Mayur Builders And Developers
MAYUR BUILDERS & DEVELOPERS · Hanamkonda · RERA P00300007728
MAYUR BUILDERS AND DEVELOPERS is a plotted development in Gorrekunta (Includes Janpaka) Revenue Village, Geesugonda Mandal, Warangal (Urban) District. The registered promoter is MAYUR BUILDERS & DEVELOPERS, a partnership. The tentative layout approval records an extent of 7 Acer 1.99 Gts; 34,122 Sq. Yds and 85 plots; building or floor configurations are not stated. The project is registered under TG-RERA number P00300007728, with a proposed completion date of 16 August 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | MAYUR BUILDERS AND DEVELOPERS RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; registration covers the proposed plotted layout in Survey Nos. 204/a/1 and 205 |
| TG-RERA registration | P00300007728 |
| Registration validity | 20 February 2024 to 16 August 2024; the certificate says validity could be extended by the Authority under the Act and Rules. An extension is not evidenced in the supplied records. Approvals record |
| Registered promoter | MAYUR BUILDERS & DEVELOPERS; partnership RERA filing Parties record |
| RERA status in supplied record | Registered; project status is recorded as “New Project.” Current registration validity/status after 16 August 2024 is not established by the supplied evidence. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Gorrekunta (Includes Janpaka) Revenue Village; also recorded as “Gorrekunta Including Janapaka Revenue” RERA record Land records |
| Mandal | Geesugonda Mandal |
| District | Warangal Urban / Warangal (Urban) District RERA record |
| PIN | 506006 in the project record; the registration certificate’s promoter address shows 506005 RERA record |
| Project survey numbers and subdivisions | 204/a/1 and 205 as recorded in the RERA project identity and tentative layout approval RERA record. The supplied title documents also refer to 204/a/2/1, 204/P, and 204/P & 205; those references are listed for parcel/title tracing and are not silently treated as the same subdivision. Land records |
| Site extent and area | RERA land record: total and net area 28,529.40 sq. m. Tentative layout approval: 7 Acer 1.99 Gts; 34,122 Sq. Yds. Land records RERA filing |
| Boundaries in RERA land record | East: land of Mothilal and others; West: 30 feet wide road; North: house of others; South: 100 feet wide Mogili Cherla Road. Land records |
| Survey-area affected by road widening / FTL / nala widening | 0 sq. m in the RERA land fields. This is the filed figure, not an independent clearance. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | GWMC Municipality / Municipal Corporation Approvals record |
| Principal approval | Tentative Layout Plan No. 0189/LO/3006/2022, approved 17 August 2022; application No. 005527/LO/DTCP/3006/0224/2022. Approvals record |
| Approved built-up area | 17,752.91 sq. m recorded in the project fields; the supplied record does not clarify its relationship to plotted-layout development. RERA filing |
| Building / floor configuration | Not disclosed in the supplied evidence; this is a plotted layout, not a documented apartment-building scheme. |
| Layout scale | Tentative approval records 85 plots. |
| Layout land-use allocation | Plotted area 4 Acer 15.47 Gts; 21,233 Sq. Yds (62.23%); roads 1 Acer 30.61 Gts; 8,544 Sq. Yds (25.04%); open-space park 0 Acer 25.71 Gts; 3,112 Sq. Yds (9.12%); social infrastructure 0 Acer 7.23 Gts; 875 Sq. Yds (2.56%); utilities 0 Acer 2.95 Gts; 357 Sq. Yds (1.05%). |
| Parking provision | No plot-wise, visitor or other parking count is established in the supplied evidence. |
Offering and status
| Item | Record |
|---|---|
| Offering | Plots; the tentative layout approval records 85 plots. Individual plot-size bands and current inventory are not supplied. RERA record |
| Booked / available counts | Not disclosed in the supplied evidence. RERA amenities |
| Construction / development stage | RERA fields record 70% completeness; this is a filed progress figure, not independent site verification. RERA record |
| Completion deadline | The Form-B declaration and project record specify 16 August 2024. RERA record |
| Occupancy / completion certificate status | No occupancy or completion certificate is supplied. The approval on file is identified as a tentative layout approval. The certificate status for any particular plot or portion is not established. Document index |
| Registration validity versus completion deadline | Registration validity ended 16 August 2024; the stated completion deadline was also 16 August 2024. These are separate recorded dates, and no extension evidence is supplied. |
2. The project story
MAYUR BUILDERS AND DEVELOPERS is presented in the TG-RERA record as a plotted-development project in Gorrekunta (including Janpaka) Revenue Village, Geesugonda Mandal, Warangal Urban. The tentative layout approval describes a residential layout of 85 plots across Survey Nos. 204/a/1 and 205, with designated areas for plots, roads, a park/open space, social infrastructure and utilities. RERA record
The promoter’s Form-B declaration gives 16 August 2024 as the project completion deadline. A project-record field states 70% completeness, but no site-inspection evidence or dated construction-stage certification is supplied to independently verify that figure. The available approval is expressly tentative; no final layout release or occupancy/completion certificate is included in the supplied documents. RERA record
3. Master plan, architecture & building design
This is a plotted layout, not a documented multi-storey building project. The tentative approval records an extent of 7 Acer 1.99 Gts; 34,122 Sq. Yds, 85 plots, and the following layout allocation:
| Layout component | Approved area and share |
|---|---|
| Plotted area | 4 Acer 15.47 Gts; 21,233 Sq. Yds — 62.23% |
| Roads | 1 Acer 30.61 Gts; 8,544 Sq. Yds — 25.04% |
| Open-space park | 0 Acer 25.71 Gts; 3,112 Sq. Yds — 9.12% |
| Social infrastructure | 0 Acer 7.23 Gts; 875 Sq. Yds — 2.56% |
| Utilities | 0 Acer 2.95 Gts; 357 Sq. Yds — 1.05% |
| Mortgage area, identified as 15.52% of plotted area | 0 Acer 27.46 Gts; 3,322 Sq. Yds |
The approval identifies plots 18, 3, 2, 10, 66, 65, 11 and 1 as mortgaged in favour of the Municipality / Municipal Corporation, under Mortgage Deed No. 1575 2022. It also states that roads are to remain accessible to neighbouring sites and that open-space, utility and road areas are to be handed over to the Municipality / Municipal Corporation by registered gift deed before release of the tentative layout.
No plot-by-plot drawing measurements, building footprints, floor plans or final-layout drawing are available in the supplied material. The separate uploaded drawing record (document 384016) describes land in Kodugolu, Doripremlata, Survey No. 32/4/A (R), rather than the project identity; it is not used here to describe this project’s design.
4. Homes, configurations & floor plans
The project is a plotted development. The tentative layout approval records 85 plots, but the supplied records do not provide plot-size bands, plot-wise saleable areas, or booked and available plot counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 85 (tentative layout approval) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The floor-plan review records three drawings, all scans pending; none has a software-measured area. The supplied material therefore does not support plot or dwelling-area measurements from drawings. Floor plans
5. Parking & vehicle circulation
A parking count, visitor parking provision, accessible parking, plot-wise parking allocation, or parking allotment arrangement is not established by the supplied evidence. The layout approval identifies road area of 1 Acer 30.61 Gts; 8,544 Sq. Yds (25.04%), but does not establish parking bays, driveways beyond the layout roads, or vehicle-entry arrangements.
6. Amenities, recreation & open spaces
The tentative layout approval identifies open space, social infrastructure and utilities as reserved land uses and lists proposed infrastructure works. Separately, the RERA amenities record marks listed layout facilities as available at 100% or 0%; this is a filed status, not independent verification of delivery. RERA amenities
| Description / size | Open-space park: 0 Acer 25.71 Gts; 3,112 Sq. Yds (9.12%) |
|---|---|
| Evidence source | Tentative layout approval; RERA amenities record RERA amenities |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
| Description / size | Reserved site: 0 Acer 7.23 Gts; 875 Sq. Yds (2.56%) |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Amenities record shows community buildings at 0%; delivery status not independently verified |
| Description / size | Road area: 1 Acer 30.61 Gts; 8,544 Sq. Yds (25.04%) |
|---|---|
| Evidence source | Tentative layout approval; RERA amenities record RERA amenities |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
| Description / size | No size or quantity stated |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
| Description / size | No size or quantity stated |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Listed in proposed infrastructure; completed status not established |
| Description / size | Rainwater-harvesting pits listed; no number or capacity stated |
|---|---|
| Evidence source | Tentative layout approval; RERA amenities record RERA amenities |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
7. Utilities, building services & safety
The tentative approval lists water reservoir, internal water-supply pipelines, overhead tank, septic tank, common septic tank / STP, underground drainage lines, storm-water drains, electric transformer, solid-waste management, street lights and rainwater-harvesting pits. It gives no capacities or completion certificates for these works. The approval also requires the applicant to carry out infrastructure and amenity works and describes the utility land as including water-reservoir, septic-tank / STP, transformer and solid-waste-management uses.
The RERA amenities record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and the electrical meter room / sub-station / receiving station at 100%. It records treatment and disposal of sewage and sullage water, solid-waste management, energy management and fire protection/fire-safety requirements at 0%. These are filed status entries, not independent confirmation of installed or operational services. RERA amenities
No evidence is supplied for water source or storage capacity, sewage-treatment capacity or reuse, electrical backup, EV charging, fire systems, access control, CCTV, waste-segregation arrangements, accessible circulation or emergency access. RERA amenities
8. Location, access & connectivity
The registered project location is Gorrekunta (including Janpaka) Revenue Village, Geesugonda Mandal, Warangal Urban, PIN 506006. The tentative layout approval describes the south boundary as 100 feet wide Mogili Cherla Road and the west boundary as a 30 feet wide road; it also requires layout roads to be opened for access to neighbouring sites. RERA record
A supplied geocode is labelled as a cadastral parcel centroid at 17.41528, 78.35459. The location record lists the Financial District (Nanakramguda) at 1.2 km; the supplied evidence does not explain the measurement method or establish a travel time. Location record
9. Developer & development status
The registered promoter is MAYUR BUILDERS & DEVELOPERS, identified in the RERA record as a partnership. The supplied promoter address is MAYUR, Rangasaipet, Geesugonda Mandal, Gorrekunta including Janapaka Revenue Village, Warangal Urban, PIN 506006. GSTIN: 36ABTFM6132H1ZX. The registration certificate separately records a promoter address in Warangal Urban, PIN 506005. Parties record Corporate record
The Form-B affidavit was made at Warangal on 8 December 2023 by authorised signatory Jureddy Sudhakar Reddy. It includes promoter statements concerning land title, encumbrances, project funds and pending approvals. These are promoter declarations.
The project record states 70% completeness. The supplied evidence does not include a dated independent site inspection or a verified update establishing present physical progress. The project’s TG-RERA registration certificate states validity from 20 February 2024 to 16 August 2024; no extension document is supplied. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Project registration certificate for MAYUR BUILDERS AND DEVELOPERS, registration P00300007728; survey numbers 204/a/1 and 205; validity 20 February 2024–16 August 2024. |
| Principal layout approval | GWMC Municipality / Municipal Corporation tentative layout approval 0189/LO/3006/2022, dated 17 August 2022; application No. 005527/LO/DTCP/3006/0224/2022. |
| Layout approval particulars | Tentative residential plotted layout, 85 plots, stated extent 7 Acer 1.99 Gts; 34,122 Sq. Yds, in Survey Nos. 204/a/1 and 205, Gorrekunta (Includes Janpaka), Geesugonda Mandal, Warangal (Urban) District. |
| Form-B declaration | Promoter affidavit dated 8 December 2023, including declared completion date of 16 August 2024. |
| Title-related filing | Advocate’s title search report dated 18 December 2023 and filed development-agreement / GPA and supplementary-deed materials are listed in the project evidence. These document records do not replace the full title review. |
| Other layout drawing record | Document 384016 identifies a different locality and survey number; it is not relied on as a project layout drawing. |
| Final layout / completion or occupancy certificate | Not supplied in the reviewed evidence. The listed approval is tentative. |
The approval document also records receipt Nos. TS/15305/2022 and TS/15306/2022 dated 24 May 2022, receipt No. TS/15307/2022 dated 22 July 2022, and Mortgage Deed No. 1575 2022 dated 22 July 2022.
1. Project at a glance
Project identity
Registered project name: MAYUR BUILDERS AND DEVELOPERS
Project type: Plotted development
Phase / registered portion: Phase not separately identified; registration covers the proposed plotted layout in Survey Nos. 204/a/1 and 205
TG-RERA registration: P00300007728
Registration validity: 20 February 2024 to 16 August 2024; the certificate says validity could be extended by the Authority under the Act and Rules. An extension is not evidenced in the supplied records.
Registered promoter: MAYUR BUILDERS & DEVELOPERS; partnership
RERA status in supplied record: Registered; project status is recorded as “New Project.” Current registration validity/status after 16 August 2024 is not established by the supplied evidence.
Land and geographic identity
Locality / revenue village: Gorrekunta (Includes Janpaka) Revenue Village; also recorded as “Gorrekunta Including Janapaka Revenue”
Mandal: Geesugonda Mandal
District: Warangal Urban / Warangal (Urban) District
PIN: 506006 in the project record; the registration certificate’s promoter address shows 506005
Project survey numbers and subdivisions: 204/a/1 and 205 as recorded in the RERA project identity and tentative layout approval. The supplied title documents also refer to 204/a/2/1, 204/P, and 204/P & 205; those references are listed for parcel/title tracing and are not silently treated as the same subdivision.
Site extent and area: RERA land record: total and net area 28,529.40 sq. m. Tentative layout approval: 7 Acer 1.99 Gts; 34,122 Sq. Yds.
Boundaries in RERA land record: East: land of Mothilal and others; West: 30 feet wide road; North: house of others; South: 100 feet wide Mogili Cherla Road.
Survey-area affected by road widening / FTL / nala widening: 0 sq. m in the RERA land fields. This is the filed figure, not an independent clearance.
Development identity
Sanctioning authority: GWMC Municipality / Municipal Corporation
Principal approval: Tentative Layout Plan No. 0189/LO/3006/2022, approved 17 August 2022; application No. 005527/LO/DTCP/3006/0224/2022.
Approved built-up area: 17,752.91 sq. m recorded in the project fields; the supplied record does not clarify its relationship to plotted-layout development.
Building / floor configuration: Not disclosed in the supplied evidence; this is a plotted layout, not a documented apartment-building scheme.
Layout scale: Tentative approval records 85 plots.
Layout land-use allocation: Plotted area 4 Acer 15.47 Gts; 21,233 Sq. Yds (62.23%); roads 1 Acer 30.61 Gts; 8,544 Sq. Yds (25.04%); open-space park 0 Acer 25.71 Gts; 3,112 Sq. Yds (9.12%); social infrastructure 0 Acer 7.23 Gts; 875 Sq. Yds (2.56%); utilities 0 Acer 2.95 Gts; 357 Sq. Yds (1.05%).
Parking provision: No plot-wise, visitor or other parking count is established in the supplied evidence.
Offering and status
Offering: Plots; the tentative layout approval records 85 plots. Individual plot-size bands and current inventory are not supplied.
Booked / available counts: Not disclosed in the supplied evidence.
Construction / development stage: RERA fields record 70% completeness; this is a filed progress figure, not independent site verification.
Completion deadline: The Form-B declaration and project record specify 16 August 2024.
Occupancy / completion certificate status: No occupancy or completion certificate is supplied. The approval on file is identified as a tentative layout approval. The certificate status for any particular plot or portion is not established.
Registration validity versus completion deadline: Registration validity ended 16 August 2024; the stated completion deadline was also 16 August 2024. These are separate recorded dates, and no extension evidence is supplied.
2. The project story
MAYUR BUILDERS AND DEVELOPERS is presented in the TG-RERA record as a plotted-development project in Gorrekunta (including Janpaka) Revenue Village, Geesugonda Mandal, Warangal Urban. The tentative layout approval describes a residential layout of 85 plots across Survey Nos. 204/a/1 and 205, with designated areas for plots, roads, a park/open space, social infrastructure and utilities.
The promoter’s Form-B declaration gives 16 August 2024 as the project completion deadline. A project-record field states 70% completeness, but no site-inspection evidence or dated construction-stage certification is supplied to independently verify that figure. The available approval is expressly tentative; no final layout release or occupancy/completion certificate is included in the supplied documents.
3. Master plan, architecture & building design
This is a plotted layout, not a documented multi-storey building project. The tentative approval records an extent of 7 Acer 1.99 Gts; 34,122 Sq. Yds, 85 plots, and the following layout allocation:
Plotted area: 4 Acer 15.47 Gts; 21,233 Sq. Yds — 62.23%
Roads: 1 Acer 30.61 Gts; 8,544 Sq. Yds — 25.04%
Open-space park: 0 Acer 25.71 Gts; 3,112 Sq. Yds — 9.12%
Social infrastructure: 0 Acer 7.23 Gts; 875 Sq. Yds — 2.56%
Utilities: 0 Acer 2.95 Gts; 357 Sq. Yds — 1.05%
Mortgage area, identified as 15.52% of plotted area: 0 Acer 27.46 Gts; 3,322 Sq. Yds
The approval identifies plots 18, 3, 2, 10, 66, 65, 11 and 1 as mortgaged in favour of the Municipality / Municipal Corporation, under Mortgage Deed No. 1575 2022. It also states that roads are to remain accessible to neighbouring sites and that open-space, utility and road areas are to be handed over to the Municipality / Municipal Corporation by registered gift deed before release of the tentative layout.
No plot-by-plot drawing measurements, building footprints, floor plans or final-layout drawing are available in the supplied material. The separate uploaded drawing record (document 384016) describes land in Kodugolu, Doripremlata, Survey No. 32/4/A (R), rather than the project identity; it is not used here to describe this project’s design.
4. Homes, configurations & floor plans
The project is a plotted development. The tentative layout approval records 85 plots, but the supplied records do not provide plot-size bands, plot-wise saleable areas, or booked and available plot counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 85 (tentative layout approval) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
The floor-plan review records three drawings, all scans pending; none has a software-measured area. The supplied material therefore does not support plot or dwelling-area measurements from drawings.
5. Parking & vehicle circulation
A parking count, visitor parking provision, accessible parking, plot-wise parking allocation, or parking allotment arrangement is not established by the supplied evidence. The layout approval identifies road area of 1 Acer 30.61 Gts; 8,544 Sq. Yds (25.04%), but does not establish parking bays, driveways beyond the layout roads, or vehicle-entry arrangements.
6. Amenities, recreation & open spaces
The tentative layout approval identifies open space, social infrastructure and utilities as reserved land uses and lists proposed infrastructure works. Separately, the RERA amenities record marks listed layout facilities as available at 100% or 0%; this is a filed status, not independent verification of delivery.
| Description / size | Open-space park: 0 Acer 25.71 Gts; 3,112 Sq. Yds (9.12%) |
|---|---|
| Evidence source | Tentative layout approval; RERA amenities record |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
| Description / size | Reserved site: 0 Acer 7.23 Gts; 875 Sq. Yds (2.56%) |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Amenities record shows community buildings at 0%; delivery status not independently verified |
| Description / size | Road area: 1 Acer 30.61 Gts; 8,544 Sq. Yds (25.04%) |
|---|---|
| Evidence source | Tentative layout approval; RERA amenities record |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
| Description / size | No size or quantity stated |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
| Description / size | No size or quantity stated |
|---|---|
| Evidence source | Tentative layout approval |
| Declared progress / verified status | Listed in proposed infrastructure; completed status not established |
| Description / size | Rainwater-harvesting pits listed; no number or capacity stated |
|---|---|
| Evidence source | Tentative layout approval; RERA amenities record |
| Declared progress / verified status | RERA amenities record: 100%; independently verified completion not supplied |
7. Utilities, building services & safety
The tentative approval lists water reservoir, internal water-supply pipelines, overhead tank, septic tank, common septic tank / STP, underground drainage lines, storm-water drains, electric transformer, solid-waste management, street lights and rainwater-harvesting pits. It gives no capacities or completion certificates for these works. The approval also requires the applicant to carry out infrastructure and amenity works and describes the utility land as including water-reservoir, septic-tank / STP, transformer and solid-waste-management uses.
The RERA amenities record marks water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, and the electrical meter room / sub-station / receiving station at 100%. It records treatment and disposal of sewage and sullage water, solid-waste management, energy management and fire protection/fire-safety requirements at 0%. These are filed status entries, not independent confirmation of installed or operational services.
No evidence is supplied for water source or storage capacity, sewage-treatment capacity or reuse, electrical backup, EV charging, fire systems, access control, CCTV, waste-segregation arrangements, accessible circulation or emergency access.
8. Location, access & connectivity
The registered project location is Gorrekunta (including Janpaka) Revenue Village, Geesugonda Mandal, Warangal Urban, PIN 506006. The tentative layout approval describes the south boundary as 100 feet wide Mogili Cherla Road and the west boundary as a 30 feet wide road; it also requires layout roads to be opened for access to neighbouring sites.
A supplied geocode is labelled as a cadastral parcel centroid at 17.41528, 78.35459. The location record lists the Financial District (Nanakramguda) at 1.2 km; the supplied evidence does not explain the measurement method or establish a travel time.
9. Developer & development status
The registered promoter is MAYUR BUILDERS & DEVELOPERS, identified in the RERA record as a partnership. The supplied promoter address is MAYUR, Rangasaipet, Geesugonda Mandal, Gorrekunta including Janapaka Revenue Village, Warangal Urban, PIN 506006. GSTIN: 36ABTFM6132H1ZX. The registration certificate separately records a promoter address in Warangal Urban, PIN 506005.
The Form-B affidavit was made at Warangal on 8 December 2023 by authorised signatory Jureddy Sudhakar Reddy. It includes promoter statements concerning land title, encumbrances, project funds and pending approvals. These are promoter declarations.
The project record states 70% completeness. The supplied evidence does not include a dated independent site inspection or a verified update establishing present physical progress. The project’s TG-RERA registration certificate states validity from 20 February 2024 to 16 August 2024; no extension document is supplied.
10. Approvals, official records & documents
TG-RERA registration: Project registration certificate for MAYUR BUILDERS AND DEVELOPERS, registration P00300007728; survey numbers 204/a/1 and 205; validity 20 February 2024–16 August 2024.
Principal layout approval: GWMC Municipality / Municipal Corporation tentative layout approval 0189/LO/3006/2022, dated 17 August 2022; application No. 005527/LO/DTCP/3006/0224/2022.
Layout approval particulars: Tentative residential plotted layout, 85 plots, stated extent 7 Acer 1.99 Gts; 34,122 Sq. Yds, in Survey Nos. 204/a/1 and 205, Gorrekunta (Includes Janpaka), Geesugonda Mandal, Warangal (Urban) District.
Form-B declaration: Promoter affidavit dated 8 December 2023, including declared completion date of 16 August 2024.
Title-related filing: Advocate’s title search report dated 18 December 2023 and filed development-agreement / GPA and supplementary-deed materials are listed in the project evidence. These document records do not replace the full title review.
Other layout drawing record: Document 384016 identifies a different locality and survey number; it is not relied on as a project layout drawing.
Final layout / completion or occupancy certificate: Not supplied in the reviewed evidence. The listed approval is tentative.
The approval document also records receipt Nos. TS/15305/2022 and TS/15306/2022 dated 24 May 2022, receipt No. TS/15307/2022 dated 22 July 2022, and Mortgage Deed No. 1575 2022 dated 22 July 2022.
Frequently asked questions
Is MAYUR BUILDERS AND DEVELOPERS registered with Telangana RERA?
Yes. MAYUR BUILDERS AND DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P00300007728; the registration status is New Project.
Who is the developer of MAYUR BUILDERS AND DEVELOPERS?
The promoter named in the RERA registration is MAYUR BUILDERS & DEVELOPERS.
Where is MAYUR BUILDERS AND DEVELOPERS located?
MAYUR BUILDERS AND DEVELOPERS is in gorrekunta including janapaka revenue village, Hanamkonda, Telangana (506006).
When will MAYUR BUILDERS AND DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 16/08/2024. This is the promoter's declaration, not a guarantee.
More projects in Hanamkonda