Metro Colony

MOHD · Sangareddy · RERA P01100007382

METRO COLONY is a residential plotted layout in ZAHEERABAD, ZAHEERABAD Mandal, Sangareddy District. The registered promoter is Mohd Matloob Ahmed. The project record states a registered site extent of 26,547.88 sq m and the tentative layout approval describes 101 residential plots; plot sizes are 84.99–253.38 sq m (101.6–303.0 sq yd), for detached dwelling houses designed for single-family occupation. The project is registered with TG-RERA under P01100007382, with certificate validity from 19 December 2023 to 17 August 2025; the promoter’s Form B declaration states a completion date of 17 August 2024.

01What we found

Period endedTG-RERA registration ran to 17 Aug 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
1court case on this project's land (survey 243, Zaheerabad)
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameMETRO COLONY RERA record
Project typePlotted development / residential plotted layout RERA record
Phase / registered portionPhase not disclosed; TG-RERA registration is for the project as identified on the certificate
TG-RERA registrationP01100007382
Registration validity19 December 2023–17 August 2025; certificate says it is not extended
Registered promoterMohd Matloob Ahmed; the project header uses “MOHD” RERA record
RERA status“New Project” in the project record; the supplied certificate’s stated validity has ended, and no extension is shown in the supplied evidence RERA record

Land and geographic identity

FieldRecord
LocalityZAHEERABAD RERA record
Revenue villageZAHEERABAD Revenue Village; also stated in the title material as Zahirabad [N.P.] Village
Mandal / district / PINZAHEERABAD / Sangareddy / 502220 RERA record
Survey numbers and subdivisions243/A/3/1/2/1/1; 243/A/2/1/2; 243/A/1/1/2; 246/A2/5/1; 246/A1/1/1; 246/A2/4/3; 246/A1/2/1
Registered site extent26,547.88 sq m in the project record; approval document states “6 Acer 22.4 Gts 31751 Sq. Yds” RERA filing
Net / affected areaProject record: net area 17,063.69 sq m and road-widening/FTL/nala-widening affected area 9,484.19 sq m RERA filing
Layout drawing area statement26,546.79 sq m total/net layout area Layout record
BoundariesEast: OTHERS LAND; West: OTHERS LAND; North: S Y NO 243; South: OTHERS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityZAHEERABAD Municipality/Municipal Corporation
Principal approvalTentative layout approval No. 0010/LO/3057/2022, dated 17 August 2022 Approvals record
Application number004289/LO/DTCP/3057/0017/2022 Approvals record
Approved built-up area17,063.69 sq m is recorded as “Approved Built up Area” in the project information; for this plotted layout, no building-level built-up schedule is supplied RERA filing
Plot count101 plots, stated in the tentative layout approval and plot schedule Layout record
Towers / floors / parking levelsNot disclosed; the evidence concerns a plotted layout, not a tower or apartment building Document index

Offering and status

FieldRecord
Offered unit typeResidential plots; the RERA-filed layout approval allows detached dwelling houses for single-family occupation
Plot size rangeSoftware-read from the approved layout drawing: 84.99–253.38 sq m (101.6–303.0 sq yd) Layout record
Booked / available plotsNot supplied RERA filing
Construction stageNo independently verified site-progress evidence supplied. The project’s RERA amenity records show 0% for each listed item; this is a recorded progress figure, not an independent site inspection RERA amenities
Completion datesForm B promoter declaration: 17 August 2024; RERA certificate validity ends 17 August 2025
Occupancy / completion certificateNot supplied. No building-level or phase-wise OC/CC status is established by the supplied documents Document index

2. The project story

METRO COLONY is a residential plotted layout in ZAHEERABAD Revenue Village, ZAHEERABAD Mandal, Sangareddy District. Its identified land comprises seven survey-number subdivisions: 243/A/3/1/2/1/1, 243/A/2/1/2, 243/A/1/1/2, 246/A2/5/1, 246/A1/1/1, 246/A2/4/3 and 246/A1/2/1. The tentative layout approval describes 101 plots and requires detached single-family dwellings; the supplied evidence does not establish that homes have been constructed or that any are ready for occupation.

The approval is expressly for a tentative layout. It assigns land to plots, roads, open space, social infrastructure and utilities, and sets development obligations for the layout applicant. The approval document describes infrastructure works to be carried out by the applicant; it does not establish that those works are complete. No independent site inspection or verified construction-progress evidence is included. RERA amenities

3. Master plan, architecture & building design

The approved drawing records 101 plots across two layout sheets. Software extraction from the drawing identifies plot sizes from 84.99 to 253.38 sq m, with a median of 139.36 sq m; 42 plots are shown at 139.36 sq m. The drawing-based plot schedule and area readings should be checked against the original drawing. Layout record

Layout useAreaShare shown in drawing
Plots13,739.77 sq m51.76%
Roads9,483.90 sq m35.73%
Parks / open space2,389.48 sq m9.00%
Utilities268.82 sq m1.01%
Social infrastructure664.82 sq m2.50%
Amenities0.00 sq m0.00%

The approval document separately states an extent of “6 Acer 22.4 Gts 31751 Sq. Yds” and lists 101 plots. It reserves 9% for open space, 2.5% for social infrastructure and 1.01% for utilities, and specifies 35.73% for roads and 51.76% for plotted area. Layout record

The layout approval records a mortgage by conditional sale of Plot Nos. 19, 30, 29, 20, 28, 21, 22, 27, 26, 23, 25, 31, 33, 32, 17 and 18, under deed No. 7272/2022, in favour of the Municipality/Municipal Corporation. The approval states that development works must be completed and the mortgaged land released before final layout release and relevant development/building permissions.

No building plans, dwelling-house floor plans, building footprints, floor configurations or residential/commercial building areas are supplied. The RERA-filed approval calls for roads to be opened to neighbouring sites and prohibits a compound wall or fencing around the site.

4. Homes, configurations & floor plans

The RERA-filed offering is for plots, not pre-configured apartments. The layout approval states that only detached dwelling houses designed for single-family occupation may be built on a site. The supplied records do not state booked or available plot counts, plot-specific prices, or plot-to-buyer allocations. RERA filing

Plot informationSupplied figure
Plots in approved layout101
Software-read size range84.99–253.38 sq m (101.6–303.0 sq yd)
Median software-read plot size139.36 sq m (166.7 sq yd)
Plots in 100–150 sq yd band33
Plots in 150–200 sq yd band57
Plots in 200–250 sq yd band9
Plots in 250–300 sq yd band1
Plots in 300–400 sq yd band1
Booked / availableNot supplied

These sizes are software-read from the approved layout drawing, not RERA-filed apartment saleable or carpet areas. No home floor-plan measurements are available: the supplied drawing review reports two layout sheets and no flat plans to measure. Layout record Floor plans

5. Parking & vehicle circulation

No sanctioned parking-space count, visitor or accessible parking provision, parking arrangement, or buyer-specific parking allocation is supplied. The layout approval provides for roads and requires roads to be opened for access to neighbouring sites, but does not provide a parking schedule or vehicle-circulation drawing in the supplied evidence. Document index

6. Amenities, recreation & open spaces

The tentative layout approval describes facilities and works to be provided by the layout applicant; it does not establish completion. The RERA amenity record lists the following 14 items at 0% progress each. RERA amenities

Park / open space
Description / size2,389.48 sq m in the layout drawing; approval states 9%
Evidence sourceLayout record
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Social infrastructure
Description / size664.82 sq m in the layout drawing; approval states 2.5%
Evidence sourceLayout record
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Roads and footpaths
Description / size9,483.90 sq m of road area in the layout drawing; approval requires road formation with black top
Evidence sourceLayout record
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Utilities area
Description / size268.82 sq m in the layout drawing; approval lists water reservoir, septic tank/STP, electric transformer and solid-waste facilities
Evidence sourceLayout record
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Storm-water drains
Description / sizeSpecified in approval; no capacity stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Sewerage / sewage and sullage treatment
Description / sizeApproval describes underground drainage lines and a common septic tank/STP
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Internal water supply
Description / sizeApproval describes internal pipelines, an assured water-supply source, and an overhead tank/sump
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Electrical supply and street lighting
Description / sizeApproval describes electrical supply lines, street lights and a transformer
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Avenue plantation and park development
Description / sizeListed in the layout approval; no quantities or capacities stated
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Rainwater harvesting
Description / sizeApproval requires harvesting pits; no number or capacity stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded amenity progress: 0%; not independently verified complete
Community buildings
Description / sizeListed in RERA amenity records; no building, area or facility details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress: 0%; not independently verified complete
Solid-waste management and disposal
Description / sizeListed in the approval and RERA amenity records; no capacity stated
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress: 0%; not independently verified complete
Energy management
Description / sizeListed in RERA amenity records; no system details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress: 0%; not independently verified complete
Fire protection and fire safety
Description / sizeListed in RERA amenity records; no system details supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress: 0%; not independently verified complete

Vendor listings mention a clubhouse, swimming pool, gym, children’s play area, landscaped garden and security; these are vendor-marketed claims, not facilities established by the supplied tentative layout approval or RERA amenity progress record. Promoter website

7. Utilities, building services & safety

The layout approval specifies internal water-supply pipelines, an assured water-supply source, an overhead tank/sump, underground drainage, a common septic tank/STP, storm-water drains, electrical supply lines, a transformer, street lights, solid-waste management and rainwater-harvesting pits. It does not state capacities, the source of water, treatment specifications, backup-power provision or the completion status of these works.

The RERA amenity record reports 0% progress for water supply, sewerage, storm-water drainage, waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical facilities. This is the supplied recorded progress; no independent completion verification is provided. RERA amenities

No evidence is supplied for building lifts, escape stairs, fire-system design or clearances, security systems, CCTV, access control, accessible routes, ramps or EV charging. The approval’s infrastructure description is not, by itself, evidence that any facility is completed or that a statutory clearance has been issued. Document index

8. Location, access & connectivity

The registered location is ZAHEERABAD, ZAHEERABAD Mandal, Sangareddy District, Telangana 502220, at the seven listed survey subdivisions in ZAHEERABAD Revenue Village. RERA record

The supplied layout approval requires the roads to be opened for access to neighbouring sites. The location data contains one mapped connectivity record—Financial District (Nanakramguda), 1.2 km—but this is not identified in the supplied record as an independently verified route distance. No approach-road, public-transport, or landmark distances are otherwise established. Location record

9. Developer & development status

The RERA registration certificate identifies the promoter as Mohd Matloob Ahmed. The project header abbreviates the promoter as “MOHD”; the supplied evidence does not specify the promoter’s legal entity type, corporate registration identifiers, registered office, official contact details or official website. RERA record Corporate record

In Form B dated 7 November 2023, the promoter declared a completion date of 17 August 2024. The TG-RERA certificate records registration validity from 19 December 2023 to 17 August 2025 and no extension. These are distinct declaration and registration-validity dates; neither establishes actual completion. No independent construction-stage evidence or occupancy/completion certificate is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100007382; issued 19 December 2023; stated validity to 17 August 2025
What it establishes in the supplied evidenceRegistration of METRO COLONY as a plotted development; certificate records no extension
Tentative layout approval
Identifier / date0010/LO/3057/2022; 17 August 2022
What it establishes in the supplied evidenceZAHEERABAD Municipality/Municipal Corporation approval for a tentative plotted layout covering the stated survey numbers and 101 plots, subject to conditions
Layout application
Identifier / date004289/LO/DTCP/3057/0017/2022
What it establishes in the supplied evidenceApplication identifier recorded in the approval document
Mortgage deed referenced in approval
Identifier / date7272/2022; 1 August 2022
What it establishes in the supplied evidenceApproval document records specified plots mortgaged in favour of the Municipality/Municipal Corporation
Promoter Form B declaration
Identifier / date7 November 2023
What it establishes in the supplied evidencePromoter’s title and encumbrance declarations and 17 August 2024 completion undertaking
Layout drawing
Identifier / dateDocument 369402; two sheets
What it establishes in the supplied evidenceSource for the software-read plot schedule and layout area allocation Layout record
Title report
Identifier / dateDocument 369410
What it establishes in the supplied evidenceAdvocate’s title opinion concerning agricultural land in the identified survey numbers at Zahirabad

The supplied records establish a tentative layout approval. They do not include a final layout release, building permissions for individual homes, or an occupancy/completion certificate. The approval document states that the layout applicant is responsible for development works and describes conditions for infrastructure provision and release of mortgaged plots.

Frequently asked questions

Is METRO COLONY registered with Telangana RERA?

Yes. METRO COLONY is registered with the Telangana Real Estate Regulatory Authority as P01100007382; the registration status is New Project.

Who is the developer of METRO COLONY?

The promoter named in the RERA registration is MOHD.

Where is METRO COLONY located?

METRO COLONY is in ZAHEERABAD, Sangareddy, Telangana (502220).

When will METRO COLONY be completed?

The promoter's proposed date of completion filed with RERA is 17/08/2025. This is the promoter's declaration, not a guarantee.