Ideal Avasa Three
IDEAL INFRA · Rangareddy · RERA P02400008695
IDEAL AVASA THREE is a residential apartment project in NARSINGI, WARD NO 01, Gandipet, Ranga Reddy District, being developed by the registered promoter IDEAL INFRA, a partnership. The project has a registered site extent of 750.31 sq m and one residential building, Building A, with a stilt floor for parking and 5 upper residential floors. It has 20 homes: 19 2BHK units and 1 4BHK unit. Its TG-RERA registration number is P02400008695, and the project header records a proposed completion date of 21 July 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | IDEAL AVASA THREE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase designation not disclosed. The filed site and sanction identify Plot Nos. 19 (part), 20, 21 and 22 in Survey No. 340/3 (PART), Narsingi. Land records |
| TG-RERA registration | P02400008695 RERA record Approvals record |
| Registration validity | 27 August 2024 to 21 March 2027, unless extended by the Authority Approvals record |
| Registered promoter | IDEAL INFRA, a partnership RERA filing Corporate record |
| RERA status | New Project; the supplied certificate records registration. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | NARSINGI, WARD NO 01; the filed plan also identifies Appollo Town Phase I RERA record RERA filing |
| Revenue village | Narsingi / Narsinghi, as written in the registration and filed approval documents RERA record |
| Mandal | Gandipet RERA record |
| District | Ranga Reddy RERA record |
| PIN | 500075 in the project identity record and registration certificate RERA record |
| Project survey number | 340/3 (PART) Land records |
| Filed plot identifiers | Plot No. 19 PART, 20, 21 and 22 RERA filing |
| Registered site extent | 750.31 sq m RERA filing |
| Affected / net area | Road-affected area: 170.34 sq m. Net area is recorded as 579.97 sq m in the project land record; the commencement approval separately records net area as 576.07 m². RERA filing Land records |
| Boundaries | East: existing wide road 30 MT; west and north: others’ land; south: 30 feet road RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Narsingi Municipality/Municipal Corporation; the approval document identifies TS-DTCP as authority and Narsingi Municipality as the delegated authority Approvals record |
| Principal building approval | 0021/BP/3129/2024, approved 22 March 2024 Approvals record |
| File number | 002282/BP/DTCP/3129/0019/2024 |
| Building count / arrangement | One residential building, identified as Building A RERA filing |
| Sanctioned floors | 1 stilt floor for parking plus 5 upper residential floors; total height recorded as 19.71 m, with building height 14.75 m excluding the stilt floor |
| Approved built-up area | 1,417.40 sq m including parking; 1,181.20 sq m excluding parking. Parking area is recorded as 236.20 sq m in the building-plan extraction. RERA filing |
| Units | 20 units in the filed plan and 20 as per approved plan in the project record RERA filing |
| Approved layout / layout-plan record | A layout-plan document is filed under document 465879; the extracted content describes a building-permit plan for the apartment building. Document index |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 19 × 2BHK and 1 × 4BHK RERA unit table RERA unit table |
| RERA-filed saleable areas | 2BHK: 65.4 sq m; 4BHK: 120.77 sq m RERA unit table RERA unit table |
| Booked / available | 0 booked and 19 available 2BHK units; 0 booked and 1 available 4BHK unit. Portal counts are indicative because the record has no as-of date. RERA unit table RERA unit table |
| Construction stage | No project-specific construction-progress percentage or independently verified site-progress report is supplied. The RERA registration is for a new project. RERA record RERA amenities |
| Completion dates | Promoter’s Form B undertaking states completion by 21 March 2027; the project header records proposed completion as 21 July 2027. These are presented as separate filed records. RERA record |
| Registration deadline | Registration validity ends 21 March 2027 unless extended; this is distinct from the completion dates above. |
| Occupancy / completion certificate | The supplied approval extraction records that completion is not certified. No occupancy or completion certificate is supplied; the approval requires an OC before occupation. |
2. The project story
IDEAL AVASA THREE is registered as a residential apartment project in Narsingi, Gandipet Mandal, Ranga Reddy District. The registered site is identified as Survey No. 340/3 (PART) and the filed plan names Plot Nos. 19 (part), 20, 21 and 22 in Appollo Town Phase I. The sanctioned proposal is one building with a stilt parking floor and five upper residential floors. RERA record Land records
The RERA unit schedule records 20 homes: 19 two-bedroom apartments and one four-bedroom apartment. The supplied portal snapshot lists all 20 as available, but does not provide a read date. The approval document requires a completion notice and occupancy certificate before occupation; no project-specific OC or independently verified construction-progress evidence is included in the supplied records. RERA unit table
3. Master plan, architecture & building design
The filed building plan describes one residential building on the 750.31 sq m site, with one stilt floor and five upper floors. It records 1,181.20 sq m of proposed built-up area excluding parking and 1,417.40 sq m including parking; parking area is separately stated as 236.20 sq m. These are plan-extracted figures, not carpet or saleable-area figures.
The approval extraction gives a building height of 14.75 m excluding the stilt and a total height of 19.71 m. It records 14% open-space contribution charges, setbacks, a 1.5 m high compound wall, and a requirement for peripheral planting and a maintained tot-lot. The supplied records do not establish the actual built footprint, floor-by-floor apartment arrangement, number of flats per floor, lift count, or completed landscaping.
The plan lists a lift, stair, rainwater harvesting, septic tank, visitor parking and tot-lot. The commencement approval also requires a transformer space, garbage house, rainwater-harvesting structure, and use of the stilt for parking. These are approval or plan records, not evidence that the facilities have been installed or completed.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists 19 two-bedroom homes and one four-bedroom home. Saleable areas below are the RERA-filed figures. The carpet-area measurements are software-measured from the filed plan drawing and are not RERA disclosures; the drawing measurement record says they need review. Saleable area and carpet area are different measures, and no RERA-filed carpet area or 4BHK loading is supplied. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 19 | 0 | 19 | 65.4 sq m | 43.3–44.9 sq m; median 44.1 sq m (software-measured) | 33% (drawing-measurement record) |
| 4BHK | 1 | 0 | 1 | 120.77 sq m | Not supplied | Not supplied |
The approved-plan drawing record includes measured 2BHK layouts, with a median software-measured carpet area of 44.1 sq m across four measured designs. The extracted typical-plan room schedule includes a living/kitchen, two bedrooms and a toilet; room dimensions are drawing-derived and should be checked against the plan. No unit-specific balcony, utility, orientation or common-area allocation is established in the supplied records. RERA unit details Floor plans
5. Parking & vehicle circulation
The sanctioned plan allocates the stilt floor for parking and records 236.20 sq m of parking area. The plan also lists visitor parking, but no count of car or two-wheeler spaces, accessible spaces, EV charging bays, or unit-specific parking allocations is supplied. A plan’s parking provision does not by itself establish an exclusive parking right for an individual buyer.
The plan extraction identifies a 4.5 m wide driveway and existing/proposed road widths; the supplied information does not specify the final vehicle-entry arrangement, internal driveway circulation, ramps, or pedestrian separation. The approval includes an EV-charging infrastructure requirement for parking places, but the records do not establish that charging equipment has been installed.
6. Amenities, recreation & open spaces
The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, while the recorded progress percentages for the listed amenities are 0. The schedule does not provide facility sizes or independent verification of completion. RERA amenities
The building plan also names a lift, stair, septic tank, visitor parking and tot-lot.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Lift and stair | Quantities and specifications not stated | Building-plan extraction | Listed in plan; installation status not supplied |
| Tot-lot / green strip | Size not stated; approval requires fencing and maintenance as greenery before OC | Building-plan extraction and approval | Required/listed; completion not verified |
| Visitor parking | Count not stated | Building-plan extraction | Listed; completion and allocation not verified |
| Internal roads and footpaths | No dimensions or detailed scope supplied | RERA amenity schedule | 0% recorded RERA amenities |
| Community buildings | No description or size supplied | RERA amenity schedule | 0% recorded RERA amenities |
| Water supply | Source and capacity not stated | RERA amenity schedule | “YES”; 0% recorded RERA amenities |
| Sewerage / sewage treatment and disposal | RERA schedule lists sewerage and treatment/disposal; plan names septic tank | RERA amenity schedule and building plan | “YES” for sewerage; progress recorded as 0%; treatment/disposal progress 0% RERA amenities |
| Storm-water drains | No dimensions or discharge details supplied | RERA amenity schedule | “YES”; 0% recorded RERA amenities |
| Rainwater harvesting | Approval requires a rainwater-harvesting structure / percolation pit; quantity recorded as one RWHP | Building-plan extraction and approval | “YES”; 0% recorded in RERA amenity schedule |
| Solid-waste management and disposal | No system details supplied | RERA amenity schedule | 0% recorded RERA amenities |
| Street lighting | No specifications supplied | RERA amenity schedule | 0% recorded RERA amenities |
| Aggregate recreational open space | No area stated in the schedule | RERA amenity schedule | 0% recorded RERA amenities |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station. It does not identify the water source, storage or treatment capacity, sewerage-treatment capacity, electrical load, backup generation, or service capacities. The building plan names a septic tank and requires a rainwater-harvesting structure; those entries describe filed plan provisions, not verified installed systems. RERA amenities
The building approval requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It assigns fire-safety provision responsibility to the owner, builder/developer, architect and site engineer, and requires an occupancy certificate before occupation. The supplied records do not list specific fire-fighting equipment, escape-stair configuration, lift capacities, CCTV, access-control systems, waste segregation arrangements, accessibility facilities, or completed safety clearances.
8. Location, access & connectivity
The registered location is Narsingi, Gandipet Mandal, Ranga Reddy District, PIN 500075, with the project land identified as Survey No. 340/3 (PART), Narsingi revenue village. The filed plan locates the site at Plot Nos. 19 (part), 20, 21 and 22, Appollo Town Phase I. RERA record
The land record describes an existing 30-metre road along the eastern boundary and a 30-foot road along the southern boundary. The filed plan also labels a 4.5 m wide driveway and existing/proposed road widths. The only supplied measured connectivity point is Financial District (Nanakramguda), 4.6 km; no travel time or public-transport details are provided. RERA filing Location record
9. Developer & development status
The registered promoter is IDEAL INFRA, recorded as a partnership, with GSTIN 36AAKFI0350H1ZK. The listed partners include Bonam Srinivasa Reddy; Vallaparupu Suresh is identified as authorised signatory. The promoter address recorded in the project data is Sahithi Villas, Manikonda, Appollo Town Phase I, Narsingi, Gandipet, Ranga Reddy, 500075. The registration certificate gives a different PIN in the promoter address field; this Overview uses the project-location PIN above and reproduces the promoter-address record as filed in the project data. RERA filing Corporate record Parties record
The promoter’s Form B, dated 13 July 2024, declares a completion undertaking of 21 March 2027 and describes obligations concerning project funds, audits and approvals. The project header separately records a proposed completion date of 21 July 2027. No construction-progress percentage or independently verified site report is supplied. The registration certificate remains valid to 21 March 2027 unless extended. RERA record
10. Approvals, official records & documents
| Record | What it establishes |
|---|---|
| TG-RERA Form C certificate, P02400008695 | Registration of IDEAL AVASA THREE; certificate records validity from 27 August 2024 to 21 March 2027 unless extended. |
| Building approval 0021/BP/3129/2024, 22 March 2024 | Narsingi Municipality/Municipal Corporation approval for a residential building on Survey No. 340/3 (PART), with 1 stilt and 5 upper floors; the approval is subject to conditions. |
| File 002282/BP/DTCP/3129/0019/2024 | File number associated with the building approval. |
| Plan record TS/014510/2024 | TS-DTCP licensed technical person reference appearing in the filed plan record. |
| Commencement approval document 465884 | Extracted approval and conditions; no commencement notice or independently verified construction start date is supplied. |
| Filed building-plan document 465879 | Extracted building layout and plan details, including floors, areas, site roads and listed facilities. |
| Form B declaration, 13 July 2024 | Promoter’s affidavit-cum-declaration and completion undertaking. |
| Approved layout lookup | The HMDA DPMS approved-layout lookup was not publicly reachable in the supplied evidence; this is a record-access limitation, not evidence of refusal. HMDA |
| Occupancy / completion certificate | No OC or completion certificate is supplied; the commencement approval requires an OC before occupation. |
1. Project at a glance
Project identity
Registered project name: IDEAL AVASA THREE
Project type: Residential apartment project
Phase / registered portion: Phase designation not disclosed. The filed site and sanction identify Plot Nos. 19 (part), 20, 21 and 22 in Survey No. 340/3 (PART), Narsingi.
TG-RERA registration: P02400008695
Registration validity: 27 August 2024 to 21 March 2027, unless extended by the Authority
Registered promoter: IDEAL INFRA, a partnership
RERA status: New Project; the supplied certificate records registration.
Land and geographic identity
Locality: NARSINGI, WARD NO 01; the filed plan also identifies Appollo Town Phase I
Revenue village: Narsingi / Narsinghi, as written in the registration and filed approval documents
Mandal: Gandipet
District: Ranga Reddy
PIN: 500075 in the project identity record and registration certificate
Project survey number: 340/3 (PART)
Filed plot identifiers: Plot No. 19 PART, 20, 21 and 22
Registered site extent: 750.31 sq m
Affected / net area: Road-affected area: 170.34 sq m. Net area is recorded as 579.97 sq m in the project land record; the commencement approval separately records net area as 576.07 m².
Boundaries: East: existing wide road 30 MT; west and north: others’ land; south: 30 feet road
Development identity
Sanctioning authority: Narsingi Municipality/Municipal Corporation; the approval document identifies TS-DTCP as authority and Narsingi Municipality as the delegated authority
Principal building approval: 0021/BP/3129/2024, approved 22 March 2024
File number: 002282/BP/DTCP/3129/0019/2024
Building count / arrangement: One residential building, identified as Building A
Sanctioned floors: 1 stilt floor for parking plus 5 upper residential floors; total height recorded as 19.71 m, with building height 14.75 m excluding the stilt floor
Approved built-up area: 1,417.40 sq m including parking; 1,181.20 sq m excluding parking. Parking area is recorded as 236.20 sq m in the building-plan extraction.
Units: 20 units in the filed plan and 20 as per approved plan in the project record
Approved layout / layout-plan record: A layout-plan document is filed under document 465879; the extracted content describes a building-permit plan for the apartment building.
Offering and status
RERA-filed configurations: 19 × 2BHK and 1 × 4BHK
RERA-filed saleable areas: 2BHK: 65.4 sq m; 4BHK: 120.77 sq m
Booked / available: 0 booked and 19 available 2BHK units; 0 booked and 1 available 4BHK unit. Portal counts are indicative because the record has no as-of date.
Construction stage: No project-specific construction-progress percentage or independently verified site-progress report is supplied. The RERA registration is for a new project.
Completion dates: Promoter’s Form B undertaking states completion by 21 March 2027; the project header records proposed completion as 21 July 2027. These are presented as separate filed records.
Registration deadline: Registration validity ends 21 March 2027 unless extended; this is distinct from the completion dates above.
Occupancy / completion certificate: The supplied approval extraction records that completion is not certified. No occupancy or completion certificate is supplied; the approval requires an OC before occupation.
2. The project story
IDEAL AVASA THREE is registered as a residential apartment project in Narsingi, Gandipet Mandal, Ranga Reddy District. The registered site is identified as Survey No. 340/3 (PART) and the filed plan names Plot Nos. 19 (part), 20, 21 and 22 in Appollo Town Phase I. The sanctioned proposal is one building with a stilt parking floor and five upper residential floors.
The RERA unit schedule records 20 homes: 19 two-bedroom apartments and one four-bedroom apartment. The supplied portal snapshot lists all 20 as available, but does not provide a read date. The approval document requires a completion notice and occupancy certificate before occupation; no project-specific OC or independently verified construction-progress evidence is included in the supplied records.
3. Master plan, architecture & building design
The filed building plan describes one residential building on the 750.31 sq m site, with one stilt floor and five upper floors. It records 1,181.20 sq m of proposed built-up area excluding parking and 1,417.40 sq m including parking; parking area is separately stated as 236.20 sq m. These are plan-extracted figures, not carpet or saleable-area figures.
The approval extraction gives a building height of 14.75 m excluding the stilt and a total height of 19.71 m. It records 14% open-space contribution charges, setbacks, a 1.5 m high compound wall, and a requirement for peripheral planting and a maintained tot-lot. The supplied records do not establish the actual built footprint, floor-by-floor apartment arrangement, number of flats per floor, lift count, or completed landscaping.
The plan lists a lift, stair, rainwater harvesting, septic tank, visitor parking and tot-lot. The commencement approval also requires a transformer space, garbage house, rainwater-harvesting structure, and use of the stilt for parking. These are approval or plan records, not evidence that the facilities have been installed or completed.
4. Homes, configurations & floor plans
The TG-RERA unit schedule lists 19 two-bedroom homes and one four-bedroom home. Saleable areas below are the RERA-filed figures. The carpet-area measurements are software-measured from the filed plan drawing and are not RERA disclosures; the drawing measurement record says they need review. Saleable area and carpet area are different measures, and no RERA-filed carpet area or 4BHK loading is supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 19 | 0 | 19 | 65.4 sq m | 43.3–44.9 sq m; median 44.1 sq m (software-measured) | 33% (drawing-measurement record) |
| 4BHK | 1 | 0 | 1 | 120.77 sq m | Not supplied | Not supplied |
The approved-plan drawing record includes measured 2BHK layouts, with a median software-measured carpet area of 44.1 sq m across four measured designs. The extracted typical-plan room schedule includes a living/kitchen, two bedrooms and a toilet; room dimensions are drawing-derived and should be checked against the plan. No unit-specific balcony, utility, orientation or common-area allocation is established in the supplied records.
5. Parking & vehicle circulation
The sanctioned plan allocates the stilt floor for parking and records 236.20 sq m of parking area. The plan also lists visitor parking, but no count of car or two-wheeler spaces, accessible spaces, EV charging bays, or unit-specific parking allocations is supplied. A plan’s parking provision does not by itself establish an exclusive parking right for an individual buyer.
The plan extraction identifies a 4.5 m wide driveway and existing/proposed road widths; the supplied information does not specify the final vehicle-entry arrangement, internal driveway circulation, ramps, or pedestrian separation. The approval includes an EV-charging infrastructure requirement for parking places, but the records do not establish that charging equipment has been installed.
6. Amenities, recreation & open spaces
The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available, while the recorded progress percentages for the listed amenities are 0. The schedule does not provide facility sizes or independent verification of completion.
The building plan also names a lift, stair, septic tank, visitor parking and tot-lot.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Lift and stair | Quantities and specifications not stated | Building-plan extraction | Listed in plan; installation status not supplied |
| Tot-lot / green strip | Size not stated; approval requires fencing and maintenance as greenery before OC | Building-plan extraction and approval | Required/listed; completion not verified |
| Visitor parking | Count not stated | Building-plan extraction | Listed; completion and allocation not verified |
| Internal roads and footpaths | No dimensions or detailed scope supplied | RERA amenity schedule | 0% recorded |
| Community buildings | No description or size supplied | RERA amenity schedule | 0% recorded |
| Water supply | Source and capacity not stated | RERA amenity schedule | “YES”; 0% recorded |
| Sewerage / sewage treatment and disposal | RERA schedule lists sewerage and treatment/disposal; plan names septic tank | RERA amenity schedule and building plan | “YES” for sewerage; progress recorded as 0%; treatment/disposal progress 0% |
| Storm-water drains | No dimensions or discharge details supplied | RERA amenity schedule | “YES”; 0% recorded |
| Rainwater harvesting | Approval requires a rainwater-harvesting structure / percolation pit; quantity recorded as one RWHP | Building-plan extraction and approval | “YES”; 0% recorded in RERA amenity schedule |
| Solid-waste management and disposal | No system details supplied | RERA amenity schedule | 0% recorded |
| Street lighting | No specifications supplied | RERA amenity schedule | 0% recorded |
| Aggregate recreational open space | No area stated in the schedule | RERA amenity schedule | 0% recorded |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station. It does not identify the water source, storage or treatment capacity, sewerage-treatment capacity, electrical load, backup generation, or service capacities. The building plan names a septic tank and requires a rainwater-harvesting structure; those entries describe filed plan provisions, not verified installed systems.
The building approval requires services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It assigns fire-safety provision responsibility to the owner, builder/developer, architect and site engineer, and requires an occupancy certificate before occupation. The supplied records do not list specific fire-fighting equipment, escape-stair configuration, lift capacities, CCTV, access-control systems, waste segregation arrangements, accessibility facilities, or completed safety clearances.
8. Location, access & connectivity
The registered location is Narsingi, Gandipet Mandal, Ranga Reddy District, PIN 500075, with the project land identified as Survey No. 340/3 (PART), Narsingi revenue village. The filed plan locates the site at Plot Nos. 19 (part), 20, 21 and 22, Appollo Town Phase I.
The land record describes an existing 30-metre road along the eastern boundary and a 30-foot road along the southern boundary. The filed plan also labels a 4.5 m wide driveway and existing/proposed road widths. The only supplied measured connectivity point is Financial District (Nanakramguda), 4.6 km; no travel time or public-transport details are provided.
9. Developer & development status
The registered promoter is IDEAL INFRA, recorded as a partnership, with GSTIN 36AAKFI0350H1ZK. The listed partners include Bonam Srinivasa Reddy; Vallaparupu Suresh is identified as authorised signatory. The promoter address recorded in the project data is Sahithi Villas, Manikonda, Appollo Town Phase I, Narsingi, Gandipet, Ranga Reddy, 500075. The registration certificate gives a different PIN in the promoter address field; this Overview uses the project-location PIN above and reproduces the promoter-address record as filed in the project data.
The promoter’s Form B, dated 13 July 2024, declares a completion undertaking of 21 March 2027 and describes obligations concerning project funds, audits and approvals. The project header separately records a proposed completion date of 21 July 2027. No construction-progress percentage or independently verified site report is supplied. The registration certificate remains valid to 21 March 2027 unless extended.
10. Approvals, official records & documents
TG-RERA Form C certificate, P02400008695: Registration of IDEAL AVASA THREE; certificate records validity from 27 August 2024 to 21 March 2027 unless extended.
Building approval 0021/BP/3129/2024, 22 March 2024: Narsingi Municipality/Municipal Corporation approval for a residential building on Survey No. 340/3 (PART), with 1 stilt and 5 upper floors; the approval is subject to conditions.
File 002282/BP/DTCP/3129/0019/2024: File number associated with the building approval.
Plan record TS/014510/2024: TS-DTCP licensed technical person reference appearing in the filed plan record.
Commencement approval document 465884: Extracted approval and conditions; no commencement notice or independently verified construction start date is supplied.
Filed building-plan document 465879: Extracted building layout and plan details, including floors, areas, site roads and listed facilities.
Form B declaration, 13 July 2024: Promoter’s affidavit-cum-declaration and completion undertaking.
Approved layout lookup: The HMDA DPMS approved-layout lookup was not publicly reachable in the supplied evidence; this is a record-access limitation, not evidence of refusal.
Occupancy / completion certificate: No OC or completion certificate is supplied; the commencement approval requires an OC before occupation.
Frequently asked questions
Is IDEAL AVASA THREE registered with Telangana RERA?
Yes. IDEAL AVASA THREE is registered with the Telangana Real Estate Regulatory Authority as P02400008695; the registration status is New Project.
Who is the developer of IDEAL AVASA THREE?
The promoter named in the RERA registration is IDEAL INFRA.
Where is IDEAL AVASA THREE located?
IDEAL AVASA THREE is in NARSINGI,WARD NO 01, Narsingi, Gandipet, Rangareddy, Telangana (500075).
When will IDEAL AVASA THREE be completed?
The promoter's proposed date of completion filed with RERA is 21/07/2027. This is the promoter's declaration, not a guarantee.