Model Town
Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY · Yadadri Bhuvanagiri · RERA P02000007630
MODEL TOWN is a residential plotted development located in Bahadurpet, Alair Mandal, Yadadri Bhuvanagiri District. The registered promoter is Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY. The project covers 7,093.26 sq.m and is a layout of 19 open plots, with drawing-derived plot sizes ranging from 163.89 to 293.05 sq.m; no towers or floors are stated. It is registered under TG-RERA number P02000007630, with a proposed completion date of 23 July 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | MODEL TOWN RERA record |
| Project type | Plotted development / residential layout RERA record |
| Phase / registered portion | Phase not separately identified; the registration and layout records refer to the project at Sy. No. 72 RERA record |
| TG-RERA registration | P02000007630 RERA record |
| Registration validity | 29/01/2024 to 23/07/2024, as stated on the registration certificate; no extension is evidenced in the supplied record RERA record |
| Registered promoter | Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY RERA record RERA filing |
| RERA project status | The header identifies the project as “New Project”; the certificate gives the validity dates above. Current registration status is not established by the supplied record. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Bahadurpet; the registration certificate and layout approval also describe the site as being in Bahadurpet Village and Alair Revenue Village, respectively. RERA record |
| Mandal / district / PIN | Alair Mandal / Yadadri Bhuvanagiri District / 508101 RERA record |
| Project survey number(s) | Sy. No. 72; no project subdivision is specified in the registration certificate or layout approval. RERA record |
| Registered site extent | 7,093.26 sq.m in the project record; the layout approval also states a total layout extent of 7,093.26 sq.m. RERA filing |
| Area figures recorded separately | Total area: 7,093.26 sq.m; road-affected area: 414.80 sq.m; net area: 6,678.46 sq.m. The layout drawing’s area statement gives a total net layout figure of 6,677.75 sq.m. RERA filing |
| Boundaries in the project record | North: Others Land; South: Others Land; East: Others Land; West: Road RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Alair Municipality / Municipal Corporation, for the tentative layout approval |
| Principal layout approval | 0008/LO/3102/2022, dated 23 July 2022; tentative layout approval for 19 plots |
| Other drawing approval reference | TS/041371/2022, dated 28-06-2022, shown on the layout drawing record Approvals record |
| Approved built-up area / buildings | The layout record states proposed coverage area 0.00 and net BUA built-up area 0.00; this is a plotted layout, not a building or apartment schedule. |
| Approved floors / parking levels | Not applicable to the plotted-layout records supplied; no building floor configuration or parking levels are stated. |
| Approved units | 19 plots in the tentative layout approval. |
| RERA-declared unit count | The supplied RERA project fields do not provide a plot inventory count. The layout drawing records 19 plots. RERA filing |
Offering and status
| Item | Record |
|---|---|
| Unit type | Open plots; no apartment or villa configurations are evidenced. |
| Plot count and measured size information | Drawing-derived schedule: 19 plots, with sizes ranging from 163.89 to 293.05 sq.m (196.0 to 350.5 sq.yd); these are software-measured from the drawing and should be checked against it. Layout record |
| Booked / available counts | Not disclosed in the supplied project record. RERA filing |
| Development stage | The supplied evidence establishes a tentative layout approval and RERA registration, but does not establish independently verified on-site completion or current construction progress. |
| Completion deadline | Promoter’s Form B declares completion by 23 July 2024; the RERA certificate validity also ends on 23/07/2024. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project evidence. Document index |
The project story
MODEL TOWN is presented in TG-RERA records as a residential plotted layout in Sy. No. 72 at Bahadurpet, Alair Mandal, Yadadri Bhuvanagiri District. The tentative layout approval records 19 plots, with internal roads and land reserved for parks/open space, social infrastructure and utilities. It is a land subdivision offering, not a documented apartment or villa development. RERA record
The approval record describes the layout as tentative and makes the layout applicant responsible for carrying out the infrastructure and amenity works. The supplied file contains no independently verified site-progress report or completion certificate, so the approval and promoter’s stated completion undertaking should not be read as proof that the layout works are complete or that the project has received completion certification. Document index
Master plan, architecture & building design
The approved drawing record describes a 19-plot residential layout, rather than a building scheme. Its land-use statement allocates 3,924.19 sq.m (58.76%) to plotted area, 1,909.07 sq.m (28.59%) to roads, 606.85 sq.m (9.09%) to organized open space/park, 167.56 sq.m (2.51%) to social infrastructure and 70.08 sq.m (1.05%) to utilities. It records no amenity area, buffer zone, green belt or common parking area.
The drawing identifies internal road widths of 9.04 mt. and 9.14 mt., an existing road of 10.05 MT, and a proposed road of 18.00 MT. The approval record separately identifies 414.80 sq.m as road-affected/reserve road area. These are drawing and approval-record figures; no building footprint, floor configuration, apartment area or phase-wise building organization is supplied. RERA filing
The tentative approval records Plots 14 and 15 as mortgaged to the Municipality/Municipal Corporation, with a stated mortgage extent of 0 Acer 6.06 Gts 734 Sq. Yds; the project record gives a mortgage area of 613.49 sq.m. The approval says development works must be completed and the mortgaged land released before final layout release. RERA filing
Homes, configurations & floor plans
The offering evidenced in the project documents is open plots, not homes within buildings. The layout schedule contains 19 plots. Software measurement of the drawing gives plot sizes from 163.89 sq.m to 293.05 sq.m, with a median of 205.01 sq.m; sizes are drawing-derived and not stated as RERA-filed saleable areas. Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 19 shown on the layout drawing | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
For plotted land, “carpet area” and apartment common-area loading do not apply. The measured plot sizes above describe the areas read from the layout drawing; the project record does not provide a plot-wise booking or availability schedule. Layout record RERA filing
Parking & vehicle circulation
The drawing-derived land-use statement records 0.00 common parking area, and the tentative approval’s conditions describe roads and access within the layout. No sanctioned parking-space count, visitor or accessible parking allocation, parking arrangement for individual plots, or vehicle entry/exit design is established by the supplied evidence. A plot purchase should not be assumed to include a separately allocated parking space.
Amenities, recreation & open spaces
The tentative layout approval requires the applicant to develop infrastructure and amenities; it also requires eventual handover of designated open space, utilities and roads to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout. The project evidence does not independently establish that these works or handovers have been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 606.85 sq.m; 9.09% of the drawing’s land-use base | Reserved in layout; completion and handover not verified | |
| Social infrastructure | 167.56 sq.m; 2.51% | Reserved in layout; facility type and delivery status not specified | |
| Tot-lot | Listed among layout amenities/utilities; no size or equipment details stated | Listed in drawing record; completion not verified | |
| Internal roads | 1,909.07 sq.m; 28.59%; road widths include 9.04 mt. and 9.14 mt. internal roads | Required as layout works; completion and handover not verified |
The supplied project amenity record reports internal roads, water supply, sewerage/drainage, storm-water drains, street lighting and a green strip/tot-lot/park, with progress percentages shown in the record. These are project-reported fields, not independent verification of delivery. RERA amenities
Utilities, building services & safety
The tentative layout approval lists infrastructure works to be carried out by the applicant: road formation with black top; storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines and street lights; a transformer; avenue plantation; park development; and rainwater-harvesting pits. It also requires construction of an overhead tank/sump and septic tank as applicable, together with sufficient harvesting pits. No capacities or completed-system test records are supplied.
The project amenity record marks water supply as 100% and records 50% for sewerage, storm-water drains, street lighting, internal roads/footpaths and treatment/disposal of sewage and sullage; it shows 0% for water conservation/rainwater harvesting and electrical meter room/sub-station/receiving station. These percentages are project-record disclosures, not independent site verification. RERA amenities
Fire systems, backup power, CCTV, security arrangements, accessibility features and detailed waste-management facilities are not established by the supplied project documents. The tentative approval lists solid-waste management among utility provisions, but the project amenity record shows that item at 0%. RERA amenities
Location, access & connectivity
The registered project location is Bahadurpet, Alair Mandal, Yadadri Bhuvanagiri District, Telangana, 508101, on Sy. No. 72. The cadastral parcel centroid is recorded at 17.62220898446096, 79.04233073682433. The project record states the western boundary is a road; the layout drawing also identifies internal roads and the existing and proposed road widths listed above. RERA record RERA filing Cadastral map
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 42.9 km. This is a recorded distance estimate; no public-transport information or verified travel-time data is supplied. Location record
Developer & development status
The registered promoters are Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY. The project record describes their organization type as “Others,” with the description “JOINT DEVELOPERS”; a separate incorporated legal-entity type is not established in the supplied evidence. RERA record RERA filing Corporate record
The registration certificate identifies the same promoters and the project as MODEL TOWN. The promoter’s Form B declares a completion date of 23 July 2024. The supplied record does not establish a revised completion date, current construction progress, or completed layout works. Document index
Approvals, official records & documents
| Record | What the supplied project file shows |
|---|---|
| TG-RERA registration certificate | Form C for MODEL TOWN, registration P02000007630; valid 29/01/2024 to 23/07/2024 as stated on the certificate. |
| Layout drawing / approval record | Drawing reference TS/041371/2022, dated 28-06-2022; records the 19-plot residential layout in Sy. No. 72 and its area statement. |
| Tentative layout approval | 0008/LO/3102/2022, issued by Alair Municipality/Municipal Corporation and dated 23 July 2022; application 005383/LO/DTCP/3102/0012/2022. |
| Project declaration | Promoter Form B declares title, absence of encumbrances, project-fund undertakings, pending approvals and completion by 23 July 2024. These are promoter declarations. |
| Completion / occupancy record | No completion certificate or occupancy certificate is included in the supplied evidence. Document index |
The supplied documents describe the layout approval as tentative. The approval conditions require infrastructure works and later transfer of designated roads, open space and utilities; the full conditions are recorded in the approval document.
Project at a glance
Project identity
Registered project name: MODEL TOWN
Project type: Plotted development / residential layout
Phase / registered portion: Phase not separately identified; the registration and layout records refer to the project at Sy. No. 72
TG-RERA registration: P02000007630
Registration validity: 29/01/2024 to 23/07/2024, as stated on the registration certificate; no extension is evidenced in the supplied record
Registered promoter: Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY
RERA project status: The header identifies the project as “New Project”; the certificate gives the validity dates above. Current registration status is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Bahadurpet; the registration certificate and layout approval also describe the site as being in Bahadurpet Village and Alair Revenue Village, respectively.
Mandal / district / PIN: Alair Mandal / Yadadri Bhuvanagiri District / 508101
Project survey number(s): Sy. No. 72; no project subdivision is specified in the registration certificate or layout approval.
Registered site extent: 7,093.26 sq.m in the project record; the layout approval also states a total layout extent of 7,093.26 sq.m.
Area figures recorded separately: Total area: 7,093.26 sq.m; road-affected area: 414.80 sq.m; net area: 6,678.46 sq.m. The layout drawing’s area statement gives a total net layout figure of 6,677.75 sq.m.
Boundaries in the project record: North: Others Land; South: Others Land; East: Others Land; West: Road
Development identity
Sanctioning authority: Alair Municipality / Municipal Corporation, for the tentative layout approval
Principal layout approval: 0008/LO/3102/2022, dated 23 July 2022; tentative layout approval for 19 plots
Other drawing approval reference: TS/041371/2022, dated 28-06-2022, shown on the layout drawing record
Approved built-up area / buildings: The layout record states proposed coverage area 0.00 and net BUA built-up area 0.00; this is a plotted layout, not a building or apartment schedule.
Approved floors / parking levels: Not applicable to the plotted-layout records supplied; no building floor configuration or parking levels are stated.
Approved units: 19 plots in the tentative layout approval.
RERA-declared unit count: The supplied RERA project fields do not provide a plot inventory count. The layout drawing records 19 plots.
Offering and status
Unit type: Open plots; no apartment or villa configurations are evidenced.
Plot count and measured size information: Drawing-derived schedule: 19 plots, with sizes ranging from 163.89 to 293.05 sq.m (196.0 to 350.5 sq.yd); these are software-measured from the drawing and should be checked against it.
Booked / available counts: Not disclosed in the supplied project record.
Development stage: The supplied evidence establishes a tentative layout approval and RERA registration, but does not establish independently verified on-site completion or current construction progress.
Completion deadline: Promoter’s Form B declares completion by 23 July 2024; the RERA certificate validity also ends on 23/07/2024.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project evidence.
The project story
MODEL TOWN is presented in TG-RERA records as a residential plotted layout in Sy. No. 72 at Bahadurpet, Alair Mandal, Yadadri Bhuvanagiri District. The tentative layout approval records 19 plots, with internal roads and land reserved for parks/open space, social infrastructure and utilities. It is a land subdivision offering, not a documented apartment or villa development.
The approval record describes the layout as tentative and makes the layout applicant responsible for carrying out the infrastructure and amenity works. The supplied file contains no independently verified site-progress report or completion certificate, so the approval and promoter’s stated completion undertaking should not be read as proof that the layout works are complete or that the project has received completion certification.
Master plan, architecture & building design
The approved drawing record describes a 19-plot residential layout, rather than a building scheme. Its land-use statement allocates 3,924.19 sq.m (58.76%) to plotted area, 1,909.07 sq.m (28.59%) to roads, 606.85 sq.m (9.09%) to organized open space/park, 167.56 sq.m (2.51%) to social infrastructure and 70.08 sq.m (1.05%) to utilities. It records no amenity area, buffer zone, green belt or common parking area.
The drawing identifies internal road widths of 9.04 mt. and 9.14 mt., an existing road of 10.05 MT, and a proposed road of 18.00 MT. The approval record separately identifies 414.80 sq.m as road-affected/reserve road area. These are drawing and approval-record figures; no building footprint, floor configuration, apartment area or phase-wise building organization is supplied.
The tentative approval records Plots 14 and 15 as mortgaged to the Municipality/Municipal Corporation, with a stated mortgage extent of 0 Acer 6.06 Gts 734 Sq. Yds; the project record gives a mortgage area of 613.49 sq.m. The approval says development works must be completed and the mortgaged land released before final layout release.
Homes, configurations & floor plans
The offering evidenced in the project documents is open plots, not homes within buildings. The layout schedule contains 19 plots. Software measurement of the drawing gives plot sizes from 163.89 sq.m to 293.05 sq.m, with a median of 205.01 sq.m; sizes are drawing-derived and not stated as RERA-filed saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 19 shown on the layout drawing | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not disclosed |
For plotted land, “carpet area” and apartment common-area loading do not apply. The measured plot sizes above describe the areas read from the layout drawing; the project record does not provide a plot-wise booking or availability schedule.
Parking & vehicle circulation
The drawing-derived land-use statement records 0.00 common parking area, and the tentative approval’s conditions describe roads and access within the layout. No sanctioned parking-space count, visitor or accessible parking allocation, parking arrangement for individual plots, or vehicle entry/exit design is established by the supplied evidence. A plot purchase should not be assumed to include a separately allocated parking space.
Amenities, recreation & open spaces
The tentative layout approval requires the applicant to develop infrastructure and amenities; it also requires eventual handover of designated open space, utilities and roads to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout. The project evidence does not independently establish that these works or handovers have been completed.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 606.85 sq.m; 9.09% of the drawing’s land-use base | Reserved in layout; completion and handover not verified | |
| Social infrastructure | 167.56 sq.m; 2.51% | Reserved in layout; facility type and delivery status not specified | |
| Tot-lot | Listed among layout amenities/utilities; no size or equipment details stated | Listed in drawing record; completion not verified | |
| Internal roads | 1,909.07 sq.m; 28.59%; road widths include 9.04 mt. and 9.14 mt. internal roads | Required as layout works; completion and handover not verified |
The supplied project amenity record reports internal roads, water supply, sewerage/drainage, storm-water drains, street lighting and a green strip/tot-lot/park, with progress percentages shown in the record. These are project-reported fields, not independent verification of delivery.
Utilities, building services & safety
The tentative layout approval lists infrastructure works to be carried out by the applicant: road formation with black top; storm-water drains; underground drainage lines and a common septic tank/STP; internal water-supply pipelines, an overhead tank and an assured water-supply source; electrical supply lines and street lights; a transformer; avenue plantation; park development; and rainwater-harvesting pits. It also requires construction of an overhead tank/sump and septic tank as applicable, together with sufficient harvesting pits. No capacities or completed-system test records are supplied.
The project amenity record marks water supply as 100% and records 50% for sewerage, storm-water drains, street lighting, internal roads/footpaths and treatment/disposal of sewage and sullage; it shows 0% for water conservation/rainwater harvesting and electrical meter room/sub-station/receiving station. These percentages are project-record disclosures, not independent site verification.
Fire systems, backup power, CCTV, security arrangements, accessibility features and detailed waste-management facilities are not established by the supplied project documents. The tentative approval lists solid-waste management among utility provisions, but the project amenity record shows that item at 0%.
Location, access & connectivity
The registered project location is Bahadurpet, Alair Mandal, Yadadri Bhuvanagiri District, Telangana, 508101, on Sy. No. 72. The cadastral parcel centroid is recorded at 17.62220898446096, 79.04233073682433. The project record states the western boundary is a road; the layout drawing also identifies internal roads and the existing and proposed road widths listed above.
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 42.9 km. This is a recorded distance estimate; no public-transport information or verified travel-time data is supplied.
Developer & development status
The registered promoters are Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY. The project record describes their organization type as “Others,” with the description “JOINT DEVELOPERS”; a separate incorporated legal-entity type is not established in the supplied evidence.
The registration certificate identifies the same promoters and the project as MODEL TOWN. The promoter’s Form B declares a completion date of 23 July 2024. The supplied record does not establish a revised completion date, current construction progress, or completed layout works.
Approvals, official records & documents
TG-RERA registration certificate: Form C for MODEL TOWN, registration P02000007630; valid 29/01/2024 to 23/07/2024 as stated on the certificate.
Layout drawing / approval record: Drawing reference TS/041371/2022, dated 28-06-2022; records the 19-plot residential layout in Sy. No. 72 and its area statement.
Tentative layout approval: 0008/LO/3102/2022, issued by Alair Municipality/Municipal Corporation and dated 23 July 2022; application 005383/LO/DTCP/3102/0012/2022.
Project declaration: Promoter Form B declares title, absence of encumbrances, project-fund undertakings, pending approvals and completion by 23 July 2024. These are promoter declarations.
Completion / occupancy record: No completion certificate or occupancy certificate is included in the supplied evidence.
The supplied documents describe the layout approval as tentative. The approval conditions require infrastructure works and later transfer of designated roads, open space and utilities; the full conditions are recorded in the approval document.
Frequently asked questions
Is MODEL TOWN registered with Telangana RERA?
Yes. MODEL TOWN is registered with the Telangana Real Estate Regulatory Authority as P02000007630; the registration status is New Project.
Who is the developer of MODEL TOWN?
The promoter named in the RERA registration is Sri. AVANAGANTI PANDU AND GADDAM KONDAL REDDY.
Where is MODEL TOWN located?
MODEL TOWN is in Alair, Bahadurpet, Yadadri Bhuvanagiri, Telangana (508101).
When will MODEL TOWN be completed?
The promoter's proposed date of completion filed with RERA is 23/07/2024. This is the promoter's declaration, not a guarantee.