MAHAALAXMI TOWER BLOCK - B is a residential apartment project in Mansoorabad, Saroornagar Mandal, Ranga Reddy district, on a 741.45 sq. m plot. Registered promoter Maa Brundavan Group is developing one block with 1 Stilt + 5 upper floors and 15 homes: 2BHK and 3BHK configurations. The project is registered under TG-RERA **P03000006306**, issued 07/07/2023, and its proposed completion date is **18/08/2025**.

More from Maa Brundavan Group · 2 projects →

01What we found

Period endedTG-RERA registration ran to 18 Aug 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
5court cases on this project's land (survey 30, Mansoorabad)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMAHAALAXMI TOWER BLOCK - B
Project typeResidential apartment project RERA record
Phase / registered portionBlock B; the registration and building permit identify this block/building. Separate phase details are not disclosed. RERA record
TG-RERA registrationP03000006306, issued 07/07/2023; stated validity 07/07/2023–18/08/2025. The supplied certificate records no extension.
Registered promoterMaa Brundavan Group, identified in the RERA record as a partnership. RERA filing Parties record
RERA statusThe supplied registration period ended 18/08/2025; the evidence pack does not establish a subsequent extension or current registration status.

Land and geographic identity

FieldProject record
Locality / plotMansoorabad; Plot No. 9-B Land records
Revenue villageMansoorabad
MandalSaroornagar Mandal, as stated in the building permit; mandal is not disclosed in the RERA land details. Land records
District / PINRanga Reddy; 500068 RERA record
Survey number(s)Survey No. 30; no subdivision is stated for this project parcel in the RERA registration. Land records
Site areaTotal/plot area 741.45 sq. m; net plot area 741.45 sq. m. The permit records road-affected area 0.0 sq. m and nala-affected area 0.0 sq. m. Land records
BoundariesEast: 30 - WIDE ROAD; West: neighbours’ land; North: Plot No. 9-A; South: Plot No. 9-C Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit2788/GHMC/LBN/2022-BP, approved 18 August 2022; file no. 007980/GHMC/3922/LBN2/2022-BP Approvals record
Approved built-up areaThe permit’s stated residential upper-floor area is 1,685.15 Sq.Mt. and its stilt area is 345.2 Sq.Mt. The project record separately lists approved built-up area as 2,057.35 sq. m; these are distinct filed figures, not a recalculation. RERA filing
Building / block countOne building / one block RERA filing RERA unit table
Sanctioned configuration1 Stilt + 5 upper floors; building height stated as 14.99 (unit not specified in the supplied extraction). No basement or podium is recorded.
ParkingPermit records Total Parking Area 345.2; the unit for this extracted figure is not stated. The permit says stilt parking is for vehicle parking. No space count is supplied.
Units15 units in the RERA unit record; the building permit extraction does not state an approved unit count. RERA unit table RERA unit details

Offering and status

FieldProject record
RERA-filed configurations2BHK and 3BHK RERA unit details
RERA-filed saleable areas2BHK: 71.79 sq. m; 3BHK: 106.72 sq. m RERA unit details
Booked / availablePortal-derived counts show 0 booked / 5 available 2BHK units and 0 booked / 10 available 3BHK units. The source record has no as-of date; counts are indicative. RERA unit table RERA unit details
Construction stageRERA-filed amenities record 0% progress for each listed item. No independently verified site-progress evidence or project-wide construction percentage is supplied. RERA amenities
Completion datePromoter’s Form B declaration gives 18/08/2025 as the undertaking date. This is not evidence that completion occurred.
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied for this building. Document index

2. The project story

MAHAALAXMI TOWER BLOCK - B is a single-block residential apartment development registered for Plot No. 9-B in Mansoorabad revenue village, Survey No. 30, Ranga Reddy district. The GHMC permit describes a 1 Stilt + 5 upper-floor residential building on a 741.45 sq. m plot. The plot’s recorded east boundary is a wide road; the other boundaries are adjoining land and plots. RERA record Land records

The RERA unit record lists 15 homes: five 2BHK and ten 3BHK. The portal-derived booking snapshot shows all 15 as available and none booked, but has no as-of date and should be treated as indicative rather than current inventory. RERA unit table RERA unit details

The promoter declared a completion date of 18/08/2025. The supplied material does not include independent construction-progress verification or an occupancy/completion certificate, so it does not establish whether the building is complete or occupied. The RERA certificate’s registration validity is a separate matter from the declared completion date and from the status of any occupancy certificate. Document index

3. Master plan, architecture & building design

The RERA record and GHMC permit describe one residential building on a 741.45 sq. m plot, with a 1 Stilt + 5 upper floors configuration. The permit extraction states residential upper-floor area of 1,685.15 Sq.Mt., stilt area of 345.2 Sq.Mt., and building height 14.99 (unit not stated). The RERA fields separately report approved built-up area of 2,057.35 sq. m. These figures are retained as stated in their respective records; the supplied evidence does not provide a drawing-based area reconciliation. RERA filing

The permit records setbacks of Front 3, Rear 3.5, Side I 3.5 and Side II 3.5; units are not stated in the extraction. It also records a 14% open-space contribution charge, but does not establish an on-site open-space area from that entry.

The available floor-plan processing record says there are two drawings, but neither contains a measured floor-plan layout for this review; no flats were identified in those drawings. Consequently, the supplied evidence does not establish typical floor arrangement, flats per floor, building footprint, lift or stair count, internal circulation, or the location and dimensions of common areas. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50571.79 sq. mNot measured from drawingsNot supplied
3BHK10010106.72 sq. mNot measured from drawingsNot supplied

RERA unit details RERA unit table Floor plans

The saleable areas are the figures filed in the RERA unit record. The floor-plan drawings were not measured for this review, so no drawing-derived carpet area or room dimensions can be reported. Carpet area, balcony/utility area and saleable area are distinct measures; the supplied evidence does not quantify the first two for these homes. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction records Total Parking Area 345.2 and a stilt level. The extraction does not specify the area unit or provide the number of parking spaces, their allocation by unit, visitor or accessible parking provision, or a parking layout. The permit conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking without partition walls or rolling shutters; no cellar is identified in the supplied building configuration.

The record does not establish parking-space ownership or unit-specific allotments, nor does it provide evidence of ramps, internal driveways, pedestrian separation, mechanical parking or EV charging. Document index

6. Amenities, recreation & open spaces

The RERA amenities record lists the following facilities with 0% progress entries. “YES” is a filed availability indicator, not evidence that the facility is complete or independently verified. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water SupplyNo source, capacity or storage detail suppliedRERA amenities“YES”; 0% progress; completion not verified
Sewerage (Chamber, Lines, Septic Tank, STP)No system or capacity detail suppliedRERA amenities“YES”; 0% progress; completion not verified
Storm Water DrainsNo extent or design detail suppliedRERA amenities0% progress; completion not verified
Water Conservation, Rain water HarvestingPermit specifies 5 rainwater-harvesting pitsRERA amenitiesRERA entry “YES”; 0% progress; completion not verified
Electrical Meter Room, Sub-Station, Receiving StationPermit requires space for a transformerRERA amenitiesRERA entry “YES”; 0% progress; completion not verified
Internal Roads & FootpathsNo dimensions or layout suppliedRERA amenities0% progress; completion not verified
Green Strip/TOT LOT/ParkNo area or design detail suppliedRERA amenities0% progress; completion not verified
Street LightingNo fixture or extent detail suppliedRERA amenities0% progress; completion not verified
Community BuildingsNo building or facility detail suppliedRERA amenities0% progress; completion not verified
Treatment and Disposal of Sewage and Sullage WaterNo treatment or reuse details suppliedRERA amenities0% progress; completion not verified
Solid Waste Management and DisposalPermit also requires a garbage house within the premises; no size or system detail suppliedRERA amenities0% progress; completion not verified
Energy managementNo system detail suppliedRERA amenities0% progress; completion not verified
Fire Protection and Fire Safety RequirementsNo system detail suppliedRERA amenities0% progress; completion not verified
Aggregate area of recreational Open SpaceNo area suppliedRERA amenities0% progress; completion not verified

No clubhouse, indoor recreation, sports facility or specific community amenity is substantiated in the supplied project record. The permit’s open-space contribution charge is not a measurement of an on-site recreational area. RERA amenities

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress for the listed facilities. These entries do not establish completion, capacity or operating status. The building permit specifies 5 rainwater-harvesting pits, requires transformer space and a garbage house within the premises, and says sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision. RERA amenities

The supplied evidence gives no water source or storage capacity, STP/reuse design, electrical backup details, lift count or capacity, fire-system specifications, security/CCTV provisions, or accessible-circulation details. The permit requires an Occupancy Fire NOC from the Director (EV&DM) before issue of an Occupancy Certificate; no such NOC or occupancy certificate is supplied. Document index

8. Location, access & connectivity

The registered site is Plot No. 9-B, Mansoorabad revenue village and locality, Survey No. 30, Ranga Reddy district, PIN 500068. The building permit identifies Saroornagar Mandal. It records an east boundary of 30 - WIDE ROAD. Land records

The location record gives a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. No public-transport details, approach-road name, or further measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is Maa Brundavan Group, recorded as a partnership, with GSTIN 36ABQFM2998A1ZW. Its project registration records an office address of B, Income Tax Colony, Mansoorabad, Mansoorabad, Ranga Reddy, 500068. The certificate separately gives a promoter-office entry with incomplete village and mandal fields and PIN 500102; a complete verified office-contact or website record is not supplied. Parties record Corporate record RERA filing

The RERA declaration identifies Kongari Venkatesham as the authorised signatory and declares 18/08/2025 as the project completion date. This is the promoter’s declared undertaking, not independent evidence of completion. The supplied record does not provide a verified construction-stage assessment, occupancy certificate, or evidence that the registration was extended beyond its stated end date of 18/08/2025. Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateForm C registration under section 5 for MAHAALAXMI TOWER BLOCK - B, registration P03000006306, issued 07/07/2023; stated validity through 18/08/2025.
GHMC building permitBuilding Permit Order 2788/GHMC/LBN/2022-BP, dated 18 August 2022, file no. 007980/GHMC/3922/LBN2/2022-BP; sanctions 1 Stilt + 5 upper floors on Plot No. 9-B, Mansoorabad.
Commencement / permit documentThe supplied document is a GHMC Building Permit Order. No separate commencement notice or certificate is included.
Layout approvalA layout-plan document is listed in the RERA file, but it was not extracted; the supplied evidence does not establish its contents or an LP number. Document index HMDA
Promoter declarationForm B declaration by Maa Brundavan Group, signed by authorised signatory Kongari Venkatesham; it declares the land free of encumbrances and undertakes completion by 18/08/2025.
Occupancy / completion documentsNo occupancy certificate or completion certificate is included in the supplied project documents. Document index
Floor plansTwo drawings are recorded, but neither was measured for this review. Floor plans

The approval and document index identifies the records available for this overview; the supplied material does not establish an issued occupancy certificate or a post-expiry RERA extension. Document index

Other registrations of Mahaalaxmi

Frequently asked questions

Is MAHAALAXMI TOWER BLOCK - B registered with Telangana RERA?

Yes. MAHAALAXMI TOWER BLOCK - B is registered with the Telangana Real Estate Regulatory Authority as P03000006306; the registration status is New Project.

Who is the developer of MAHAALAXMI TOWER BLOCK - B?

The promoter named in the RERA registration is MAA BRUNDAVAN GROUP.

Where is MAHAALAXMI TOWER BLOCK - B located?

MAHAALAXMI TOWER BLOCK - B is in MANSOORABAD, Rangareddy, Telangana (500068).

When will MAHAALAXMI TOWER BLOCK - B be completed?

The promoter's proposed date of completion filed with RERA is 18/08/2025. This is the promoter's declaration, not a guarantee.