Sign in

Hill County Phase I Sector-B

AVRS Landmark Townships Private Limited · Yadadri Bhuvanagiri · RERA P02000002225

HILL COUNTY PHASE I SECTOR-B is a plotted development in Gowraipalli, Yadagirigutta mandal, Yadadri Bhuvanagiri district. The registered promoter is AVRS Landmark Townships Private Limited. The registered site extent is 20238.28 sq. m total and 10566.80 sq. m net; the offering is plots, with plot counts and configurations not provided in the supplied data. The project is registered under TG-RERA number P02000002225, with proposed completion 30/09/2025.

More from AVRS Landmark Townships Pvt Ltd · 10 projects →

01What we found

Period endedTG-RERA registration ran to 30 Sep 2025 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Gowraipalli, Yadagirigutta, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameHILL COUNTY PHASE I SECTOR-B RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionPhase I, Sector-B; this is the registered project portion RERA record
TG-RERA registrationP02000002225 RERA record
Registration validity30/10/2020 to 30/09/2025, as stated on the certificate; no extension is recorded in the supplied data. This is registration validity, not a completion or occupancy certificate.
RERA status in supplied recordRegistered project; the certificate grants registration under section 5. Current status after the recorded expiry is not established by the supplied evidence.
Registered promoterAVRS Landmark Townships Private Limited RERA record

Land and geographic identity

ItemProject record
LocalityGowraipalli / GOWRAIPALLI RERA record Promoter website
Revenue villageGowraipalli (also rendered “Gauraipally” in the title materials) RERA record Land records
Mandal / district / PINYadagirigutta / Yadadri Bhuvanagiri / 508115 RERA record
Project survey numbers184/P, 186/P & 187/P RERA record Land records
Registered site extent20238.28 sq. m total; 10566.80 sq. m net; 9671.48 sq. m recorded as affected in road widening/FTL of tanks/nala widening. RERA filing Land records
Boundaries filed with RERANorth: NEIGHBOUR LAND; South: NEIGHBOUR LAND; East: NEIGHBOUR LAND; West: VILLAGE ROAD. RERA filing
Plot numberNA on the registration certificate.

Development identity

ItemProject record
Stated sanctioning authorityDTCP in the project information fields. RERA filing
Approval reference in filed materialLI.L.P. NO. 57/2017/H, attributed in the approval record to Gowraipally Grampanchayat; the associated document is headed as a draft technical layout pattern. Approvals record
Approval date in project fields20/03/2020 RERA filing
Approved built-up area10566.80 sq. m is recorded as approved built-up area in the project fields; no drawing-based verification is available in the supplied data. RERA filing
Buildings, floors and parking levelsNot disclosed in the supplied project record. The project is a plotted development; building-level configuration is not established here. RERA filing Document index
RERA-declared units / plots and approved plot countNot available in the supplied data. RERA record Document index

Offering and status

ItemProject record
OfferingPlots; individual plot configurations, sizes and counts are not provided in the supplied data. RERA record RERA filing
Booked / available countsNot disclosed in the supplied data. Document index
Construction / development stageRERA header lists 80% completeness; the basis and verification method are not specified, so this is a recorded project figure rather than independent site verification. RERA record
Completion datesThe registration fields state proposed completion 30/09/2025; the Form B declaration states an undertaking to complete by 20/06/2025. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is present in the supplied evidence. The project is plotted, and the available record does not establish completion certification for the registered portion. Document index

2. The project story

  • Hill County Phase I Sector-B is registered as a plotted development in Gowraipalli village, Yadagirigutta mandal, Yadadri Bhuvanagiri district. The registered land description covers survey numbers 184/P, 186/P & 187/P. The RERA fields report a total site area of 20238.28 sq. m, a net area of 10566.80 sq. m, and 9671.48 sq. m affected in the stated road-widening/FTL/nala-widening category. RERA record RERA filing
  • The project record identifies plots as the offering, but does not supply plot counts, plot-size bands, a plot schedule, or a layout drawing that can be reviewed here. Nor does it describe building components or provide a verified account of completed roads, parks or utilities. The RERA header reports 80% completeness, but the supplied data does not explain how that figure was measured or independently confirm it at the site. RERA record Document index

3. Master plan, architecture & building design

  • This is a plotted project, not an apartment or tower scheme. The RERA land fields record 20238.28 sq. m total area, 10566.80 sq. m net area and 9671.48 sq. m affected area. The same 10566.80 sq. m figure appears as approved built-up area in the filed project information; the supplied documents do not include drawings or supporting detail that clarify the scope of that built-up-area entry. RERA filing RERA filing
  • The approval material lists LI.L.P. NO. 57/2017/H and references a draft TLP number 45/ 2020/HRO-HI. The underlying extracted document is described as a draft technical layout pattern; its OCR does not establish the applicant, extent or layout conditions. A layout plan or plot arrangement, internal-road dimensions, parks/open-space allocation, utility land, or land-use breakdown is not available in the supplied material. Approvals record

4. Homes, configurations & floor plans

  • The registered offering is plots. The supplied record does not provide plot counts, individual plot dimensions, plot-size bands, booked or available inventory, or RERA saleable-area figures. RERA record Document index
  • Two floor-plan drawings are recorded, but both are scans pending review and none has been measured. The supplied information therefore supports no software-measured carpet-area or room-dimension reporting for this plotted project. Floor plans

5. Parking & vehicle circulation

The project record does not establish parking-space counts, parking arrangements, plot-specific parking allocation, visitor or accessible spaces, vehicle entries/exits, or internal driveway details. A filed amenities list marks internal roads and footpaths as available, but reports 0% progress; this is a listed provision, not confirmation of completed circulation infrastructure. RERA amenities

6. Amenities, recreation & open spaces

The RERA amenities data lists the following project facilities. Each listed item has 0% progress in the supplied record; no item is independently confirmed as complete.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenitiesListed as YES; 0%; completion not independently verified
Water SupplyDetails and capacity not statedRERA amenitiesListed as YES; 0%; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Details and capacity not statedRERA amenitiesListed as YES; 0%; completion not independently verified
Storm Water DrainsDetails not statedRERA amenitiesListed as YES; 0%; completion not independently verified
Green Strip/TOT LOT/ParkArea and quantity not statedRERA amenitiesListed as YES; 0%; completion not independently verified
Street LightingDetails not statedRERA amenitiesListed as YES; 0%; completion not independently verified
Community BuildingsSize and description not statedRERA amenities0%; completion not independently verified
Treatment and Disposal of Sewage and Sullage WaterDetails and capacity not statedRERA amenities0%; completion not independently verified
Solid Waste Management and DisposalDetails not statedRERA amenities0%; completion not independently verified
Water Conservation, Rain water HarvestingDetails and capacity not statedRERA amenities0%; completion not independently verified
Energy managementDetails not statedRERA amenities0%; completion not independently verified
Fire Protection and Fire Safety RequirementsSystems not specifiedRERA amenities0%; completion not independently verified
Electrical Meter Room, Sub-Station, Receiving StationDetails and capacity not statedRERA amenities0%; completion not independently verified
Aggregate area of recreational Open SpaceArea not statedRERA amenities0%; completion not independently verified

7. Utilities, building services & safety

  • The RERA amenities list includes water supply, sewerage infrastructure (chambers, lines, septic tank and STP), sewage and sullage treatment/disposal, storm-water drains, rainwater harvesting, energy management, an electrical meter room/sub-station/receiving station, solid-waste management and fire-safety requirements. It provides no capacities, technical specifications or implementation details; all listed entries report 0% progress. These are recorded provisions, not evidence of delivered or independently verified services. RERA amenities
  • The supplied material does not specify water source or storage, treatment capacity, sewage reuse, storm-water harvesting capacity, power-backup arrangements, fire-system design, security/CCTV, accessibility features or service capacities. No such details are inferred. RERA amenities Document index

8. Location, access & connectivity

The official project location is Gowraipalli, Yadagirigutta mandal, Yadadri Bhuvanagiri district, PIN 508115. The RERA boundary description identifies a VILLAGE ROAD on the west side and neighbour land on the north, south and east sides. RERA record RERA filing

A supplied location record gives an approximate distance of 37.0 km to the nearest sampled Outer Ring Road interchange. No other approach roads, public-transport services, landmarks or travel-time information is established in the supplied data. Location record

9. Developer & development status

  • The registered promoter is AVRS Landmark Townships Private Limited, a company. The RERA party record identifies Ravindar Reddy Palle as an authorized signatory. No corporate registration number, registered-office address or official contact details are established in the supplied data. RERA record Corporate record Parties record
  • The RERA header reports 80% completeness, without an accompanying basis or independent site-verification record. The promoter’s Form B declaration, dated 27/01/2020, undertakes completion by 20/06/2025; the project fields separately state proposed completion 30/09/2025. Neither date establishes that the project was completed, and no completion or occupancy certificate is included. RERA record Document index

10. Approvals, official records & documents

RecordWhat the supplied material establishes
TG-RERA registration certificateFORM C records registration of HILL COUNTY PHASE I SECTOR-B, registration no. P02000002225, under section 5, valid from 30/10/2020 to 30/09/2025.
Layout approval referenceThe approval record lists LI.L.P. NO. 57/2017/H, attributed to Gowraipally Grampanchayat; the extracted document is headed as a draft technical layout pattern and does not establish its applicant, extent or conditions. Approvals record
Draft TLP reference45/ 2020/HRO-HI, shown as a draft TLP number in the extracted document.
Promoter declarationForm B, dated 27/01/2020, contains promoter declarations on title basis, encumbrances, separate-account obligations, approvals and completion undertaking. These are promoter declarations, not independent verification of those matters.
Approved layout / detailed drawingsA layout-plan document is listed in the RERA document register, but the supplied record does not contain an extracted plan suitable for describing plot arrangement or detailed site design. Document index
Completion / occupancy certificateNot present in the supplied evidence. Document index

Other registrations of Hill County

Frequently asked questions

Is HILL COUNTY PHASE I SECTOR-B registered with Telangana RERA?

Yes. HILL COUNTY PHASE I SECTOR-B is registered with the Telangana Real Estate Regulatory Authority as P02000002225; the registration status is New Project.

Who is the developer of HILL COUNTY PHASE I SECTOR-B?

The promoter named in the RERA registration is AVRS Landmark Townships Private Limited.

Where is HILL COUNTY PHASE I SECTOR-B located?

HILL COUNTY PHASE I SECTOR-B is in GOWRAIPALLI, Yadagirigutta, Yadadri Bhuvanagiri, Telangana (508115).

When will HILL COUNTY PHASE I SECTOR-B be completed?

The promoter's proposed date of completion filed with RERA is 30/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Gowraipalli