Sign in

Krishnas Splendour

KRISHNA HOMES · Rangareddy · RERA P02400000715

KRISHNAS SPLENDOUR is a residential apartment project in Gopanpally, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter Krishna Homes, a partnership. The project has a site area of 418.03 sq m and one proposed residential building, sanctioned as Stilt + 5, with 10 apartments: five 2BHK and five 3BHK. TG-RERA registration number P02400000715 lists the original and revised proposed completion date as 08/11/2023.

More from Krishna Homes · 2 projects →

01What we found

Period endedTG-RERA registration ran to 8 Nov 2023 - check its extension on TG-RERA
11documents on file - each fact links to its page
12court cases on this project's land (survey 231, Gopanpally)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemTG-RERA record
Registered project nameKRISHNAS SPLENDOUR RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified; the registration is for the apartment project on Plot No. 49
TG-RERA registrationP02400000715
Registration validity10/05/2019 to 08/11/2023; certificate states four years. This is the registration period, not the construction-completion or occupancy status.
Registered promoterKrishna Homes, a partnership RERA filing
RERA statusListed as On-Going Project in the supplied project record RERA filing

Land and geographic identity

ItemProject record
LocalityGopanpally RERA record RERA filing
Revenue villageGopanpally RERA record Land records
Mandal / district / PINSerilingampally / Ranga Reddy / 500107 RERA record
Project survey numbers230, 231(PART), 233/AA, 234, 307, 308, 309 RERA record Land records
PlotPlot No. 49 RERA filing
Site extentTotal area 418.03 sq m; net area 418.03 sq m; road-affected area 0 sq m in the filed land details and building permit extraction RERA filing
BoundariesEast: 60 FT ROAD; West: PLOT NO 52 AND 53; North: PLOT NO 50; South: PLOT NO 48 RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding Permit Order: approval no. 1/C11/10382/2017, file no. 1/C11/10629/2017, dated 08 November, 2017 Approvals record
Building arrangementOne proposed residential building, identified as Building - 1; sanctioned as Stilt + 5
Sanctioned height14.99 m
Approved built-up areaResidential upper floors: 1,071.60 m²; the permit extraction separately lists stilt area 235.93 m². These are the filed permit figures, not a carpet- or saleable-area figure.
Parking provisionPermit conditions say the cellar and stilt approved for parking are to be used exclusively for parking. The OC extraction records parking area as 214.32 m² per sanctioned plan and 222.39 m² per site building plan. A space count is not supplied.
Unit count10 RERA-recorded units: 5 two-bedroom and 5 three-bedroom apartments RERA unit table

Offering and status

ItemProject record
2BHK5 units; RERA-filed saleable area 112.87 m² each RERA unit table
3BHK5 units; RERA-filed saleable area 148.83 m² each RERA unit table
Booked / availablePortal-derived record shows 10 booked and 0 available; no as-of date is provided, so counts are indicative RERA unit table
Construction progressProject record reports 90% completeness; this is a recorded progress figure, not an independent site inspection RERA record
Original / revised proposed completion08/11/2023 / 08/11/2023 RERA record
Occupancy certificateA GHMC Occupancy Certificate is filed for the residential building associated with this project; its stated scope is the building on the listed project surveys. The certificate says the building was inspected and declared fit for occupation.

2. The project story

  • KRISHNAS SPLENDOUR is a single-building residential apartment project registered on Plot No. 49, Gopanpally, in revenue village Gopanpally, Serilingampally Mandal, Ranga Reddy District. The registered land identity covers survey numbers 230, 231(PART), 233/AA, 234, 307, 308 and 309, with a recorded site area of 418.03 m². RERA record Land records RERA filing
  • The GHMC permit describes one proposed residential building with a Stilt + 5 configuration and a height of 14.99 m. TG-RERA records 10 apartments in total: five 2BHK and five 3BHK units. The supplied portal-derived booking data records all 10 as booked, but does not give an as-of date. RERA unit table
  • The registration record gives 08/11/2023 as both the original and revised completion date, while the project record reports 90% completeness. Separately, the filed GHMC Occupancy Certificate states that the building was inspected and declared fit for occupation. The progress percentage and the certificate are distinct records; the percentage is not presented as an independent site verification. RERA record

3. Master plan, architecture & building design

  • The filed GHMC permit covers one residential building on a recorded site area of 418.03 m², with net area also 418.03 m² and road-affected area 0 m². It specifies Stilt + 5, a height of 14.99 m, and upper-floor residential area of 1,071.60 m². The permit extraction also lists 235.93 m² for the stilt.
  • The permit lists setbacks of Side I 2.5, Side II 2.5, Front 2.5, and Rear 4; units are not stated in the extracted values. It also requires tree planting at the site perimeter and in front of the premises, and a maintained greenery strip. No reliable drawing-derived information is supplied here on flats per floor, lift or stair arrangements, building footprint, internal circulation, or the residential/common-area distribution.
  • The permit extraction lists “Proposed Covered builtup area 53,581.00” without a unit or explanation in the supplied text; it is therefore not treated here as a verified built-up-area measurement. The permit’s stated residential upper-floor area and stilt area are reported separately above.

4. Homes, configurations & floor plans

TG-RERA records 10 apartments across two configurations. The saleable areas below are RERA-filed; carpet measurements are software-measured from the floor-plan drawing and need review. The measures are not interchangeable: saleable area is the filed unit area, while the drawing-based carpet measurement represents the measured usable internal floor area and excludes balconies. Loading is supplied by the drawing-measurement record. RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
2BHK550112.87 m²60.7 m² (software-measured; 654 sq ft)46%
3BHK550148.83 m²95.6 m² (software-measured; 1,029 sq ft)36%
  • The measured 2BHK drawing identifies a master bedroom, a bedroom, two toilets, living/dining, kitchen and two balconies. The measured 3BHK drawing identifies a master bedroom, two further bedrooms, three toilets, living/dining, kitchen and three balconies. Room dimensions are software-read from the drawing geometry, not RERA-filed measurements; the supplied records mark both measured designs as needing review. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The GHMC permit conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The Occupancy Certificate extraction records parking area as 214.32 m² under the sanctioned plan and 222.39 m² under the site building plan. These records do not provide a sanctioned parking-space count, separate resident or visitor counts, accessible-parking provision, or unit-wise parking allocations.
  • The title-report extraction refers to a 100 Sft. car parking slot with the proposed agreement for Flat No. 201; that is a document-specific reference, not evidence of a project-wide allocation schedule or exclusive title to parking.

6. Amenities, recreation & open spaces

The RERA amenity record indicates certain infrastructure items as available at 100%; its progress fields show several other items at 0%. These are portal-recorded declarations, not independent verification of delivery. The GHMC permit also specifies site-level provisions and conditions; the supplied records do not establish that every listed item is complete. RERA amenities

Landscape / open space
FacilityGreen Strip / TOT LOT / Park
Description / sizeOC extraction records tot-lot area 6 m² in both sanctioned-plan and site-building-plan fields; permit extraction lists “Tot-lot (m2) 0” and requires the tot-lot to be fenced and maintained as greenery.
Evidence sourceGHMC permit and OC; RERA amenity record
Declared progress / verified statusRERA amenity record: YES, 100%; independent completion verification not supplied.
Sports / recreation
FacilityKids’ play areas / sand pits; children’s play area; jogging track
Description / sizeNo sizes or quantities supplied. Promoter website
Evidence sourceVendor-listed amenities only
Declared progress / verified statusMarketing/vendor listing; not established as sanctioned or delivered in the supplied project records.
Clubhouse / indoor
FacilityIndoor games; gym; clubhouse
Description / sizeNo sizes or capacities supplied. Promoter website
Evidence sourceVendor-listed amenities only
Declared progress / verified statusMarketing/vendor listing; not established as sanctioned or delivered in the supplied project records.
Convenience / community
FacilityCommunity buildings
Description / sizeNo size or description supplied. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified statusProgress field: 0%.
Convenience / community
FacilityInternal roads and footpaths; street lighting
Description / sizeNo dimensions or quantities supplied. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified statusProgress fields: 0%.
Landscape / open space
FacilityAggregate recreational open space
Description / sizeNo area supplied. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified statusProgress field: 0%.

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as YES, 100%. It does not supply capacities or detailed system designs. RERA amenities

Water
Supplied evidenceRERA record lists water supply; vendor listing also names treated water supply and 24*7 water supply. No source, storage or treatment capacity is provided. RERA amenities Promoter website
Declared progress / limitationRERA record: YES, 100%; vendor details are not independently verified here.
Sewerage / drainage
Supplied evidenceRERA record lists sewerage (chamber, lines, septic tank, STP) as YES, 100%; treatment and disposal of sewage and sullage water has progress 0%. RERA amenities
Declared progress / limitationThe records do not identify the installed treatment arrangement or capacity.
Storm water / rainwater
Supplied evidenceRERA record lists water conservation/rainwater harvesting as YES, 100%, while storm water drains show 0%. The permit calls for rainwater-harvesting structures (percolation pits) and lists 6 RWHPs. RERA amenities
Declared progress / limitationDeclared availability is not independent verification of installed operation or capacity.
Electrical
Supplied evidenceRERA record marks electrical meter room/sub-station/receiving station YES, 100%; the building permit requires space for a transformer. RERA amenities
Declared progress / limitationNo supply capacity, backup capacity or commissioning details supplied.
Fire and life safety
Supplied evidenceFire protection and fire-safety requirements show progress 0% in the RERA amenity record. Vendor listing mentions fire safety. RERA amenities Promoter website
Declared progress / limitationNo project-specific fire-system details or clearance evidence supplied in this overview data.
Waste / security
Supplied evidenceSolid-waste management and disposal show progress 0%; the permit requires a garbage house within the premises. Vendor listings mention waste management, CCTV and 24 x 7 security. RERA amenities Promoter website
Declared progress / limitationVendor-listed features are not confirmed as installed; no system specifications supplied.
Lifts / accessibility
Supplied evidenceNo project-specific lift, accessible-route, ramp, or accessible-parking details supplied.
Declared progress / limitationNot disclosed in the supplied records.

8. Location, access & connectivity

  • The registered location is Gopanpally, Serilingampally Mandal, Ranga Reddy District, PIN 500107. The supplied location record gives a cadastral parcel-centroid coordinate of 17.45670, 78.30398. RERA record RERA filing Location record
  • The location data identifies the nearest sampled Outer Ring Road interchange at approximately 5.6 km. No other measured access distances or public-transport details are supplied in the project-location record. Location record

9. Developer & development status

  • The registered promoter is KRISHNA HOMES, recorded as a partnership. The RERA-filed partnership record identifies firm registration No. 1994 of 2017 and names two partners; the project record lists PRADEEP KUMAR TAMMANA as authorized signatory and SUCHARITHA TAMMANA as partner. RERA filing Parties record
  • The registration certificate gives the promoter office location only as “Village: Mandal: District: Ranga Reddy, Pin: 500084”; a complete office address and official contact details are not supplied there.
  • The Form B declaration dated 30/03/2019, made by Tammana Pradeep Kumar as authorized signatory, declares that Krishna Homes has legal title to the project land, that the land is free from encumbrances, and that completion would be by 08th November, 2023. These are promoter declarations. The project record separately reports 90% completeness, and a GHMC Occupancy Certificate for the residential building is filed. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000715; issued 10/05/2019; valid to 08/11/2023
What the supplied record establishesForm C registration for KRISHNAS SPLENDOUR, listing Krishna Homes as promoter and the project survey numbers.
GHMC building permit order
Identifier / dateApproval 1/C11/10382/2017; file 1/C11/10629/2017; 08 November, 2017
What the supplied record establishesConditional building permission for the proposed residential Building - 1, Stilt + 5, on the listed project parcels.
GHMC Occupancy Certificate
Identifier / dateApplication 2/C20/10084/2019-OC; approved 29 June, 2019
What the supplied record establishesOccupancy Certificate record for the residential building associated with the project; states inspected and declared fit for occupation.
Form B promoter declaration
Identifier / date30/03/2019
What the supplied record establishesPromoter declaration concerning title, encumbrances, completion undertaking and statutory project obligations.
Layout plan document slot
Identifier / dateRERA document record 45454 Document index
What the supplied record establishesThe supplied document entry is labelled for layout plan, but its text extraction is unavailable. The approved floor-plan drawing measurement data cites this document. Floor plans
HMDA layout lookup
Identifier / dateNo LP number in the RERA record; public approved-layout lookup unavailable in the supplied evidence HMDA
What the supplied record establishesLayout status is not established by that lookup.
  • The permit and occupancy record identify survey numbers 230, 231 (part), 233/AA, 234, 307, 308 and 309. The supplied project identity and registration records also identify the registered land as Plot No. 49, Gopanpally.

Frequently asked questions

Is KRISHNAS SPLENDOUR registered with Telangana RERA?

Yes. KRISHNAS SPLENDOUR is registered with the Telangana Real Estate Regulatory Authority as P02400000715; the registration status is On-Going Project.

Who is the developer of KRISHNAS SPLENDOUR?

The promoter named in the RERA registration is KRISHNA HOMES.

Where is KRISHNAS SPLENDOUR located?

KRISHNAS SPLENDOUR is in GOPANPALLY, Serilingampally, Rangareddy, Telangana (500107).

When will KRISHNAS SPLENDOUR be completed?

The promoter's proposed date of completion filed with RERA is 08/11/2023. This is the promoter's declaration, not a guarantee.

More projects in Gopanpally