Krishna Grandeour
KRISHNA HOMES · Rangareddy · RERA P02400000717
KRISHNA GRANDEOUR is a residential apartment project in Gopanpally, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter Krishna Homes. The project is on a 518.4 m2 site and comprises one proposed residential building with Stilt + 5 floors and 10 3BHK apartments, each with a RERA-filed saleable area of 150.5 sq.m. It is registered under TG-RERA number P02400000717, and its proposed completion date is 02/06/2024.
More from Krishna Homes · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | KRISHNA GRANDEOUR RERA record |
| Project type / registered portion | Residential apartment project; the registration covers the project on the listed survey parcels. A separate phase name is not disclosed. RERA record |
| TG-RERA registration | P02400000717; certificate issued 10/05/2019. RERA record |
| Registration validity | Certificate states validity from 10/05/2019 to 02/06/2024; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion deadline and the reported occupancy certificate. |
| Registered promoter | Krishna Homes; the supplied firm record identifies it as a partnership. RERA record Corporate record |
| RERA status | Portal record labels the project On-Going Project. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Gopanpally, Ranga Reddy District. RERA record |
| Mandal / PIN | Serilingampally / 500107. RERA record |
| Project survey numbers and subdivisions | 209/PART, 212, 213, 232, 233/PART, 235/PART, 236, 237, 239, 240. RERA record Land records |
| Plot identifiers | 31 AND 32. RERA record |
| Registered site extent | 518.4 m2 site area; 518.4 m2 net area; road-affected area recorded as 0. Land records |
| Boundaries in the RERA record | East: PLOT NO 24 AND 25; West: 40 FT ROAD; North: PLOT NO 31; South: PLOT NO 33. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 2/C20/09429/2018, approved 02 June, 2018; file no. 2/C11/09414/2018. Approvals record |
| Building count / use | One proposed residential building. |
| Sanctioned configuration | Stilt + 5 floors; stated height 14.99 m. The supplied extract does not identify a basement, podium, or separate parking level. |
| Approved built-up area | 1,266.65 (the approval extract labels the component “Residential” but does not state a unit alongside this figure); stilt area is 311.12. |
| Approved versus RERA-declared homes | GHMC extract states that the number of sanctioned units must not be increased, but the supplied approval extract does not give the sanctioned unit count. TG-RERA records 10 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK. RERA unit table |
| RERA-filed saleable area | 150.5 sq.m per unit. RERA unit table |
| Booked / available | 10 booked; 0 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative. RERA unit table |
| Completion dates | Promoter’s Form B undertaking: 02 June, 2024; the RERA record also lists the proposed and revised completion date as 02/06/2024. RERA record |
| Construction / completion evidence | The registration record reports 90% completeness, but this is a recorded progress figure, not an independent site inspection. RERA record |
| Occupancy certificate status | An architect’s certificate identifies GHMC occupancy certificate 2/C20/04069/2020, issued 20-MAR-2020, and certifies overall project completion; its stated certificate date is 16-06-2024. The supplied extract describes the registered project overall and does not identify a separate tower or phase scope. |
2. The project story
Krishna Grandeour is registered as a residential apartment project at Gopanpally, Serilingampally Mandal, on a 518.4 m2 site spanning the ten survey numbers and subdivisions listed above. GHMC’s building permit describes one proposed residential building with Stilt + 5 floors and a height of 14.99 m. The RERA filing records ten 3BHK apartments, all booked in the portal snapshot supplied; the portal record does not give an as-of date for those booking counts. RERA record Land records RERA unit table
The promoter undertook to complete the project by 02 June, 2024. Separately, the RERA record reports 90% completeness, while the architect’s Form 1A certifies overall completion and cites the GHMC occupancy certificate. These are distinct records: the percentage is a portal-reported progress measure, not an independent site verification, and the certificate extract does not specify a separate phase or tower scope. RERA record
3. Master plan, architecture & building design
GHMC’s building permit describes a single proposed residential building, Stilt + 5 floors, 14.99 m high, on a site and net area of 518.4 m2. It records 1,266.65 for the residential component and 311.12 for the stilt component; the supplied extract does not state the unit beside those area figures. These are approval-extract figures and should not be treated as carpet or saleable area.
The approval extract refers to the sanctioned plan and requires construction to follow it, but the supplied layout-plan document is not extracted. The available material therefore does not establish the building footprint, floor-by-floor unit arrangement, number of flats per floor, lift or stair configuration, detailed circulation, or full site landscaping/open-space layout. GHMC’s order includes conditions for peripheral tree planting, a fenced tot-lot maintained as greenery, a transformer space, a garbage house, and a rainwater-harvesting percolation pit. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 150.5 sq.m | Software-measured range: 88–108.4 sq.m; median: 97.0 sq.m | 36% |
The 3BHK count, booking figures, and saleable area are TG-RERA filing values. The carpet-area figures are software measurements from the floor-plan drawing, not RERA disclosures; the measurement record says four flat designs were measured and marks four for review. The filing does not indicate that its area is carpet area. Carpet area, as measured from a drawing, is not interchangeable with saleable area, which may include the home’s share of common areas. RERA unit table RERA unit details Floor plans
One measured first-floor-plan example (flat 02) labels a drawing room, kitchen, two bedrooms, a master bedroom, lobby, wash area, two toilets, and a balcony. The drawing-measured balcony is 2.91 m2 and is excluded from the measured carpet area. The drawing dimensions and area measurements are software-derived and should be checked against the drawing itself. RERA unit details
5. Parking & vehicle circulation
GHMC’s permit requires the stilt area approved for parking to be used exclusively for vehicle parking and not partitioned, enclosed, or put to another use. The supplied material does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, or a separate parking level. A parking drawing or provision does not, by itself, establish an exclusive allocation to a buyer.
6. Amenities, recreation & open spaces
| Description / size | GHMC requires a fenced tot-lot maintained as greenery and peripheral greenery; no size is supplied. |
|---|---|
| Evidence source | GHMC permit condition; RERA amenities record RERA amenities |
| Declared progress / verified status | RERA amenities record marks 100%; this is a filed progress figure, not independent verification. |
| Description / size | 25 Trees listed in the approval parameters; the permit also requires tree planting along the site periphery and front. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Required/listed in approval record; completion is not independently verified here. |
| Description / size | No project-specific clubhouse, gym, pool, or indoor recreational facility is established by the supplied RERA records. |
|---|---|
| Evidence source | RERA amenities Document index |
| Declared progress / verified status | Not evidenced in the supplied project records. |
The RERA amenities record marks water supply, sewerage, green strip/tot-lot, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as available at 100%. Other listed infrastructure entries are recorded at 0%. These are portal declarations and do not independently establish delivery or operating condition. RERA amenities
7. Utilities, building services & safety
| Service | Evidence in the project record |
|---|---|
| Water and rainwater | RERA amenities record marks water supply and water conservation/rainwater harvesting at 100%. GHMC’s permit requires a rainwater-harvesting percolation pit. No water source, storage capacity, treatment system, or reuse capacity is supplied. RERA amenities |
| Sewerage and drainage | Sewerage (chamber, lines, septic tank, STP) is marked YES / 100% in the RERA amenities record. The separate “Treatment and Disposal of Sewage and Sullage Water” entry is recorded at 0%; the supplied data does not establish an STP’s design, capacity, or operating status. Storm-water drains are recorded at 0%. RERA amenities |
| Electrical | Electrical meter room/sub-station/receiving station is marked YES / 100%; GHMC requires space for a transformer. Supply capacity and backup arrangements are not supplied. RERA amenities |
| Lifts and circulation | GHMC’s conditions refer to lifts and require services to be executed under qualified technical supervision, but the supplied evidence gives no lift count or capacity. |
| Fire and life safety | The permit places responsibility for required fire-fighting installations and fire-safety requirements on the owner, builder/developer, architect, and site engineer. The RERA amenities record lists fire protection and fire-safety requirements at 0%. The supplied evidence does not establish completed installations or a separate fire clearance. RERA amenities |
| Waste and security | GHMC requires a garbage house within the premises; the RERA solid-waste-management entry is recorded at 0%. CCTV, access control, and security arrangements are not evidenced. RERA amenities |
| Accessibility | The permit includes a general condition about facilities for physically handicapped persons in public and semi-public buildings above 300Sq.mts. The supplied record does not establish project-specific accessible routes or facilities. |
8. Location, access & connectivity
The registered location is Gopanpally, Serilingampally Mandal, Ranga Reddy District, PIN 500107. The supplied location record gives an approximate distance of 5.6 km to the nearest sampled Outer Ring Road interchange; this is a mapped distance, not a travel-time estimate. RERA record Location record
The available project records do not describe a public-transport route or provide measured distances to other landmarks. Location record
9. Developer & development status
The registered promoter is Krishna Homes, identified in the supplied corporate record as a partnership. The firm record states that the Registrar of Firms, Ranga Reddy received the prescribed statement and entered Krishna Homes as No: 1994 of 2017; it names Pradeep Kuma and Sucharitha Tammana as partners. The RERA record lists PRADEEP KUMAR TAMMANA as authorized signatory and SUCHARITHA TAMMANA as partner. Corporate record
The RERA record states the proposed and revised completion date as 02/06/2024 and reports 90% completeness. The promoter’s Form B, dated 30/03/2019, undertakes completion by 02 June, 2024. The architect’s Form 1A, dated 16-06-2024, certifies overall completion and cites GHMC occupancy certificate 2/C20/04069/2020. No separate phase-wise progress or OC scope is described in the supplied extracts. RERA record
10. Approvals, official records & documents
| Record | Supplied details |
|---|---|
| TG-RERA registration certificate | Form C for KRISHNA GRANDEOUR, registration P02400000717, issued 10/05/2019; states validity through 02/06/2024. |
| GHMC building permit | Building Permit Order 2/C20/09429/2018, file no. 2/C11/09414/2018, dated 02 June, 2018; covers the listed Gopanpally survey parcels and describes Stilt + 5 floors. |
| Occupancy certificate identified in architect’s certificate | GHMC OC 2/C20/04069/2020, stated issue date 20-MAR-2020; cited by the architect’s Form 1A. |
| Architect’s completion certificate | Form 1A dated 16-06-2024, certifies overall completion of the registered project. |
| Promoter’s Form B declaration | Dated 30/03/2019; identifies Krishna Homes as promoter, declares legal title and no encumbrances, and records the completion undertaking. These are promoter declarations. |
| Layout-plan document | A layout-plan document is listed, but the supplied item is not extracted; its detailed contents are not available here. |
| Other project-filed title and encumbrance material | Sale deeds and an encumbrance statement are among the supplied project documents; their details are addressed in the Land & Title review. Document index |
1. Project at a glance
Project identity
Registered name: KRISHNA GRANDEOUR
Project type / registered portion: Residential apartment project; the registration covers the project on the listed survey parcels. A separate phase name is not disclosed.
TG-RERA registration: P02400000717; certificate issued 10/05/2019.
Registration validity: Certificate states validity from 10/05/2019 to 02/06/2024; no extension is recorded in the supplied certificate. Registration validity is distinct from the completion deadline and the reported occupancy certificate.
Registered promoter: Krishna Homes; the supplied firm record identifies it as a partnership.
RERA status: Portal record labels the project On-Going Project.
Land and geographic identity
Locality / revenue village: Gopanpally, Ranga Reddy District.
Mandal / PIN: Serilingampally / 500107.
Project survey numbers and subdivisions: 209/PART, 212, 213, 232, 233/PART, 235/PART, 236, 237, 239, 240.
Plot identifiers: 31 AND 32.
Registered site extent: 518.4 m2 site area; 518.4 m2 net area; road-affected area recorded as 0.
Boundaries in the RERA record: East: PLOT NO 24 AND 25; West: 40 FT ROAD; North: PLOT NO 31; South: PLOT NO 33.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 2/C20/09429/2018, approved 02 June, 2018; file no. 2/C11/09414/2018.
Building count / use: One proposed residential building.
Sanctioned configuration: Stilt + 5 floors; stated height 14.99 m. The supplied extract does not identify a basement, podium, or separate parking level.
Approved built-up area: 1,266.65 (the approval extract labels the component “Residential” but does not state a unit alongside this figure); stilt area is 311.12.
Approved versus RERA-declared homes: GHMC extract states that the number of sanctioned units must not be increased, but the supplied approval extract does not give the sanctioned unit count. TG-RERA records 10 units.
Offering and status
Configuration: 3BHK.
RERA-filed saleable area: 150.5 sq.m per unit.
Booked / available: 10 booked; 0 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative.
Completion dates: Promoter’s Form B undertaking: 02 June, 2024; the RERA record also lists the proposed and revised completion date as 02/06/2024.
Construction / completion evidence: The registration record reports 90% completeness, but this is a recorded progress figure, not an independent site inspection.
Occupancy certificate status: An architect’s certificate identifies GHMC occupancy certificate 2/C20/04069/2020, issued 20-MAR-2020, and certifies overall project completion; its stated certificate date is 16-06-2024. The supplied extract describes the registered project overall and does not identify a separate tower or phase scope.
2. The project story
Krishna Grandeour is registered as a residential apartment project at Gopanpally, Serilingampally Mandal, on a 518.4 m2 site spanning the ten survey numbers and subdivisions listed above. GHMC’s building permit describes one proposed residential building with Stilt + 5 floors and a height of 14.99 m. The RERA filing records ten 3BHK apartments, all booked in the portal snapshot supplied; the portal record does not give an as-of date for those booking counts.
The promoter undertook to complete the project by 02 June, 2024. Separately, the RERA record reports 90% completeness, while the architect’s Form 1A certifies overall completion and cites the GHMC occupancy certificate. These are distinct records: the percentage is a portal-reported progress measure, not an independent site verification, and the certificate extract does not specify a separate phase or tower scope.
3. Master plan, architecture & building design
GHMC’s building permit describes a single proposed residential building, Stilt + 5 floors, 14.99 m high, on a site and net area of 518.4 m2. It records 1,266.65 for the residential component and 311.12 for the stilt component; the supplied extract does not state the unit beside those area figures. These are approval-extract figures and should not be treated as carpet or saleable area.
The approval extract refers to the sanctioned plan and requires construction to follow it, but the supplied layout-plan document is not extracted. The available material therefore does not establish the building footprint, floor-by-floor unit arrangement, number of flats per floor, lift or stair configuration, detailed circulation, or full site landscaping/open-space layout. GHMC’s order includes conditions for peripheral tree planting, a fenced tot-lot maintained as greenery, a transformer space, a garbage house, and a rainwater-harvesting percolation pit.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 150.5 sq.m | Software-measured range: 88–108.4 sq.m; median: 97.0 sq.m | 36% |
The 3BHK count, booking figures, and saleable area are TG-RERA filing values. The carpet-area figures are software measurements from the floor-plan drawing, not RERA disclosures; the measurement record says four flat designs were measured and marks four for review. The filing does not indicate that its area is carpet area. Carpet area, as measured from a drawing, is not interchangeable with saleable area, which may include the home’s share of common areas.
One measured first-floor-plan example (flat 02) labels a drawing room, kitchen, two bedrooms, a master bedroom, lobby, wash area, two toilets, and a balcony. The drawing-measured balcony is 2.91 m2 and is excluded from the measured carpet area. The drawing dimensions and area measurements are software-derived and should be checked against the drawing itself.
5. Parking & vehicle circulation
GHMC’s permit requires the stilt area approved for parking to be used exclusively for vehicle parking and not partitioned, enclosed, or put to another use. The supplied material does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, or a separate parking level. A parking drawing or provision does not, by itself, establish an exclusive allocation to a buyer.
6. Amenities, recreation & open spaces
| Description / size | GHMC requires a fenced tot-lot maintained as greenery and peripheral greenery; no size is supplied. |
|---|---|
| Evidence source | GHMC permit condition; RERA amenities record |
| Declared progress / verified status | RERA amenities record marks 100%; this is a filed progress figure, not independent verification. |
| Description / size | 25 Trees listed in the approval parameters; the permit also requires tree planting along the site periphery and front. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Required/listed in approval record; completion is not independently verified here. |
| Description / size | No project-specific clubhouse, gym, pool, or indoor recreational facility is established by the supplied RERA records. |
|---|---|
| Declared progress / verified status | Not evidenced in the supplied project records. |
The RERA amenities record marks water supply, sewerage, green strip/tot-lot, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as available at 100%. Other listed infrastructure entries are recorded at 0%. These are portal declarations and do not independently establish delivery or operating condition.
7. Utilities, building services & safety
Water and rainwater: RERA amenities record marks water supply and water conservation/rainwater harvesting at 100%. GHMC’s permit requires a rainwater-harvesting percolation pit. No water source, storage capacity, treatment system, or reuse capacity is supplied.
Sewerage and drainage: Sewerage (chamber, lines, septic tank, STP) is marked YES / 100% in the RERA amenities record. The separate “Treatment and Disposal of Sewage and Sullage Water” entry is recorded at 0%; the supplied data does not establish an STP’s design, capacity, or operating status. Storm-water drains are recorded at 0%.
Electrical: Electrical meter room/sub-station/receiving station is marked YES / 100%; GHMC requires space for a transformer. Supply capacity and backup arrangements are not supplied.
Lifts and circulation: GHMC’s conditions refer to lifts and require services to be executed under qualified technical supervision, but the supplied evidence gives no lift count or capacity.
Fire and life safety: The permit places responsibility for required fire-fighting installations and fire-safety requirements on the owner, builder/developer, architect, and site engineer. The RERA amenities record lists fire protection and fire-safety requirements at 0%. The supplied evidence does not establish completed installations or a separate fire clearance.
Waste and security: GHMC requires a garbage house within the premises; the RERA solid-waste-management entry is recorded at 0%. CCTV, access control, and security arrangements are not evidenced.
Accessibility: The permit includes a general condition about facilities for physically handicapped persons in public and semi-public buildings above 300Sq.mts. The supplied record does not establish project-specific accessible routes or facilities.
8. Location, access & connectivity
The registered location is Gopanpally, Serilingampally Mandal, Ranga Reddy District, PIN 500107. The supplied location record gives an approximate distance of 5.6 km to the nearest sampled Outer Ring Road interchange; this is a mapped distance, not a travel-time estimate.
The available project records do not describe a public-transport route or provide measured distances to other landmarks.
9. Developer & development status
The registered promoter is Krishna Homes, identified in the supplied corporate record as a partnership. The firm record states that the Registrar of Firms, Ranga Reddy received the prescribed statement and entered Krishna Homes as No: 1994 of 2017; it names Pradeep Kuma and Sucharitha Tammana as partners. The RERA record lists PRADEEP KUMAR TAMMANA as authorized signatory and SUCHARITHA TAMMANA as partner.
The RERA record states the proposed and revised completion date as 02/06/2024 and reports 90% completeness. The promoter’s Form B, dated 30/03/2019, undertakes completion by 02 June, 2024. The architect’s Form 1A, dated 16-06-2024, certifies overall completion and cites GHMC occupancy certificate 2/C20/04069/2020. No separate phase-wise progress or OC scope is described in the supplied extracts.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for KRISHNA GRANDEOUR, registration P02400000717, issued 10/05/2019; states validity through 02/06/2024.
GHMC building permit: Building Permit Order 2/C20/09429/2018, file no. 2/C11/09414/2018, dated 02 June, 2018; covers the listed Gopanpally survey parcels and describes Stilt + 5 floors.
Occupancy certificate identified in architect’s certificate: GHMC OC 2/C20/04069/2020, stated issue date 20-MAR-2020; cited by the architect’s Form 1A.
Architect’s completion certificate: Form 1A dated 16-06-2024, certifies overall completion of the registered project.
Promoter’s Form B declaration: Dated 30/03/2019; identifies Krishna Homes as promoter, declares legal title and no encumbrances, and records the completion undertaking. These are promoter declarations.
Layout-plan document: A layout-plan document is listed, but the supplied item is not extracted; its detailed contents are not available here.
Other project-filed title and encumbrance material: Sale deeds and an encumbrance statement are among the supplied project documents; their details are addressed in the Land & Title review.
Frequently asked questions
Is KRISHNA GRANDEOUR registered with Telangana RERA?
Yes. KRISHNA GRANDEOUR is registered with the Telangana Real Estate Regulatory Authority as P02400000717; the registration status is On-Going Project.
Who is the developer of KRISHNA GRANDEOUR?
The promoter named in the RERA registration is KRISHNA HOMES.
Where is KRISHNA GRANDEOUR located?
KRISHNA GRANDEOUR is in GOPANPALLY, Serilingampally, Rangareddy, Telangana (500107).
When will KRISHNA GRANDEOUR be completed?
The promoter's proposed date of completion filed with RERA is 02/06/2024. This is the promoter's declaration, not a guarantee.
More projects in Gopanpally