HASINI RESIDENCY is a residential apartment project in BHEEMARAM, Warangal Urban district; the mandal is not disclosed in the supplied project land identity. It is being developed by registered promoter AMR CONSTRUCTIONS AND BUILDERS. The project has a total land area of 728.27 sq m and one building with 1 Stilt + 5 upper floors, listing 20 2BHK apartments with a saleable area of 48.77 m² per listed configuration. Its TG-RERA registration is P00300006816, and the registration record and promoter declaration state completion by 26/11/2027.

01What we found

RegisteredTG-RERA - valid till 26 Nov 2027
17documents on file - each fact links to its page
1court case on this project's land (survey 590, Bheemaram)
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameHASINI RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not disclosed; the RERA record identifies the registered project against Sy. Nos. 591/B, 589 and 590/A RERA record
TG-RERA registrationP00300006816, granted under section 5; registration certificate issued 30/08/2023 RERA record
Registration validityCertificate states 30/08/2023–26/11/2027; no extension is recorded in the supplied certificate RERA record
Registered promoterAMR CONSTRUCTIONS AND BUILDERS; entity type recorded as Partnership RERA record Corporate record Parties record
RERA statusProject status is recorded as “New Project”; the supplied certificate records the registration period above RERA filing

Land and geographic identity

FieldProject record
Locality / revenue villageBHEEMARAM / Bheemaram; the building permit identifies the village as BHEEMARAM RERA record RERA filing
MandalNot disclosed in the supplied project land identity Land records
DistrictWarangal Urban in the project identity; the building permit states WARANGAL RERA record RERA filing
PIN506170 RERA record
Survey numbers and subdivisions591/B, 589 and 590/A RERA record Land records
Site areaTotal area 728.27 sq m; net area 713.17 sq m; area recorded as affected by road widening/FTL/nala widening: 15.1 sq m RERA filing
Building-permit area figuresSite Area 728.27 m²; Ground Area 711.3 m²; Road affected area 240.94 m², as extracted from the permit
BoundariesEast: 9 M WIDE PROPOSED ROAD; West: LAND OF PRAHAKAR; North: 7 62 M ROAD; South: LAND OF PRAKASH RAO RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Warangal Municipal Corporation Approvals record
Principal approvalBuilding Permit Order 3006/33448/W46/2021, approved 26 November 2021 Approvals record
Approved built-up area1,823.40 m², recorded as “Upper floors Area” in the permit extraction RERA filing
Building countOne building; the permit identifies residential building “MAHENDER (1)” RERA filing
Sanctioned floor configuration1 Stilt + 5 upper floors; permit extraction states height 14.25 m
Parking levels / areaThe permit records “Parking floors Area (m2) 370.59”; the supplied record does not specify a parking-space count or further parking-level arrangement
Approved versus RERA-declared unitsPermit extraction states “num_units: 5”; the RERA unit record lists 20 apartments. The Overview does not reconcile these figures RERA unit table
Other permit area entries“Ground Area (m2) 711.3”; “Road affected area (m2) 240.94.” The extracted permit also contains “TOTAL: 503,473.96” and “Commercial INA”; their intended meaning is not established by the supplied extraction

Offering and status

FieldProject record
RERA-filed configuration2BHK; 20 units RERA unit table RERA unit details
RERA-filed saleable area48.77 m² per listed configuration RERA unit table RERA unit details
Booked / available0 booked; 20 available in the portal-derived record, which has no as-of date and is indicative RERA unit table
Construction stageNo independently verified site-progress evidence is supplied. The RERA completeness field records 70%; this is a project-record figure, not an independent site inspection RERA record
Completion datesThe RERA registration record and promoter Form B declarations state completion by 26/11/2027; the header also gives a proposed completion date of 26/03/2028. The supplied record does not identify that latter date as an approved extension RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building permit says an Occupancy Certificate is compulsory before occupation

2. The project story

HASINI RESIDENCY is registered with TG-RERA as a residential apartment project at Bheemaram, Warangal Urban, on land identified by survey numbers 591/B, 589 and 590/A. The project record describes one building and lists 20 two-bedroom apartments. The filed saleable area is 48.77 m² per listed unit. RERA record Land records RERA unit table

The building permit authorizes a residential building described as 1 Stilt + 5 upper floors. The RERA record shows 70% completeness, but the supplied evidence does not include an independently verified construction inspection or a certificate confirming completion. No occupancy or completion certificate is provided. RERA record Document index

The registration certificate runs to 26/11/2027. The permit also states that construction was to commence before 26 May 2023 and be completed before 26 November 2027. The project’s recorded proposed completion date is 26/03/2028; no supporting extension order is supplied. RERA record

3. Master plan, architecture & building design

The building permit describes one residential building, “MAHENDER (1),” with a configuration of 1 Stilt + 5 upper floors and a stated height of 14.25 m. It records upper-floor area of 1,823.40 m², ground area of 711.3 m² and parking-floor area of 370.59 m². These are permit-extraction figures; no separate FSI-counted, gross built-up, carpet-area or building-footprint schedule is supplied.

The project land record gives total area of 728.27 sq m and net area of 713.17 sq m, with 15.1 sq m recorded as affected by road widening/FTL/nala widening. The permit extraction separately records a road-affected area of 240.94 m²; the supplied materials do not explain that entry. RERA filing

No drawing-derived information is supplied on flats per floor, lifts, staircases, entrances, internal circulation, landscaping or common-area arrangement. Two floor-plan drawings are listed, but both are scans pending measurement; there are no measured drawing results in the supplied data. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002048.77 m²Not measuredNot supplied

Unit counts, bookings, availability and saleable area are from the TG-RERA-derived unit record; its booking figures have no stated as-of date and should be treated as indicative. No carpet-area measurement is available: the two listed floor-plan drawings remain unmeasured. RERA unit table RERA unit details Floor plans

The RERA-filed saleable area is not presented as carpet area. The supplied records do not provide a unit-specific breakdown of carpet area, balconies or utilities, or common-area loading. RERA unit details Floor plans

5. Parking & vehicle circulation

The building permit extraction records a parking-floor area of 370.59 m². It does not establish the number of parking spaces, their type or location, visitor or accessible parking, vehicle circulation, ramps, EV charging, or allocation to individual apartments. No unit-specific parking allocation is supplied. RERA unit table

The RERA record indicates the listed 2BHK units as mortgaged, but this does not specify a parking allocation. RERA unit table

6. Amenities, recreation & open spaces

The building permit names a tot-lot and requires it to be fenced and maintained as greenery before an occupancy certificate is issued. The TG-RERA amenities record lists the following site infrastructure and facilities, with progress recorded as 0% where shown. No independently verified completion evidence is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit identifies a tot-lot; no size suppliedRERA amenitiesAmenities record: 0%; completion not independently verified
Community buildingsListed; no further description or size suppliedRERA amenities0%; completion not independently verified
Internal roads & footpathsListed; no dimensions suppliedRERA amenities0%; completion not independently verified
Street lightingListed; no further details suppliedRERA amenities0%; completion not independently verified

The vendor data lists facilities such as a pool, gym, clubhouse and children’s play area, but those are not established as RERA-filed or permit-approved facilities in the supplied project evidence. They are therefore not treated here as confirmed project provisions. Promoter website

7. Utilities, building services & safety

The building permit requires a rainwater-harvesting percolation pit, space for a transformer and a garbage house. It also requires a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. These are permit conditions; the supplied record does not establish that they have been completed.

Water supply
Evidence in project recordListed as available in the RERA amenities record; no source, storage or treatment capacity supplied
Status / limitationAmenities record shows 0% progress; completion not independently verified RERA amenities
Sewerage and sewage treatment
Evidence in project record“Sewerage (Chamber, Lines, Septic Tank, STP)” is listed as available; treatment/disposal is separately listed
Status / limitationNo capacity or completion evidence supplied; listed progress is 0% RERA amenities
Storm-water drainage
Evidence in project recordListed
Status / limitationProgress recorded as 0%; no design details supplied RERA amenities
Rainwater harvesting
Evidence in project recordPermit requires a percolation pit; RERA amenities record lists water conservation/rainwater harvesting
Status / limitationCompletion not independently verified RERA amenities
Electrical
Evidence in project recordPermit requires transformer space; RERA amenities record lists an electrical meter room, sub-station and receiving station as available
Status / limitationNo capacity or completion evidence supplied; listed progress is 0% RERA amenities
Waste
Evidence in project recordPermit requires a garbage house; RERA amenities record lists solid-waste management and disposal
Status / limitationCompletion not independently verified; listed progress is 0% RERA amenities
Fire and life safety
Evidence in project recordFire-protection and fire-safety requirements are listed in the RERA amenities record
Status / limitationNo system specification, clearance or completion evidence supplied; listed progress is 0% RERA amenities
Lifts, backup, CCTV and accessibility
Evidence in project recordNo project-specific verified details supplied
Status / limitationNot established by the supplied project documents Document index

8. Location, access & connectivity

The registered project location is Bheemaram village, Warangal Urban district, PIN 506170, on survey numbers 591/B, 589 and 590/A. The permit identifies the site locality as GOPALAPURAM ROAD_W46 and records boundaries including a 9 M WIDE PROPOSED ROAD to the east and “7 62 M ROAD” to the north. The supplied project record does not identify public-transport services or other nearby landmarks. RERA record RERA filing

The location data includes a geocoded cadastral parcel centroid at 17.41528, 78.35459 and a supplied distance of 1.2 km to Financial District (Nanakramguda); no route or travel time is provided. Location record

9. Developer & development status

The registered promoter is AMR CONSTRUCTIONS AND BUILDERS, recorded as a partnership, with GSTIN 36ABOFA3755F1ZB. The project record gives the promoter address as Oorugonda Village, Atmakur Mandal, Gopalapuram Road, Bheemaram, Warangal Urban, 506170. ANDE MAHENDER is recorded as an authorized signatory; partners listed are ANDE MAHENDER, NALUBALA SRINIVAS and GATTU AVINASH GOUD. Corporate record Parties record RERA filing

The promoter’s Form B declaration states a completion undertaking of 26/11/2027 and includes declarations on project funds, audited accounts and pending approvals. The RERA completeness field records 70%, but no independent construction-progress verification or occupancy certificate is supplied. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM C certificate for HASINI RESIDENCY, registration P00300006816, issued 30/08/2023; certificate states validity through 26/11/2027
Building permitGreater Warangal Municipal Corporation Building Permit Order 3006/33448/W46/2021, dated 26 November 2021; covers a 1 Stilt + 5 upper floors residential building on Sy. Nos. 591/B, 589 and 590/A at Bheemaram
Layout / subdivision referencePermit extraction lists KUDAL008947/2015-17 as the Layout / Sub Divn. No.; a separate layout-plan document is listed but not extracted Document index
Commencement and occupancyPermit conditions require a commencement notice before construction and an occupancy certificate before occupation. No occupancy/completion certificate is supplied Document index
Project declarationsForm B declarations identify the promoter, state the land is free from encumbrances and undertake completion by 26/11/2027
Other listed project documentsEncumbrance statement (doc. 347709); title-report documents (docs. 330358, 342516, 330339, 330341, 330342 and 330343); sale-agreement template (doc. 334766); authorized-signatory certificate (doc. 330357) Document index

The supplied record does not provide an extracted, stamped approved layout plan or an occupancy/completion certificate. The building permit states that construction permission does not confer ownership rights. Document index

Frequently asked questions

Is HASINI RESIDENCY registered with Telangana RERA?

Yes. HASINI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P00300006816; the registration status is New Project.

Who is the developer of HASINI RESIDENCY?

The promoter named in the RERA registration is AMR CONSTRUCTIONS AND BUILDERS.

Where is HASINI RESIDENCY located?

HASINI RESIDENCY is in BHEEMARAM, Hanamkonda, Telangana (506170).

When will HASINI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 26/03/2028. This is the promoter's declaration, not a guarantee.