Khammam Haritage Phase-3
AADHAAR BUILDERS AND INFRASTRUCTURE LLP · Khammam · RERA P00800008024
KHAMMAM HARITAGE PHASE-3 is a plotted development in RAGHUNADHA PALEM, Raghunadhapalem Mandal, Khammam District, being developed by AADHAAR BUILDERS AND INFRASTRUCTURE LLP. The registered site extent is 29,484.10 sq m, and the layout provides for 121 plots; no building or floor count is stated. The plots have software-measured sizes of 83.61–181.27 sq m. The project is registered under TG-RERA number P00800008024, with proposed completion on 30/11/2026.
More from Aadhaar Builders And Infrastructure LLP · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | KHAMMAM HARITAGE PHASE-3 RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase / registered portion | Phase 3; the registration identifies the project as “KHAMMAM HARITAGE PHASE-3.” RERA record |
| TG-RERA registration number | P00800008024 Approvals record |
| Registration validity | 8 April 2024 to 20 March 2026, as stated in the registration certificate. This is the registration period, not a statement of completion or occupancy certification. Approvals record |
| Registered promoter | AADHAAR BUILDERS AND INFRASTRUCTURE LLP RERA record Corporate record |
| RERA status in supplied record | New project; the certificate records registration. No extension record is supplied. RERA record Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | RAGHUNADHA PALEM RERA record RERA filing |
| Revenue village | Raghunadha Palem Revenue Village RERA record |
| Mandal | Raghunadhapalem RERA record RERA filing |
| District | Khammam RERA record RERA filing |
| PIN | 507002 RERA record RERA filing |
| Project survey numbers and subdivisions | 61/A/1, 61/A/2/1, 61/A/2/2, 61/AA/1, 61/AA/2, 61/AA/3, 61/AA/4, 61/E/1, 61/E/2, 61/EE/1, 61/EE/1/2, 61/EE/2, 60/E/1/1, 66/AA/6, 61/PART, 60/PART, 66/PART RERA record Land records |
| Registered site extent | 29,484.10 sq m in the RERA land details. RERA filing |
| Layout area shown in drawing extraction | 29,483.86 sq m; the layout drawing’s area statement gives the same figure for total and net layout area. Layout record |
| Boundaries | North: EXISTING ROAD 60; South, East and West: AGRICULTURAL LAND. RERA filing Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Layout approval document identifies SUDA approval, delegated to Raghunadhalem Grampanchayat; the approval file also identifies TS-DTCP. Approvals record |
| Principal layout approval | Tentative Layout Plan approval 368334/LP/GP/202445/0004/2024, dated 21-03-2024. Approvals record |
| Other layout numbers printed in drawing record | TS/007191/2024; approved TLP numbers 215877/LP/GP/202445/0011/2022 and 238648/LP/GP/ 202445/0016/2022. Approvals record |
| Approved built-up area | 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters. This is a plotted layout, not a residential building plan. |
| Plots | 121 individual sub-plots, as stated in the layout drawing and approval extraction. Layout record |
| Buildings / floors | No building count or floor configuration is supplied; the approval record is for a plotted layout. |
| Parking | The layout approval lists 0.00 common parking area; no project parking-space count or unit-level allocation is supplied. |
Offering and status
| Field | Record |
|---|---|
| Offered property | 121 plots in a plotted layout. Plot sizes are software-read from the approved drawing; see the plot schedule below. Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. RERA record |
| Construction stage | No independently verified site-progress information is supplied. RERA record |
| Completion dates | The RERA project record gives 30/11/2026 as proposed completion; the Form B affidavit states an undertaking to complete by 20-03-2026. The evidence does not include an extension order. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The approval document is for a tentative layout plan and requires completion certification by a Licensed Technical Person for final layout approval. |
2. The project story
KHAMMAM HARITAGE PHASE-3 is a registered plotted-layout project in Raghunadha Palem Revenue Village, Raghunadhapalem Mandal, Khammam District. The registered land description covers the survey numbers and subdivisions listed above, and the layout approval provides for 121 individual plots. It is not an apartment or multi-storey building project in the supplied approval record. RERA record Land records
The layout drawing allocates land to plots, internal roads, organized open space/park, social infrastructure and utilities. Its stated net layout area is 29,483.86 sq m. The available record establishes approval of a tentative layout plan; it does not establish that development works are complete or that a final layout plan or completion certificate has been issued. The approval conditions call for infrastructure and amenity works and submission of a Licensed Technical Person’s work-completion certificate for final layout approval. No independent construction-progress verification is supplied. Layout record
The RERA record gives 30 November 2026 as the proposed completion date. Separately, the promoter’s Form B declaration states a completion undertaking of 20 March 2026. The supplied documents do not explain this difference or include an extension decision, so these dates are reported as separate filed statements rather than reconciled here. RERA record
3. Master plan, architecture & building design
The approved drawing is a plotted-layout plan. It states a total and net layout area of 29,483.86 sq m and allocates the land as follows. These are drawing-derived figures, not building floor-area measurements. Layout record
| Layout use | Area | Share |
|---|---|---|
| Plotted Area | 18,693.63 sq m | 63.40% |
| Road Area | 7,103.74 sq m | 24.09% |
| Organized open space/park Area | 2,653.90 sq m | 9.00% |
| Social Infrastructure Area | 737.55 sq m | 2.50% |
| Utility Area | 295.03 sq m | 1.00% |
| Amenity Area | 0.00 sq m | 0.00% |
| Total net layout | 29,483.85 sq m | 100.00% |
The drawing lists internal and adjoining/proposed road widths including 9.14 mt. Wide InternalRoad, 18.29 MT WIDE EXISTING, 18.29 MT WIDE PROPOSED ROAD, 9.144, 12.19, 13.72 and 15.24. The layout record states 121 plots. It does not provide building footprints, building heights, floor levels, or apartment arrangements.
The approval document describes a tentative layout and includes conditions for development of roads, drainage, storm-water channels, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions and proposed works; they are not evidence that the works have been completed.
4. Homes, configurations & floor plans
This is a plotted project, so the RERA-filed offering is plots rather than apartment configurations. The drawing extraction states 121 plots and records all 121 plot sizes as software-read from the drawing’s plot schedule; the extraction notes that the total of plot areas matches the plotted area in the drawing’s area statement. These measurements are drawing-derived and should be checked against the approved drawing. Layout record
| Offering | Count | Size information |
|---|---|---|
| Plots | 121 | Software-measured range: 83.61–181.27 sq m; median: 153.09 sq m. Layout record |
The drawing-derived size bands are:
| Plot size band | Number of plots |
|---|---|
| 0–100 sq yd | 1 |
| 100–150 sq yd | 11 |
| 150–200 sq yd | 57 |
| 200–250 sq yd | 52 |
The most common drawing-read sizes are 167.23 sq m (44 plots), 150.50 sq m (44), 181.27 sq m (6), 162.69 sq m (6) and 92.90 sq m (3). No RERA-filed plot-by-plot booking or availability schedule is supplied. Layout record
5. Parking & vehicle circulation
The layout approval records 0.00 common parking area. The supplied evidence does not state a count of car or two-wheeler spaces, visitor or accessible parking, or plot-specific parking allocations.
The layout drawing identifies internal roads and road widths, including a 9.14 m-wide internal road. The tentative-layout approval conditions require roads to be formed and opened for accessibility to neighbouring sites, but no independent evidence of completed roads, vehicle circulation or parking allocation is supplied.
6. Amenities, recreation & open spaces
The layout approval identifies open space, social infrastructure and utility land. The listed RERA amenity fields are recorded as available with 0% progress where a progress figure appears; this is a filed status, not independent confirmation of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 2,653.90 sq m; 9.00% of net layout area | Approved layout drawing | Layout provision; completion not independently verified |
| Social infrastructure | 737.55 sq m; 2.50% | Approved layout drawing | Layout provision; completion not independently verified |
| Green Strip/TOT LOT/Park | Listed as YES | RERA amenity record RERA amenities | 0%; not independently verified |
| Community Buildings | Listed without a supplied area or quantity | RERA amenity record RERA amenities | 0%; not independently verified |
| Internal Roads & Footpaths | Listed as YES | RERA amenity record RERA amenities | 0%; not independently verified |
No clubhouse, indoor recreation facility, sports facility or facility-specific capacity is established by the supplied evidence. The layout approval’s infrastructure conditions are summarized under utilities and services below.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, street lighting and an electrical meter room/sub-station/receiving station as YES, with 0% progress where the record reports a percentage. These are filed declarations, not independent completion checks. RERA amenities
The tentative-layout approval requires the developer to provide a protected water supply system, an overhead tank or sump, sewerage disposal, septic tank as applicable, storm-water drains and nala channelization, rainwater-harvesting pits, street lighting and electricity facilities. It also identifies water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management among the listed utilities. No capacities, operating status or completion certificates for these facilities are supplied.
Fire-protection/fire-safety requirements and energy management appear in the amenity record without an affirmative availability entry or progress. No project-specific fire-clearance evidence, lift information, accessibility details, security/CCTV provisions, or independently verified utility status is supplied. RERA amenities
8. Location, access & connectivity
The official project location is Raghunadha Palem, Raghunadhapalem, Khammam, 507002, in Raghunadha Palem Revenue Village, Raghunadhapalem Mandal. The layout record describes the north boundary as EXISTING ROAD 60 and the other three boundaries as agricultural land. RERA record RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange at 163.4 km; this is a recorded approximate distance, not a travel-time estimate. No additional public-transport details, local landmark distances or approach-route measurements are supplied. Location record
9. Developer & development status
The registered promoter is AADHAAR BUILDERS AND INFRASTRUCTURE LLP, an LLP. The supplied corporate identifier is GSTIN 36ABXFA0125A1ZU; the promoter record also lists AAZ-8993. Corporate record RERA filing
The promoter’s listed address is KLK KSHETRA, ROAD NUMBER 12, RAGHUNADHA PALEM, RAGHUNADHA PALEM, Raghunadhapalem, Khammam, 507002. The supplied promoter website is https://www.aadhaarbuild.com. No project-specific phone number or email contact is supplied. Parties record Corporate record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | P00800008024, certificate records validity from 08/04/2024 to 20/03/2026. Approvals record |
| Principal layout approval | Tentative Layout Plan 368334/LP/GP/202445/0004/2024, dated 21-03-2024; approval document identifies SUDA and delegation to Raghunadhalem Grampanchayat. Approvals record |
| Layout drawing / file reference | Layout plan document 428580; includes file number TS/007191/2024 and other TLP references. |
| Commencement / phase certificate document | Document 428581 is named “Commencement Certificates for each building in each phase,” but its extracted content describes tentative layout approval. No separate building commencement certificate is identified in the supplied material. Document index |
| Promoter declaration | Form B affidavit by Shashank Agarwal as authorized signatory, including title, encumbrance, funds and completion declarations. |
| Occupancy / completion certificate | Not supplied. The tentative-layout approval calls for a Licensed Technical Person’s work-completion certificate for final layout approval. |
The supplied evidence supports identification of the project registration and tentative layout approval. It does not include a final layout approval or evidence that the required layout infrastructure has been completed.
1. Project at a glance
Project identity
Registered project name: KHAMMAM HARITAGE PHASE-3
Project type: Plotted development / plotted layout
Phase / registered portion: Phase 3; the registration identifies the project as “KHAMMAM HARITAGE PHASE-3.”
TG-RERA registration number: P00800008024
Registration validity: 8 April 2024 to 20 March 2026, as stated in the registration certificate. This is the registration period, not a statement of completion or occupancy certification.
Registered promoter: AADHAAR BUILDERS AND INFRASTRUCTURE LLP
RERA status in supplied record: New project; the certificate records registration. No extension record is supplied.
Land and geographic identity
Locality: RAGHUNADHA PALEM
Revenue village: Raghunadha Palem Revenue Village
Mandal: Raghunadhapalem
District: Khammam
PIN: 507002
Project survey numbers and subdivisions: 61/A/1, 61/A/2/1, 61/A/2/2, 61/AA/1, 61/AA/2, 61/AA/3, 61/AA/4, 61/E/1, 61/E/2, 61/EE/1, 61/EE/1/2, 61/EE/2, 60/E/1/1, 66/AA/6, 61/PART, 60/PART, 66/PART
Registered site extent: 29,484.10 sq m in the RERA land details.
Layout area shown in drawing extraction: 29,483.86 sq m; the layout drawing’s area statement gives the same figure for total and net layout area.
Boundaries: North: EXISTING ROAD 60; South, East and West: AGRICULTURAL LAND.
Development identity
Sanctioning authority: Layout approval document identifies SUDA approval, delegated to Raghunadhalem Grampanchayat; the approval file also identifies TS-DTCP.
Principal layout approval: Tentative Layout Plan approval 368334/LP/GP/202445/0004/2024, dated 21-03-2024.
Other layout numbers printed in drawing record: TS/007191/2024; approved TLP numbers 215877/LP/GP/202445/0011/2022 and 238648/LP/GP/ 202445/0016/2022.
Approved built-up area: 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters. This is a plotted layout, not a residential building plan.
Plots: 121 individual sub-plots, as stated in the layout drawing and approval extraction.
Buildings / floors: No building count or floor configuration is supplied; the approval record is for a plotted layout.
Parking: The layout approval lists 0.00 common parking area; no project parking-space count or unit-level allocation is supplied.
Offering and status
Offered property: 121 plots in a plotted layout. Plot sizes are software-read from the approved drawing; see the plot schedule below.
Booked / available counts: Not disclosed in the supplied evidence.
Construction stage: No independently verified site-progress information is supplied.
Completion dates: The RERA project record gives 30/11/2026 as proposed completion; the Form B affidavit states an undertaking to complete by 20-03-2026. The evidence does not include an extension order.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The approval document is for a tentative layout plan and requires completion certification by a Licensed Technical Person for final layout approval.
2. The project story
KHAMMAM HARITAGE PHASE-3 is a registered plotted-layout project in Raghunadha Palem Revenue Village, Raghunadhapalem Mandal, Khammam District. The registered land description covers the survey numbers and subdivisions listed above, and the layout approval provides for 121 individual plots. It is not an apartment or multi-storey building project in the supplied approval record.
The layout drawing allocates land to plots, internal roads, organized open space/park, social infrastructure and utilities. Its stated net layout area is 29,483.86 sq m. The available record establishes approval of a tentative layout plan; it does not establish that development works are complete or that a final layout plan or completion certificate has been issued. The approval conditions call for infrastructure and amenity works and submission of a Licensed Technical Person’s work-completion certificate for final layout approval. No independent construction-progress verification is supplied.
The RERA record gives 30 November 2026 as the proposed completion date. Separately, the promoter’s Form B declaration states a completion undertaking of 20 March 2026. The supplied documents do not explain this difference or include an extension decision, so these dates are reported as separate filed statements rather than reconciled here.
3. Master plan, architecture & building design
The approved drawing is a plotted-layout plan. It states a total and net layout area of 29,483.86 sq m and allocates the land as follows. These are drawing-derived figures, not building floor-area measurements.
| Layout use | Area | Share |
|---|---|---|
| Plotted Area | 18,693.63 sq m | 63.40% |
| Road Area | 7,103.74 sq m | 24.09% |
| Organized open space/park Area | 2,653.90 sq m | 9.00% |
| Social Infrastructure Area | 737.55 sq m | 2.50% |
| Utility Area | 295.03 sq m | 1.00% |
| Amenity Area | 0.00 sq m | 0.00% |
| Total net layout | 29,483.85 sq m | 100.00% |
The drawing lists internal and adjoining/proposed road widths including 9.14 mt. Wide InternalRoad, 18.29 MT WIDE EXISTING, 18.29 MT WIDE PROPOSED ROAD, 9.144, 12.19, 13.72 and 15.24. The layout record states 121 plots. It does not provide building footprints, building heights, floor levels, or apartment arrangements.
The approval document describes a tentative layout and includes conditions for development of roads, drainage, storm-water channels, greenery, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions and proposed works; they are not evidence that the works have been completed.
4. Homes, configurations & floor plans
This is a plotted project, so the RERA-filed offering is plots rather than apartment configurations. The drawing extraction states 121 plots and records all 121 plot sizes as software-read from the drawing’s plot schedule; the extraction notes that the total of plot areas matches the plotted area in the drawing’s area statement. These measurements are drawing-derived and should be checked against the approved drawing.
| Offering | Count | Size information |
|---|---|---|
| Plots | 121 | Software-measured range: 83.61–181.27 sq m; median: 153.09 sq m. |
The drawing-derived size bands are:
0–100 sq yd: 1
100–150 sq yd: 11
150–200 sq yd: 57
200–250 sq yd: 52
The most common drawing-read sizes are 167.23 sq m (44 plots), 150.50 sq m (44), 181.27 sq m (6), 162.69 sq m (6) and 92.90 sq m (3). No RERA-filed plot-by-plot booking or availability schedule is supplied.
5. Parking & vehicle circulation
The layout approval records 0.00 common parking area. The supplied evidence does not state a count of car or two-wheeler spaces, visitor or accessible parking, or plot-specific parking allocations.
The layout drawing identifies internal roads and road widths, including a 9.14 m-wide internal road. The tentative-layout approval conditions require roads to be formed and opened for accessibility to neighbouring sites, but no independent evidence of completed roads, vehicle circulation or parking allocation is supplied.
6. Amenities, recreation & open spaces
The layout approval identifies open space, social infrastructure and utility land. The listed RERA amenity fields are recorded as available with 0% progress where a progress figure appears; this is a filed status, not independent confirmation of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organized open space / park | 2,653.90 sq m; 9.00% of net layout area | Approved layout drawing | Layout provision; completion not independently verified |
| Social infrastructure | 737.55 sq m; 2.50% | Approved layout drawing | Layout provision; completion not independently verified |
| Green Strip/TOT LOT/Park | Listed as YES | RERA amenity record | 0%; not independently verified |
| Community Buildings | Listed without a supplied area or quantity | RERA amenity record | 0%; not independently verified |
| Internal Roads & Footpaths | Listed as YES | RERA amenity record | 0%; not independently verified |
No clubhouse, indoor recreation facility, sports facility or facility-specific capacity is established by the supplied evidence. The layout approval’s infrastructure conditions are summarized under utilities and services below.
7. Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, street lighting and an electrical meter room/sub-station/receiving station as YES, with 0% progress where the record reports a percentage. These are filed declarations, not independent completion checks.
The tentative-layout approval requires the developer to provide a protected water supply system, an overhead tank or sump, sewerage disposal, septic tank as applicable, storm-water drains and nala channelization, rainwater-harvesting pits, street lighting and electricity facilities. It also identifies water reservoir, septic tank, sewerage treatment plant, electric transformer and solid-waste management among the listed utilities. No capacities, operating status or completion certificates for these facilities are supplied.
Fire-protection/fire-safety requirements and energy management appear in the amenity record without an affirmative availability entry or progress. No project-specific fire-clearance evidence, lift information, accessibility details, security/CCTV provisions, or independently verified utility status is supplied.
8. Location, access & connectivity
The official project location is Raghunadha Palem, Raghunadhapalem, Khammam, 507002, in Raghunadha Palem Revenue Village, Raghunadhapalem Mandal. The layout record describes the north boundary as EXISTING ROAD 60 and the other three boundaries as agricultural land.
The supplied location data gives the nearest sampled Outer Ring Road interchange at 163.4 km; this is a recorded approximate distance, not a travel-time estimate. No additional public-transport details, local landmark distances or approach-route measurements are supplied.
9. Developer & development status
The registered promoter is AADHAAR BUILDERS AND INFRASTRUCTURE LLP, an LLP. The supplied corporate identifier is GSTIN 36ABXFA0125A1ZU; the promoter record also lists AAZ-8993.
The promoter’s listed address is KLK KSHETRA, ROAD NUMBER 12, RAGHUNADHA PALEM, RAGHUNADHA PALEM, Raghunadhapalem, Khammam, 507002. The supplied promoter website is https://www.aadhaarbuild.com. No project-specific phone number or email contact is supplied.
10. Approvals, official records & documents
TG-RERA registration: P00800008024, certificate records validity from 08/04/2024 to 20/03/2026.
Principal layout approval: Tentative Layout Plan 368334/LP/GP/202445/0004/2024, dated 21-03-2024; approval document identifies SUDA and delegation to Raghunadhalem Grampanchayat.
Layout drawing / file reference: Layout plan document 428580; includes file number TS/007191/2024 and other TLP references.
Commencement / phase certificate document: Document 428581 is named “Commencement Certificates for each building in each phase,” but its extracted content describes tentative layout approval. No separate building commencement certificate is identified in the supplied material.
Promoter declaration: Form B affidavit by Shashank Agarwal as authorized signatory, including title, encumbrance, funds and completion declarations.
Occupancy / completion certificate: Not supplied. The tentative-layout approval calls for a Licensed Technical Person’s work-completion certificate for final layout approval.
The supplied evidence supports identification of the project registration and tentative layout approval. It does not include a final layout approval or evidence that the required layout infrastructure has been completed.
Frequently asked questions
Is KHAMMAM HARITAGE PHASE-3 registered with Telangana RERA?
Yes. KHAMMAM HARITAGE PHASE-3 is registered with the Telangana Real Estate Regulatory Authority as P00800008024; the registration status is New Project.
Who is the developer of KHAMMAM HARITAGE PHASE-3?
The promoter named in the RERA registration is AADHAAR BUILDERS AND INFRASTRUCTURE LLP.
Where is KHAMMAM HARITAGE PHASE-3 located?
KHAMMAM HARITAGE PHASE-3 is in RAGHUNADHA PALEM, Raghunadhapalem, Khammam, Telangana (507002).
When will KHAMMAM HARITAGE PHASE-3 be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.