Sign in

Mango Leaf

KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC) · Sangareddy · RERA P01100000703

MANGO LEAF is a residential gated community of villas in KOLLUR, RC PURAM mandal, Sangareddy district, developed by KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC). It has a total site area of 10117.51 sqmts and net area of 10100.00 sqmts, with 27 dwelling units/buildings, generally Ground + 2 upper floors. The RERA filing lists 27 3BHK units, each with a filed saleable area of 207.43 sq.mt. The project is registered under TG-RERA **P01100000703**, issued 08/05/2019, with proposed completion recorded as 22/03/2023.

📘 Project brochure from the promoter’s website ↗

More from Kakatiya Infra Projects Pvt Ltd(opc) · 2 projects →

01What we found

Period endedTG-RERA registration ran to 22 Mar 2022 - check its extension on TG-RERA
15documents on file - each fact links to its page
46court cases on this project's land (survey 191, Kollur)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from homes247.inPhoto from houssed.com
▦ View all 2 photos
Kollur, Rc Puram, Sangareddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameMANGO LEAF RERA record
Project typeResidential; the filed and approved plans describe a gated community of residential villas. RERA record RERA filing
Phase / registered portionNot separately identified in the supplied registration record. The approved plan refers to Survey No. 191 PART. RERA record
TG-RERA registrationP01100000703, issued 08/05/2019; recorded validity 08/05/2019–22/03/2022. RERA record
RERA statusThe project record labels it “On-Going Project”; the registration certificate’s stated validity ended 22/03/2022. No extension or current registration status is established by the supplied evidence. RERA record
Registered promoterKAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC); company. RERA record Corporate record

Land and geographic identity

ItemRecord
Locality / revenue villageRERA record: KOLLUR, with locality RC PURAM. The approval documents identify Kollur-ORRGC / Kollur. RERA record RERA filing
MandalRC PURAM in the RERA identity record; approval documents use Ramchandrapuram-ORRGC. RERA record
DistrictSangareddy; approval documents also print SANGA REDDY. RERA record
PIN533255. RERA record
Project survey number(s)RERA: 191; approved layout and plan: 191 PART. The title materials also refer to 191/25AA1, 191/25AA2, 191/25, 191/20 Part and 191/21. RERA filing
Site extentApproved drawing: 10117.51 SQ.MT. total plot area and 10100.00 SQ.MT. net area. The RERA land record separately states total 10117.51 sqmts, affected area 17.51 sqmts, and net area 10100.00 sqmts. Land records
BoundariesRERA record: East—ROAD WIDTH; West—CTS NO; North—CTS NO; South—ROAD NWIDTH. The approved drawing specifies south road width 12.00 and east road width 15.00. RERA filing

Development identity

ItemRecord
Principal sanctioning authorityHMDA; technical approval dated 22-03-2018, forwarded to the local body for final sanction. Approvals record
Principal approval reference004884/ZOA/LO/U6/HMDA/08112017; related approval number 000046/LO/Plg/HMDA/2018. Approvals record
Local-body permission on fileTellapur Municipality proceedings A1/52/MCT/2018, dated 08/01/2019, for residential layout buildings on Survey No. 191/P, extent 10100 Sq. Mt. Approvals record
Approved built-up areaThe supplied RERA identity record lists 5616.31 sqmts as approved built-up area. The plan extraction includes individual villa built-up areas, but the supplied evidence does not provide a reconciled project-wide built-up-area statement. RERA filing
Buildings / floorsThe plan describes 27 dwelling units/buildings, generally Ground + 2 upper floors; it also states NO OF FLOORS: 3. RERA unit table
ParkingThe plan labels parking but the supplied records do not establish a total sanctioned space count, parking levels, or unit-wise allocation.
Unit countApproved plan: 27 units; RERA record: 27 total building units and 27 proposed units as per agreement. RERA unit table RERA filing

Offering and status

ItemRecord
RERA-filed configuration3BHK, 27 units; filed saleable area 207.43 sq.mt. per unit. RERA unit table RERA unit table
Booked / available0 booked / 27 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so these counts are indicative. RERA unit table
Construction stageRERA header reports 80% completeness. This is a filed/reported progress figure; independent site verification is not supplied. RERA record
Completion datesRERA record: proposed completion 22/03/2023 and revised proposed completion 22/03/2023. The registration certificate ends on a separate date, 22/03/2022. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate is identified in the supplied project evidence. No tower-wise or phase-wise OC status is supplied. Document index

2. The project story

MANGO LEAF is registered as a residential project in Kollur, Sangareddy, and its filed layout and building-plan material describes a gated residential villa development on Survey No. 191 PART. The RERA identity records the land as Survey No. 191. The RERA land schedule states a total site area of 10117.51 sqmts, including 17.51 sqmts affected area, with a net area of 10100.00 sqmts. RERA record RERA filing

The approved plan identifies 27 plots and 27 dwelling units, arranged as villas with Ground + 2 upper floors. The RERA filing likewise records 27 units and lists them as 3BHK. The record reports 80% completeness, but this is a reported figure rather than an independently verified site assessment. The supplied evidence does not establish which individual villas are complete, occupied, or covered by an occupancy certificate. RERA unit table RERA record

3. Master plan, architecture & building design

The approved layout drawing gives a total site area of 10117.51 SQ.MT. and a net area of 10100.00 SQ.MT. Its area statement allocates 5616.31 to plotted area, 2873.71 to roads, and 1610.00 to organized open space/park/utility area. These are drawing figures, not a separate RERA disclosure of carpet or saleable area. Layout record

The plan describes 27 residential villa buildings, generally Ground + 2 upper floors. The plan extraction identifies several villa types and individual built-up figures, including 215.63 sq.mt. for PROP (EFT 5), 259.72 sq.mt. for PROP (EFT 6), 265.38 sq.mt. for PROP (EFT 7), 293.29 sq.mt. for PROP (EFT 8), 301.01 sq.mt. for PROP (NFT 1), 296.72 sq.mt. for PROP (WFT 1), and 250.76 sq.mt. for PROP (WFT 2 A). These are plan-extraction figures for the named types; the supplied evidence does not establish one consolidated project-wide gross or FSI-counted area.

The drawing depicts internal roads, including 9 m and 12 m wide roads, and an existing 15.00 m road. It also labels a tot lot, open area, parking, a 50 KLD STP, a 750kVA oil-cooled transformer, municipal sewer and storm-water lines, sewage and storm-water pipelines, and a percolation pit. These are drawing notations; they do not independently establish installation or completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK27027207.43 sq.mt.Not suppliedNot supplied

RERA unit table RERA unit table

The 3BHK count, booking figures and saleable area are from the RERA filing. “Saleable area” is not the same measure as carpet area; the supplied project evidence does not give a RERA-filed carpet-area figure for these 3BHK units. No measured carpet-area result for this RERA configuration is available in the supplied drawing measurements. RERA unit table RERA unit details

The plan describes Ground + 2 upper floors and identifies the development as villas, but the supplied evidence does not provide verified room-by-room dimensions for the RERA-filed 3BHK configuration. The drawing-derived measurement records identify a 1BHK configuration in two designs, while that configuration is not matched to the RERA filing; it is therefore not used as the RERA unit offering here. RERA unit details Floor plans

5. Parking & vehicle circulation

The approved drawing labels parking and shows internal roads, including 9 m and 12 m wide roads and an existing 15.00 m road. The evidence supplied does not establish the total number of parking spaces, whether spaces are covered or open, parking levels, visitor or accessible provision, EV charging, or unit-specific parking allocations. A plan label alone does not establish exclusive parking rights for a purchaser.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space1610.00 in the approved layout area statementApproved planDrawing provision; completion not independently verified
Tot lotLabelled on the planApproved planDrawing notation; completion not independently verified
Community buildingsRERA amenity record lists “YES”; reported 70%RERA amenitiesRERA-recorded progress; not independently verified
Green strip / tot lot / parkRERA amenity record lists “YES”; reported 70%RERA amenitiesRERA-recorded progress; not independently verified
Avenue plantation and park developmentListed in the local-body/HMDA approval materialApproval-document description; completion not independently verified
Clubhouse, swimming pool, sports and other recreation featuresPromoter brochure lists these facilities, including a clubhouse, swimming pool, tennis, indoor shuttle, gymnasium, indoor games and party lawnsPromoter-marketed; the supplied evidence does not establish approval or delivery

The RERA amenity record also reports internal roads and footpaths at 75%, street lighting at 50%, and aggregate recreational open space at 0%. These are project-record progress entries, not independent verification of site condition. RERA amenities

7. Utilities, building services & safety

Water supply
Evidence in the recordRERA amenity record: “Water Supply” YES, reported 100%. Approval material specifies a hydro-pneumatic water-supply system, sump/OHT, and rainwater-harvesting pits. RERA amenities
Status representedRERA-reported progress and approval-document provisions; independent operational verification not supplied
Sewerage and drainage
Evidence in the recordRERA amenity record: sewerage YES, 100%; storm-water drains YES, 100%; sewage treatment/disposal 60%. Plan labels include a 50 KLD STP, municipal sewer line, municipal storm-water line, and sewage/storm-water pipes. RERA amenities
Status representedReported progress and plan notations; capacity/operation not independently verified
Rainwater management
Evidence in the recordRERA amenity record reports water conservation/rainwater harvesting 100%; approval material lists rainwater-harvesting pits. RERA amenities
Status representedRERA-reported progress and approval-document provision
Electrical
Evidence in the recordPlan labels a 750kVA OIL COOLED TF; RERA amenity record lists electrical meter room/sub-station/receiving station at 75%. Approval material also lists a transformer and street lights. RERA amenities
Status representedPlan and RERA-record entries; operational status not independently verified
Solid waste
Evidence in the recordRERA amenity record lists solid-waste management and disposal at 0%. RERA amenities
Status representedRERA-recorded progress
Fire and life safety
Evidence in the recordRERA amenity record lists fire-protection and fire-safety requirements at 0%. RERA amenities
Status representedRERA-recorded progress; no completion evidence supplied
Lifts, backup power, CCTV, accessibility
Evidence in the recordNo project-specific RERA or approval detail establishing these services is supplied.
Status representedNot established in supplied project record

8. Location, access & connectivity

The registered project location is KOLLUR, RC PURAM mandal, Sangareddy district, PIN 533255. The approved-plan material describes the site as Kollur-ORRGC in the Outer Ring Road Growth Corridor. RERA record RERA filing

The supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 7.4 km. No other verified road, public-transport, landmark-distance, or travel-time measurements are supplied. Location record

9. Developer & development status

The RERA-registered promoter is KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC), identified as a company. The project record names KAKUMANU SRINIVASA RAO as director and authorized signatory. A board resolution dated 3 April 2019 authorizes Srinivasa Rao Kakumanu to take steps and file documents for the company’s RERA registration. Corporate record Parties record

The promoter’s registered office is stated on the TG-RERA certificate as Village Madhapur, Serilingampally mandal, Ranga Reddy district, PIN 500081. The project promoter page supplied in the evidence identifies https://kakatiyainfra.com/project-details.php?n=1; the RERA certificate lists the promoter office address separately. Parties record

The RERA record reports 80% completeness and 27 units, with proposed and revised completion both recorded as 22/03/2023. No independent construction inspection, tower-wise completion schedule, or occupancy certificate is supplied. RERA record RERA unit table Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100000703; issued 08/05/2019; stated validity to 22/03/2022
What the supplied evidence establishesRegistration certificate for MANGO LEAF, with stated registration conditions.
HMDA layout / technical approval
Identifier / date004884/ZOA/LO/U6/HMDA/08112017; dated 22-03-2018
What the supplied evidence establishesTechnical approval for a gated-community layout, forwarded to the local body for final sanction; drawing refers to Survey No. 191 PART.
HMDA approval reference
Identifier / date000046/LO/Plg/HMDA/2018
What the supplied evidence establishesApproval reference appearing in the filed approval material.
HMDA plan drawings
Identifier / dateSheets 01/15 and 02/15 are among the supplied drawing references
What the supplied evidence establishesShow the proposed layout and villa configuration; the plan states that approval is not proof of land title.
Tellapur Municipality permission
Identifier / dateA1/52/MCT/2018, dated 08/01/2019
What the supplied evidence establishesPermission for residential layout buildings on Survey No. 191/P, extent 10100 Sq. Mt., subject to listed conditions.
Promoter Form B declaration
Identifier / dateDated 3 March 2019
What the supplied evidence establishesPromoter declaration includes a completion undertaking of May 2022 and identifies an HMDA mortgage deed in its encumbrance disclosure.
Title and development documents filed
Identifier / dateDevelopment Agreement Cum GPA dated 15T day of May, 2018; title reports and recited deeds
What the supplied evidence establishesSupplied project-filed materials include the development agreement and title reports; they are indexed here as project documents, not as an independent title determination.
Occupancy / completion certificate
Identifier / dateNot identified in supplied evidence
What the supplied evidence establishesNo certificate or phase/tower scope is established in this Overview. Document index

The supplied evidence does not establish an occupancy or completion certificate for the project. The approval documents include plan conditions and local-body permissions; their detailed conditions and any outstanding approval questions are addressed in the approvals review.

Frequently asked questions

Is MANGO LEAF registered with Telangana RERA?

Yes. MANGO LEAF is registered with the Telangana Real Estate Regulatory Authority as P01100000703; the registration status is On-Going Project.

Who is the developer of MANGO LEAF?

The promoter named in the RERA registration is KAKATIYA INFRA PROJECTS PRIVATE LIMITED(OPC).

Where is MANGO LEAF located?

MANGO LEAF is in RC PURAM, KOLLUR, Sangareddy, Telangana (533255).

When will MANGO LEAF be completed?

The promoter's proposed date of completion filed with RERA is 22/03/2023. This is the promoter's declaration, not a guarantee.

More projects in Kollur