Green City
MADHAVA RAO ADUSUMALLI & OTHERS · Khammam · RERA P00800005905
GREEN CITY is a plotted development in Kaikondaigudem, Khammam Urban Madal, Khammam District. The registered promoter is MADHAVA RAO ADUSUMALLI & OTHERS. The site area is 52,050.66 sq. m, and the DTCP communication describes a draft layout for 177 plots across Ac. 12.862 Cents; 62252.08 Sq.Yds.; plot configurations are not supplied. The project is registered under TG-RERA number P00800005905, with a promoter-declared completion date of 18/12/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | GREEN CITY RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Phase not disclosed; the RERA record identifies a project covering the listed survey numbers RERA record |
| TG-RERA registration | P00800005905 RERA record |
| Registration validity | Certificate states validity from 28/03/2023 to 18/12/2023 and records “0 years”; no extension is recorded in the supplied certificate |
| Registered promoter | MADHAVA RAO ADUSUMALLI & OTHERS RERA record Corporate record |
| Promoter entity type | Proprietorship, as stated in the RERA promoter information RERA filing |
| RERA status | The certificate records registration under section 5; it does not establish a current registration extension or current project status |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | KAIKONDAIGUDEM / Kaikondaigudem RERA record Land records |
| Mandal | The RERA land identity does not disclose a mandal. The DTCP communication identifies Khammam Urban Madal Land records |
| District / PIN | Khammam / 507002 RERA record |
| Project survey numbers and subdivisions | 243/6, 223/2, 243/11, 243/3, 268/5, 243/7, 243/9, 244/4, 268/2, 243/10, 243/8, 262/2, 243/5, 243/4, 223/4, 244/5, 268/5, 243/2, 223/3, 244/6, 268/4, 262/3 & 263/2 RERA record Land records |
| Site area in RERA land record | 52,050.66 sq. m total area; net area also stated as 52,050.66 sq. m Land records |
| Boundaries | East: EXISTING ROAD 30; West, North and South: OTHERS LAND Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP), with layout functions delegated to Stambhadri Urban Development Authority (SUDA), Khammam Approvals record |
| Principal layout record | File No.DTCP-WGLM/1/2019-HYD Sec-DTCP; proceedings Lr.D.Dis.No.4461/2019/W; communicated 20-12-2019 Approvals record |
| Layout reference / draft number | Lr.Roc.No.33/2019/DTCPO/SUDA/Layouts, dated 07-10-2019; Draft - TLP.No.06/2019/W/SUDA-KMM Approvals record |
| Layout permission scope | Draft technical layout pattern for 177 plots over Ac. 12.862 Cents; 62252.08 Sq.Yds. |
| Approved built-up area / buildings / floors | Not applicable to the plotted-layout record; no building count or floor configuration is supplied RERA filing |
| Plot area split in the DTCP communication | Developable area: Ac.8.070 Cents; 39058.80 Sq. Yds. (62.74%); roads: Ac.3.378 Cents; 16349.52 Sq.Yds. (26.26%); open space: Ac.0.965 Cents; 4670.60 Sq.Yds. (7.50%); social infrastructure: Ac.0.321 Cents; 1553.64 Sq.Yds. (2.50%); utility area: Ac.0.128 Cents; 619.52 Sq. Yds. (1.00%) |
| Mortgage and SUDA reservation shown in the layout record | Mortgage area: Ac. 1.214 Cents; 5875.76 Sq.Yds. (15.04%); SUDA master-plan facilities: Ac.0.424 Cents; 2052.23 Sq.Yds. (5.25%) |
Offering and status
| Field | Record |
|---|---|
| Offering | Plots; the draft layout communication records 177 plots |
| RERA-filed plot count / sizes / booked and available inventory | Not supplied in the available records RERA record Document index |
| Construction / development stage | No independently verified site-progress assessment is supplied. The RERA certificate and promoter declaration give a completion date of 18/12/2023; the supplied documents do not establish whether the layout works were completed |
| Completion deadline | Promoter-declared date: 18/12/2023 |
| Occupancy / completion certificate status | Not supplied; the available principal approval is described as a draft technical layout pattern approval, not a completion or occupancy certificate |
The project story
- GREEN CITY is a proposed plotted layout in Kaikondaigudem, Khammam District. Its RERA-filed identity covers the survey numbers listed above, and the DTCP communication describes a draft layout pattern for 177 plots across a site stated as Ac. 12.862 Cents; 62252.08 Sq.Yds. RERA record Land records
- The layout record allocates land to developable plots, roads, open space, social infrastructure and utilities, and identifies land to be mortgaged to SUDA-Khammam and land for SUDA master-plan facilities. The communication sets conditions for infrastructure development and final-layout release. The supplied evidence does not provide a current progress report or establish completion of those works; the date 18/12/2023 is the promoter’s stated completion undertaking, not independent confirmation of completion.
Master plan, architecture & building design
- The project is a plotted development, so the available design evidence concerns the layout rather than apartment buildings. The DTCP communication describes a 177-plot draft technical layout and records these land-use components: 62.74% developable area; 26.26% roads; 7.50% open space; 2.50% social infrastructure; and 1.00% utility area. It also identifies 15.04% as mortgage area on plotted land and 5.25% for SUDA master-plan facilities.
- The supplied extract does not include a plot schedule with individual plot dimensions, plot-size bands or a drawing from which plot arrangement or road widths can be described. Building footprints, floors, parking levels and residential/commercial building distribution are not provided. The DTCP communication states that shops, business premises and industrial units are not allowed except on sites specially reserved for such proposals in the draft plan.
Homes, configurations & floor plans
- This is presented in the RERA record as a plotted development, not an apartment offering. The DTCP communication records 177 plots, but the available material does not include a RERA-filed plot inventory, individual plot sizes, booked or available counts, or plot-specific saleable areas. RERA record
- Two drawing records are listed, but both remain unmeasured and pending scan review; no plot or home dimensions can be reported from them. Floor plans
Parking & vehicle circulation
The supplied layout information does not specify parking counts, visitor or accessible parking, parking allocation, or dedicated parking facilities. It records roads as Ac.3.378 Cents; 16349.52 Sq.Yds. (26.26%) of the site, but gives no road-width, entry/exit, driveway or pedestrian-circulation measurements.
Amenities, recreation & open spaces
The RERA record lists layout facilities and infrastructure at a general level. Availability is recorded for some items, but the listed progress percentages are 0; the pack does not establish that any facility is complete or independently verified. RERA amenities
| Description / size | Open-space reservation: Ac.0.965 Cents; 4670.60 Sq.Yds. (7.50%) in the draft-layout extract; individual facility sizes are not supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record shows progress 0; no independent completion verification supplied |
| Description / size | Social infrastructure reservation: Ac.0.321 Cents; 1553.64 Sq.Yds. (2.50%); specific buildings and capacities not identified |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record shows progress 0; no independent completion verification supplied |
| Description / size | Road area: Ac.3.378 Cents; 16349.52 Sq.Yds. (26.26%); dimensions not supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available in the RERA amenities record; progress 0; completion not independently verified |
| Description / size | No quantity or design details supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available in the RERA amenities record; progress 0; completion not independently verified |
Utilities, building services & safety
- The draft-layout communication directs the developer to provide drainage and nala channelization, street lighting and electricity, sewerage, water supply, underground utility ducting, greenery, and a low-height compound wall with ornamental iron grill to open spaces. It also identifies a 1.00% utility area of Ac.0.128 Cents; 619.52 Sq. Yds. The RERA amenities record lists water supply, sewerage/STP, storm-water drains, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station, but gives no capacities, system specifications or completion evidence. RERA amenities
- The DTCP communication calls for an independent sewerage and sump system and protected water supply, underground ducting, street lighting and electricity facilities including transformers, and avenue planting. No water source or storage capacity, treatment capacity, power-backup details, fire-system design, security arrangements, or accessibility provisions are supplied.
Location, access & connectivity
- The registered location is Kaikondaigudem, Khammam District, PIN 507002. The RERA boundary record identifies an EXISTING ROAD 30 on the eastern boundary. The DTCP communication refers to Mallemadugu G.P. and identifies Khammam Urban Madal; the RERA land record does not disclose a mandal. RERA record Land records
- The supplied location record contains a geocoded cadastral-parcel centroid at 17.41528, 78.35459 and one connectivity entry, Financial District (Nanakramguda), 1.2 km. This is a location-record distance; no route, travel time, public-transport details or approach-road description is provided. Location record
Developer & development status
- The registered promoter is MADHAVA RAO ADUSUMALLI & OTHERS, recorded as a Proprietorship; ADUSUMALLI MADHAVA RAO is listed as authorized signatory. The supplied records do not provide a verified corporate identifier, official website or contact details. Corporate record RERA filing
- The promoter’s Form-B declaration states a completion undertaking of 18/12/2023. The RERA certificate states validity from 28/03/2023 to 18/12/2023 and no extension; neither document, by itself, confirms current on-site progress or delivery status. No phase-wise or plot-wise construction status is supplied.
Approvals, official records & documents
| Identifier / date | P00800005905; issued 28/03/2023 |
|---|---|
| What the supplied record establishes | Form C certificate for GREEN CITY, with stated validity through 18/12/2023 |
| Identifier / date | File DTCP-WGLM/1/2019-HYD Sec-DTCP; proceedings Lr.D.Dis.No.4461/2019/W; 20-12-2019 |
|---|---|
| What the supplied record establishes | Draft technical layout pattern approval communication for 177 plots, subject to stated conditions |
| Identifier / date | Lr.Roc.No.33/2019/DTCPO/SUDA/Layouts, 07-10-2019; Draft - TLP.No.06/2019/W/SUDA-KMM |
|---|---|
| What the supplied record establishes | Proposal and draft-layout identifiers recorded in the DTCP communication |
| Identifier / date | Form B |
|---|---|
| What the supplied record establishes | Promoter’s declarations on title, encumbrances, project completion and statutory undertakings |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No final-layout release, completion certificate or occupancy certificate appears in the supplied project evidence Document index Approvals record |
Project at a glance
Project identity
Registered project name: GREEN CITY
Project type: Plotted development / plotted layout
Phase / registered portion: Phase not disclosed; the RERA record identifies a project covering the listed survey numbers
TG-RERA registration: P00800005905
Registration validity: Certificate states validity from 28/03/2023 to 18/12/2023 and records “0 years”; no extension is recorded in the supplied certificate
Registered promoter: MADHAVA RAO ADUSUMALLI & OTHERS
Promoter entity type: Proprietorship, as stated in the RERA promoter information
RERA status: The certificate records registration under section 5; it does not establish a current registration extension or current project status
Land and geographic identity
Locality / revenue village: KAIKONDAIGUDEM / Kaikondaigudem
Mandal: The RERA land identity does not disclose a mandal. The DTCP communication identifies Khammam Urban Madal
District / PIN: Khammam / 507002
Project survey numbers and subdivisions: 243/6, 223/2, 243/11, 243/3, 268/5, 243/7, 243/9, 244/4, 268/2, 243/10, 243/8, 262/2, 243/5, 243/4, 223/4, 244/5, 268/5, 243/2, 223/3, 244/6, 268/4, 262/3 & 263/2
Site area in RERA land record: 52,050.66 sq. m total area; net area also stated as 52,050.66 sq. m
Boundaries: East: EXISTING ROAD 30; West, North and South: OTHERS LAND
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP), with layout functions delegated to Stambhadri Urban Development Authority (SUDA), Khammam
Principal layout record: File No.DTCP-WGLM/1/2019-HYD Sec-DTCP; proceedings Lr.D.Dis.No.4461/2019/W; communicated 20-12-2019
Layout reference / draft number: Lr.Roc.No.33/2019/DTCPO/SUDA/Layouts, dated 07-10-2019; Draft - TLP.No.06/2019/W/SUDA-KMM
Layout permission scope: Draft technical layout pattern for 177 plots over Ac. 12.862 Cents; 62252.08 Sq.Yds.
Approved built-up area / buildings / floors: Not applicable to the plotted-layout record; no building count or floor configuration is supplied
Plot area split in the DTCP communication: Developable area: Ac.8.070 Cents; 39058.80 Sq. Yds. (62.74%); roads: Ac.3.378 Cents; 16349.52 Sq.Yds. (26.26%); open space: Ac.0.965 Cents; 4670.60 Sq.Yds. (7.50%); social infrastructure: Ac.0.321 Cents; 1553.64 Sq.Yds. (2.50%); utility area: Ac.0.128 Cents; 619.52 Sq. Yds. (1.00%)
Mortgage and SUDA reservation shown in the layout record: Mortgage area: Ac. 1.214 Cents; 5875.76 Sq.Yds. (15.04%); SUDA master-plan facilities: Ac.0.424 Cents; 2052.23 Sq.Yds. (5.25%)
Offering and status
Offering: Plots; the draft layout communication records 177 plots
RERA-filed plot count / sizes / booked and available inventory: Not supplied in the available records
Construction / development stage: No independently verified site-progress assessment is supplied. The RERA certificate and promoter declaration give a completion date of 18/12/2023; the supplied documents do not establish whether the layout works were completed
Completion deadline: Promoter-declared date: 18/12/2023
Occupancy / completion certificate status: Not supplied; the available principal approval is described as a draft technical layout pattern approval, not a completion or occupancy certificate
The project story
- GREEN CITY is a proposed plotted layout in Kaikondaigudem, Khammam District. Its RERA-filed identity covers the survey numbers listed above, and the DTCP communication describes a draft layout pattern for 177 plots across a site stated as Ac. 12.862 Cents; 62252.08 Sq.Yds.
- The layout record allocates land to developable plots, roads, open space, social infrastructure and utilities, and identifies land to be mortgaged to SUDA-Khammam and land for SUDA master-plan facilities. The communication sets conditions for infrastructure development and final-layout release. The supplied evidence does not provide a current progress report or establish completion of those works; the date 18/12/2023 is the promoter’s stated completion undertaking, not independent confirmation of completion.
Master plan, architecture & building design
- The project is a plotted development, so the available design evidence concerns the layout rather than apartment buildings. The DTCP communication describes a 177-plot draft technical layout and records these land-use components: 62.74% developable area; 26.26% roads; 7.50% open space; 2.50% social infrastructure; and 1.00% utility area. It also identifies 15.04% as mortgage area on plotted land and 5.25% for SUDA master-plan facilities.
- The supplied extract does not include a plot schedule with individual plot dimensions, plot-size bands or a drawing from which plot arrangement or road widths can be described. Building footprints, floors, parking levels and residential/commercial building distribution are not provided. The DTCP communication states that shops, business premises and industrial units are not allowed except on sites specially reserved for such proposals in the draft plan.
Homes, configurations & floor plans
- This is presented in the RERA record as a plotted development, not an apartment offering. The DTCP communication records 177 plots, but the available material does not include a RERA-filed plot inventory, individual plot sizes, booked or available counts, or plot-specific saleable areas.
- Two drawing records are listed, but both remain unmeasured and pending scan review; no plot or home dimensions can be reported from them.
Parking & vehicle circulation
The supplied layout information does not specify parking counts, visitor or accessible parking, parking allocation, or dedicated parking facilities. It records roads as Ac.3.378 Cents; 16349.52 Sq.Yds. (26.26%) of the site, but gives no road-width, entry/exit, driveway or pedestrian-circulation measurements.
Amenities, recreation & open spaces
The RERA record lists layout facilities and infrastructure at a general level. Availability is recorded for some items, but the listed progress percentages are 0; the pack does not establish that any facility is complete or independently verified.
| Description / size | Open-space reservation: Ac.0.965 Cents; 4670.60 Sq.Yds. (7.50%) in the draft-layout extract; individual facility sizes are not supplied |
|---|---|
| Declared progress / verified status | RERA amenities record shows progress 0; no independent completion verification supplied |
| Description / size | Social infrastructure reservation: Ac.0.321 Cents; 1553.64 Sq.Yds. (2.50%); specific buildings and capacities not identified |
|---|---|
| Declared progress / verified status | RERA amenities record shows progress 0; no independent completion verification supplied |
| Description / size | Road area: Ac.3.378 Cents; 16349.52 Sq.Yds. (26.26%); dimensions not supplied |
|---|---|
| Declared progress / verified status | Listed as available in the RERA amenities record; progress 0; completion not independently verified |
| Description / size | No quantity or design details supplied |
|---|---|
| Declared progress / verified status | Listed as available in the RERA amenities record; progress 0; completion not independently verified |
Utilities, building services & safety
- The draft-layout communication directs the developer to provide drainage and nala channelization, street lighting and electricity, sewerage, water supply, underground utility ducting, greenery, and a low-height compound wall with ornamental iron grill to open spaces. It also identifies a 1.00% utility area of Ac.0.128 Cents; 619.52 Sq. Yds. The RERA amenities record lists water supply, sewerage/STP, storm-water drains, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station, but gives no capacities, system specifications or completion evidence.
- The DTCP communication calls for an independent sewerage and sump system and protected water supply, underground ducting, street lighting and electricity facilities including transformers, and avenue planting. No water source or storage capacity, treatment capacity, power-backup details, fire-system design, security arrangements, or accessibility provisions are supplied.
Location, access & connectivity
- The registered location is Kaikondaigudem, Khammam District, PIN 507002. The RERA boundary record identifies an EXISTING ROAD 30 on the eastern boundary. The DTCP communication refers to Mallemadugu G.P. and identifies Khammam Urban Madal; the RERA land record does not disclose a mandal.
- The supplied location record contains a geocoded cadastral-parcel centroid at 17.41528, 78.35459 and one connectivity entry, Financial District (Nanakramguda), 1.2 km. This is a location-record distance; no route, travel time, public-transport details or approach-road description is provided.
Developer & development status
- The registered promoter is MADHAVA RAO ADUSUMALLI & OTHERS, recorded as a Proprietorship; ADUSUMALLI MADHAVA RAO is listed as authorized signatory. The supplied records do not provide a verified corporate identifier, official website or contact details.
- The promoter’s Form-B declaration states a completion undertaking of 18/12/2023. The RERA certificate states validity from 28/03/2023 to 18/12/2023 and no extension; neither document, by itself, confirms current on-site progress or delivery status. No phase-wise or plot-wise construction status is supplied.
Approvals, official records & documents
| Identifier / date | P00800005905; issued 28/03/2023 |
|---|---|
| What the supplied record establishes | Form C certificate for GREEN CITY, with stated validity through 18/12/2023 |
| Identifier / date | File DTCP-WGLM/1/2019-HYD Sec-DTCP; proceedings Lr.D.Dis.No.4461/2019/W; 20-12-2019 |
|---|---|
| What the supplied record establishes | Draft technical layout pattern approval communication for 177 plots, subject to stated conditions |
| Identifier / date | Lr.Roc.No.33/2019/DTCPO/SUDA/Layouts, 07-10-2019; Draft - TLP.No.06/2019/W/SUDA-KMM |
|---|---|
| What the supplied record establishes | Proposal and draft-layout identifiers recorded in the DTCP communication |
| Identifier / date | Form B |
|---|---|
| What the supplied record establishes | Promoter’s declarations on title, encumbrances, project completion and statutory undertakings |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No final-layout release, completion certificate or occupancy certificate appears in the supplied project evidence |
Frequently asked questions
Is GREEN CITY registered with Telangana RERA?
Yes. GREEN CITY is registered with the Telangana Real Estate Regulatory Authority as P00800005905; the registration status is New Project.
Who is the developer of GREEN CITY?
The promoter named in the RERA registration is MADHAVA RAO ADUSUMALLI & OTHERS.
Where is GREEN CITY located?
GREEN CITY is in KAIKONDAIGUDEM, Khammam, Telangana (507002).
When will GREEN CITY be completed?
The promoter's proposed date of completion filed with RERA is 18/12/2023. This is the promoter's declaration, not a guarantee.
More projects in Khammam