendor references to water supply, a sewage treatment plant, power backup, lifts, fire safety and CCTV are not project-specific verification of installed or approved services. Document index Promoter website
8. Location, access & connectivity
The registered project location is Kamlapuri Colony, Shaikpet mandal, Hyderabad district, PIN 500081. The GHMC permit identifies Shaikpet Village and describes a road frontage in its boundary schedule; it records a road width of 18 m in the permit extraction. The RERA boundary schedule separately describes the northern boundary as a 12 FEET ROAD. RERA record RERA filing
The supplied location record identifies Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. This is a recorded distance, not a travel-time estimate. The records do not provide verified public-transport routes or additional measured distances to landmarks. Location record
9. Developer & development status
The registered promoter is MOIZ HOUSING PROJECTS, identified as a partnership in the RERA organization fields. Its GSTIN is 36AAQFM4053M2ZQ. The listed partners are MOIZUDDIN MOHAMMED, FATIMUNNISA IBRAHIM, SARA SULTHANA and HUSNA MOIZ; MUDASSAR MOIZ MOHAMMED is listed as an authorized signatory. RERA filing Corporate record Parties record
The RERA certificate gives a promoter-office address in Maredpally, Hyderabad, PIN 500026. The project address is in Kamlapuri Colony, PIN 500081; these are separate address fields in the supplied records. No official promoter website or contact details are supplied. RERA record
The promoter’s Form B affidavit declares a 24-month completion period and states that the land is free of encumbrances; these are promoter declarations, not independent findings. The supplied record does not establish actual construction progress, a revised timeline, or current occupancy status.
10. Approvals, official records & documents
| What the supplied evidence establishes | FORM “C” records registration P02500001006 for MOIZ HOUSING PROJECT - I, issued 12/07/2019, with stated validity to 03/11/2024. |
|---|
| What the supplied evidence establishes | Building Permit Order No. 2/C19/17239/2018, file No. 2/C19/18646/2018, approved 03 November, 2018; identifies Building A, stilt plus five upper floors. |
|---|
| What the supplied evidence establishes | LRS27072016024821 appears in the building-permit record. A separate approved layout plan is not available in the supplied material. |
|---|
| What the supplied evidence establishes | Affidavit by Mohammed Mudassar Moiz for MOIZ HOUSING PROJECTS, dated “19# day of March 2019” in the extraction; includes promoter declarations on title, encumbrances and completion. |
|---|
| What the supplied evidence establishes | Requests recognition of Mohammed Mudassar Moiz as authorized signatory for MOIZ HOUSING PROJECTS. The extraction does not give a declaration date. |
|---|
| What the supplied evidence establishes | No such certificate is included in the supplied documents. |
|---|---|
| Reference | Document index |
The GHMC permit lists conditions including commencement and completion notices, rainwater harvesting, transformer space, garbage-house provision, parking use of the approved stilt/cellar areas and an occupancy certificate before occupation. The permit also states that it does not confer ownership rights.
1. Project at a glance
Project identity
Registered project name: MOIZ HOUSING PROJECT - I
Project type: Residential apartment project
Phase / registered portion: Phase not disclosed; the RERA registration is for MOIZ HOUSING PROJECT - I.
TG-RERA registration: P02500001006; issued 12/07/2019, valid to 03/11/2024. The available certificate says it was not extended; registration validity is distinct from the stated construction completion date.
Registered promoter: MOIZ HOUSING PROJECTS; partnership.
RERA status in available record: The certificate records registration through 03/11/2024. No extension is recorded in the supplied evidence; current status should be confirmed directly with TG-RERA.
Land and geographic identity
Locality: KAMLAPURI COLONY; the RERA certificate also identifies Shaikpet locality.
Revenue village: RERA project fields do not disclose a revenue village. The GHMC building-permit order identifies Shaikpet Village; the title material also uses Shaikpet and Yousufguda/Yousuffguda descriptions.
Mandal / district / PIN: Shaikpet / Hyderabad / 500081.
Survey identity: Survey No. 133; the GHMC permit describes old Survey No. 347 corresponding to new Survey No. 133. No project subdivision is disclosed in the RERA land fields.
Site address reference: Plot No. 8-3-678/132,133/1.
Registered site extent: 547.57 sq m total and net area; the permit records road-affected area as 0 sq m.
Boundaries: North: 12 FEET ROAD; South: EXISTING BUILDING; East and West: OPEN LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order No. 2/C19/17239/2018; file No. 2/C19/18646/2018; approved 03 November, 2018.
Building / configuration: One proposed residential Building A, sanctioned as stilt plus five upper floors. The permit states height 14.99 m.
Approved built-up area: Residential: 1,342.80 m²; stilt: 263.41 m². The permit separately lists site area 547.57 m².
Sanctioned parking level: The permit identifies the stilt as parking; it does not provide a parking-space count.
Unit counts: GHMC permit: the number of sanctioned units is not stated in the supplied extraction. RERA filing: 10 3BHK units.
Layout approval: Layout/subdivision reference LRS27072016024821 is listed in the permit. A separate approved layout plan is not available in the supplied material.
Offering and status
RERA-filed offering: 10 units, all recorded as 3BHK; filed saleable area 134.28 m² per unit.
Booked / available: 0 booked and 10 available in the portal data supplied; no as-of date is provided, so these counts are indicative rather than a live availability check.
Construction stage: No verified site-progress or construction-stage record is supplied.
Completion deadline: The RERA certificate and GHMC permit state completion by 03/11/2024. This is separate from the registration validity date.
Revised completion date: No revised completion date is disclosed in the supplied evidence.
Occupancy / completion certificate: No occupancy or completion certificate is supplied or recorded in the reviewed documents; certificate status should be confirmed with GHMC and TG-RERA.
2. The project story
MOIZ HOUSING PROJECT - I is registered as a residential apartment project at Kamlapuri Colony, in the Shaikpet mandal of Hyderabad. The RERA record identifies Survey No. 133, with the GHMC permit linking the site to old Survey No. 347 and new Survey No. 133. The permit describes one proposed building, Building A, with a stilt and five upper floors.
The RERA filing records ten 3BHK homes, with none shown as booked in the supplied portal snapshot. No construction-progress evidence or occupancy/completion certificate is included, so the project’s physical completion and current handover status cannot be established from these materials. The stated completion deadline was 03/11/2024; that date is not itself evidence that construction was completed or that an occupancy certificate was issued.
3. Master plan, architecture & building design
The GHMC permit describes a single proposed residential building, Building A, on a 547.57 m² site, with a stilt and five upper residential floors. It records 1,342.80 m² of residential built-up area and 263.41 m² for the stilt, with a stated building height of 14.99 m. These are permit figures; the supplied evidence does not provide a separately identified FSI-counted area, carpet-area schedule, floor-by-floor unit arrangement, or building footprint.
The permit lists two rainwater-harvesting structures, 25 trees and a compound wall of 88.23 running metres; it records the tot-lot area as 0 m². A separate approved layout drawing was not available in the supplied material, and the building-permit extraction does not establish the number of flats per floor, lift or stair arrangements, common-area distribution, or detailed circulation.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 134.28 m² | Not supplied | Not supplied |
The RERA filing identifies only the 3BHK configuration and gives its saleable area as 134.28 m². The available floor-plan extraction does not provide a measured drawing-based carpet area for that RERA-filed configuration.
A software measurement of two 2BHK designs from the drawing file reports carpet area of 78.2–78.4 m² (median 78.3 m²). This is a drawing-based software measurement, not a RERA-filed unit configuration or area disclosure; the 2BHK is not listed in the supplied RERA unit schedule. The measured example includes living/dining, bedrooms, toilets, kitchen and a utility; the utility is excluded from the software carpet-area calculation. Verify any drawing measurement against the original plan.
Carpet area and saleable area are different measurements: the supplied drawing-measurement note describes RERA saleable area as also including the home’s share of common areas. No unit-specific balcony, utility, or loading schedule is supplied for the RERA-filed 3BHK homes.
5. Parking & vehicle circulation
The GHMC permit identifies the stilt as a parking level and states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking. The supplied permit extraction does not state the number of car or two-wheeler spaces, and no approved parking plan or unit-wise parking allocation is available here.
The RERA unit record marks the 3BHK units as mortgaged, but it does not establish an individual buyer’s parking entitlement. Visitor, accessible or EV-charging spaces, parking circulation, ramps and pedestrian separation are not documented in the supplied project records. A space shown on a plan, if any, would not by itself establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Rainwater harvesting | Two structures; permit specifies a percolation pit. | GHMC building permit | Required by the permit; completion is not independently verified. |
| Transformer space | Space to be provided on site. | GHMC building permit | Permit condition; completion is not independently verified. |
| Garbage house | Required within the premises. | GHMC building permit | Permit condition; completion is not independently verified. |
| Trees | 25 listed. | GHMC building permit | Permit figure; planting and current status are not verified. |
| Tot-lot / recreational open space | Permit records 0 m² for tot-lot. | GHMC building permit | Permit figure. |
| Community buildings | RERA amenities record shows 0%. | RERA amenities record | No completion evidence supplied. |
The vendor material lists a range of facilities, including a clubhouse, swimming pool, gym, children’s play area, landscaped garden and indoor games. These are vendor claims, not established by the supplied GHMC permit or RERA amenities record; their project-specific approval, provision and delivery are not evidenced here.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting percolation pit, transformer space and a garbage house. It also requires that the sanctioned plan be followed and that an occupancy certificate be obtained before occupation. These are permit requirements, not proof that the facilities have been installed or that statutory compliance has been completed.
The RERA amenities record marks water supply, sewerage, water conservation/rainwater harvesting, energy management, fire protection and fire safety, and electrical meter room/sub-station/receiving station as “YES” and 100%. The same record reports 0% for storm-water drains, street lighting, solid-waste management and treatment/disposal of sewage and sullage water. No supporting service-capacity schedules or independent completion verification are supplied.
The supplied project records do not specify water sources or storage capacity, STP capacity or reuse arrangements, electrical supply or backup capacity, lift numbers or capacities, fire-system details, CCTV/security arrangements, or accessibility provisions. Vendor references to water supply, a sewage treatment plant, power backup, lifts, fire safety and CCTV are not project-specific verification of installed or approved services.
8. Location, access & connectivity
The registered project location is Kamlapuri Colony, Shaikpet mandal, Hyderabad district, PIN 500081. The GHMC permit identifies Shaikpet Village and describes a road frontage in its boundary schedule; it records a road width of 18 m in the permit extraction. The RERA boundary schedule separately describes the northern boundary as a 12 FEET ROAD.
The supplied location record identifies Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. This is a recorded distance, not a travel-time estimate. The records do not provide verified public-transport routes or additional measured distances to landmarks.
9. Developer & development status
The registered promoter is MOIZ HOUSING PROJECTS, identified as a partnership in the RERA organization fields. Its GSTIN is 36AAQFM4053M2ZQ. The listed partners are MOIZUDDIN MOHAMMED, FATIMUNNISA IBRAHIM, SARA SULTHANA and HUSNA MOIZ; MUDASSAR MOIZ MOHAMMED is listed as an authorized signatory.
The RERA certificate gives a promoter-office address in Maredpally, Hyderabad, PIN 500026. The project address is in Kamlapuri Colony, PIN 500081; these are separate address fields in the supplied records. No official promoter website or contact details are supplied.
The promoter’s Form B affidavit declares a 24-month completion period and states that the land is free of encumbrances; these are promoter declarations, not independent findings. The supplied record does not establish actual construction progress, a revised timeline, or current occupancy status.
10. Approvals, official records & documents
| What the supplied evidence establishes | FORM “C” records registration P02500001006 for MOIZ HOUSING PROJECT - I, issued 12/07/2019, with stated validity to 03/11/2024. |
|---|
| What the supplied evidence establishes | Building Permit Order No. 2/C19/17239/2018, file No. 2/C19/18646/2018, approved 03 November, 2018; identifies Building A, stilt plus five upper floors. |
|---|
| What the supplied evidence establishes | LRS27072016024821 appears in the building-permit record. A separate approved layout plan is not available in the supplied material. |
|---|
| What the supplied evidence establishes | Affidavit by Mohammed Mudassar Moiz for MOIZ HOUSING PROJECTS, dated “19# day of March 2019” in the extraction; includes promoter declarations on title, encumbrances and completion. |
|---|
| What the supplied evidence establishes | Requests recognition of Mohammed Mudassar Moiz as authorized signatory for MOIZ HOUSING PROJECTS. The extraction does not give a declaration date. |
|---|
| What the supplied evidence establishes | No such certificate is included in the supplied documents. |
|---|
The GHMC permit lists conditions including commencement and completion notices, rainwater harvesting, transformer space, garbage-house provision, parking use of the approved stilt/cellar areas and an occupancy certificate before occupation. The permit also states that it does not confer ownership rights.
Frequently asked questions
Is MOIZ HOUSING PROJECT - I registered with Telangana RERA?
Yes. MOIZ HOUSING PROJECT - I is registered with the Telangana Real Estate Regulatory Authority as P02500001006; the registration status is New Project.
Who is the developer of MOIZ HOUSING PROJECT - I?
The promoter named in the RERA registration is MOIZ HOUSING PROJECTS.
Where is MOIZ HOUSING PROJECT - I located?
MOIZ HOUSING PROJECT - I is in KAMLAPURI COLONY, Shaikpet, Hyderabad, Telangana (500081).
When will MOIZ HOUSING PROJECT - I be completed?
The promoter's proposed date of completion filed with RERA is 03/11/2024. This is the promoter's declaration, not a guarantee.