JYOSTHNA NILAYAM is a residential apartment project in Miyapur, Serilingampally mandal, Ranga Reddy district. The registered promoter developing it is SRI VATHSA HOMES PVT LTD. The project has a registered land area of 744.53 sq m and one residential building sanctioned as Stilt + 5 floors, with 20 filed 2BHK apartments. Its TG-RERA registration number is P02400000742, and its proposed completion date is 19/04/2024.

More from Sri Vathsa Homes Pvt Ltd · 5 projects →

01What we found

Period endedTG-RERA registration ran to 19 Apr 2024 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from commonfloor.com

1. Project at a glance

Project identity

FieldRecord
Registered project nameJYOSTHNA NILAYAM RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project named above. RERA record
TG-RERA registrationP02400000742; granted 15/05/2019; certificate states validity through 19/04/2024. RERA record
RERA statusRecorded as “On-Going Project.” Registration validity is a separate date range from the completion deadline; no extension is recorded in the certificate supplied. RERA record
Registered promoterSRI VATHSA HOMES PVT LTD, a private limited company. RERA record Corporate record

Land and geographic identity

FieldRecord
LocalityMiyapur; the building-permission record also names Matrusr i Colony / Matrusr i Nagar, while the RERA address record names Sardar Patel Nagar, Matrusri Nagar. RERA record RERA filing
Revenue villageMiyapur. The supplied project records do not identify a second revenue village for this project parcel. RERA record Land records
MandalSerilingampally is stated in the GHMC plan extraction; the RERA certificate separately records Kukatpally. The project-land record itself leaves mandal undisclosed. Land records
District / PINRanga Reddy / 500049 in the project header and land record. RERA record Land records
Project survey number(s) and subdivisionsSurvey No. 44/1 is stated in the title and encumbrance records; the building-plan extraction lists 44/1 and 44/4 and separately describes Plot Nos. 483 part and 484. The GHMC permit-order extraction lists 144/1. These identifiers are reproduced as recorded; the supplied documents do not resolve the differing survey references. Land records
Registered site extent744.53 sq m total and net area in the RERA land record. RERA filing Land records
BoundariesEast: Plot No. 485; West: part of Plot No. 483; North: Plot Nos. 475 and 476; South: 40-ft-wide road. RERA filing Land records
Site-area figure in permit extractionBuilding-permission extraction records site area 744.53 sq m; another extracted field in the same record is OCR-rendered as “Net Area(m2) (944.53”.

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building-permit number / date2/C12/06687/2018, dated 19 April 2018. Approvals record
Approved built-up areaGHMC plan extraction records 1,929.76 as Net BUA and residential Net BUA; the permit-order extraction records a sanctioned area of 1,929.75 m². The plan extraction separately lists 2,349.54 as “BUILT UP AREA.”
Buildings / configurationOne residential building; sanctioned as Stilt + 5 floors. RERA filing
Height14.95 m in the permit-order extraction.
Parking levels / provisionStilt parking is identified in the permit record; the plan extraction also lists cellar as 0.00. No approved parking-space count is established by the supplied GHMC plan extraction.
Approved versus RERA-declared unitsRERA land details record 1 building unit, while the unit record lists 20 apartments. The permit conditions state that sanctioned unit numbers must not be increased without GHMC approval; an approved apartment-count figure is not established in the supplied extracts. RERA filing RERA unit table

Offering and status

FieldRecord
RERA-filed configuration2BHK; 20 units; filed saleable area 61.06 sq m per unit. RERA unit table RERA unit details
Portal booking snapshot0 booked and 20 available in the supplied TG-RERA record; no as-of date is provided for these counts, so they are indicative. RERA unit table RERA unit details
Construction stageThe RERA project status is “On-Going Project”; the supplied evidence does not establish current physical progress through an independent site inspection. RERA record RERA amenities
Completion deadlinePromoter-declared proposed and revised completion date: 19/04/2024. RERA record RERA filing
Occupancy certificateThe permit requires an occupancy certificate before occupation. No occupancy certificate is included in the supplied documents; the permit extraction records completion as not certified.

2. The project story

JYOSTHNA NILAYAM is registered with TG-RERA as a residential apartment project in Miyapur, Ranga Reddy district. Its RERA record describes a single-building development, with 20 filed 2BHK apartments; the building-permission record describes a Stilt + 5-floor residential building. The registered land area is 744.53 sq m. The site is identified in the RERA record by boundaries to adjoining plots and a 40-ft-wide road, and the building-plan extraction identifies Plot Nos. 483 part and 484. The promoter’s stated completion date is 19/04/2024. The project is still recorded as “On-Going Project,” and the supplied permit requires an occupancy certificate before occupation. The available evidence does not establish the building’s present on-site completion or an issued occupancy certificate. RERA booking figures are a portal snapshot without an as-of date, not an independently checked sales position. RERA record RERA unit table RERA filing

3. Master plan, architecture & building design

The project is a single residential building on a site recorded as 744.53 sq m, with a GHMC building permit dated 19 April 2018. The extracted permit describes the building as Stilt + 5 floors and gives a height of 14.95 m. RERA filing

The building-plan extraction records 1,929.76 as Net BUA and Residential Net BUA, 2,349.54 as “BUILT UP AREA,” and 385.95 as proposed coverage area (51.84%). The permit-order extraction separately records a sanctioned area of 1,929.75 m². These labels are retained as extracted; the supplied material does not provide a complete, legible area schedule explaining their relationship.

A typical-floor-plan document is supplied, but its extraction does not establish a reliable unit layout, number of apartments per floor, floor-by-floor arrangement, or measured apartment areas. The available extracts do not establish lift and stair counts, entrances and exits beyond the conditions noted under utilities and safety, or the building’s internal circulation design.

The site record identifies a proposed coverage area and a vacant-plot-area figure, while the permit conditions refer to a tot-lot, peripheral greenery and tree planting. The evidence does not provide a verified landscaped/open-space plan or a separately stated residential/common-area schedule.

4. Homes, configurations & floor plans

The TG-RERA unit record lists 20 apartments, all in the 2BHK configuration, with filed saleable area of 61.06 sq m per unit. The record shows 0 booked and 20 available, but does not provide an as-of date for those counts. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002061.06 sq mNot available: supplied floor-plan drawings are not measured.Not supplied.

Carpet area and saleable area are different measures: saleable area can include a unit’s share of common areas, while carpet area measures the usable internal area under the applicable measurement basis. No software-measured carpet area is supplied for this project; the floor-plan record says five scans are pending measurement and one drawing contains no flats. Room dimensions, balcony or utility areas, orientation, and typical apartment arrangements therefore cannot be reported from the supplied evidence. Floor plans RERA unit table

5. Parking & vehicle circulation

The GHMC permit record identifies stilt parking and requires cellar/stilt areas approved for parking to remain used exclusively for parking; its extraction lists cellar area as 0.00. A typical-floor-plan extraction mentions 20 parking spaces and 8 “Sale of Parking’s,” but it does not establish sanctioned parking provision or legally documented allocation to particular apartments.

The supplied evidence does not establish resident-versus-visitor spaces, accessible spaces, two-wheeler capacity, parking-bay dimensions, ramp or driveway arrangement, pedestrian separation, or EV charging. A drawn or listed parking bay is not, by itself, evidence of exclusive ownership or allocation to a buyer.

6. Amenities, recreation & open spaces

The table below distinguishes RERA-listed amenities and permit requirements from any verified delivery. Percentages are the portal’s declared progress figures; the supplied records do not independently verify completion. RERA amenities

Tot-lot / green area
Description / sizePermit extraction lists “Tot-lot (m2)” without a readable area; GHMC conditions require fencing and maintaining it as greenery before occupancy certification.
Declared progress / verified statusRERA “Green Strip/TOT LOT/Park”: 0%; no independent completion verification. RERA amenities
Community buildings
Description / sizeNo project-specific building description or size supplied.
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified status0%; not independently verified.
Recreational open space
Description / sizeRERA record marks aggregate recreational open space as available but supplies no area.
Evidence sourceRERA amenities
Declared progress / verified status0%; not independently verified.

The separate HUDA layout drawing describes a larger residential layout and lists parks, playground, community centre, school and other uses. It does not establish these as facilities delivered within JYOSTHNA NILAYAM, so they are not presented as project amenities.

7. Utilities, building services & safety

The GHMC permit conditions and plan extraction identify several proposed or required building services. These are approval-record requirements, not evidence that the facilities have been installed, commissioned or inspected.

Water
Evidence in the project recordThe plan extraction lists separate underground static storage of 25,000 litres and a separate 25,000-litre terrace tank for residential buildings. Public water connections are conditioned on production of an occupancy certificate.
Status / limitationCapacities are stated in the plan conditions; installation and operational status are not independently verified.
Sewerage / drainage
Evidence in the project recordRERA amenity record lists sewerage at 60% and storm-water drains at 70%; it lists treatment and disposal of sewage and sullage at 0%.
Status / limitationPortal progress only; no verified commissioning or treatment capacity supplied. RERA amenities
Water conservation
Evidence in the project recordPermit requires a rainwater-harvesting percolation pit; RERA record lists water conservation/rainwater harvesting at 0%.
Status / limitationRequirement recorded; completion not verified. RERA amenities
Electrical
Evidence in the project recordPermit conditions require transformer space and a generator as an alternate supply; electrical installation is to be certified by electrical engineers.
Status / limitationNo generator capacity or installed/operational status supplied.
Lifts and circulation
Evidence in the project recordThe plan extraction lists a lift and requires a fire-resistant swing door for the collapsible lift on all floors; it also requires one entry and one exit with stated minimum dimensions.
Status / limitationLift count, capacity, commissioning and accessible circulation are not established.
Fire and life safety
Evidence in the project recordPlan conditions include emergency lighting in corridors, common passages and staircases, water-type extinguishers, and a sprinkler requirement if basement area exceeds 200 sq m. Fire protection is listed at 0% in the RERA amenity record.
Status / limitationRequirements are not evidence of installation or statutory clearance. RERA amenities
Waste
Evidence in the project recordPermit requires a garbage house within the premises; RERA solid-waste management and disposal is listed at 0%.
Status / limitationNo segregation system or operational status supplied. RERA amenities
Accessibility
Evidence in the project recordNo project-specific accessibility provisions are established in the supplied apartment records.
Status / limitationNot disclosed in the available project evidence.

8. Location, access & connectivity

The registered project location is Miyapur, Ranga Reddy district, PIN 500049. The RERA address fields identify Matrusri Nagar and Sardar Patel Nagar; the building-permission record names Matrusr i Colony / Matrusr i Nagar and Plot Nos. 483 part and 484. RERA record RERA filing

The location dataset identifies the Financial District (Nanakramguda) as an anchor at 1.2 km from the supplied parcel-centroid location. This is the available measured distance; no travel time, route or mode of travel is supplied. Location record

The record describes the southern boundary as a 40-ft-wide road. The building-permit extraction also refers to an 18 m road condition, but the supplied information does not establish a project-specific public-transport connection or a verified route to other landmarks. RERA filing

9. Developer & development status

The registered promoter is SRI VATHSA HOMES PVT LTD, recorded as a company/private limited entity. The RERA project record names MADDINENI NAVA JEEVAN as authorized signatory. The supplied RERA address is JAMUNA RESIDENCY, SARDAR PATEL NAGAR, MATRUSRI NAGAR, MIYAPUR, Ranga Reddy, 500049; the registration certificate separately gives a promoter-office address in Kukatpally, Medchal-Malkajgiri, PIN 500085. No official website or contact details are supplied in the project record. Corporate record Parties record

The promoter’s Form B declaration records an undertaking that the project would be completed by 19-04-2024 and includes declarations concerning approvals, project funds and audits. It is a promoter declaration, not independent confirmation of construction progress or completion.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400000742; issued 15/05/2019; stated validity through 19/04/2024
Scope and evidenceForm C identifies JYOSTHNA NILAYAM and SRI VATHSA HOMES PVT LTD.
GHMC building permit
Identifier / date2/C12/06687/2018; 19 April 2018
Scope and evidenceConditional residential building permission; extraction describes Stilt + 5 floors and the site at Plot Nos. 483 part and 484.
GHMC building-plan extraction
Identifier / dateApproval 2/C12/06687/2018; 19 April 2018
Scope and evidencePlan details include area schedules, building services and permit conditions.
Proposed residential plan
Identifier / date3/CI/07607/2018; 15-04-2018
Scope and evidenceExtract identifies proposed residential construction and area figures; issuing authority and validity period are not stated in the extraction.
HUDA layout record
Identifier / datePermit 2209; letter 2209/MP2/HUDA/90; proceedings G-127 / LP / 1348 / 94
Scope and evidenceA proposed/revalidated residential-layout drawing concerning Miyapur and Hafeez Pet lands.
Title / land records filed with RERA
Identifier / dateSurvey No. 44/1 records include sale, release and development-agreement documents
Scope and evidenceThe title report and encumbrance statement are available in the project file.
Form B promoter declaration
Identifier / dateDeclaration filed for SRI VATHSA HOMES PRIVATE LIMITED
Scope and evidenceRecords promoter undertakings; the OCR does not state a TG-RERA registration number.
Occupancy / completion certificate
Identifier / dateNot present in the supplied documents
Scope and evidenceGHMC permit conditions require an occupancy certificate before occupation; no issued certificate is established here.

The HMDA master-plan sheets are image-based and the supplied record does not identify the precise zoning at the project survey. The public HMDA DPMS layout lookup was unavailable in the supplied evidence; that unavailability is not evidence that an approval was refused. HMDA

Frequently asked questions

Is JYOSTHNA NILAYAM registered with Telangana RERA?

Yes. JYOSTHNA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02400000742; the registration status is On-Going Project.

Who is the developer of JYOSTHNA NILAYAM?

The promoter named in the RERA registration is SRI VATHSA HOMES PVT LTD.

Where is JYOSTHNA NILAYAM located?

JYOSTHNA NILAYAM is in MIYAPUR, Rangareddy, Telangana (500049).

When will JYOSTHNA NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 19/04/2024. This is the promoter's declaration, not a guarantee.

More projects in Rangareddy