Marutisvijaychandraheights
MARUTI BUILDERS · Hanamkonda · RERA P00300000972
MARUTISVIJAYCHANDRAHEIGHTS is a residential apartment project in Hanmaknda, Hanamkonda mandal, Warangal Urban district. It is being developed by registered promoter MARUTI BUILDERS. The project has a registered site area of 654.98 sq m and one sanctioned building, Building - A, with Stlt + 5 floors and 15 homes: 10 2BHK and 5 3BHK. Its TG-RERA registration number is P00300000972, and the proposed completion date is 12/07/2024.
More from Maruti Builders · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | MARUTISVIJAYCHANDRAHEIGHTS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | One registered project; one sanctioned building, identified as Building - A. No separate phase name is disclosed. RERA record |
| TG-RERA registration | P00300000972 RERA record |
| Registration validity | 02/07/2019 to 12/07/2024; certificate states five years. This is the registration period, not the construction-completion deadline. No extension is recorded in the supplied certificate data. RERA record |
| Registered promoter | MARUTI BUILDERS RERA record Corporate record |
| RERA status | The supplied record identifies the project as “New Project.” The registration certificate records the validity dates above; a current registration-status determination is not supplied. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address | Hanmaknda; the RERA address record also gives Dwarakamai Appartments, Ramnagar, Chaitanya Puri, RTC Bus Depot, Hanamkonda, Warangal Urban, Telangana 506001. RERA record RERA filing |
| Revenue village | Hanmaknda in the RERA identity record. The building-permit document identifies WADDEPALLY; the title reports identify Waddepally Revenue Village. These are the village names recorded in the respective project documents. RERA record Land records |
| Mandal / district / PIN | Hanamkonda / Warangal Urban / 506001 RERA record |
| Project survey numbers / subdivisions | 536/E; 674/2; 536 E (NEW), 674/E (OLD) in the building permit. The title reports additionally identify 536/E, New, 674/E Old and 536/E, New, 674/ABCD Old. The RERA land record itself does not disclose a survey number. Land records |
| Registered site extent | RERA land record: total and net area 654.98 sq m. Building permit: site area 654.90 m², net area 654.58 m². Land records RERA filing |
| Boundaries (RERA filing) | East: KVEERAIAH LAND; West: APPARTMENT; North: PLOT OF NBALAKRISHNA AND OTHERS; South: 30 FT WIDE ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation Approvals record |
| Principal approval | Building Permit Order 3006/12070/W51/2018, dated 12 July, 2018 Approvals record |
| Approved building area | Residential upper-floor area 1,742.60 m²; stilt area 327.97 m². The RERA filing separately records approved built-up area 1,742.60 sq m. RERA filing |
| Building count / configuration | One sanctioned residential building, Building - A; Stlt + 5. The permit records height 14.95 m. |
| Parking levels / area | The permit says cellar and stilt approved for parking, but the supplied extracted parameters do not state a parking-space count or identify the cellar configuration in the floor schedule. |
| Unit count | Building permit: no sanctioned unit count is stated in the supplied extraction. RERA filing: 15 units—10 2BHK and 5 3BHK. RERA unit table RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 10 units; 3BHK: 5 units. RERA unit table RERA unit table |
| RERA-filed saleable area | 2BHK: 60.28 sq m; 3BHK: 152.07 sq m. RERA unit table RERA unit table |
| Booked / available | Portal snapshot records 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. The portal extract gives no as-of date, so counts are indicative. RERA unit table RERA unit table |
| Construction stage | No independently verified site-progress evidence is supplied. The registration certificate records its validity dates; the building-permit extract states completion is to be completed before 112 July 2024, while the RERA header and registration certificate state 12/07/2024 as the proposed completion / validity end date. RERA record |
| Completion / OC | A promoter Form B declaration undertakes completion by 31.12.2020. The building-permit extract says an occupancy certificate is compulsory before occupation and records completion_certified: false. No occupancy or completion certificate is supplied. |
2. The project story
MARUTISVIJAYCHANDRAHEIGHTS is recorded as a residential apartment project in the Hanmaknda/Hanamkonda area of Warangal Urban. The building permit identifies Building - A as a stilt-plus-five-storey apartment building on a site of 654.90 m² and lists residential upper-floor area of 1,742.60 m². The RERA filing lists 15 homes: ten 2BHK and five 3BHK. RERA record RERA filing RERA unit table
The project’s completion status is not established by the supplied records. The permit requires a completion notice and occupancy certificate, and its extracted status says completion is not certified; no OC is included in the supplied documents. The RERA registration certificate records a validity end date of 12/07/2024, which is distinct from proof of physical completion or permission to occupy. No independent site inspection or verified construction-progress report is supplied.
3. Master plan, architecture & building design
The building permit sanctions one residential building, Building - A, with Stlt + 5 floors and a stated height of 14.95 m. The extracted plan parameters state a site area of 654.90 m², net area of 654.58 m², residential upper-floor area of 1,742.60 m², and stilt area of 327.97 m². The RERA filing records an approved built-up area of 1,742.60 sq m. These are the areas as separately labelled in the respective records; no FSI-counted area, carpet-area total, floor-by-floor layout, or building-footprint measurement is supplied. RERA filing
The permit lists setbacks of front 3.51 m, rear 3.5 m, side 1 3.51 m, and side II 3.51 m. It also lists 10 trees, a tot-lot, transformer space, a garbage house and a rainwater-harvesting percolation pit. The supplied drawing extracts do not establish the number of flats per floor, lift or stair arrangement, entry and exit locations, internal circulation, or the dimensions of open areas.
The RERA filing lists one building unit and 15 proposed apartments. The building-permit extraction does not state an approved apartment count, so the filed unit count should not be read as a separately verified drawing count. RERA filing RERA unit table
4. Homes, configurations & floor plans
The following counts and saleable areas are from the RERA filing. “Booked” and “available” are portal figures without an as-of date. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 60.28 sq m | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 152.07 sq m | Not available | Not supplied |
Two floor-plan drawings are listed, but both remain scans pending; no software-measured carpet areas or room dimensions are available. The RERA saleable-area figures are not carpet-area measurements. The supplied data does not provide a measured breakdown of the home’s internal area, balcony or utility area, or share of common areas. Floor plans RERA unit details RERA unit table
5. Parking & vehicle circulation
The building permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count, resident-versus-visitor allocation, accessible spaces, or unit-by-unit parking assignments. The RERA filing marks both configurations as mortgaged, but the supplied record does not establish which individual parking spaces, if any, are allocated to particular units. RERA unit table
The permit also requires an uninterrupted driveway, with the watchman room and toilet in the stilt floor shifted to maintain it. No ramp dimensions, internal driveway plan, pedestrian separation, mechanical parking, or EV-charging provision is evidenced in the supplied material.
6. Amenities, recreation & open spaces
The RERA amenity record lists the following facilities with 0% progress where a percentage is supplied; it does not establish independent completion or verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot and peripheral greenery are required by the building-permit conditions; no area or capacity is stated. | Permit condition; RERA amenity listing RERA amenities | Permit-required; RERA amenity record shows 0%; completion not independently verified. |
| Community buildings | No further description or size supplied. | RERA amenity listing RERA amenities | 0%; completion not independently verified. |
| Aggregate recreational open space | No area supplied. | RERA amenity listing RERA amenities | 0%; completion not independently verified. |
| Internal roads and footpaths | No dimensions or layout details supplied. | RERA amenity listing RERA amenities | 0%; completion not independently verified. |
| Street lighting | No specification supplied. | RERA amenity listing RERA amenities | 0%; completion not independently verified. |
No clubhouse, indoor recreation facility, sports facility, or separately described convenience/community facility is evidenced in the supplied records.
7. Utilities, building services & safety
The permit lists a rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house. It also requires water supply and electricity connections to be provided only on production of an occupancy certificate, and makes an occupancy certificate compulsory before occupation. These are permit conditions; the supplied evidence does not verify installation or operation.
The RERA amenity record marks water supply, rainwater harvesting and an electrical meter room/substation/receiving station as available, while recording 0% progress for listed water supply, sewerage, storm-water drains, sewage treatment/disposal, solid-waste management, energy management and fire protection/safety items. “Available” is the filing’s entry, not independent verification of commissioning. RERA amenities
The supplied documents do not state water source or storage capacity; sewage-treatment capacity or reuse arrangements; electrical supply or backup capacity; lift count or capacity; fire-system specifications; CCTV or access-control arrangements; or accessibility provisions for this building. The permit’s general condition concerning accessibility for public and semi-public buildings above 3005g.mts. does not establish building-specific accessibility features. RERA amenities
8. Location, access & connectivity
The RERA location record identifies Hanmaknda, Hanamkonda, Warangal Urban, Telangana 506001; its address fields mention Dwarakamai Appartments, Ramnagar, Chaitanya Puri and the RTC Bus Depot. The building permit places the site in WADDEPALLY and names Prashanti Nagar WSI; Chaithnayapuri Colony. RERA record RERA filing
The supplied location data includes nearby mapped points and distances, but does not document the project’s approach road or verify a transport route:
| Mapped point | Recorded distance |
|---|---|
| IndusInd Bank | 0.4 km |
| Nanakramguda Govt primary school | 0.5 km |
| Financial District (Nanakramguda) | 1.2 km |
| (unnamed park) | 1.2 km |
| Manuu Polytechnic Hyderabad | 1.6 km |
| Sankaraya Eye Hospital | 1.6 km |
| (unnamed bus_station) | 2.2 km |
| South india shopping mall | 2.6 km |
| ADP | 0.0 km |
These are distances in the supplied location dataset, not stated travel times. The mapped coordinate is labelled “cadastral parcel centroid”; no project-specific route, public-transport service detail, or independently verified connectivity assessment is supplied. Location record
9. Developer & development status
The registered promoter is MARUTI BUILDERS, recorded as a partnership. The RERA record names VENKATESHWARLU SURYADEVARA as a partner and RAJENDRAPRASAD BADAM as authorized signatory. The supplied records do not provide a verified corporate registration identifier, registered-office address distinct from the project address, or official contact details. Corporate record Parties record
A Form B affidavit filed for “MARUTI BUILDER” is signed by a person identified in the extraction as “Asten,” described as Managing Partner, and declares a completion undertaking of 31.12.2020. The registration certificate states a validity end date of 12/07/2024. Neither date, on its own, establishes actual completion; the supplied building-permit extraction records completion as not certified, and no OC is supplied.
10. Approvals, official records & documents
| Identifier / date | P00300000972; issued 02/07/2019; valid to 12/07/2024 |
|---|---|
| What the supplied record establishes | Form C registration certificate for MARUTISVIJAYCHANDRAHEIGHTS. |
| Identifier / date | 3006/12070/W51/2018; 12 July, 2018 |
|---|---|
| What the supplied record establishes | Permit extraction identifies Building - A, a residential Stlt + 5 building, and site/building parameters and conditions. |
| Identifier / date | Document 14548 |
|---|---|
| What the supplied record establishes | Promoter affidavit includes title and encumbrance declarations, RERA compliance undertakings, and completion undertaking of 31.12.2020. |
| Identifier / date | Documents 32806, 32807, 47115 |
|---|---|
| What the supplied record establishes | Title-report and development-agreement material concerning the site and development rights. |
| Identifier / date | Document 14483 |
|---|---|
| What the supplied record establishes | Project-filed encumbrance statement; a fresh current extract is not supplied. |
| Identifier / date | Document 14487; two drawings listed |
|---|---|
| What the supplied record establishes | Drawing scans are pending; no drawing-based unit measurements are available. Floor plans |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The permit requires an occupancy certificate before occupation; the extracted permit record says completion is not certified. |
The supplied HMDA layout-status record says no LP number is present in the RERA record and that the public DPMS lookup was unavailable. This is an access limitation, not evidence of an approval refusal. The HMDA land-use record could not confidently assign a covering sheet for Hanamkonda/HANMAKNDA. The environmental-clearance search is a promoter-name search and is not a project-specific clearance determination. HMDA Regulatory record
1. Project at a glance
Project identity
Registered name: MARUTISVIJAYCHANDRAHEIGHTS
Project type: Residential apartment project
Phase / registered portion: One registered project; one sanctioned building, identified as Building - A. No separate phase name is disclosed.
TG-RERA registration: P00300000972
Registration validity: 02/07/2019 to 12/07/2024; certificate states five years. This is the registration period, not the construction-completion deadline. No extension is recorded in the supplied certificate data.
Registered promoter: MARUTI BUILDERS
RERA status: The supplied record identifies the project as “New Project.” The registration certificate records the validity dates above; a current registration-status determination is not supplied.
Land and geographic identity
Locality / address: Hanmaknda; the RERA address record also gives Dwarakamai Appartments, Ramnagar, Chaitanya Puri, RTC Bus Depot, Hanamkonda, Warangal Urban, Telangana 506001.
Revenue village: Hanmaknda in the RERA identity record. The building-permit document identifies WADDEPALLY; the title reports identify Waddepally Revenue Village. These are the village names recorded in the respective project documents.
Mandal / district / PIN: Hanamkonda / Warangal Urban / 506001
Project survey numbers / subdivisions: 536/E; 674/2; 536 E (NEW), 674/E (OLD) in the building permit. The title reports additionally identify 536/E, New, 674/E Old and 536/E, New, 674/ABCD Old. The RERA land record itself does not disclose a survey number.
Registered site extent: RERA land record: total and net area 654.98 sq m. Building permit: site area 654.90 m², net area 654.58 m².
Boundaries (RERA filing): East: KVEERAIAH LAND; West: APPARTMENT; North: PLOT OF NBALAKRISHNA AND OTHERS; South: 30 FT WIDE ROAD.
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation
Principal approval: Building Permit Order 3006/12070/W51/2018, dated 12 July, 2018
Approved building area: Residential upper-floor area 1,742.60 m²; stilt area 327.97 m². The RERA filing separately records approved built-up area 1,742.60 sq m.
Building count / configuration: One sanctioned residential building, Building - A; Stlt + 5. The permit records height 14.95 m.
Parking levels / area: The permit says cellar and stilt approved for parking, but the supplied extracted parameters do not state a parking-space count or identify the cellar configuration in the floor schedule.
Unit count: Building permit: no sanctioned unit count is stated in the supplied extraction. RERA filing: 15 units—10 2BHK and 5 3BHK.
Offering and status
RERA-filed configurations: 2BHK: 10 units; 3BHK: 5 units.
RERA-filed saleable area: 2BHK: 60.28 sq m; 3BHK: 152.07 sq m.
Booked / available: Portal snapshot records 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. The portal extract gives no as-of date, so counts are indicative.
Construction stage: No independently verified site-progress evidence is supplied. The registration certificate records its validity dates; the building-permit extract states completion is to be completed before 112 July 2024, while the RERA header and registration certificate state 12/07/2024 as the proposed completion / validity end date.
Completion / OC: A promoter Form B declaration undertakes completion by 31.12.2020. The building-permit extract says an occupancy certificate is compulsory before occupation and records completion_certified: false. No occupancy or completion certificate is supplied.
2. The project story
MARUTISVIJAYCHANDRAHEIGHTS is recorded as a residential apartment project in the Hanmaknda/Hanamkonda area of Warangal Urban. The building permit identifies Building - A as a stilt-plus-five-storey apartment building on a site of 654.90 m² and lists residential upper-floor area of 1,742.60 m². The RERA filing lists 15 homes: ten 2BHK and five 3BHK.
The project’s completion status is not established by the supplied records. The permit requires a completion notice and occupancy certificate, and its extracted status says completion is not certified; no OC is included in the supplied documents. The RERA registration certificate records a validity end date of 12/07/2024, which is distinct from proof of physical completion or permission to occupy. No independent site inspection or verified construction-progress report is supplied.
3. Master plan, architecture & building design
The building permit sanctions one residential building, Building - A, with Stlt + 5 floors and a stated height of 14.95 m. The extracted plan parameters state a site area of 654.90 m², net area of 654.58 m², residential upper-floor area of 1,742.60 m², and stilt area of 327.97 m². The RERA filing records an approved built-up area of 1,742.60 sq m. These are the areas as separately labelled in the respective records; no FSI-counted area, carpet-area total, floor-by-floor layout, or building-footprint measurement is supplied.
The permit lists setbacks of front 3.51 m, rear 3.5 m, side 1 3.51 m, and side II 3.51 m. It also lists 10 trees, a tot-lot, transformer space, a garbage house and a rainwater-harvesting percolation pit. The supplied drawing extracts do not establish the number of flats per floor, lift or stair arrangement, entry and exit locations, internal circulation, or the dimensions of open areas.
The RERA filing lists one building unit and 15 proposed apartments. The building-permit extraction does not state an approved apartment count, so the filed unit count should not be read as a separately verified drawing count.
4. Homes, configurations & floor plans
The following counts and saleable areas are from the RERA filing. “Booked” and “available” are portal figures without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 60.28 sq m | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 152.07 sq m | Not available | Not supplied |
Two floor-plan drawings are listed, but both remain scans pending; no software-measured carpet areas or room dimensions are available. The RERA saleable-area figures are not carpet-area measurements. The supplied data does not provide a measured breakdown of the home’s internal area, balcony or utility area, or share of common areas.
5. Parking & vehicle circulation
The building permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count, resident-versus-visitor allocation, accessible spaces, or unit-by-unit parking assignments. The RERA filing marks both configurations as mortgaged, but the supplied record does not establish which individual parking spaces, if any, are allocated to particular units.
The permit also requires an uninterrupted driveway, with the watchman room and toilet in the stilt floor shifted to maintain it. No ramp dimensions, internal driveway plan, pedestrian separation, mechanical parking, or EV-charging provision is evidenced in the supplied material.
6. Amenities, recreation & open spaces
The RERA amenity record lists the following facilities with 0% progress where a percentage is supplied; it does not establish independent completion or verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot and peripheral greenery are required by the building-permit conditions; no area or capacity is stated. | Permit condition; RERA amenity listing | Permit-required; RERA amenity record shows 0%; completion not independently verified. |
| Community buildings | No further description or size supplied. | RERA amenity listing | 0%; completion not independently verified. |
| Aggregate recreational open space | No area supplied. | RERA amenity listing | 0%; completion not independently verified. |
| Internal roads and footpaths | No dimensions or layout details supplied. | RERA amenity listing | 0%; completion not independently verified. |
| Street lighting | No specification supplied. | RERA amenity listing | 0%; completion not independently verified. |
No clubhouse, indoor recreation facility, sports facility, or separately described convenience/community facility is evidenced in the supplied records.
7. Utilities, building services & safety
The permit lists a rainwater-harvesting structure (percolation pit), space for a transformer, and a garbage house. It also requires water supply and electricity connections to be provided only on production of an occupancy certificate, and makes an occupancy certificate compulsory before occupation. These are permit conditions; the supplied evidence does not verify installation or operation.
The RERA amenity record marks water supply, rainwater harvesting and an electrical meter room/substation/receiving station as available, while recording 0% progress for listed water supply, sewerage, storm-water drains, sewage treatment/disposal, solid-waste management, energy management and fire protection/safety items. “Available” is the filing’s entry, not independent verification of commissioning.
The supplied documents do not state water source or storage capacity; sewage-treatment capacity or reuse arrangements; electrical supply or backup capacity; lift count or capacity; fire-system specifications; CCTV or access-control arrangements; or accessibility provisions for this building. The permit’s general condition concerning accessibility for public and semi-public buildings above 3005g.mts. does not establish building-specific accessibility features.
8. Location, access & connectivity
The RERA location record identifies Hanmaknda, Hanamkonda, Warangal Urban, Telangana 506001; its address fields mention Dwarakamai Appartments, Ramnagar, Chaitanya Puri and the RTC Bus Depot. The building permit places the site in WADDEPALLY and names Prashanti Nagar WSI; Chaithnayapuri Colony.
The supplied location data includes nearby mapped points and distances, but does not document the project’s approach road or verify a transport route:
IndusInd Bank: 0.4 km
Nanakramguda Govt primary school: 0.5 km
Financial District (Nanakramguda): 1.2 km
(unnamed park): 1.2 km
Manuu Polytechnic Hyderabad: 1.6 km
Sankaraya Eye Hospital: 1.6 km
(unnamed bus_station): 2.2 km
South india shopping mall: 2.6 km
ADP: 0.0 km
These are distances in the supplied location dataset, not stated travel times. The mapped coordinate is labelled “cadastral parcel centroid”; no project-specific route, public-transport service detail, or independently verified connectivity assessment is supplied.
9. Developer & development status
The registered promoter is MARUTI BUILDERS, recorded as a partnership. The RERA record names VENKATESHWARLU SURYADEVARA as a partner and RAJENDRAPRASAD BADAM as authorized signatory. The supplied records do not provide a verified corporate registration identifier, registered-office address distinct from the project address, or official contact details.
A Form B affidavit filed for “MARUTI BUILDER” is signed by a person identified in the extraction as “Asten,” described as Managing Partner, and declares a completion undertaking of 31.12.2020. The registration certificate states a validity end date of 12/07/2024. Neither date, on its own, establishes actual completion; the supplied building-permit extraction records completion as not certified, and no OC is supplied.
10. Approvals, official records & documents
| Identifier / date | P00300000972; issued 02/07/2019; valid to 12/07/2024 |
|---|---|
| What the supplied record establishes | Form C registration certificate for MARUTISVIJAYCHANDRAHEIGHTS. |
| Identifier / date | 3006/12070/W51/2018; 12 July, 2018 |
|---|---|
| What the supplied record establishes | Permit extraction identifies Building - A, a residential Stlt + 5 building, and site/building parameters and conditions. |
| Identifier / date | Document 14548 |
|---|---|
| What the supplied record establishes | Promoter affidavit includes title and encumbrance declarations, RERA compliance undertakings, and completion undertaking of 31.12.2020. |
| Identifier / date | Documents 32806, 32807, 47115 |
|---|---|
| What the supplied record establishes | Title-report and development-agreement material concerning the site and development rights. |
| Identifier / date | Document 14483 |
|---|---|
| What the supplied record establishes | Project-filed encumbrance statement; a fresh current extract is not supplied. |
| Identifier / date | Document 14487; two drawings listed |
|---|---|
| What the supplied record establishes | Drawing scans are pending; no drawing-based unit measurements are available. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The permit requires an occupancy certificate before occupation; the extracted permit record says completion is not certified. |
The supplied HMDA layout-status record says no LP number is present in the RERA record and that the public DPMS lookup was unavailable. This is an access limitation, not evidence of an approval refusal. The HMDA land-use record could not confidently assign a covering sheet for Hanamkonda/HANMAKNDA. The environmental-clearance search is a promoter-name search and is not a project-specific clearance determination.
Frequently asked questions
Is MARUTISVIJAYCHANDRAHEIGHTS registered with Telangana RERA?
Yes. MARUTISVIJAYCHANDRAHEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P00300000972; the registration status is New Project.
Who is the developer of MARUTISVIJAYCHANDRAHEIGHTS?
The promoter named in the RERA registration is MARUTI BUILDERS.
Where is MARUTISVIJAYCHANDRAHEIGHTS located?
MARUTISVIJAYCHANDRAHEIGHTS is in HANMAKNDA, Hanamkonda, Telangana (506001).
When will MARUTISVIJAYCHANDRAHEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 12/07/2024. This is the promoter's declaration, not a guarantee.