Jaswitha Cyber Connect -1 Block -1
MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS · Rangareddy · RERA P02400004081
JASWITHA CYBER CONNECT -1 BLOCK -1 is a residential apartment project in KONDAPUR, Serilingampally Mandal, Ranga Reddy District, developed by MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS. The site area is 474.15 sq. m, with one residential building, BUILDING-1, comprising 1 Stilt + 5 upper floors and 15 2BHK units. It is registered under TG-RERA number P02400004081, with proposed completion on 15/11/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | JASWITHA CYBER CONNECT -1 BLOCK -1 RERA record |
| Project type / phase | Residential apartment project; registered portion is Block-1 RERA record |
| TG-RERA registration | P02400004081; registration certificate issued 04/02/2022, valid through 15/07/2027. This is registration validity, not the project’s completion deadline. RERA record |
| Registered promoter | MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS RERA record |
| RERA status | The supplied record labels the project New Project. The certificate records a five-year registration; no extension is recorded in the supplied certificate. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | KONDAPUR locality; revenue village recorded as Serilingampally. The GHMC permit documents identify the site as Kondapur. RERA record RERA filing |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500030 RERA record RERA filing |
| Survey numbers and subdivisions | 112/PART, 112/2 RERA record Land records |
| Site extent | 474.15 sq. m recorded as site area. The revised permit separately lists Net Area(m2) 472.22 and Road affected area (m2) 0. RERA filing |
| Boundaries in the RERA record | East: 30 Wide Road; West: Plot No 37; North: Plot No 39; South: Plot No 40-1. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | GHMC Building Permit Order 2/C20/02133/2021, dated 11 February, 2021; revised permit 2/C20/06808/2021, dated 08 September, 2021. Approvals record |
| Building and sanctioned floors | One residential building, BUILDING-1; both permit records describe 1 Stilt + 5 upper floors. |
| Approved area figures | The original permit lists Proposed Covered builtup area 64,968.90 (as recorded in the supplied extraction). The revised permit lists Residential upper floors area: 1,338.20 m2 and Stilt parking area: 240.80 m2. These are reproduced as distinct permit figures; the supplied record does not clarify the original figure’s unit. |
| Parking / approved units | Stilt parking is identified in the revised permit; the permit condition says cellar and stilt areas approved for parking must be used exclusively for vehicle parking. No sanctioned parking-space count is supplied. RERA records 15 units; the revised permit condition says sanctioned unit numbers must not be increased without GHMC approval. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 15 units; saleable area 100.67 sqm per unit in the RERA record. RERA unit table RERA unit details |
| Booked / available | 0 booked / 15 available, as last read from the TG-RERA portal; the supplied unit record has no as-of date, so counts are indicative. RERA unit table |
| Construction stage | No independently verified or dated site-progress assessment is supplied. The RERA amenities record marks excavation 100% and basement 10%; the other listed progress percentages are 0%. RERA amenities |
| Completion dates | Promoter’s Form B declares completion by 15/07/2027. The project header records proposed completion 15/11/2027. These are completion-date entries, separate from registration validity. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied documents. The GHMC permits state that an Occupancy Certificate is required before occupation. Document index |
2. The project story
JASWITHA CYBER CONNECT -1 BLOCK -1 is a single-building residential apartment project on a site recorded in the RERA materials as 474.15 sq. m, in Kondapur, Serilingampally Mandal, Ranga Reddy District. Its registered land identity is Survey Nos. 112/PART and 112/2. The GHMC permit records describe a stilt-plus-five-upper-floor residential building. RERA record Land records
- The RERA unit schedule lists fifteen 2BHK apartments. The portal-derived booking snapshot shows all fifteen as available, but it has no supplied as-of date. RERA unit table
- The supplied record does not establish current on-site construction progress through an independent inspection. RERA’s progress entries list excavation at 100% and basement at 10%, with 0% shown for the other listed items. RERA amenities
- The project is registered through 15/07/2027; that date is the registration-validity end date, not a certificate of completion or permission to occupy. The supplied documents include no OC or completion certificate. Document index
3. Master plan, architecture & building design
The GHMC permit records describe one residential building, BUILDING-1, with 1 Stilt + 5 upper floors and a stated height of 14.95 m. The revised permit lists Residential upper floors area: 1,338.20 m2 and Stilt parking area: 240.80 m2. The original permit extraction separately records Proposed Covered builtup area 64,968.90; its unit is not identified in the supplied extraction, so it is not treated as interchangeable with the revised permit’s square-metre figures.
The recorded site area is 474.15 sq. m; the revised permit also records Net Area(m2) 472.22, Road affected area (m2) 0, and Nala affected area (m2) 0. RERA filing
The provided material does not include readable floor-plan geometry, so it does not establish flats per floor, building footprint, lift or stair arrangement, internal circulation, or detailed common-area distribution. No separate approved layout drawing is available in the supplied material. Floor plans Document index
4. Homes, configurations & floor plans
The RERA filing lists one configuration, 2BHK, across fifteen units. Its saleable area is a RERA-filed figure; no software-measured carpet-area figure is available from the supplied floor-plan records. The drawing set is recorded as two drawings, neither measured and neither identified as containing flats. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 100.67 sqm | Not available | Not supplied |
Saleable area and carpet area are different measures; the supplied record provides no measured carpet area to compare with the RERA-filed saleable area. The available floor-plan materials do not support room dimensions, balcony or utility descriptions, orientation, or typical-floor arrangements. RERA unit details Floor plans
5. Parking & vehicle circulation
The revised GHMC permit lists Stilt parking area: 240.80 m2. Its conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not give a parking-space count, parking allocation by apartment, visitor or accessible-space provision, or details of ramps, vehicle entries and exits, or internal driveways. A parking bay or area does not, by itself, establish exclusive allocation to a buyer.
6. Amenities, recreation & open spaces
The following are marked in the supplied RERA amenities record. Progress percentages are portal-recorded values, not independent verification of construction or delivery. The GHMC revised permit also includes a tot-lot and certain site provisions. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | No size supplied; revised GHMC permit requires the tot-lot to be fenced and maintained as greenery before issue of OC. | RERA amenities | RERA progress 0%; completion not independently verified. |
| Aggregate recreational open space | Quantity or size not supplied. | RERA amenities | RERA record marks “YES”; progress 0%; not independently verified. |
| Community buildings | No description or size supplied. | RERA amenities | Progress 0%; facility status not independently verified. |
7. Utilities, building services & safety
| Service | Supplied evidence |
|---|---|
| Water and rainwater | RERA lists water supply and water conservation/rainwater harvesting as available, with progress 0%. The permits require a rainwater-harvesting structure/percolation pit; the revised permit specifies a piped connection from the terrace and all sides. No storage or treatment capacity is supplied. RERA amenities |
| Sewerage and drainage | RERA lists sewerage (chamber, lines, septic tank, STP), storm-water drains, and treatment/disposal of sewage and sullage water; each has progress 0%. The permit requires an ETP, but no capacity or completion evidence is supplied. RERA amenities |
| Electricity | RERA lists an electrical meter room/sub-station/receiving station with progress 0%. The permit requires space for a transformer. No supply, backup, substation capacity, or EV-charging details are supplied. RERA amenities |
| Fire and life safety | RERA lists fire protection/fire-safety requirements with progress 0%. The revised permit requires a working fire extinguisher on each floor and an occupancy fire NOC before issue of the OC. The supplied record does not confirm installation or clearance. RERA amenities |
| Waste and security | RERA lists solid-waste management/disposal with progress 0%; the permit identifies a garbage house. The revised permit requires CCTV installation and linkage to the concerned SHO; installation is not independently verified. RERA amenities |
| Accessibility and vertical transport | No lift, accessible route, ramp, service-lift, or capacity information is supplied. The revised permit requires a zero ramp onto the road slope; this is a permit condition, not evidence of completed construction. |
8. Location, access & connectivity
The registered location is Kondapur, in Serilingampally revenue village, Serilingampally Mandal, Ranga Reddy District, PIN 500030. The project boundary record identifies a 30 Wide Road to the east; the GHMC permits describe an 18 mt. road or 18 mt. road widths. RERA record RERA filing RERA filing
A cadastral parcel-centroid location is supplied at 17.48016, 78.31972. The nearest sampled Outer Ring Road interchange is listed at approximately 7.0 km. No other independently measured distances or travel times are supplied for this overview. Location record
9. Developer & development status
The registered promoter is MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS. The RERA record identifies the organization type as “Others” and lists GSTIN 36AATFM7578E1ZL; the legal-entity form is not further established in the supplied record. RERA record Corporate record
The RERA record gives the promoter address as Madhavi Hills, KONDAPUR, KONDAPUR, Serilingampally, Ranga Reddy, 500030. No official project website, promoter contact details, or independently confirmed registered-office address is supplied. Parties record
The Form B affidavit, dated 13 August, 2021, is made by Mr. Ramprasad Reddy Arani as an authorized signatory for the promoter entities and declares a completion undertaking of 15/07/2027. That is a promoter declaration; the project header separately records 15/11/2027 as proposed completion. The supplied record contains no independent construction inspection or OC. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for JASWITHA CYBER CONNECT -1 BLOCK -1, registration P02400004081, issued 04/02/2022, valid through 15/07/2027. |
| GHMC original building permit | Building Permit Order 2/C20/02133/2021, dated 11 February, 2021; Building-1, Survey No. 112/2. |
| GHMC revised building permit | Revised Building Permit Order 2/C20/06808/2021, dated 08 September, 2021; Building-1, Survey Nos. 112/PART and 112/2. The permit extraction records validity through 08 September, 2027. |
| Promoter declaration | Form B affidavit dated 13 August, 2021, with title, encumbrance, separate-account and completion declarations. |
| Occupancy / completion certificate | Not present in the supplied documents. The permits state that an OC is compulsory before occupation. Document index |
| Approved layout / floor plans | No extracted approved layout plan is supplied; the floor-plan record contains two drawings, neither measured and neither identified as a flat plan. Document index Floor plans |
The permit documents also record a contractor’s all-risk policy numbered 433702/44/2021/939, valid up to 23 December, 2026.
1. Project at a glance
Project identity
Registered project name: JASWITHA CYBER CONNECT -1 BLOCK -1
Project type / phase: Residential apartment project; registered portion is Block-1
TG-RERA registration: P02400004081; registration certificate issued 04/02/2022, valid through 15/07/2027. This is registration validity, not the project’s completion deadline.
Registered promoter: MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS
RERA status: The supplied record labels the project New Project. The certificate records a five-year registration; no extension is recorded in the supplied certificate.
Land and geographic identity
Locality / revenue village: KONDAPUR locality; revenue village recorded as Serilingampally. The GHMC permit documents identify the site as Kondapur.
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500030
Survey numbers and subdivisions: 112/PART, 112/2
Site extent: 474.15 sq. m recorded as site area. The revised permit separately lists Net Area(m2) 472.22 and Road affected area (m2) 0.
Boundaries in the RERA record: East: 30 Wide Road; West: Plot No 37; North: Plot No 39; South: Plot No 40-1.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: GHMC Building Permit Order 2/C20/02133/2021, dated 11 February, 2021; revised permit 2/C20/06808/2021, dated 08 September, 2021.
Building and sanctioned floors: One residential building, BUILDING-1; both permit records describe 1 Stilt + 5 upper floors.
Approved area figures: The original permit lists Proposed Covered builtup area 64,968.90 (as recorded in the supplied extraction). The revised permit lists Residential upper floors area: 1,338.20 m2 and Stilt parking area: 240.80 m2. These are reproduced as distinct permit figures; the supplied record does not clarify the original figure’s unit.
Parking / approved units: Stilt parking is identified in the revised permit; the permit condition says cellar and stilt areas approved for parking must be used exclusively for vehicle parking. No sanctioned parking-space count is supplied. RERA records 15 units; the revised permit condition says sanctioned unit numbers must not be increased without GHMC approval.
Offering and status
RERA-filed configuration: 2BHK, 15 units; saleable area 100.67 sqm per unit in the RERA record.
Booked / available: 0 booked / 15 available, as last read from the TG-RERA portal; the supplied unit record has no as-of date, so counts are indicative.
Construction stage: No independently verified or dated site-progress assessment is supplied. The RERA amenities record marks excavation 100% and basement 10%; the other listed progress percentages are 0%.
Completion dates: Promoter’s Form B declares completion by 15/07/2027. The project header records proposed completion 15/11/2027. These are completion-date entries, separate from registration validity.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied documents. The GHMC permits state that an Occupancy Certificate is required before occupation.
2. The project story
JASWITHA CYBER CONNECT -1 BLOCK -1 is a single-building residential apartment project on a site recorded in the RERA materials as 474.15 sq. m, in Kondapur, Serilingampally Mandal, Ranga Reddy District. Its registered land identity is Survey Nos. 112/PART and 112/2. The GHMC permit records describe a stilt-plus-five-upper-floor residential building.
- The RERA unit schedule lists fifteen 2BHK apartments. The portal-derived booking snapshot shows all fifteen as available, but it has no supplied as-of date.
- The supplied record does not establish current on-site construction progress through an independent inspection. RERA’s progress entries list excavation at 100% and basement at 10%, with 0% shown for the other listed items.
- The project is registered through 15/07/2027; that date is the registration-validity end date, not a certificate of completion or permission to occupy. The supplied documents include no OC or completion certificate.
3. Master plan, architecture & building design
The GHMC permit records describe one residential building, BUILDING-1, with 1 Stilt + 5 upper floors and a stated height of 14.95 m. The revised permit lists Residential upper floors area: 1,338.20 m2 and Stilt parking area: 240.80 m2. The original permit extraction separately records Proposed Covered builtup area 64,968.90; its unit is not identified in the supplied extraction, so it is not treated as interchangeable with the revised permit’s square-metre figures.
The recorded site area is 474.15 sq. m; the revised permit also records Net Area(m2) 472.22, Road affected area (m2) 0, and Nala affected area (m2) 0.
The provided material does not include readable floor-plan geometry, so it does not establish flats per floor, building footprint, lift or stair arrangement, internal circulation, or detailed common-area distribution. No separate approved layout drawing is available in the supplied material.
4. Homes, configurations & floor plans
The RERA filing lists one configuration, 2BHK, across fifteen units. Its saleable area is a RERA-filed figure; no software-measured carpet-area figure is available from the supplied floor-plan records. The drawing set is recorded as two drawings, neither measured and neither identified as containing flats.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 100.67 sqm | Not available | Not supplied |
Saleable area and carpet area are different measures; the supplied record provides no measured carpet area to compare with the RERA-filed saleable area. The available floor-plan materials do not support room dimensions, balcony or utility descriptions, orientation, or typical-floor arrangements.
5. Parking & vehicle circulation
The revised GHMC permit lists Stilt parking area: 240.80 m2. Its conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extraction does not give a parking-space count, parking allocation by apartment, visitor or accessible-space provision, or details of ramps, vehicle entries and exits, or internal driveways. A parking bay or area does not, by itself, establish exclusive allocation to a buyer.
6. Amenities, recreation & open spaces
The following are marked in the supplied RERA amenities record. Progress percentages are portal-recorded values, not independent verification of construction or delivery. The GHMC revised permit also includes a tot-lot and certain site provisions.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | No size supplied; revised GHMC permit requires the tot-lot to be fenced and maintained as greenery before issue of OC. | RERA progress 0%; completion not independently verified. | |
| Aggregate recreational open space | Quantity or size not supplied. | RERA record marks “YES”; progress 0%; not independently verified. | |
| Community buildings | No description or size supplied. | Progress 0%; facility status not independently verified. |
7. Utilities, building services & safety
Water and rainwater: RERA lists water supply and water conservation/rainwater harvesting as available, with progress 0%. The permits require a rainwater-harvesting structure/percolation pit; the revised permit specifies a piped connection from the terrace and all sides. No storage or treatment capacity is supplied.
Sewerage and drainage: RERA lists sewerage (chamber, lines, septic tank, STP), storm-water drains, and treatment/disposal of sewage and sullage water; each has progress 0%. The permit requires an ETP, but no capacity or completion evidence is supplied.
Electricity: RERA lists an electrical meter room/sub-station/receiving station with progress 0%. The permit requires space for a transformer. No supply, backup, substation capacity, or EV-charging details are supplied.
Fire and life safety: RERA lists fire protection/fire-safety requirements with progress 0%. The revised permit requires a working fire extinguisher on each floor and an occupancy fire NOC before issue of the OC. The supplied record does not confirm installation or clearance.
Waste and security: RERA lists solid-waste management/disposal with progress 0%; the permit identifies a garbage house. The revised permit requires CCTV installation and linkage to the concerned SHO; installation is not independently verified.
Accessibility and vertical transport: No lift, accessible route, ramp, service-lift, or capacity information is supplied. The revised permit requires a zero ramp onto the road slope; this is a permit condition, not evidence of completed construction.
8. Location, access & connectivity
The registered location is Kondapur, in Serilingampally revenue village, Serilingampally Mandal, Ranga Reddy District, PIN 500030. The project boundary record identifies a 30 Wide Road to the east; the GHMC permits describe an 18 mt. road or 18 mt. road widths.
A cadastral parcel-centroid location is supplied at 17.48016, 78.31972. The nearest sampled Outer Ring Road interchange is listed at approximately 7.0 km. No other independently measured distances or travel times are supplied for this overview.
9. Developer & development status
The registered promoter is MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS. The RERA record identifies the organization type as “Others” and lists GSTIN 36AATFM7578E1ZL; the legal-entity form is not further established in the supplied record.
The RERA record gives the promoter address as Madhavi Hills, KONDAPUR, KONDAPUR, Serilingampally, Ranga Reddy, 500030. No official project website, promoter contact details, or independently confirmed registered-office address is supplied.
The Form B affidavit, dated 13 August, 2021, is made by Mr. Ramprasad Reddy Arani as an authorized signatory for the promoter entities and declares a completion undertaking of 15/07/2027. That is a promoter declaration; the project header separately records 15/11/2027 as proposed completion. The supplied record contains no independent construction inspection or OC.
10. Approvals, official records & documents
TG-RERA registration: Form C for JASWITHA CYBER CONNECT -1 BLOCK -1, registration P02400004081, issued 04/02/2022, valid through 15/07/2027.
GHMC original building permit: Building Permit Order 2/C20/02133/2021, dated 11 February, 2021; Building-1, Survey No. 112/2.
GHMC revised building permit: Revised Building Permit Order 2/C20/06808/2021, dated 08 September, 2021; Building-1, Survey Nos. 112/PART and 112/2. The permit extraction records validity through 08 September, 2027.
Promoter declaration: Form B affidavit dated 13 August, 2021, with title, encumbrance, separate-account and completion declarations.
Occupancy / completion certificate: Not present in the supplied documents. The permits state that an OC is compulsory before occupation.
Approved layout / floor plans: No extracted approved layout plan is supplied; the floor-plan record contains two drawings, neither measured and neither identified as a flat plan.
The permit documents also record a contractor’s all-risk policy numbered 433702/44/2021/939, valid up to 23 December, 2026.
Frequently asked questions
Is JASWITHA CYBER CONNECT -1 BLOCK -1 registered with Telangana RERA?
Yes. JASWITHA CYBER CONNECT -1 BLOCK -1 is registered with the Telangana Real Estate Regulatory Authority as P02400004081; the registration status is New Project.
Who is the developer of JASWITHA CYBER CONNECT -1 BLOCK -1?
The promoter named in the RERA registration is MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURES PROJECTS.
Where is JASWITHA CYBER CONNECT -1 BLOCK -1 located?
JASWITHA CYBER CONNECT -1 BLOCK -1 is in KONDAPUR, Serilingampally, Rangareddy, Telangana (500030).
When will JASWITHA CYBER CONNECT -1 BLOCK -1 be completed?
The promoter's proposed date of completion filed with RERA is 15/11/2027. This is the promoter's declaration, not a guarantee.