Mahaalaxmi Tower Block - B
MAA BRUNDAVAN GROUP · Rangareddy · RERA P03000006306
MAHAALAXMI TOWER BLOCK - B is a residential apartment project in Mansoorabad, Saroornagar Mandal, Ranga Reddy district, on a 741.45 sq. m plot. Registered promoter Maa Brundavan Group is developing one block with 1 Stilt + 5 upper floors and 15 homes: 2BHK and 3BHK configurations. The project is registered under TG-RERA **P03000006306**, issued 07/07/2023, and its proposed completion date is **18/08/2025**.
More from Maa Brundavan Group · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MAHAALAXMI TOWER BLOCK - B |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Block B; the registration and building permit identify this block/building. Separate phase details are not disclosed. RERA record |
| TG-RERA registration | P03000006306, issued 07/07/2023; stated validity 07/07/2023–18/08/2025. The supplied certificate records no extension. |
| Registered promoter | Maa Brundavan Group, identified in the RERA record as a partnership. RERA filing Parties record |
| RERA status | The supplied registration period ended 18/08/2025; the evidence pack does not establish a subsequent extension or current registration status. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / plot | Mansoorabad; Plot No. 9-B Land records |
| Revenue village | Mansoorabad |
| Mandal | Saroornagar Mandal, as stated in the building permit; mandal is not disclosed in the RERA land details. Land records |
| District / PIN | Ranga Reddy; 500068 RERA record |
| Survey number(s) | Survey No. 30; no subdivision is stated for this project parcel in the RERA registration. Land records |
| Site area | Total/plot area 741.45 sq. m; net plot area 741.45 sq. m. The permit records road-affected area 0.0 sq. m and nala-affected area 0.0 sq. m. Land records |
| Boundaries | East: 30 - WIDE ROAD; West: neighbours’ land; North: Plot No. 9-A; South: Plot No. 9-C Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permit | 2788/GHMC/LBN/2022-BP, approved 18 August 2022; file no. 007980/GHMC/3922/LBN2/2022-BP Approvals record |
| Approved built-up area | The permit’s stated residential upper-floor area is 1,685.15 Sq.Mt. and its stilt area is 345.2 Sq.Mt. The project record separately lists approved built-up area as 2,057.35 sq. m; these are distinct filed figures, not a recalculation. RERA filing |
| Building / block count | One building / one block RERA filing RERA unit table |
| Sanctioned configuration | 1 Stilt + 5 upper floors; building height stated as 14.99 (unit not specified in the supplied extraction). No basement or podium is recorded. |
| Parking | Permit records Total Parking Area 345.2; the unit for this extracted figure is not stated. The permit says stilt parking is for vehicle parking. No space count is supplied. |
| Units | 15 units in the RERA unit record; the building permit extraction does not state an approved unit count. RERA unit table RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit details |
| RERA-filed saleable areas | 2BHK: 71.79 sq. m; 3BHK: 106.72 sq. m RERA unit details |
| Booked / available | Portal-derived counts show 0 booked / 5 available 2BHK units and 0 booked / 10 available 3BHK units. The source record has no as-of date; counts are indicative. RERA unit table RERA unit details |
| Construction stage | RERA-filed amenities record 0% progress for each listed item. No independently verified site-progress evidence or project-wide construction percentage is supplied. RERA amenities |
| Completion date | Promoter’s Form B declaration gives 18/08/2025 as the undertaking date. This is not evidence that completion occurred. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is supplied for this building. Document index |
2. The project story
MAHAALAXMI TOWER BLOCK - B is a single-block residential apartment development registered for Plot No. 9-B in Mansoorabad revenue village, Survey No. 30, Ranga Reddy district. The GHMC permit describes a 1 Stilt + 5 upper-floor residential building on a 741.45 sq. m plot. The plot’s recorded east boundary is a wide road; the other boundaries are adjoining land and plots. RERA record Land records
The RERA unit record lists 15 homes: five 2BHK and ten 3BHK. The portal-derived booking snapshot shows all 15 as available and none booked, but has no as-of date and should be treated as indicative rather than current inventory. RERA unit table RERA unit details
The promoter declared a completion date of 18/08/2025. The supplied material does not include independent construction-progress verification or an occupancy/completion certificate, so it does not establish whether the building is complete or occupied. The RERA certificate’s registration validity is a separate matter from the declared completion date and from the status of any occupancy certificate. Document index
3. Master plan, architecture & building design
The RERA record and GHMC permit describe one residential building on a 741.45 sq. m plot, with a 1 Stilt + 5 upper floors configuration. The permit extraction states residential upper-floor area of 1,685.15 Sq.Mt., stilt area of 345.2 Sq.Mt., and building height 14.99 (unit not stated). The RERA fields separately report approved built-up area of 2,057.35 sq. m. These figures are retained as stated in their respective records; the supplied evidence does not provide a drawing-based area reconciliation. RERA filing
The permit records setbacks of Front 3, Rear 3.5, Side I 3.5 and Side II 3.5; units are not stated in the extraction. It also records a 14% open-space contribution charge, but does not establish an on-site open-space area from that entry.
The available floor-plan processing record says there are two drawings, but neither contains a measured floor-plan layout for this review; no flats were identified in those drawings. Consequently, the supplied evidence does not establish typical floor arrangement, flats per floor, building footprint, lift or stair count, internal circulation, or the location and dimensions of common areas. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 71.79 sq. m | Not measured from drawings | Not supplied |
| 3BHK | 10 | 0 | 10 | 106.72 sq. m | Not measured from drawings | Not supplied |
RERA unit details RERA unit table Floor plans
The saleable areas are the figures filed in the RERA unit record. The floor-plan drawings were not measured for this review, so no drawing-derived carpet area or room dimensions can be reported. Carpet area, balcony/utility area and saleable area are distinct measures; the supplied evidence does not quantify the first two for these homes. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit extraction records Total Parking Area 345.2 and a stilt level. The extraction does not specify the area unit or provide the number of parking spaces, their allocation by unit, visitor or accessible parking provision, or a parking layout. The permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters; no cellar is identified in the supplied building configuration.
The record does not establish parking-space ownership or unit-specific allotments, nor does it provide evidence of ramps, internal driveways, pedestrian separation, mechanical parking or EV charging. Document index
6. Amenities, recreation & open spaces
The RERA amenities record lists the following facilities with 0% progress entries. “YES” is a filed availability indicator, not evidence that the facility is complete or independently verified. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water Supply | No source, capacity or storage detail supplied | RERA amenities | “YES”; 0% progress; completion not verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No system or capacity detail supplied | RERA amenities | “YES”; 0% progress; completion not verified |
| Storm Water Drains | No extent or design detail supplied | RERA amenities | 0% progress; completion not verified |
| Water Conservation, Rain water Harvesting | Permit specifies 5 rainwater-harvesting pits | RERA amenities | RERA entry “YES”; 0% progress; completion not verified |
| Electrical Meter Room, Sub-Station, Receiving Station | Permit requires space for a transformer | RERA amenities | RERA entry “YES”; 0% progress; completion not verified |
| Internal Roads & Footpaths | No dimensions or layout supplied | RERA amenities | 0% progress; completion not verified |
| Green Strip/TOT LOT/Park | No area or design detail supplied | RERA amenities | 0% progress; completion not verified |
| Street Lighting | No fixture or extent detail supplied | RERA amenities | 0% progress; completion not verified |
| Community Buildings | No building or facility detail supplied | RERA amenities | 0% progress; completion not verified |
| Treatment and Disposal of Sewage and Sullage Water | No treatment or reuse details supplied | RERA amenities | 0% progress; completion not verified |
| Solid Waste Management and Disposal | Permit also requires a garbage house within the premises; no size or system detail supplied | RERA amenities | 0% progress; completion not verified |
| Energy management | No system detail supplied | RERA amenities | 0% progress; completion not verified |
| Fire Protection and Fire Safety Requirements | No system detail supplied | RERA amenities | 0% progress; completion not verified |
| Aggregate area of recreational Open Space | No area supplied | RERA amenities | 0% progress; completion not verified |
No clubhouse, indoor recreation, sports facility or specific community amenity is substantiated in the supplied project record. The permit’s open-space contribution charge is not a measurement of an on-site recreational area. RERA amenities
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed facilities. These entries do not establish completion, capacity or operating status. The building permit specifies 5 rainwater-harvesting pits, requires transformer space and a garbage house within the premises, and says sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. RERA amenities
The supplied evidence gives no water source or storage capacity, STP/reuse design, electrical backup details, lift count or capacity, fire-system specifications, security/CCTV provisions, or accessible-circulation details. The permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of an Occupancy Certificate; no such NOC or occupancy certificate is supplied. Document index
8. Location, access & connectivity
The registered site is Plot No. 9-B, Mansoorabad revenue village and locality, Survey No. 30, Ranga Reddy district, PIN 500068. The building permit identifies Saroornagar Mandal. It records an east boundary of 30 - WIDE ROAD. Land records
The location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No public-transport details, approach-road name, or further measured landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is Maa Brundavan Group, recorded as a partnership, with GSTIN 36ABQFM2998A1ZW. Its project registration records an office address of B, Income Tax Colony, Mansoorabad, Mansoorabad, Ranga Reddy, 500068. The certificate separately gives a promoter-office entry with incomplete village and mandal fields and PIN 500102; a complete verified office-contact or website record is not supplied. Parties record Corporate record RERA filing
The RERA declaration identifies Kongari Venkatesham as the authorised signatory and declares 18/08/2025 as the project completion date. This is the promoter’s declared undertaking, not independent evidence of completion. The supplied record does not provide a verified construction-stage assessment, occupancy certificate, or evidence that the registration was extended beyond its stated end date of 18/08/2025. Document index
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C registration under section 5 for MAHAALAXMI TOWER BLOCK - B, registration P03000006306, issued 07/07/2023; stated validity through 18/08/2025. |
| GHMC building permit | Building Permit Order 2788/GHMC/LBN/2022-BP, dated 18 August 2022, file no. 007980/GHMC/3922/LBN2/2022-BP; sanctions 1 Stilt + 5 upper floors on Plot No. 9-B, Mansoorabad. |
| Commencement / permit document | The supplied document is a GHMC Building Permit Order. No separate commencement notice or certificate is included. |
| Layout approval | A layout-plan document is listed in the RERA file, but it was not extracted; the supplied evidence does not establish its contents or an LP number. Document index HMDA |
| Promoter declaration | Form B declaration by Maa Brundavan Group, signed by authorised signatory Kongari Venkatesham; it declares the land free of encumbrances and undertakes completion by 18/08/2025. |
| Occupancy / completion documents | No occupancy certificate or completion certificate is included in the supplied project documents. Document index |
| Floor plans | Two drawings are recorded, but neither was measured for this review. Floor plans |
The approval and document index identifies the records available for this overview; the supplied material does not establish an issued occupancy certificate or a post-expiry RERA extension. Document index
1. Project at a glance
Project identity
Registered project name: MAHAALAXMI TOWER BLOCK - B
Project type: Residential apartment project
Phase / registered portion: Block B; the registration and building permit identify this block/building. Separate phase details are not disclosed.
TG-RERA registration: P03000006306, issued 07/07/2023; stated validity 07/07/2023–18/08/2025. The supplied certificate records no extension.
Registered promoter: Maa Brundavan Group, identified in the RERA record as a partnership.
RERA status: The supplied registration period ended 18/08/2025; the evidence pack does not establish a subsequent extension or current registration status.
Land and geographic identity
Locality / plot: Mansoorabad; Plot No. 9-B
Revenue village: Mansoorabad
Mandal: Saroornagar Mandal, as stated in the building permit; mandal is not disclosed in the RERA land details.
District / PIN: Ranga Reddy; 500068
Survey number(s): Survey No. 30; no subdivision is stated for this project parcel in the RERA registration.
Site area: Total/plot area 741.45 sq. m; net plot area 741.45 sq. m. The permit records road-affected area 0.0 sq. m and nala-affected area 0.0 sq. m.
Boundaries: East: 30 - WIDE ROAD; West: neighbours’ land; North: Plot No. 9-A; South: Plot No. 9-C
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 2788/GHMC/LBN/2022-BP, approved 18 August 2022; file no. 007980/GHMC/3922/LBN2/2022-BP
Approved built-up area: The permit’s stated residential upper-floor area is 1,685.15 Sq.Mt. and its stilt area is 345.2 Sq.Mt. The project record separately lists approved built-up area as 2,057.35 sq. m; these are distinct filed figures, not a recalculation.
Building / block count: One building / one block
Sanctioned configuration: 1 Stilt + 5 upper floors; building height stated as 14.99 (unit not specified in the supplied extraction). No basement or podium is recorded.
Parking: Permit records Total Parking Area 345.2; the unit for this extracted figure is not stated. The permit says stilt parking is for vehicle parking. No space count is supplied.
Units: 15 units in the RERA unit record; the building permit extraction does not state an approved unit count.
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 71.79 sq. m; 3BHK: 106.72 sq. m
Booked / available: Portal-derived counts show 0 booked / 5 available 2BHK units and 0 booked / 10 available 3BHK units. The source record has no as-of date; counts are indicative.
Construction stage: RERA-filed amenities record 0% progress for each listed item. No independently verified site-progress evidence or project-wide construction percentage is supplied.
Completion date: Promoter’s Form B declaration gives 18/08/2025 as the undertaking date. This is not evidence that completion occurred.
Occupancy / completion certificate: No occupancy certificate or completion certificate is supplied for this building.
2. The project story
MAHAALAXMI TOWER BLOCK - B is a single-block residential apartment development registered for Plot No. 9-B in Mansoorabad revenue village, Survey No. 30, Ranga Reddy district. The GHMC permit describes a 1 Stilt + 5 upper-floor residential building on a 741.45 sq. m plot. The plot’s recorded east boundary is a wide road; the other boundaries are adjoining land and plots.
The RERA unit record lists 15 homes: five 2BHK and ten 3BHK. The portal-derived booking snapshot shows all 15 as available and none booked, but has no as-of date and should be treated as indicative rather than current inventory.
The promoter declared a completion date of 18/08/2025. The supplied material does not include independent construction-progress verification or an occupancy/completion certificate, so it does not establish whether the building is complete or occupied. The RERA certificate’s registration validity is a separate matter from the declared completion date and from the status of any occupancy certificate.
3. Master plan, architecture & building design
The RERA record and GHMC permit describe one residential building on a 741.45 sq. m plot, with a 1 Stilt + 5 upper floors configuration. The permit extraction states residential upper-floor area of 1,685.15 Sq.Mt., stilt area of 345.2 Sq.Mt., and building height 14.99 (unit not stated). The RERA fields separately report approved built-up area of 2,057.35 sq. m. These figures are retained as stated in their respective records; the supplied evidence does not provide a drawing-based area reconciliation.
The permit records setbacks of Front 3, Rear 3.5, Side I 3.5 and Side II 3.5; units are not stated in the extraction. It also records a 14% open-space contribution charge, but does not establish an on-site open-space area from that entry.
The available floor-plan processing record says there are two drawings, but neither contains a measured floor-plan layout for this review; no flats were identified in those drawings. Consequently, the supplied evidence does not establish typical floor arrangement, flats per floor, building footprint, lift or stair count, internal circulation, or the location and dimensions of common areas.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 71.79 sq. m | Not measured from drawings | Not supplied |
| 3BHK | 10 | 0 | 10 | 106.72 sq. m | Not measured from drawings | Not supplied |
The saleable areas are the figures filed in the RERA unit record. The floor-plan drawings were not measured for this review, so no drawing-derived carpet area or room dimensions can be reported. Carpet area, balcony/utility area and saleable area are distinct measures; the supplied evidence does not quantify the first two for these homes.
5. Parking & vehicle circulation
The GHMC permit extraction records Total Parking Area 345.2 and a stilt level. The extraction does not specify the area unit or provide the number of parking spaces, their allocation by unit, visitor or accessible parking provision, or a parking layout. The permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters; no cellar is identified in the supplied building configuration.
The record does not establish parking-space ownership or unit-specific allotments, nor does it provide evidence of ramps, internal driveways, pedestrian separation, mechanical parking or EV charging.
6. Amenities, recreation & open spaces
The RERA amenities record lists the following facilities with 0% progress entries. “YES” is a filed availability indicator, not evidence that the facility is complete or independently verified.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water Supply | No source, capacity or storage detail supplied | “YES”; 0% progress; completion not verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No system or capacity detail supplied | “YES”; 0% progress; completion not verified | |
| Storm Water Drains | No extent or design detail supplied | 0% progress; completion not verified | |
| Water Conservation, Rain water Harvesting | Permit specifies 5 rainwater-harvesting pits | RERA entry “YES”; 0% progress; completion not verified | |
| Electrical Meter Room, Sub-Station, Receiving Station | Permit requires space for a transformer | RERA entry “YES”; 0% progress; completion not verified | |
| Internal Roads & Footpaths | No dimensions or layout supplied | 0% progress; completion not verified | |
| Green Strip/TOT LOT/Park | No area or design detail supplied | 0% progress; completion not verified | |
| Street Lighting | No fixture or extent detail supplied | 0% progress; completion not verified | |
| Community Buildings | No building or facility detail supplied | 0% progress; completion not verified | |
| Treatment and Disposal of Sewage and Sullage Water | No treatment or reuse details supplied | 0% progress; completion not verified | |
| Solid Waste Management and Disposal | Permit also requires a garbage house within the premises; no size or system detail supplied | 0% progress; completion not verified | |
| Energy management | No system detail supplied | 0% progress; completion not verified | |
| Fire Protection and Fire Safety Requirements | No system detail supplied | 0% progress; completion not verified | |
| Aggregate area of recreational Open Space | No area supplied | 0% progress; completion not verified |
No clubhouse, indoor recreation, sports facility or specific community amenity is substantiated in the supplied project record. The permit’s open-space contribution charge is not a measurement of an on-site recreational area.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed facilities. These entries do not establish completion, capacity or operating status. The building permit specifies 5 rainwater-harvesting pits, requires transformer space and a garbage house within the premises, and says sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision.
The supplied evidence gives no water source or storage capacity, STP/reuse design, electrical backup details, lift count or capacity, fire-system specifications, security/CCTV provisions, or accessible-circulation details. The permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of an Occupancy Certificate; no such NOC or occupancy certificate is supplied.
8. Location, access & connectivity
The registered site is Plot No. 9-B, Mansoorabad revenue village and locality, Survey No. 30, Ranga Reddy district, PIN 500068. The building permit identifies Saroornagar Mandal. It records an east boundary of 30 - WIDE ROAD.
The location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No public-transport details, approach-road name, or further measured landmark distances are supplied.
9. Developer & development status
The registered promoter is Maa Brundavan Group, recorded as a partnership, with GSTIN 36ABQFM2998A1ZW. Its project registration records an office address of B, Income Tax Colony, Mansoorabad, Mansoorabad, Ranga Reddy, 500068. The certificate separately gives a promoter-office entry with incomplete village and mandal fields and PIN 500102; a complete verified office-contact or website record is not supplied.
The RERA declaration identifies Kongari Venkatesham as the authorised signatory and declares 18/08/2025 as the project completion date. This is the promoter’s declared undertaking, not independent evidence of completion. The supplied record does not provide a verified construction-stage assessment, occupancy certificate, or evidence that the registration was extended beyond its stated end date of 18/08/2025.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C registration under section 5 for MAHAALAXMI TOWER BLOCK - B, registration P03000006306, issued 07/07/2023; stated validity through 18/08/2025.
GHMC building permit: Building Permit Order 2788/GHMC/LBN/2022-BP, dated 18 August 2022, file no. 007980/GHMC/3922/LBN2/2022-BP; sanctions 1 Stilt + 5 upper floors on Plot No. 9-B, Mansoorabad.
Commencement / permit document: The supplied document is a GHMC Building Permit Order. No separate commencement notice or certificate is included.
Layout approval: A layout-plan document is listed in the RERA file, but it was not extracted; the supplied evidence does not establish its contents or an LP number.
Promoter declaration: Form B declaration by Maa Brundavan Group, signed by authorised signatory Kongari Venkatesham; it declares the land free of encumbrances and undertakes completion by 18/08/2025.
Occupancy / completion documents: No occupancy certificate or completion certificate is included in the supplied project documents.
Floor plans: Two drawings are recorded, but neither was measured for this review.
The approval and document index identifies the records available for this overview; the supplied material does not establish an issued occupancy certificate or a post-expiry RERA extension.
Other registrations of Mahaalaxmi
Frequently asked questions
Is MAHAALAXMI TOWER BLOCK - B registered with Telangana RERA?
Yes. MAHAALAXMI TOWER BLOCK - B is registered with the Telangana Real Estate Regulatory Authority as P03000006306; the registration status is New Project.
Who is the developer of MAHAALAXMI TOWER BLOCK - B?
The promoter named in the RERA registration is MAA BRUNDAVAN GROUP.
Where is MAHAALAXMI TOWER BLOCK - B located?
MAHAALAXMI TOWER BLOCK - B is in MANSOORABAD, Rangareddy, Telangana (500068).
When will MAHAALAXMI TOWER BLOCK - B be completed?
The promoter's proposed date of completion filed with RERA is 18/08/2025. This is the promoter's declaration, not a guarantee.
More projects in Rangareddy





