Sign in

Aparna Sunstone

APARNA INFRAHOUSING PRIVATE LIMITED · Rangareddy · RERA P02400007601

APARNA SUNSTONE is a residential apartments project in Gopanpally, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter APARNA INFRAHOUSING PRIVATE LIMITED. The registered site extent is 100750.69 sq. m, and the development comprises 9 residential blocks, with 3 Basements + Ground + 44 Upper Floors, and 3213 units. RERA-filed configurations include 1BHK and a 3BHK group, with additional units filed as “BHK,” “3BHBK” and “3B HK.” The TG-RERA registration is P02400007601, and the project header records proposed completion as 05/04/2029.

More from Aparna Infrahousing Pvt Ltd · 9 projects →

01What we found

RegisteredTG-RERA - valid till 5 Dec 2028
13documents on file - each fact links to its page
79court cases on this project's land (survey 124, 262, Gopanpally)
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameAPARNA SUNSTONE RERA record
Project typeResidential apartments RERA record
Phase / registered portionNo phase name is supplied; the registration identifies the project on Survey Nos. 124(P) and 262(P). RERA record
TG-RERA registrationP02400007601 RERA record
Registration validity20 January 2024 to 5 December 2028; this is the registration period, not the completion deadline. RERA record
Registered promoterAPARNA INFRAHOUSING PRIVATE LIMITED, a private limited company RERA record Corporate record
RERA project status“New Project” in the project record RERA record

Land and geographic identity

ItemRecord
LocalityGopanpally RERA record Land records
Revenue villageGopanpally; the approval documents also print “GOPANPALLE” and “Gopanpally Village.” RERA record Land records
MandalSerilingampally RERA record Land records
DistrictRanga Reddy RERA record Land records
PIN502221 in the project identity record RERA record
All project survey numbers / subdivisionsSurvey Nos. 124(P) and 262(P) RERA record Land records
Registered site extentThe approval/order and RERA land record state net area 100750.69 sq. m. RERA record Land records
Boundaries in project recordNorth: road and land in Sy. Nos. 144 and 263; South: 30 m master-plan road; East: 18 m master-plan road; West: Osman Nagar village boundary. Land records

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building permit4612/GHMC/SLP/2023-BP, dated 06 December 2023 Approvals record
Approved built-up area562706.01 sq. m, identified in the sanctioned plan as proposed built-up area excluding parking RERA filing
Residential blocks9: Blocks A–I
Sanctioned residential floorsThe plan describes residential blocks as 3 Basements + Ground + 44 Upper Floors. The permit extraction lists Blocks A–H as Ground + 44 upper floors and Block I as 3 Cellars + Ground + 44 upper floors; see the recorded-document index for these plan records.
Amenities buildingsTwo: Amenities 01 is shown as 3 Basements + Ground + 4 Upper Floors in the plan; Amenities 02 as Ground + 2 Floors.
Sanctioned height142.50 m for the residential building height in the plan record
Unit countGHMC plan record: 3213.00 units; project unit record: 3213 total units. RERA unit table
ParkingPermit extract records Total Parking Area 204470.5; plan extract records GRAND TOTAL PARKING 203439.10.

Offering and status

ItemRecord
RERA-filed unit types1BHK; 3BHK group (filed labels include 3BHB, 3BHJ, 3BHK and 3NHK); 11 units filed as “BHK”; and two units filed as “3BHBK” and “3B HK.” RERA unit table RERA unit details
RERA-filed saleable area1BHK: 74.95 sq. m; 3BHK group: 137.31–207.45 sq. m; “BHK”: 102.62 sq. m; the two other filed labels: 178.0 sq. m each. RERA unit table RERA unit details
Booked / available countsPortal-derived counts: 647 booked and 2,566 available, out of 3,213 units. The portal record carries no as-of date; treat these figures as indicative. RERA unit table
Construction stageThe project is labelled “New Project”; no construction-progress percentage or independently verified site-progress record is supplied here. RERA record RERA unit table
Completion datePromoter’s Form B completion undertaking: 05.12.2028; project header proposed completion: 05/04/2029. RERA record
Occupancy / completion certificateNo completion certificate or occupancy certificate is recorded in the supplied project evidence; the building permit requires an occupancy certificate before occupation. The evidence does not establish the OC status of any phase or tower beyond that record. Approvals record

2. The project story

APARNA SUNSTONE is registered as a residential apartment project in Gopanpally, Serilingampally Mandal, Ranga Reddy District. The RERA record covers land identified as Survey Nos. 124(P) and 262(P). The development is organised as nine residential blocks, with two separately identified amenities buildings in the GHMC plan and permit records. RERA record Land records

The sanctioned residential design is a high-rise configuration: the plan describes 3 basements, a ground floor and 44 upper floors, with a stated building height of 142.50 m. The project record lists 3,213 units across nine blocks. The documents describe amenity buildings, internal roads, open-space elements and project services, but the supplied evidence does not provide a verified construction-progress assessment or evidence that any building or facility is complete or occupancy-certified. RERA unit table RERA amenities

The RERA portal’s booking figures are indicative only because the supplied record does not state when they were captured. The floor-plan review data reports two drawings, with no measured drawings and one scan pending; accordingly, no drawing-based carpet-area measurements can be reported from this evidence. RERA unit table RERA unit details

3. Master plan, architecture & building design

The GHMC plan record identifies a site area of 100758.98 and net plot area of 100754.39; the permit record gives a net plot area of 100750.69 sq. m. The plan separately records proposed built-up area excluding parking (562706.01), proposed built-up area including parking (766145.11), net built-up area (552532.01) and parking area (203439.10). These are differently labelled plan quantities and should not be treated as interchangeable.

The plan shows nine residential blocks and two amenities buildings. Its principal residential configuration is 3 basements, ground and 44 upper floors, with the plan stating 142.50 m building height. Amenities 01 is recorded as 3 basements, ground and 4 upper floors; Amenities 02 as ground and 2 floors. The separate permit extraction gives a different floor description for some individual blocks; the full building and floor descriptions are retained in the official-record index below.

Other drawing-extracted features include organised open spaces labelled “ORGANIZED OPEN SPACE 01” and “ORGANIZED OPEN SPACE 02 AREA: 5932.94 SQM,” a green strip, tot-lot, vehicular ramps, and internal road references. The plan also lists 18.29 m and 30.00 m road references, including existing and proposed roads. No supplied drawing-derived record establishes the exact building footprints, flat count per floor, lift or stair count, or detailed residential/common-area distribution.

4. Homes, configurations & floor plans

The following are RERA-filed unit counts and saleable areas. Booked and available counts are portal-derived and have no supplied as-of date. The supplied drawing-review record contains no measured floor plans, so software-measured carpet areas are unavailable. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK3003074.95 sq. mNot availableNot supplied
3BHK group (filed labels: 3BHB, 3BHJ, 3BHK, 3NHK)3,1655162,649137.31–207.45 sq. mNot availableNot supplied
“BHK” (filed as unspecified configuration)1129102.62 sq. mNot availableNot supplied
Filed as “3BHBK” and “3B HK”211178.0 sq. m eachNot availableNot supplied

The RERA filing identifies the above as saleable areas; these are not drawing-measured carpet areas. Carpet area, exclusive balcony/verandah or open-terrace area, and a unit’s share of common areas are distinct area concepts. The supplied project evidence does not give carpet-area measurements, balcony or utility dimensions, room dimensions, or loading figures. RERA unit table RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction lists total parking area 204470.5; the plan extract separately lists parking area 203439.10 and “GRAND TOTAL PARKING 203439.10.” These are area figures, not a supplied count of parking spaces. The permit identifies cellar and stilt areas approved for parking and requires those areas to be used exclusively for vehicle parking.

The plan extract identifies vehicular ramps, including a ramp recorded as 36.00 mt. long, 4.50 mt. high and 5.40 mt. wide, and another as 12.20 mt. long, 1.50 mt. high and 5.40 mt. wide. It also specifies a minimum width of 4.5 m and height clearance of 5 m. The evidence supplied here does not establish parking-space counts by vehicle type, visitor or accessible provision, EV charger quantity, or unit-specific parking allocations. A drawn or sanctioned parking area does not, by itself, establish exclusive ownership or allotment to a buyer.

6. Amenities, recreation & open spaces

The amenity record marks the following 14 categories “YES”; each has a recorded progress percentage of 0. These entries show what is listed in the RERA amenity record, not independently verified completion. RERA amenities

Community / amenities buildings
Description / sizeTwo amenity buildings are identified in the GHMC plan; the permit extraction describes Amenities 01 and 02.
Evidence sourceGHMC plan and building permit
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified
Sports / recreation open space
Description / size“Aggregate area of recreational Open Space” is listed; plan also identifies organised open-space elements and a tot-lot. No complete facility schedule or capacity is supplied. RERA amenities
Evidence sourceRERA amenity record and GHMC plan
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified
Green strip / tot-lot / park
Description / sizeListed in the RERA amenity record; GHMC permit also refers to a tot-lot and greenery. RERA amenities
Evidence sourceRERA amenity record and GHMC plan/permit
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified
Internal roads and footpaths
Description / sizeListed as available in the RERA amenity record. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified status0%; completion not independently verified
Street lighting
Description / sizeListed as available in the RERA amenity record. RERA amenities
Evidence sourceRERA amenity record
Declared progress / verified status0%; completion not independently verified

The promoter’s website material describes a 70,000+ sq. ft. clubhouse, 60+ lifestyle amenities and 10 sports courts. These are promoter-marketed descriptions, not the supplied RERA amenity schedule or evidence of delivery. Promoter website

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage and sewage/sullage treatment, storm-water drains, rainwater harvesting and water conservation, solid-waste management, energy management, fire protection and fire-safety requirements, and electrical meter room/sub-station/receiving station. Each is marked “YES” with 0% progress in the supplied record; completion is not independently verified. RERA amenities

The GHMC plan extract identifies rainwater-harvesting structures and 12 rainwater-harvesting pits, a transformer/distribution-transformer, meter room, garbage house and services. It records separate underground static water storage tank capacity of 25,000 lits. and a separate terrace tank of 25,000 lits capacity for Residential buildings. The permit also requires an STP and refers to sewerage, storm-water disposal, rainwater harvesting and garbage disposal.

The supplied evidence does not state a water source, STP capacity, electricity-substation capacity, generator or backup-power capacity, lift count or capacity, detailed fire-system specifications, CCTV/security provisions, or accessibility features. The permit requires an occupancy fire NOC for Amenities Block 2 before occupancy certification; no such NOC or occupancy certificate is supplied here.

8. Location, access & connectivity

The registered project location is Gopanpally, Serilingampally Mandal, Ranga Reddy District, with survey identity 124(P) and 262(P). The project identity record gives PIN 502221. The RERA certificate extraction prints Gopanpally, Serilingampally, Ranga Reddy, PIN 500078; the building-permit extraction identifies Gopanpally and Ranga Reddy, and the plan also references Vattinagulapally. RERA record Land records

The project record describes road boundaries on the east, south and north. The GHMC plan refers to 18.29 m and 30.00 m roads, including an existing 30.00 m road, a proposed 30.00 m road and an 18.29 m access-road reference. A supplied location measurement places the nearest sampled Outer Ring Road interchange approximately 4.8 km from the cadastral parcel centroid; this is a sampled distance, not a travel-time estimate. No public-transport routes or further verified landmark distances are supplied. Land records Location record

9. Developer & development status

The registered legal promoter is APARNA INFRAHOUSING PRIVATE LIMITED, recorded as a private limited company with GSTIN 36AAFCA8372D1ZP. Its RERA-listed address is Astral Heights, Road No. 1, Vattinagulapally Village Road, Gopanpally, Serilingampally, Ranga Reddy, PIN 502221. The supplied record lists the company website as https://www.aparnaconstructions.com. RERA record Corporate record Parties record

The development is described in the GHMC permit as a landowner-and-developer arrangement: M/s Siris Ltd and others are the applicants/landowners, represented through a DAGPA holder, M/s Aparna Infrahousing Pvt Ltd, as developer. The permit records conditional building permission and requires commencement notice, completion notice and an occupancy certificate before occupation.

The project is recorded as a “New Project.” No independent construction inspection or verified progress percentage is supplied. The Form B affidavit states completion by 05.12.2028, while the project header records proposed completion as 05/04/2029; the evidence does not identify a revised-completion order or explain the relationship between these entries. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / dateP02400007601; valid 20 January 2024 to 5 December 2028
What the supplied record establishesForm C registration for APARNA SUNSTONE, identifying APARNA INFRAHOUSING PRIVATE LIMITED as promoter.
GHMC building permit order
Reference / datePermit 4612/GHMC/SLP/2023-BP; 06 December 2023; file 009342/GHMC/4648/SLP1/2023-BP
What the supplied record establishesConditional building permission for the residential development; the order states that permission does not confer ownership rights and requires an occupancy certificate before occupation.
GHMC plan record
Reference / datePlan showing APARNA SUNSTONE, Survey Nos. 124(P) and 262(P)
What the supplied record establishesRecords nine residential blocks, two amenities buildings, proposed areas, floors, parking and plan conditions.
Building-floor-plan record
Reference / dateBuilding-permit plan for APARNA SUNSTONE
What the supplied record establishesIdentifies residential blocks and amenities buildings; no measured flat drawings are available in the supplied floor-plan review record.
Promoter Form B declaration
Reference / date19 December 2023
What the supplied record establishesPromoter-declared undertakings, including a completion date of 05.12.2028.
Agreement for Sale record
Reference / datePartially completed Rule 38 form Document index
What the supplied record establishesThe extracted record describes project land and parties; allottee, unit particulars, price and RERA registration number are unfilled in the OCR.
Occupancy / completion certificate
Reference / dateNot supplied Approvals record
What the supplied record establishesThe supplied record does not establish that an OC or completion certificate has been issued.

The GHMC permit lists conditions including adherence to the sanctioned plan, separate approval for modifications, commencement and completion notices, parking use of cellar/stilt areas, STP provision, and an occupancy fire NOC for Amenities Block 2. Full condition-by-condition review belongs with the approvals assessment.

Frequently asked questions

Is APARNA SUNSTONE registered with Telangana RERA?

Yes. APARNA SUNSTONE is registered with the Telangana Real Estate Regulatory Authority as P02400007601; the registration status is New Project.

Who is the developer of APARNA SUNSTONE?

The promoter named in the RERA registration is APARNA INFRAHOUSING PRIVATE LIMITED.

Where is APARNA SUNSTONE located?

APARNA SUNSTONE is in Gopanpally, Serilingampally, Rangareddy, Telangana (502221).

When will APARNA SUNSTONE be completed?

The promoter's proposed date of completion filed with RERA is 05/04/2029. This is the promoter's declaration, not a guarantee.

More projects in Gopanpally