KTR ENCLAVE is a residential apartment project in Gopalpuram, HANAMKONDA mandal, Warangal Urban district, developed by registered promoter Kodati Thirupathi Rao. It occupies 407.32 sq.m. and comprises one residential building with 1 Stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. The project is registered under TG-RERA number P00300008032, and the promoter’s Form B undertaking states completion by 11/01/2026.

01What we found

Period endedTG-RERA registration ran to 11 Jan 2026 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameKTR ENCLAVE RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified; registration is for the project recorded as KTR ENCLAVE
TG-RERA registration numberP00300008032
Registration validityCertificate states validity commencing 08/04/2024 and ending 11/01/2026, unless extended by the Authority
Registered promoterKodati Thirupathi Rao
RERA status in supplied recordRegistered; no extension or current-status order is supplied. Registration validity and the promoter’s completion undertaking are separate matters.

Land and geographic identity

FieldProject record
LocalityGopalpuram / GOPALPURAM RERA record RERA filing
Revenue villageGopalpuram; also rendered as GOPALAPURAM in approval records. RERA record
MandalHANAMKONDA in the supplied layout-plan extraction; not disclosed in the project identity fields.
DistrictWarangal Urban in the project record; the layout-plan extraction states HANAMKONDA. RERA record
PIN506170 RERA record
Survey number(s) / subdivision(s)Survey No. 14; no subdivision is specified. Land records
Plot identificationPlot Nos. 9 & 10 in the registration certificate.
Registered site extent407.32 sq.m. RERA filing
Net / other stated areaNet area 404.28 sq.m. in the approval extracts; the RERA land fields report net area 407.32 sq.m. RERA filing
BoundariesEast: OPEN PLOT; West: ROAD; North: ROAD; South: PLOT 11 AND 12. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Warangal Municipal Corporation (GWMC) Municipality/Municipal Corporation
Principal building approvalApproval No. 0344/BP/3006/2023, dated 11 January, 2023; file No. 013847/BP/DTCP/3006/0497/2022 Approvals record
Other approval identifiers on fileApproval No. CA 2015/70684 and application/permit No. TS/080848/2022, dated 21-12-2022 in the layout-plan extraction
Approved built-up areaApproval extraction reports 1,054.35 m² residential net BUA and 1,251.95 m² total proposed BUA including parking.
Building count / arrangementOne residential building; RERA record lists one building unit. RERA filing
Sanctioned floors and height1 Stilt + 5 upper floors; stated height 14.75 m (also 17.65 m from GL in the layout-plan extraction).
ParkingApproval extraction states proposed number of parkings: 0; it separately lists 197.60 m² parking area. The building approval says the approved cellar/stilt parking area is to be used exclusively for parking.
Unit counts10 units in the approval extraction and 10 in the RERA unit record: 5 2BHK and 5 3BHK. RERA unit table

Offering and status

FieldProject record
Configurations offered2BHK and 3BHK apartments RERA unit table
RERA-filed saleable areas2BHK: 105.77 m²; 3BHK: 130.72 m² RERA unit table
Booked / availablePortal-read record shows 2BHK: 0 booked / 5 available; 3BHK: 0 booked / 5 available. Counts are indicative because the record has no as-of date. RERA unit table
Construction stageNo independently verified construction-stage evidence supplied. The project record’s 80% completeness is a data-completeness measure, not construction progress. RERA record
Completion datePromoter’s Form B undertaking states completion by 11/01/2026.
Occupancy / completion certificateNot supplied. The filed Form–1A completion document states only “NOT APPLICABLE”; it does not establish an occupancy or completion certificate.
Registration expiry vs completionRegistration certificate ends 11/01/2026; the Form B completion undertaking also states 11/01/2026. No extension order is provided.

2. The project story

KTR ENCLAVE is registered as a residential apartment project on Survey No. 14, Plot Nos. 9 & 10, at Gopalpuram, PIN 506170. The supplied approval records describe a single residential building with a stilt and five upper floors, intended to contain ten apartments: five 2BHK and five 3BHK units. RERA unit table

The promoter’s Form B sets a completion undertaking of 11/01/2026. The supplied record does not establish construction progress or that any portion is complete or occupied. The filed completion-form entry is “NOT APPLICABLE,” and no occupancy certificate is included in the materials reviewed.

3. Master plan, architecture & building design

The building approval describes one residential block of 1 Stilt + 5 upper floors, with a stated height of 14.75 m; the layout-plan extraction also states 17.65 m from GL. The approval records a site area of 407.32 m², net area of 404.28 m², vacant plot area of 193.42 m², proposed coverage of 210.87 m² (51.77%), and proposed residential net BUA of 1,054.35 m².

The layout-plan extraction separately reports total proposed built-up area of 1,251.95 m² including parking, parking area of 197.60 m², and total BUA of 1,277.80 m² with deductions of 13.23 m² and net BUA of 1,054.35 m². These are separate figures as recorded in the approval extraction; they are not treated as interchangeable area measures.

The approval extraction identifies a 2.50 m wide passage and a 1.33 m wide balcony. It lists a lift, overhead water tank, septic tank, rainwater harvesting, watchman room and toilet. The supplied material does not give a floor-by-floor flat schedule, lift count or capacity, stair arrangement, entrance/exit layout, or detailed common-area plan.

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. Carpet areas and loading figures are software measurements from the filed plan drawing, not RERA disclosures; the drawing measurements are flagged for review where stated. Carpet area is distinct from saleable area, which includes the home’s share of common areas. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505105.77 m²69.5–70.0 m² (software-measured; median 70.0 m²)34%
3BHK505130.72 m²92.1 m² (software-measured)30%

The typical-floor drawing panel is labelled “TYPICAL - FIRST, SECOND, THIRD & FOURTH FLOOR PLAN.” The measured 2BHK example includes a hall, dining area, kitchen, two bedrooms, two toilets and a balcony labelled 1.33 M. WIDE BALC. The measured 3BHK example includes a hall, kitchen, three bedrooms, three toilets and a balcony labelled 1.33 M. WIDE BALC. Room dimensions are drawing-based software measurements and should be checked against the plan. RERA unit details

5. Parking & vehicle circulation

The layout-plan extraction records 0 proposed parkings and 197.60 m² as parking area. The building-approval conditions state that the approved cellar and stilt parking area is to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied material does not establish a sanctioned parking-space count, visitor or accessible parking, a parking-allocation schedule, EV charging, or a vehicle ramp and circulation arrangement. A parking area shown or described in an approval does not by itself establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity record lists facilities and shows 0% progress for each listed item; it does not establish that any facility is complete. The building approval also includes conditions concerning rainwater harvesting, a garbage house, a transformer space, tree planting and a fenced tot-lot/greenery before occupancy. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsNo size statedRERA amenity record RERA amenitiesListed; 0%; completion not independently verified
Green strip / tot-lot / parkNo size stated; approval requires a fenced tot-lot maintained as greenery before occupancyRERA amenity record; building approval RERA amenitiesListed; 0%; completion not independently verified
Aggregate recreational open spaceNo area statedRERA amenity record RERA amenitiesListed; 0%; completion not independently verified
Community buildingsNo description or size statedRERA amenity record RERA amenitiesListed; 0%; completion not independently verified
Watchman roomNo size statedLayout-plan extractionListed in approval extraction; completion not independently verified

7. Utilities, building services & safety

The approval extraction lists a septic tank, rainwater harvesting, lift, and overhead water tank. The building approval requires a rainwater-harvesting structure/percolation pit, space for a transformer, a garbage house, and tree planting. RERA’s amenity record lists water supply, sewerage, storm-water drains, street lighting, water conservation/rainwater harvesting, electrical meter room/sub-station/receiving station, energy management, solid-waste management and fire protection; these entries show 0% progress in the supplied record and are not evidence of completed facilities. RERA amenities

The supplied documents do not specify water source or storage capacity, sewage-treatment capacity or reuse arrangements, electrical backup, lift count/capacity, fire-system details, CCTV/access-control provisions, or accessible routes and facilities. The approval requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of an occupancy certificate.

8. Location, access & connectivity

The registered location is Gopalpuram, Warangal Urban, Telangana, PIN 506170, on Survey No. 14. The parcel record gives its boundaries as an open plot to the east, road to the west and north, and Plot 11 and 12 to the south. RERA record RERA filing RERA filing

The location record supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and lists Financial District (Nanakramguda) at 1.2 km. The supplied material does not document public-transport services, additional measured distances, or travel times. Location record

9. Developer & development status

The TG-RERA certificate identifies Kodati Thirupathi Rao as the registered promoter. The legal-entity type, registered office and official contact details are not established in the supplied project materials; the certificate lists a Hyderabad address. Corporate record

The promoter’s Form B, dated APR-02-2024, declares legal title, states that the land is free from encumbrances, and undertakes completion by 11/01/2026. These are promoter declarations in the filed affidavit. The supplied record does not provide independently verified construction progress or an occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300008032; validity stated as 08/04/2024–11/01/2026
What the supplied record establishesForm C certificate for KTR ENCLAVE; identifies Kodati Thirupathi Rao as promoter and Survey No. 14, Plot Nos. 9 & 10.
Building-construction approval
Identifier / date0344/BP/3006/2023, 11 January, 2023; file 013847/BP/DTCP/3006/0497/2022
What the supplied record establishesGWMC Municipality/Municipal Corporation approval for a residential building at Gopalpuram, Survey No. 14.
Layout/building-plan extraction
Identifier / dateApproval CA 2015/70684; application/permit TS/080848/2022, 21-12-2022
What the supplied record establishesPlan extraction describes a stilt and five upper floors and records site, area and building parameters.
Promoter declaration
Identifier / dateForm B, dated APR-02-2024
What the supplied record establishesPromoter’s filed declarations and completion undertaking.
Title-report document
Identifier / dateDoc 432582
What the supplied record establishesAdvocate’s title opinion dated 31-01-2023, as identified in the filed-document record.
Completion form
Identifier / dateDoc 432604
What the supplied record establishesOCR text states “NOT APPLICABLE”; it does not establish project completion or an occupancy certificate.
Allotment / sale documents
Identifier / dateDocs 432608, 432609
What the supplied record establishesAllotment letter is a blank form; the agreement-for-sale document is partially completed and does not identify a specific apartment sale.

Frequently asked questions

Is KTR ENCLAVE registered with Telangana RERA?

Yes. KTR ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00300008032; the registration status is New Project.

Who is the developer of KTR ENCLAVE?

The promoter named in the RERA registration is KODATI.

Where is KTR ENCLAVE located?

KTR ENCLAVE is in GOPALPURAM, Hanamkonda, Telangana (506170).

When will KTR ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 11/01/2026. This is the promoter's declaration, not a guarantee.